A02 - Sources Sought SOW.pdf

PDF 1 MB Posted

Attached to
Video Surveillance System Upgrade - New York Division
Solicitation number
D-25-IS-0003
Issued by

About this file

This document is a Sources Sought Statement of Work (SOW) for a Video Surveillance System (VSS) Upgrade for the Drug Enforcement Administration's New York Division. The project involves upgrading approximately 173 cameras and associated hardware across multiple floors of a facility, with a requirement for HANWHA brand cameras or equivalent models. The system must be compatible with the DEA's enterprise Video Management System called Castle, and will include complete removal of existing equipment, new equipment installation, and ensuring a fully functional surveillance system.

The sources sought notice requests vendors submit 2-3 page capability statements detailing their experience and ability to meet the VSS upgrade requirements. Vendors are asked to provide specific information including equipment removal specifications, replacement equipment details, warranty terms, GSA schedule listings, small business certifications, and past government/military experience with similar solutions. The DEA anticipates hosting an industry day for prospective vendors based on the submitted capabilities statements, with responses to be emailed to Kathrine.r.leach@dea.gov. This is a market research phase and not a formal solicitation, with the goal of assessing vendor capabilities for a future comprehensive video surveillance system upgrade.

View the file

Other files

File Type Posted
VSS Building prints - redacted drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRUG ENFORCEMENT ADMINISTRATION (DEA)

OFFICE OF SECURITY PROGRAMS (ISPS)

VIDEO SURVELLIENCE SYSTEM (VSS) UPGRADE

NEW YORK DIVISION

VIDEO SURVEILLANCE SYSTEM (VSS) Upgrade

SECTION I - GENERAL REQUIREMENTS

1.01 Summary of Work

DEA requires the complete installation and upgrade of the New York Division Video Surveillance System (VSS). The contractor shall furnish a complete system including all labor, materials and equipment for a complete and functional security system. All personnel used in performance of this requirement will require review by DEA Physical Security Section. Upon an award, the contractor shall test and certify all existing network cabling prior to new component installation. The vendor will furnish DEA with a Certification Memo regarding the status of currently installed infrastructure and systems prior to commencement of work.

1.02 Systems, warranties and maintenance

The work included as specified herein and as shown on the contract drawings consists of, but is not limited to, the following:

a. Video Surveillance System (VSS)

b. Commercial Warranty coverage

c. Systems tracking

d. Submittals and shop drawings

1.03 Preexisting conditions

The contractor shall visit the site, check all existing conditions and detail concerns, in writing to DEA. There will be no structural changes performed in performance of this contract, or prior to performance. No allowances shall be made for any extra expense due to the contractor’s failure or neglect to discover prior conditions affecting the work, to include hardware and labor necessary to complete the work.

1.04 Location of Work

99 10th Ave. New York, NY 10011

1.05 Equipment

All equipment provided must be fully compliant with NDAA H.R. 5115 also known as the John S. McCain National Defense Authorization Act, as well as Trade Agreements Act (TAA) FAR 52.255-5. TAA compliance applies to all equipment provided for the project, not solely products listed on the GSA Schedule Contract.

Substitution of equipment after award may be approved by the DEA if there is significant advantage created by an overall upgrading of a component(s) by a manufacturer or an operational advantage created by a change in the state of the art of the equipment. In the event the above occurs, the contractor shall make the DEA aware of the new equipment/information. No changes shall be made without DEA approval in the form of written notification.

*No additional cost shall be incurred for any changes without DEA approval via an executed modification to the award. *

1.06 Coordination

A. The contractor shall provide an onsite project manager who will maintain coordination with the DEA to provide project status at a minimum on a weekly basis. The status should include but is not limited to; project constraints, status of equipment, installation status and updates on timelines for completion.

B. The contractor is responsible for understanding all associated trades with this requirement that affect the security system to include but not limited to; power, cabling, networking, raceway, backboards, pull-strings, hardware, patching, painting and other services to ensure a fully functional system.

1.07 Regulatory Requirements

Performance of work included in this project shall be in accordance with but not limited to the following codes, rules and regulations.

a. Appropriate local government codes

b. National Electric Code (NFPA – 70)

c. Uniform Building Code

d. National Fire Code (NFPA - 1)

1.08 Licenses and Permits

The contractor shall be fully licensed to perform all specific tasks by the local authority of the job location. The licensing may include but not be limited to a valid state Electrical Contractor, Low Voltage System Contractor, Alarm Operator and local business license.

