This is a Quality Assurance Surveillance Plan (QASP) for the Norman Fuel Reduction (Phase 3) Eastern Red Cedar Tree Removal project at Lake Thunderbird State Park in Oklahoma. The QASP outlines two primary tasks: Task 4.1 requires the mastication of all eastern red cedar trees, and Task 4.2 covers manual lopping and scattering of eastern red cedar trees in areas where topography or tree density prevents machinery use.
The plan specifies that the Contracting Officer's Representative (COR) will conduct inspections through direct observation and walkthrough of cleared areas. These inspections will occur either when the contractor completes a section or upon contractor request. Cody McCrackin is listed as the inspector, though other key positions like the Contracting Officer and contractor name are left blank in this draft document.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Draft_PWS_1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Norman Fuel Reduction (Phase3) - Eastern Red Cedar Tree Removal Lake Thunderbird State Park Norman Project, Oklahoma Solicitation No.
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
CONTRACT NO.: Specify contract number
CONTRACTOR: Specify name of contractor
CONTRACTING OFFICER: Specify name of Contracting Officer
INSPECTOR(S): Cody McCrackin
TASK
DESCRIPTION
WHAT
WHO
WHEN
WHERE
METHOD
4.1 Masticate all
eastern red cedar trees
Inspection for remaining live eastern red cedar trees
COR As contractor finishes a section or upon contractor request
In the field direct observation;
walkthrough of the cleared area
4.2 Manually lop
and scatter all eastern red cedar trees in areas where topography or tree density prohibits the use of machinery.
Inspection for remaining live eastern red cedar trees
COR As contractor finishes a section or upon contractor request
In the field direct observation;
walkthrough of the cleared area
Draf t