The file is an Excel-based Schedule of Milestones and Payments for the DARPA Rads to Watts Program, detailing nine sequential milestones focused on radiation voltaics research and development. The milestones span from Month 2 to Month 20 and require progressive technical reporting on unit cell radiation performance, including experimental plans, real-time radiation source testing, fluence and degradation data collection, and system power/mass estimation. Each milestone demands a comprehensive report documenting design approaches, material and architectural performance under radiation exposure, and verification of specific technical metrics such as maintaining performance at >1E+14/cm2 fluence and achieving >10 W/kg power density. The later milestones (6-9) have tentative funding and CLIN/ACRN designations, indicating potential flexibility in the research progression.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Milestone Schedule

Milestone #MilestoneExit Citeria /DeliverableDue
DatePaymentFundedCLIN
SUBCLINACRN
1Report on documented, modeling- and simulation-supported experimental plans for reaching performer-specified fluence and power density objectives prior to month 15Milestone report describing design approach to meeting the metrics and goals for base periodMonth 2
2Report on real time unit cell test on unit cell Rev 1.0 with constantly emitting radiation source to acquire fluence and degradation dataMilestone report summarizing performance of materials and architectures to withstand radiation per base period metricsMonth 8
3Report on real time unit cell test on unit cell Rev 2.0 with constantly emitting radiation source to acquire fluence and degradation dataMilestone report summarizing performance of materials and architectures to withstand radiation per base period metricsMonth 11
4Report documenting the verification of unit cell’s ability to withstand >1E+14/cm2 fluence at approximately 0% degradationMilestone report summarizing performance of materials and architectures to withstand radiation per base period metrics. Report will synthesize data from all experiments in order to support metrics and competitive down-select.Month 14
5Report on proposed operational system power and mass estimate to calculate specific power for reaching the >10 W/kg metricMilestone report summarizing performance of materials and architectures to withstand radiation per base period metrics. Report will synthesize data from all experiments in order to support metrics and competitive down-select. This report will include modleing and simulation results to capture operational system parameters.Month 14
Sub-Total Base Period$ - 0$ - 0
6Report on modeling and simulation to support experimental plans validating performer-specified fluence and power density objectives prior to month 24Milestone report describing design approach to meeting the metrics and goals for base periodMonth 16$ - 0TBDTBD
7Report on real-time test on unit cell Rev N.0 with constantly emitting radiation source to acquire fluence and degradation dataMilestone report summarizing performance of materials and architectures to withstand radiation per base period metricsMonth 18$ - 0TBDTBD
8Report on real-time test on unit cell Rev N.N with constantly emitting radiation source to acquire fluence and degradation dataMilestone report summarizing performance of materials and architectures to withstand radiation per base period metricsMonth 20$ - 0TBDTBD
9Report on the ability of unit cell to withstand >1E+17/cm2 fluence at <20% degradationMilestone report summarizing performance of materials and architectures to withstand radiation per base period metrics. Report will synthesize data from all experiments in order to support metrics and competitive down-select.Month 23$ - 0TBDTBD
10Performer report on IV&V team’s post-irradiation examination of the unit cell used in linac test, and the unit cell used in time capsule test, with a comparison of the degradation of each cellMilestone report summarizing performance of materials and architectures to withstand radiation per base period metrics. Report will synthesize data from all experiments in order to support metrics and competitive down-select.Month 23$ - 0TBDTBD
Sub-Total Option Period 1$ - 0$ - 0
11Final report transmitted with results of scalability study for transition partnerFinal report which utilizes data obtained throughout course of program as evidence to support the scalability study's operational system performance. This final report will include an updated and refined specific power estimate. This report will include a conceptual design, such as CAD rendering with primary structural elements, to include the radiovoltaic developed in the course of the program, which will make it possible to fabricate the full scale system at the end of the option period 2.Month 30$ - 0TBDTBD
Sub-Total Option Period 2 (Bonus)$ - 0
Total Agreement$ - 0$ - 0
*Tasks and targets are keyed to Attachment 1 - Task Description Document
HIGHLIGHTED SECTION NOT TO BE FILLED OUT BY PROPOSERS

Attachment 3 - Schedule of Milestones and Payments