1.09 Warranties & Service

A. The contractor shall ensure the upgrade is fully functional for all equipment and systems for a minimum of a one-year after acceptance by the DEA. The contractor’s warranty shall cover at a minimum, all costs to ensure functionality including parts, labor, delivery, reinstallation and retesting as required.

1.10 Removal of Old Equipment

a. The contractor is required to un-install and remove existing VSS system components and equipment in preparation for new equipment/installation and upgrades. The contractor is responsible for disposing of all equipment and coordinating with DEA on the place of disposal.

b. The contractor will securely handle any system components that could potentially contain sensitive information and return the components to the DEA. Examples of system components can include but are not limited to, computers, hard drives, digital storage arrays or equipment with stored memory.

SECTION II - GENERAL SYSTEM SPECIFICATIONS

2.01 Scope

The selected contractor shall install and ensure a fully functional Video Surveillance System (VSS) upon completion of this effort.

The system shall be Underwriters Laboratory (UL) rated. Installation of cabling, equipment, testing and training associated with the security system shall be included. If at any point in this project, DEA space is required to be vacant so the contractor can perform any aspect of this upgrade (install, wiring etc), the contractor will work with the DEA POC to notify the offices and schedule office moves accordingly.

2.02 Description of the System

The VSS system shall be comprised of fixed, color, indoor and outdoor, vandal resistant IP based cameras; will be recorded by Milestone XProtect Corporate software running on one or more computers; with video distribution to flat screen displays throughout the facility. All systems will be installed per manufacturer specifications.

The computer, networking equipment, and camera devices must be protected from power spikes and brief power failures by dedicated rack mounted UPS with built in voltage surge protectors designed to protect digital video surveillance systems and associated components. Security screws must be used for all ESS components that are exposed (i.e. can be viewed externally or are not secured from behind a face plate).

2.03 Infrastructure

All wiring and cabling shall be in accordance with VSS manufacturer recommendations. Wiring for all VSS field devices shall not be exposed (i.e. must be internal to a secure space wall, ceilings, doorframes, etc.) upon installation. Wiring for all VSS components should remain within DEA space when possible. When it is not feasible for wiring to remain internal to DEA space the contractor shall provide a conduit solution to the DEA Security Specialist for review. No wiring may be directly in contact with acoustical ceiling tiles. When replacing existing security systems, the contractor must remove abandoned VSS wiring in the ceiling per the applicable code.

Underground exterior cabling shall be direct burial cable meeting the requirements of the end point devices connected to it.

Contractor shall use “PURPLE” colored cable for all Security Systems, to include patch panels. All cables will be pulled from point to point, terminated, and tested. Cables will meet all applicable industry standards.

Cables must be labeled at all termination points, panels, patch panels and switches. Labeling shall mirror end point device naming as specified in the Milestone programming sheet. Photo proof of cable labeling for all security system panels, patch panels and switches will be required to be sent to the Castle Helpdesk hq-ispacastleteam-dl@dea.gov prior to system acceptance.

Include in the email to the Castel Helpdesk inbox, job location or office name and photos of the labeled terminations in the panels, the patch panels and switches. If the panels, patch panels and switches are installed in a classified area where photography is prohibited, collecting the photo proof will be the responsibility of the local DEA Security POC for that office or space.

SECTION III - SYSTEM COMPONENTS

3.01 General

All devices, wire, and equipment shall be listed by the Underwriters Laboratory (UL) or be Factory Mutual approved. Devices will be installed in full accordance with UL and manufacturer’s installation guides and requirements. All systems must be fully functional at the time of acceptance testing. Conflicts between manufacturer’s recommendations, specification, and/or contract documents must be reported in writing to the designated DEA Security Specialist.

3.02 Video Surveillance System (VSS)

The VSS will provide coverage as identified in documentation provided by DEA. Table 1, Facility Cameras, identifies camera names, locations and Statement of Objectives for the system.

A. The VSS shall be designed for surveillance and industrial applications. The cameras shall be high resolution, fully automatic, color and capable of providing high resolution video over an IP LAN/WAN network.

B. Cameras shall be fully supported by the current Milestone XProtect™ Corporate Video Device Driver Package.

Milestone supported cameras can be found at this link Milestone Systems | Support devices for XProtect® Corporate

1. Fixed cameras shall have a varifocal lens, 180, 360 or multiple lens options.

2. Cameras shall, at minimum, be capable of providing a minimum of four simultaneous H264 or H.265 video streams at 30 frames per second.

