This document comprises Davis-Bacon and Build America Buy America (BABA) signature forms issued by the Kansas Department of Health and Environment (KDHE) in connection with the Russian Stotts Abandoned Mine Land (AML) project in Crawford County, Kansas. The project is funded through federal grants from the Department of Interior's Office of Surface Mine Reclamation and Enforcement (OSMRE). The forms serve as acknowledgement and compliance documentation that bidders must execute to demonstrate understanding of prevailing wage requirements and domestic content procurement preferences applicable to the federally-funded infrastructure project.
The BABA statement form establishes requirements that all iron, steel, manufactured products, and construction materials used in the project must be produced in the United States, effective on or after May 14, 2022, unless an approved waiver is granted. Manufactured products must contain at least 55 percent domestic content by cost, while iron and steel must complete all manufacturing processes within the United States. The KDHE may grant waivers under three circumstances: non-availability of domestic materials in sufficient quantities or satisfactory quality, unreasonable cost increases exceeding 25 percent of the overall project, or public interest considerations. Two general applicability waivers exist: one for small grants not exceeding $250,000 and another for de minimis purchases up to 5 percent of applicable project costs or $1,000,000, whichever is lower. The Davis-Bacon Acknowledgement Form confirms that bidders have received the Department of Labor's prevailing wage determination rates and agree to comply with prevailing wage requirements for all laborers and mechanics on the project. Bidders must sign both forms acknowledging their understanding and commitment to these federal requirements.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| EVT0010903_Bid_Documents.pdf | ||
| Orender_FINAL_PLANS.pdf | ||
| EVT0010900_Bid_Documents.pdf | ||
| Russian_Stotts_FINAL_PLANS.pdf | ||
| AVS_Information_and_Instructions_Form_EXP_1-28.pdf | ||
| Bond_Info.docx | DOCX document | |
| US_Dept_of_Interior_Document.pdf | ||
| Russian_Stotts_Abandoned_Mine_Land_Project.pdf | ||
| Davis_Bacon_Wages_Crawford_County_070126.pdf | ||
| Unique_Entity_ID_(UEI)_Registration_Checklist.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Buy America Domestic Procurement Preference:
As required by the Build America, Buy America Act (Buy America preference) included in Section 70914 of the Bipartisan Infrastructure Law (also known as the Infrastructure Investment and Jobs Act), Pub. L. No. 117‐58, on or after May 14, 2022, none of the funds under a Federal award that are part of a Federal financial assistance program for infrastructure may be obligated for a project unless all of the iron, steel, manufactured products, and construction materials used in the project are produced in the United States, unless subject to an approved waiver. The requirements of this section must be included in all subawards, including all contracts and purchase orders for work or products under this program.
Recipients of an award of Federal financial assistance are hereby notified that none of the funds provided under this award may be used for a project for infrastructure unless:
1. All iron and steel used in the project are produced in the United States—this means all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States;
2. All manufactured products used in the project are produced in the United States—this means the manufactured product was manufactured in the United States; and the cost of the components of the manufactured product that are mined, produced, or manufactured in the United States is greater than 55 percent of the total cost of all components of the manufactured product, unless another standard for determining the minimum amount of domestic content of the manufactured product has been established under applicable law or regulation; and
3. All construction materials are manufactured in the United States—this means that all manufacturing processes for the construction material occurred in the United States.
The Buy America preference only applies to articles, materials, and supplies that are consumed in, incorporated into, or affixed to an infrastructure project. As such, it does not apply to tools, equipment, and supplies, such as temporary scaffolding, brought to the construction site and removed at or before the completion of the infrastructure project. Nor does a Buy America preference apply to equipment and furnishings, such as movable chairs, desks, and portable computer equipment, that are used at or within the finished infrastructure project, but are not an integral part of the structure or permanently affixed to the infrastructure project.
