Attachment_I_Schedule_of_Milestones_and_Payments_v3.xlsx
XLSX spreadsheet 21 KB Posted
- Attached to
- Rads to Watts Program Solicitation Federal contract opportunity
- Solicitation number
- DARPA-PS-25-27
About this file
The file is an Excel-based Milestone Schedule for the DARPA Rads to Watts Program, detailing nine specific research milestones focused on radiation-to-electricity conversion technology. The milestones cover technical progression from an initial kickoff meeting through progressively complex unit cell testing, with specific deliverables due between Month 2 and Month 20 of the project. Key milestone objectives include documenting experimental plans, conducting real-time unit cell tests with radiation sources, verifying unit cell radiation fluence resistance, and generating reports on materials performance, power estimates, and modeling/simulation results.
Each milestone requires a detailed report summarizing technical performance, with specific focus on materials architectures, radiation resilience, and achieving performance metrics like fluence levels (>1E+14/cm2 and >1E+17/cm2) and power density targets (>10 W/kg). The schedule indicates some later milestone payments and specific CLINs are to be determined (TBD), suggesting flexibility in the final contract structure. The milestones align with the broader DARPA solicitation goal of developing radiovoltaic technologies capable of scaling from milliwatt to kilowatt-level power generation using innovative radiation-hardened materials and techniques.
View the file
Other files for this federal contract opportunity
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Milestone Schedule
| Milestone # | Milestone | Exit Citeria /Deliverable | Due | |||||
| Date | Payment | Funded | CLIN | |||||
| SUBCLIN | ACRN | |||||||
| 1 | Kickoff Meeting: A briefing on the technical plan for the effort to include milestone schedule and path to accomplish the objectives of the agreement. Report on documented, modeling- and simulation-supported experimental plans for reaching performer-specified fluence and power density objectives prior to month 15 | Milestone report describing design approach to meeting the metrics and goals for base period | Month 2 | |||||
| 2 | Report on real time unit cell test on unit cell Rev 1.0 with constantly emitting radiation source to acquire fluence and degradation data | Milestone report summarizing performance of materials and architectures to withstand radiation per base period metrics | Month 8 | |||||
| 3 | Report on real time unit cell test on unit cell Rev 2.0 with constantly emitting radiation source to acquire fluence and degradation data | Milestone report summarizing performance of materials and architectures to withstand radiation per base period metrics | Month 11 | |||||
| 4 | Report documenting the verification of unit cell’s ability to withstand >1E+14/cm2 fluence at approximately 0% degradation | Milestone report summarizing performance of materials and architectures to withstand radiation per base period metrics. Report will synthesize data from all experiments in order to support metrics and competitive down-select. | Month 14 | |||||
| 5 | Report on proposed operational system power and mass estimate to calculate specific power for reaching the >10 W/kg metric | Milestone report summarizing performance of materials and architectures to withstand radiation per base period metrics. Report will synthesize data from all experiments in order to support metrics and competitive down-select. This report will include modleing and simulation results to capture operational system parameters. | Month 14 | |||||
| Sub-Total Base Period | $ - 0 | $ - 0 | ||||||
| 6 | Report on modeling and simulation to support experimental plans validating performer-specified fluence and power density objectives prior to month 24 | Milestone report describing design approach to meeting the metrics and goals for base period | Month 16 | $ - 0 | TBD | TBD | ||
| 7 | Report on real-time test on unit cell Rev N.0 with constantly emitting radiation source to acquire fluence and degradation data | Milestone report summarizing performance of materials and architectures to withstand radiation per base period metrics | Month 18 | $ - 0 | TBD | TBD | ||
| 8 | Report on real-time test on unit cell Rev N.N with constantly emitting radiation source to acquire fluence and degradation data | Milestone report summarizing performance of materials and architectures to withstand radiation per base period metrics | Month 20 | $ - 0 | TBD | TBD | ||
| 9 | Report on the ability of unit cell to withstand >1E+17/cm2 fluence at <20% degradation | Milestone report summarizing performance of materials and architectures to withstand radiation per base period metrics. Report will synthesize data from all experiments in order to support metrics and competitive down-select. | Month 23 | $ - 0 | TBD | TBD | ||
| 10 | Performer report on IV&V team’s post-irradiation examination of the unit cell used in linac test, and the unit cell used in time capsule test, with a comparison of the degradation of each cell | Milestone report summarizing performance of materials and architectures to withstand radiation per base period metrics. Report will synthesize data from all experiments in order to support metrics and competitive down-select. | Month 23 | $ - 0 | TBD | TBD | ||
| Sub-Total Option Period 1 | $ - 0 | $ - 0 | ||||||
| 11 | Final report transmitted with results of scalability study for transition partner | Final report which utilizes data obtained throughout course of program as evidence to support the scalability study's operational system performance. This final report will include an updated and refined specific power estimate. This report will include a conceptual design, such as CAD rendering with primary structural elements, to include the radiovoltaic developed in the course of the program, which will make it possible to fabricate the full scale system at the end of the option period 2. | Month 30 | $ - 0 | TBD | TBD | ||
| Sub-Total Option Period 2 (Bonus) | $ - 0 |
| Total Agreement | $ - 0 | $ - 0 |
| *Tasks and targets are keyed to Attachment 1 - Task Description Document | ||
| HIGHLIGHTED SECTION NOT TO BE FILLED OUT BY PROPOSERS |
Attachment 3 - Schedule of Milestones and Payments