3. Cameras encoding rate shall be selectable from 1 to 30 frames per second in all available resolutions.

4. Cameras must be capable of providing a minimum of eight simultaneous, unicast RTSP video streams.

5. Cameras shall be designed to support power over the Ethernet (PoE) using UTP Category 6 or better cable with

RJ45 connectors when an IEEE802.3af compliant switch is utilized.

6. Cameras must be capable of performing upgrades, such as the firmware, through web browser without the use of additional software applications.

7. Cameras must be NDAA and TAA compliant.

8. Cameras must be capable of being reset to factory settings/defaults by physical means, such as, a reset button.

9. All cameras must be reviewed and approved by the DEA.

10. Cameras shall not be near end of life (EOL). If the proposed camera(s) cycle to EOL, equivalent replacement cameras will be proposed to DEA prior to selection and DEA must approve the camera change.

11. Cameras are to be set to DHCP v static IP.

C. Camera housings shall have multiple mounting options. Camera housings will match the general design of the building.

All camera housings will entirely enclose wiring and cameras and be vandal resistant.

D. Exterior cameras may be either dome or other environmental housing which suits the general appearance of the facility and appropriate to local weather conditions. All housings will entirely enclose wiring and cameras, vandal-resistant and IP66 rated. All exterior VSS camera transmission lines must protect against lightning and other related power surges.

E. Camera placement must be approved in writing and temporarily field mounted prior to installation. Camera placements and views must be reviewed and approved by the DSO and/or the onsite point of contact in coordination with the vendor/installer.

F. Cabling will be Cat 6, or fiber for cases of distance runs and/or camera types that require fiber.

G. For devices requiring other than 802.3af power over ethernet; the vendor is to provide a power injector capable meeting the manufacturers max power consumption requirements for that specific device.

H. Video decoders are required to allow camera views to be seen on the security displays installed within the office. The video decoding units will be mounted behind each security display unless utilizing an approved HDMI splitter system.

Video decoding units will be directly connected to each security display using a HDMI 1.4a cable or better. Acceptable equipment is the IoNodes R100S.

I. Video display(s) shall be sized to appropriately fit the space of the room/office in which it is to be installed. Minimum screen size of 32 inches and maximum of 55 inches, unless otherwise specified by the DEA. All displays shall be wall mounted adjacent to the ceiling to provide the best viewing by the primary users while protecting the view within the protected space. Display shall be commercial digital signage quality, resolution must be a minimum of 1080p, HDMI video input connection. Smart TV or similar type displays are not authorized for use.

J. All power requirements for the equipment shall be coordinated with the electrical contractor on site. All breakers shall be marked and if dedicated circuits are required the security contractor is responsible for interfacing with the electrical contractor for the requisite circuits.

K. Vendor must include a 1U or 2U rackmount console. With 1080p widescreen LCD panel, integrated keyboard and mouse.

L. Rack mounted 120V UPS backup power is required to be no less than 15 minutes and must send a shutdown signal to the

VSS server in the event of a power failure. Vendor must test soft shutdown with ISPA staff during the testing phase of the project.

3.03 Recording Server

The recording server(s) shall be used for recording video feeds and for communicating with cameras and other devices. The recording server(s) shall communicate via network with the management server at another location. New York Division will require three (3) recording servers; one for the Lab, one for the exterior cameras, and one for interior cameras.

A. The recording servers shall be provided by the contractor.

B. The recording servers shall meet or exceed the following requirements based off VSS requirements:

a. Dell or equivalent server grade hardware – BCD is preferred but not required.

b. Windows Server 2022

c. Minimum 16tb RAID 5 for video recording, video retention requirement is a minimum of 30 days for all cameras.

Recording calculation is 25% motion recording, resolution 1080p at 5mb, 15FPS, Codec H265.

d. Minimum commercial warranty to include hardware and services to repair recording server if there are failures.

e. 2 x 1GbE LAN Ports

f. iDRAC with Enterprise Licensing

g. Energy Star compliance

h. Minimum 16gb ram

i. Rack mount

j. RAID 5 for video storage shall be pre-configured from the manufacturer or equipment reseller prior to shipping to DEA

k. iDRAC must be configured onsite by vendor with the assistance of ISPA staff.

