About this file
The file contains architectural floor plans for a building located at 99 Tenth Avenue in New York, NY, with 10 floor plans ranging from the basement to the roof level. These detailed drawings appear to be supporting documentation for a Video Surveillance System (VSS) Upgrade project for the Drug Enforcement Administration (DEA) New York Field Division. The drawings show the building's layout, including elevator banks, stairwells, and floor-specific configurations, which are likely intended to help potential contractors understand the physical infrastructure for camera placement and system integration.
The accompanying sources sought notice indicates the DEA is seeking to upgrade an end-of-life video surveillance system, replacing approximately 173 cameras with Hanwha or equivalent equipment. The project requires removing existing equipment, installing new hardware, cabling, and ensuring a fully functional system. The agency is conducting market research to assess vendor capabilities, with a preference for vendors experienced in government/military installations. Interested contractors are asked to submit 2-3 page capability statements detailing their approach, warranty terms, GSA schedule status, and past performance. The notice suggests a potential industry day for site viewing and further project discussion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A02 - Sources Sought SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3
9a
12 15
6 9
32 33 34
373839
131132
135136
142143
145 146 147 148 149
156157
160 161
168169
MON 22 - 23
MON 24
60 61
82MON 01- 07MON 08 - 15
MON 16
90 91
110109
111 112
117118
121 122
MON 21
MON 18 - 21
MON 17
| CCTV SOW Template - 10-02-24.pdf |
| This summary applies to the procurement, installation, training and implementation of an integrated security management system for the site described. |
| SECTION I - GENERAL REQUIREMENTS |
| 1.01 Summary of Work |
| 1.02 Systems, warranties and maintenance |
| 1.03 Preexisting conditions |
| 1.04 Location of Work |
| 1.05 Equipment |
| 1.06 Coordination |
| 1.07 Regulatory Requirements |
| 1.08 Submittals of material lists, technical information sheets and variances |
| 1.09 Licenses and Permits |
| 1.10 Warranties & Service |
| 1.11 Removal of Old Equipment |
| SECTION II - GENERAL SYSTEM SPECIFICATIONS |
| 2.01 Scope |
| 2.02 Description of the System |
| 2.03 Infrastructure |
| SECTION III - SYSTEM COMPONENTS |
| 3.01 General |
| 3.02 Video Surveillance System (VSS) |
| 3.03 Recording Server |
| 3.04 Programming VSS |
| 3.05 Warranty and Service |
| Appendix 1: Example Bid Format |
| ATTACHEMENT 2: Sampling of camera makes and models currently installed at DEA Offices. Vendor is not required to use the same but must propose equal salient features and characteristics (should not be near end-of-life cycle) |
| Camera Statement of Objectives - NY Division 20240930.pdf |
| Table 1 - Total |
| Table 2 |
99 TENTH - Camera Locations.pdf
File details come from the government source that posted it. Updated .