Definitions
“Construction materials” includes an article, material, or supply that is or consists primarily of:
ꞏ non‐ferrous metals;
ꞏ plastic and polymer‐based products (including polyvinylchloride, composite building materials, and polymers used in fiber optic cables);
ꞏ glass (including optic glass);
ꞏ lumber; or ꞏ drywall.
“Construction Materials” does not include cement and cementitious materials, aggregates such as stone, sand, or gravel, or aggregate binding agents or additives.
“Domestic content procurement preference’’ means all iron and steel used in the project are produced in the United States; the manufactured products used in the project are produced in the United States; or the construction materials used in the project are produced in the United States.
“Infrastructure” includes, at a minimum, the structures, facilities, and equipment for, in the United States, roads, highways, and bridges; public transportation; dams, ports, harbors, and other maritime facilities; intercity passenger and freight railroads; freight and intermodal facilities; airports; water systems, including drinking water and wastewater systems; electrical transmission facilities and systems; utilities; broadband infrastructure; and buildings and real property. Infrastructure includes facilities that generate, transport, and distribute energy.
‘‘Project’’ means the construction, alteration, maintenance, or repair of infrastructure in the United States.
For further information on the Buy America preference, please visit:
www.doi.gov/grants/BuyAmerica. Additional information can also be found at the White House Made in America Office website: www.whitehouse.gov/omb/management/made‐in‐america/.
Waivers:
When necessary, recipients may apply for, and the Department of the Interior (DOI) may grant, a waiver from these requirements, subject to review by the Made in America Office. The DOI may waive the application of the domestic content procurement preference in any case in which it is determined that one of the below circumstances applies:
1. Non‐availability Waiver: the types of iron, steel, manufactured products, or construction materials are not produced in the United States in sufficient and reasonably available quantities or of a satisfactory quality;
2. Unreasonable Cost Waiver: the inclusion of iron, steel, manufactured products, or construction materials produced in the United States will increase the cost of the overall project by more than 25 percent; or
3. Public Interest Waiver: applying the domestic content procurement preference would be inconsistent with the public interest.
There may be instances where an award qualifies, in whole or in part, for an existing DOI general applicability waiver as described at:
www.doi.gov/grants/BuyAmerica/GeneralApplicabilityWaivers. If the specific financial assistance agreement, infrastructure project, or non‐domestic materials meets the criteria of an existing general applicability waiver within the limitations defined within the waiver, the recipient is not required to request a separate waiver for non‐domestic materials.
If a general applicability waiver does not already apply, and a recipient believes that one of the above circumstances applies to an award, a request to waive the application of the domestic content procurement preference may be submitted to the financial assistance awarding officer in writing. Waiver requests shall include the below information. The recipient must not include any Privacy Act information, sensitive data, or proprietary information within their waiver request. Waiver requests will be posted to www.doi.gov/grants/buyamerica and are subject to public comment periods of no less than 15 days. Waiver requests will also be reviewed by the Made in America Office.
1. Type of waiver requested (non‐availability, unreasonable cost, or public interest).
2. Requesting entity and Unique Entity Identifier (UEI) submitting the request.
3. Department of the Interior Bureau or Office who issued the award.
4. Federal financial assistance listing name and number (reference block 2 on DOI Notice of Award)
5. Financial assistance title of project (reference block 8 on DOI Notice of Award).
6. Federal Award Identification Number (FAIN).
7. Federal funding amount (reference block 11.m. on DOI Notice of Award).
8. Total cost of Infrastructure expenditures (includes federal and non‐federal funds to the extent known).
9. Infrastructure project description(s) and location(s) (to the extent known).
10. List of iron or steel item(s), manufactured goods, and construction material(s) the recipient seeks to waive from Buy America requirements. Include the name, cost, countries of origin (if known), and relevant PSC or NAICS code for each.
11. A certification that the recipient made a good faith effort to solicit bids for domestic products supported by terms included in requests for proposals, contracts, and nonproprietary communications with the prime contractor.