C. Specific to this upgrade, the vendor is to include licensing for the Milestone XProtect software for each of the devices that will require it in the proposal/quote. This software is to be applied to DEA’s Milestone SLC. On end-of-life projects, the contractor must coordinate with the System Security Unit (ISPA at HQ- ISPACastleTeam-DL@dea.gov) for verification of all potential license requirements.

D. The recording servers, once configured, shall run independently of the management server, and continue to operate if the management server is offline.

E. The recording server shall utilize optimized or purpose-built disk drives in a RAID 5 configuration for video surveillance systems.

F. An independent SSD drive will be provided for the operating system and application volume. It will not be used for the video storage. OS/Application volume type JBOD.

G. The recording server shall have the ability to accept the full frame rate supplied by the cameras, while recording a lower frame rate, yet still make the higher frame rate available to the Clients for live viewing.

H. Contractor shall prepare VSS end point devices for programming by DEA staff.

3.04 Programming VSS

A. The System Security Unit (ISPA) is responsible for working with the office, the contractor, and DEA’s IT office to ensure the proper programming of the VSS system. As such, ISPA requires the vendor to complete and return to ISPA, ISPS, and the onsite POC, the Milestone programming sheets (will be provided at award) a minimum of one week prior to installation to ensure the systems are operational prior to the installation sign off. In addition to completing and returning the programming sheets, the vendor must coordinate with either the Division Security Officer or the onsite point of contact to point the camera views as the office specifies. This is to be completed prior to turning the programming over to ISPA to ensure the camera views are as required by the office.

3.05 Warranty and Service

The recording server shall include the minimum commercial warranty to begin on the date of acceptance of a fully functional system by DEA. If the contractor provides a warranty above the commercial standard, these details should be provided. At a minimum, the warranty will include all hardware and services to repair the recording server.

Generic System Diagram

ATTACHEMENT 1: ELECTRONIC SECURITY SYSTEM DETAILS

1. VIDEO SURVEILLANCE SYSTEM

1. Exterior Areas

i. The following locations require cameras, approved for use by DEA, providing Field of Views of the below areas:

1. Office Perimeter Door(s)

2. Office Perimeter Roll-Up Door(s)

3. Office Perimeter Walls

4. Vehicle Gate(s)

5. Pedestrian Gate(s)

6. Secure Parking Area

2. Interior Areas

i. The following locations require cameras, approved for use by DEA, providing Field of Views of the below areas:

1. Secure Reception (Public Side)

2. Prisoner Processing

3. Sally Port(s)

4. Evidence Processing

5. Imprest Funds (Transaction Side)

6. Imprest Funds (Cashier Side)

7. Imprest Funds (Imprest Room Overview)

3. Video Display Locations

i. The following areas require video displays:

1. Head of Office

2. Secure Reception (Secure Side)

3. Adjacent to each Group work bay area

4. Office Perimeter Door(s)

4. Video Intercom Door Stations

i. The following areas require video intercom door stations from public areas to DEA controlled space:

1. Pedestrian Gate(s)

2. Office Perimeter Door(s)

3. Vehicle Gate(s)

5. Video Intercom Door Release Stations

i. The following areas require video intercom door release stations:

1. Head of Office

2. Secure Reception (Secure Side)

3. Adjacent to each Group work bay area

• Designated Break Area(s)

Table 1. Facility Camera Locations

ID Camera Name Camera Type (Fixed, PTRZ, 180, 360)

Desired Field of View Description Camera Model †

Roof #1 - 196

Fixed

Existing Camera to Remain.

N/A

Roof #2 - 197

Roof #3 - 198

Roof #4 - 199

8th Floor Stair A East

Ceiling

Relocate to be centered in hallway. Mounted on wall using tilted wall mount.

XNF-8010R

8th Floor Stair A West

Wall

Panoramic

Relocate. Centered on Stair Up

TNV-C8011RW

8th Floor Stair A East

Corner

Add. View of Stair A East and immediate are to include Cyber Suited Area.

TNV-C7013RC

8th Floor T-III & Enforcement

View of immediate area to include doors entering/exiting

8th Floor Stair B

Relocate. Centered on Stair Up

9a

8th Floor Elevator G Lobby

8th Floor Imprest 1 Room

Remote Head

View of the Imprest room door, safe and money counting machine

PNM-9000QB

SLA-T1080FA

8th Floor Imprest 1 Cashier

Dome

View of Cashier side of transaction counter

8th Floor Imprest 1 Transaction

View of Customer side of transaction counter

8th Floor Imprest 2 Room

8th Floor Imprest 2 Cashier

8th Floor Imprest 2 Transaction

8th Floor Imprest 3 Room

8th Floor Imprest 3 Cashier

8th Floor Imprest 3 Transaction

8th Floor Stair C West

Relocated existing. View of immediate area to include Stair C entry/exit.

8th Floor Service Elvator

Relocated existing. View of immediate area to include Service Elevator.

8th Floor Stair C Interior

Relocate. Tilted wall mount centered on Stair Up

SBV-140TBW

8th Floor Elevator Lobby

Flush

Relocate. Flush mount. View of Elevator Lobby.

XND-6081FZ

8th Floor SAC Entrance

Relocate. Center on Stair C door and Elevator Lobby Hallway. In-ceiling housing. View of surrounding area to include Stair C and SAC Entrance Doors.

XNF-8010RW

SHD-1600FPW

8th Floor SAC Hallway

Relocate. Center on Hallway and Elevator Lobby intersection. Flush mount. Hallway view format.

View of hallway and surrounding area.

8th Floor SAC Waiting

Add. In-ceiling housing. View of immediate area to include entry/exit doors.

8th Floor Stair D

Relocated above Front Office Rear Door. View of immediate area to include Stair D.

8th Floor Stair 7

Relocate. Flush mount. View of immediate area and

Stair E entry/exit.

7th Floor Stair C East

Relocate. Center on Stair C door and Elevator Lobby area to include Stair C.

7th Floor Elevator Lobby

7th Floor Hallway

Relocate. Center on Hallway and Elevator Lobby intersection. Flush mount. Hallway view format.

View of hallway and surrounding area.

7th Floor Night Evidence

Relocated above Front Office Rear Door. View of immediate area to include Stair D.

7th Floor NDE & Gun Vault

Flush mount. View of Gun Vault.

7th Floor Money Vault

Flush mount. View of Money Vault.

7th Floor High Value

Relocate. Flush mount. View of Personal Surrender and High Value Vault to include interior of Vault

Vestibule door.

7th Floor Stair C and Service Elevator

Lobby

Relocate. Center on Stair C door and Elevator Lobby area to include Stair C.

7th Floor Overnight Drop

New. View of Overnight Drop and immediate area to include Service Elevator and Hallway.

7th Floor Main Hallway

New. Tilted wall mount centered on Service Elevator

Hallway.

7th Floor Non-Drug

Relocate. Tilted wall mount centered on Non-Drug

Door.

7th Floor Stair B East

Relocate. Tilted wall mount centered on Hallway to

Stair B East and

7th Floor Elevator G Lobby

Add. View of Elevator G and immediate area.

7th Floor Non-Drug

Relocate. Tilted wall mount centered on Non-Drug

7th Floor Digital Evidence

7th Floor Digital Vault

7th Floor Stair A

Relocate. Tilted wall mount centered on Stair A.

7th Floor Hall & Lab Exterior

Relocate. Center on area. In-ceiling housing. View of immediate area to include doors entering/exiting.

7th Floor Lab Exterior Double Door

Relocate. Tilted wall mount centered on double doors.

7th Floor Pistol Range

Add. Center on area. In-ceiling housing. View of immediate area.

6th Floor Elevator Lobby

6th Floor Stair C

Add. Center on double door. In-ceiling housing.

View of immediate area.

6th Floor Stair C West

Relocate. Tilted wall mount centered on Stair C Door.

6th Floor Processing Hallway

Relocate. View of immediate area to include doors

6th Floor Processing Hallway

New. View of immediate area to include doors

6th Floor Lock Up Processing Door

6th Floor Lock Up Cell Doors

6th Floor Lock Up Cell #3

6th Floor Lock Up Cell #2

6th Floor Lock Up Cell #1

6th Floor Lock Up Interivew

New View of immediate area to include doors

6th Floor Lock Up JABS 1

6th Floor Lock Up JABS 2

6th Floor Lock Up JABS 3

6th Floor Floor Hallway

Relocate. Center on hallway intersection. In-ceiling housing. View of immediate area.

6th Floor Hallway

Center on hallway intersection. In-ceiling housing.

6th Floor Stair D

Relocate. Center above cubicle files cabinets. In-ceiling housing. View of immediate area to include

Stair D and Mechanical Room Door.

6th Floor Stair E

Relocate. Center on hallway intersection. In-ceiling housing. View of immediate area to include Stair E.