12. A statement of waiver justification, including a description of efforts made (e.g., market research, industry outreach) by the recipient, in an attempt to avoid the need for a waiver. Such a justification may cite, if applicable, the absence of any Buy America‐compliant bids received in response to a solicitation.
13. Anticipated impact if no waiver is issued.
Approved waivers will be posted at www.doi.gov/grants/BuyAmerica/ApprovedWaivers;
recipients requesting a waiver will be notified of their waiver request determination by an awarding officer.
DOI‐Specific Buy America Preference General Applicability Waivers:
1. GENERAL APPLICABILITY WAIVER FOR SMALL GRANTS1
On February 21, 2023, DOI approved a general applicability waiver of the requirements of the Buy America preference for small grants, having determined such waiver to be in the public interest. This waiver is critical to ensure that agency small infrastructure projects conducted through small grants sustain progress and reduce the burden on recipients, many of whom are small organizations operating in rural or disadvantaged communities. The waiver will remain in effect for all eligible DOI Federal grants for a period of five years from the date of final approval and will be reviewed as often as necessary.
This waiver action permits the use of non‐domestic iron, steel, manufactured products, and construction materials in such projects that may otherwise be prohibited under section 70914(a) during the specified period of time for small grants that meet the following standard:
The total award amount does not exceed the Simplified Acquisition Threshold,2 which is currently $250,000.00;
The award amount is not anticipated to exceed the Simplified Acquisition Threshold for the life of the grant.
Additional information about the DOI Small Grants Waiver is available at:
https://www.doi.gov/grants/BuyAmerica/GeneralApplicabilityWaivers.
For purposes of this waiver, grants encompass all forms of Federal financial assistance that DOI administers, including cooperative agreements and grants.
2 Simplified Acquisition Threshold is defined at 48 C.F.R. § 2.101. As of the date of this waiver, the threshold is $250,000.00.
2. GENERAL APPLICABILITY WAIVER FOR DE MINIMIS PURCHASES
On February 21, 2023, DOI approved a general applicability waiver of the Buy America preference requirements for “De Minimis Purchases,” having determined such waiver to be in the public interest. This waiver is critical to ensure that infrastructure project purchases below a de minimis threshold funded through financial assistance agreements sustain progress while reducing the burden on recipients. The waiver will remain in effect for all DOI Federal financial assistance infrastructure projects for a period of five years from the date of final approval and will be reviewed as often as necessary.
This waiver exempts otherwise covered infrastructure project purchases, totaling up to 5 percent of the total applicable project costs,3 up to a maximum of $1,000,000.00. For example, if a recipient will expend $4,000,000.00 in costs that are subject to the Buy America preference under an infrastructure project, up to $200,000.00 (5%) would be exempt from the Buy America preference. If a recipient’s applicable costs are $20,000,000.00 or greater, this waiver is capped at $1,000,000.00 total in otherwise covered project purchases. Once a Federal financial assistance recipient’s total purchases of materials otherwise covered by the Buy America preference reach 5 percent or $1,000,000.00, whichever is lower, all other applicable project purchases must comply with the Buy America preference.
Additional information about the DOI De Minimis Purchases Waiver is available at:
https://www.doi.gov/grants/BuyAmerica/GeneralApplicabilityWaivers.
Davis‐Bacon Wages:
Davis‐ Bacon Act
40 U.S.C. parts 3141–3144, 3146, 3147; 42 U.S.C. part 3212 The Davis‐Bacon Act – Requires that all contractors and subcontractors performing construction, alteration and repair (including painting and decorating) work under federal or District of Columbia contracts in excess of $2,000 pay their laborers and mechanics not less than the prevailing wage and fringe benefits for the geographic location. Construction or renovation projects funded by federal funds, in whole or in part, are subject in their entirety to the Davis‐Bacon Act as amended 40 U.S.C. parts 276(a) through 276(a5). Award recipients are required by law to furnish assurances to the Secretary of Labor that all laborers and mechanics employed by contractors or subcontractors on DOI‐supported construction projects shall be paid wages at rates that are not less than those prevailing on similar construction in the locality, as determined by the Secretary of Labor.