6th Floor Elevator G Lobby

Relocated. View of immediate area to include doors

6th Floor Stair B

Relocate. Tilted wall mount centered on hallway.

View of immediate are to include Stair B door.

6th Floor Stair A

Relocate. In-ceiling housing. View of immediate area to include Stair D and Mechanical Room Door.

5th Floor Elevator Lobby

5th Floor Snack Room

New . In-ceiling housing. Center within room on entrance double doors. View of the immediate area.

5th Floor Stair C

Relocate. Center between Stair C and Elevator on hallway. In-ceiling housing. View of immediate area to include Stair C and Elevator Shaft 3.

5th Floor Service Elevator

Relocate. Tilted wall mount centered above double door. View of immediate area to include Service

Elevator C.

5th Floor Hallway

Relocate. Tilted wall mount centered on service elevator hallway. View of immediate area.

5th Floor Stair D

Relocate. Center above files cabinets. In-ceiling housing. View of immediate area to include Stair D and Mechanical Room Door.

5th Floor Stair E

Relocate. Center on Copy Room. In-ceiling housing.

View of immediate area to include Stair E.

5th Floor Tech Cage

Relocate. Tilted wall mount centered on service elevator hallway. View of immediate area.

5th Floor Stair A

Relocate. View of immediate area to include Stair A

5th Floor Gym

Relocate. Center on hallway and main gym area. In-ceiling housing. 12MP. View of immediate area to include Restroom doors and Gym entrance Door.

XNF-9010RV

5th Floor Elevator G Lobby

5th Floor Stair B

5th Floor Hallway

In-ceiling housing. 12MP. View of immediate area to include Mail Room and Firebird Room Doors.

5th Floor Mail Room

New. In-ceiling housing. View of immediate area to include Mail Room transaction double doors.

1st Floor Lobby Visitor

In-ceiling

Relocate. In-ceiling mount. View of immediate area to include 10th St. Lobby Entrance and Screening

Eequipment.

XNV-8083RZ

SHD-1370FPW

1st Floor Lobby Visitor Waiting

Relocate. In-ceiling mount. View of immediate area to include Guard Desk and Visitor Waiting Area.

1st Floor Lobby Employee Entrance

Relocate. In-ceiling mount. View of immediate area to include Guard Desk and Visitor Screening Equipment.

1st Floor Lobby 17th St. Doors

Relocate. In-ceiling mount. View of immediate area to include 17th Stree Lobby Entrance.

1st Floor Elevator Lobby

Relocate. In-ceiling. Hallway Mode. View of immediate area to include Elevator Lobby and ATM.

XND-8081FZ

1st Floor Lobby Desk

In-ceiling housing. 12MP. View of immediate area.

1st Floor Service Elevator H

Relocate. View of immediate area to include Service

Elevator.

1st Floor After Hours Entrance

Relocate. May require Additional Extension Pipe.

Positioned to view After Hours Door, corridors and

After Hours Exit Door.

XNV-6083RZ

SBP-300CMW1

SBP-180HMW1

1st Floor After Hours Exit

Hallway Mode. Positioned to view After Hours Exit

Door.

XNV-6083RZ

1st Floor Stair D

Relocate. Tilted wall mount centered Exit door. View of

1st Floor Stair E

Relocate. Tilted wall mount centered Exit door. View of

1st Floor Stair A

Relocate. Tilted wall mount centered on Stair Up.

entering/exiting such as the Storeroom Door.

1st Floor W 17th St Stairwell Exit

New. Ceiling. May require Additional Extension Pipe.

View of Stairwell Exit Door, corridor and Storage area.

XNF-9010RV

SBP-160HMW1

1st Floor Elevator G Lobby

Relocate. View of immediate area.

1st Floor W 17th Street Exit Only

New. Tilted wall mount centered on exterior double door. View of immediate area to include doors entering/exiting.

1st Floor Stair B

New. Tilted wall mount centered on landing. View of immediate area to include doors entering/exiting.

1st Floor Stair B Exit Hallway

View of Stairwell Exit Door, corridor and Storage area.

XNF-9010RV

1st Floor Stair B Exit to W 17th St.

Positioned to view After Hours Door, corridors and

After Hours Exit Door.

XNV-6083RZ

1st Floor Loading Dock Overhead Door

Positioned to view Loading Dock Overhead Door and Loading Dock Double Door. May require Additional

Extension Pipe.

PNM-C7083RVD

SBP-215HMW

1st Floor Loading Dock Screening

New. May require Additional Extension Pipe.

Positioned to view Loading Dock and Screening

Equipment.

XNF-8010RV

SBP-300HM5

SBP-300CM

1st Floor Garage Inside Doors

Positioned to view immediate area including Service

Elevator Double Doors and Vehicle In/Out.

XNF-9010RV

1st Floor Garage Entrance Inside

Relocate. Hallway format. View of Garage vehicle entrance overhead and Control Room Screening.

XNV-6083RZ

SBP-300WMW1

1st Floor Garage Exit Inside

Relocate. Hallway format. View of Garage vehicle exit overhead and Control Room Screening.

XNV-6083RZ

SBP-300WMW1

Outside 10th St Garage Exit

PTZ

View of immediate area to incldue Garage Vehicle

Exit.

XNP-C6403

SBP-115PA

SBP-400WMW

Outside 10th St Garage Entrance

View of immediate area to include Garage Vehicle

Entrnace.

XNP-C6403

Outside 17th St Lobby Entrance

View of immediate area to include 17th Street employee entrance.

XNP-C6403

Outside 17th St East

View of immediate area to include Loading Dock.

XNP-C6403

Outside 17th St West

View of immediate area to include 17th Street Exit only Double Doors and Stair A Street Exit.

XNP-C6403

Outside 16th St East

View of immediate area to incldue Stair D Exit.

Outside 16th St West

View of immediate area to include Stair E Exit.

Outside Westside North

Outside Wesside South

Outside 10th Ave Lobby Entrance

View of immediate area to include 10th Ave visitor entrance.

XNP-C6403

Outside 10th Ave North View

XNP-C8253

Outside 16th St West View

Outside 16th St East View

Outside Westside North View

Outside Westside South View

Outside 17th St East View

Outside 17th St Stair A Exit

Outside Highline

2nd Floor Seized Vehicles

Positioned to view immediate area.

XNF-9010RV

Basement Water Meter

Basement Sprinkler Room

Basement Mechanical Rooms

Basement Mechanical Rooms

Basement Vehicle Maintenance

Labs Vestibule Processing

New. View of immediate are to include Evidence

Preparation area.

Labs Evidence Window Vestibule

New. View of the Vestibule Evidence Tech

Transaction Window

Labs Evidence Window Tech

New. View of Evidence Tech Transaction Window

Labs Evidence Tech Room

New. View of Evidence Tech Room

Labs Evidence Tech In/Out

New. View of immediate area.

Labs Stair D

Relocate. Tilted wall mount centered on alcove. View of immediate area to include Stair D door.

Labs Main Auto Doors

Relocate. View of immediate area to include Air Lock auto doors, Labs Group 3

Relocate. Flush mount. View of Group 3 Area.

Labs Room 755

Relocate. In-ceiling housing. View of immediate area.

Labs Room 756

Labs Room 758 to include hoods.

Labs Room 758

Relocate. View of immediate area to include door entering/exiting and hood.

Labs Room 772

Relocate. View of immediate area.

Labs Room 772

Add. View of immediate area.

Labs Room 770 to include hood.

Labs Group 3 North

Relocate. Flush mount. View of Group 3 Area.

Labs Group 2 North

Relocate. Flush mount. View of Group 2 Area.

Labs Group 2 North

Relocate. Flush mount. View of Group 2 Area.

Labs Group 1 North

Relocate. Flush mount. View of Group 1 Area.

Labs Group 1 North

Relocate. Flush mount. View of Group 1 Area.

Labs Room 745 Door

Relocate. View of hallway leading to entry/exit door

Room 745.

Labs Room 745 Buld Evidence

Relocate. View of immediate area to include entry/exit door.

Labs Room 745 Buld Evidence entry/exit door Room 745.

Labs Main Vault NW Door

Relocate. View of immediate area to include Main

Vault entry/exit door.

Labs Main Vault SW Door

Relocate. View of immediate area to include Main

Vault entry/exit door.

Labs In-Process Vault

Labs In-Process Vault

Relocate. View of the immediate area.

SBF-100B1

Labs Stair E

Relocate. Flush mount. View of Stair E door and walkway from In-Processing Vault

Labs Entrance 792

Labs Entrance Vault 700

Labs Service Exit

Relocate. Mounted above double door. View of

Labs Main Vault North Door entry/exit doors.