Questions pertaining to waivers should be directed to the financial assistance awarding officer.
3 Applicable project costs are defined as material costs subject to the Buy America preference.
BUILD AMERICA BUY AMERICA (BABA) STATEMENT FORM
BUILD AMERICA BUY AMERICA (BABA) STATEMENT
As required by Section 70914 of the Bipartisan Infrastructure Law (also known as the Infrastructure Investment and Jobs Act), P.L. 117-58, on or after May 14, 2022, none of the funds under a federal award that are part of Federal financial assistance program for infrastructure may be obligated for a project unless all of the iron, steel, manufactured products, and construction materials used in the project are produced in the United States, unless subject to an approved waiver. The requirements of this section must be included in all subawards, including all contracts and purchase orders for work or products under this program.
Recipients of an award of Federal financial assistance are hereby notified that none of the funds provided under this award may be used for a project for infrastructure unless:
1. all iron and steel used in the project are produced in the United States--this means all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States;
2. all manufactured products used in the project are produced in the United States—this means the manufactured product was manufactured in the United States; and the cost of the components of the manufactured product that are mined, produced, or manufactured in the United States is greater than 55 percent of the total cost of all components of the manufactured product, unless another standard for determining the minimum amount of domestic content of the manufactured product has been established under applicable law or regulation; and
3. all construction materials are manufactured in the United States—this means that all manufacturing processes for the construction material occurred in the United States.
The Buy America preference only applies to articles, materials, and supplies that are consumed in, incorporated into, or affixed to an infrastructure project. As such, it does not apply to tools, equipment, and supplies, such as temporary scaffolding, brought to the construction site and removed at or before the completion of the infrastructure project. Nor does a Buy America preference apply to equipment and furnishings, such as movable chairs, desks, and portable computer equipment, that are used at or within the finished infrastructure project, but are not an integral part of the structure or permanently affixed to the infrastructure project.
For further information on the Buy America preference, please visit www.doi.gov/grants/BuyAmerica.
Additional information can also be found at the White House Made in America Office website:
www.whitehouse.gov/omb/management/made-in-america/.
Waivers
When necessary, recipients may apply for, and the Department of the Interior (DOI) may grant, a waiver from these requirements, subject to review by the Made in America Office. The DOI may waive the application of the domestic content procurement preference in any case in which it is determined that one of the below circumstances applies:
1. Non-availability Waiver: the types of iron, steel, manufactured products, or construction materials are not produced in the United States in sufficient and reasonably available quantities or of a satisfactory quality;
2. Unreasonable Cost Waiver: the inclusion of iron, steel, manufactured products, or construction materials produced in the United States will increase the cost of the overall project by more than 25 percent; or
3. Public Interest Waiver: applying the domestic content procurement preference would be inconsistent with the public interest.
There may be instances where an award qualifies, in whole or in part, for an existing DOI general applicability waiver as described at: www.doi.gov/grants/BuyAmerica/GeneralApplicabilityWaivers. If the specific financial assistance agreement, infrastructure project, or non-domestic materials meets the criteria of an existing general applicability waiver within the limitations defined within the waiver, the recipient is not required to request a separate waiver for non-domestic materials.
If a general applicability waiver does not already apply, and a recipient believes that one of the above circumstances applies to an award, a request to waive the application of the domestic content procurement preference may be submitted to the financial assistance awarding officer in writing. Waiver requests shall include the below information. The waiver shall not include any Privacy Act information, sensitive data, or proprietary information within their waiver request. Waiver requests will be posted to www.doi.gov/grants/buyamerica and are subject to public comment periods of no less than 15 days. Waiver requests will also be reviewed by the Made in America Office.