Labs Main Vault North

View of Stairwell Exit Door, corridor and Storage area.

XNF-9010RV

Labs Main Vault NE

View of Stairwell Exit Door, corridor and Storage area.

XNF-9010RV

Labs Main Vault SE

View of Stairwell Exit Door, corridor and Storage area.

XNF-9010RV

Labs Main Vault NW Door

View of Stairwell Exit Door, corridor and Storage area.

XNF-9010RV

Labs Vault 700

Relocate. Flush mount. View of immediate area to incldue Vault 700 entry/exit door.

Labs Vault 700

View of interior vault area.

XNF-9010RV

Labs LAN Room 766

New. View of immediate area to include entry/exit doors.

Labs Room 767

New. View of immediate area to include entry/exit door.

Labs Room 765

New. View of immediate area to include hood and

Labs NW Perimeter Exit

New. In-ceiling housing. View of immediate area to perimeter entry/exit door.

Labs 2nd Floor Storage Outside

Relocate. Ceiling. May require Additional Extension Pipe. View of innediate area to include Lab Evidence

Storage entry/exit door.

XNF-9010RV

Labs 2nd Floor Storage Inside

Relocate. Ceiling. May require Additional Extension Pipe. View of innediate area to include Lab Evidence

Storage entry/exit door.

XNF-9010RV

Table 2. Facility Monitor Groups

Se cu rit y

M on ito rs

ID Monitor Location Size Type

MON 01 Base 55" Wall

MON 02 Base 55" Wall

MON 03 Base 55" Wall

MON 04 Base 55" Wall

MON 05 Base 32" Desktop

MON 06 Base 32" Desktop

MON 07 Base 32" Desktop

MON 08 Command Center 55" Wall

MON 09 Command Center 55" Wall

MON 10 Command Center 55" Wall

MON 11 Command Center 55" Wall

MON 12 Command Center 55" Wall

MON 13 Command Center 55" Wall

MON 14 Command Center 55" Wall

MON 15 Command Center 55" Wall

MON 16 DSO 55" Wall

MON 17 Garage Guard Booth 55" Wall

MON 18 Garage Guard Booth 32" Open Console

MON 19 Garage Guard Booth 32" Open Console

MON 20 Garage Guard Booth 32" Open Console

MON 21 Lobby Guard Booth 27" Desktop

MON 22 Labs Admin 55" Wall

MON 23 Labs Admin 55" Wall

MON 24 Labs Deputy / SO 55" Wall

Table 2. Facility IP PTZ Controller Locations

Se cu rit y

M on ito rs

ID

PTZ Controller Location

PTZ 01 DSO Office PTZ 02 Garage Guard Booth PTZ 03 Command Center PTZ 04 Base

DEA SECURITY SYSTEM

ATTACHEMENT 2: DEA requires HANWHA brand cameras (as currently installed) or cameras with equivalent salient characteristics as stated below. The brand of camera should not be near end-of-life cycle (EOL). Cameras shall be milestone compatible.

XNV-6080R

60 frames per second H.265 compliant Motorized, Varifocal Lens Minimum 119 – 27 degree Horizontal Field of View 150 dB WDR (4 exposure) Minimum Color Illumination 0.015 lux Built-in IR Composite Out 5 Year Warranty

XNV-6081Z

H.265 compliant Composite Out Modular Design (Housing separate from camera module) Remote Adjustment

PNM-7002VD

H.265 compliant 150 dB WDR (4 exposure) Minimum Color Illumination 0.055 lux

TNV-7010RC / 8010C

H.265 compliant Minimum Color Illumination 0.1 lux

IP66, IP6K9K, 1K10+ (50J)

Minimum of 5 Year Warranty

PNM-9022V

30 frames per second H.265 compliant Minimum Color Illumination 0.3 / 0.1 lux

PNM-9080VQ

H.265 compliant Motorized, Varifocal Lens 150 dB WDR (4 exposure)

XND-6080RV

H.265 compliant Motorized, Varifocal Lens Minimum 119 – 27 degree Horizontal Field of View 150 dB WDR (4 exposure) Minimum Color Illumination 0.015 lux Built-in IR

XNF-8010RV / R

30 frames per second H.265 compliant Minimum Color Illumination 0.1 lux Built-in IR

XNV-8080R

H.265 compliant Motorized, Varifocal Lens 30 frames per second Minimum 92 - 38 degree Horizontal Field of View Minimum Color Illumination 0.07 lux Built-in IR