1. Type of waiver requested (non-availability, unreasonable cost, or public interest).
2. Requesting entity and Unique Entity Identifier (UEI) submitting the request.
3. Department of Interior Bureau or Office who issued the award.
4. Federal financial assistance listing name and number (reference block 2 on DOI Notice of Award)
5. Financial assistance title of project (reference block 8 on DOI Notice of Award).
6. Federal Award Identification Number (FAIN).
7. Federal funding amount (reference block 11.m. on DO Notice of Award).
Michael Worsley Cross-Out
BUILD AMERICA BUY AMERICA (BABA) STATEMENT FORM
8. Total cost of Infrastructure expenditures (includes federal and non-federal funds to the extent known).
9. Infrastructure project description(s) and location(s) (to the extent known).
10. List of iron or steel item(s), manufactured goods, and construction material(s) the recipient seeks to waive from Buy
America requirements. Include the name, cost, countries of origin (if known), and relevant PSC or NAICS code for each.
11. A certification that the recipient made a good faith effort to solicit bids for domestic products supported by terms included in requests for proposals, contracts, and nonproprietary communications with the prime contractor.
12. A statement of waiver justification, including a description of efforts made (e.g., market research, industry outreach) by the recipient, in an attempt to avoid the need for a waiver. Such a justification may cite, if applicable, the absence of any Buy America-compliant bids received in response to a solicitation.
13. Anticipated impact if no waiver is issued.
Approved waivers will be posted at www.doi.gov/grants/BuyAmerica/ApprovedWaivers; recipients requesting a waiver will be notified of their waiver request determination by an awarding officer.
Questions pertaining to waivers should be directed to the financial assistance awarding officer.
Definitions
“Construction materials” includes an article, material, or supply that is or consists primarily of:
• non-ferrous metals;
• plastic and polymer-based products (including polyvinylchloride, composite building materials, and polymers used in fiber optic cables);
• glass (including optic glass);
• lumber; or
• drywall.
“Construction Materials” does not include cement and cementitious materials, aggregates such as stone, sand, or gravel, or aggregate binding agents or additives.
“Domestic content procurement preference’’ means all iron and steel used in the project are produced in the United States; the manufactured products used in the project are produced in the United States; or the construction materials used in the project are produced in the United States.
“Infrastructure” includes, at a minimum, the structures, facilities, and equipment for, in the United States, roads, highways, and bridges; public transportation; dams, ports, harbors, and other maritime facilities; intercity passenger and freight railroads; freight and intermodal facilities; airports; water systems, including drinking water and wastewater systems; electrical transmission facilities and systems; utilities; broadband infrastructure; and buildings and real property. Infrastructure includes facilities that generate, transport, and distribute energy.
‘‘Project’’ means the construction, alteration, maintenance, or repair of infrastructure in the United States
I have reviewed the content of Build America Buy America Statement form and agree to follow the guidance contained within.
Bidder’s Signature Date
Bidder’s Printed Name Bidder’s Title
Bidder’s Company Name
Bidders Company Address
END OF DOCUMENT
DAVIS-BACON ACKNOWLEDGEMENT FORM
Davis Bacon Prevailing Wage Requirement Acknowledgement Form
Funding for The Kansas Department of Health and Environment’s Abandoned Mine Reclamation Program stems from grants received from the Federal Department of Interior (DOI), Office of Surface Mine Reclamation and Enforcement (OSMRE). As such, these funds fall under the provisions of the Davis Bacon Act and require that Davis Bacon Prevailing Wage Rates be implemented for this project. Your signature on this form acknowledges that you have been provided the most recent wage determination rate for this project as issued by the Department of Labor.
Bidder’s Signature Date
Bidder’s Printed Name Bidder’s Title
Bidder’s Company Name
Bidder’s Company Address
END OF DOCUMENT
| BiddersPrintedName: |
| BiddersCompanyName: |
| BiddersCompanyAddress: |
| BiddersTitle: |
| BiddersPrintedName_2: |
| BiddersTitle_2: |
| BiddersCompanyName_2: |
| BiddersCompanyAddress_2: |
| Date DB Form: |
| Date Doc AD: |