D21-027-OA2.docx
DOCX document 45 KB Posted
- Solicitation number
- D21-027-O
- Issued by
- Wisconsin
About this file
This is Amendment #2 to a Request for Bid (D21-027-O) issued by the University of Wisconsin-Milwaukee (UWM), a Wisconsin state agency, for the furnish and installation of new uninterruptible power supply (UPS) batteries for Mitsubishi equipment. The project involves the replacement of 120 existing 12HX505-FR 12V506W valve-regulated lead-acid batteries with comparable new batteries, including removal and disposal of the existing units. The replacement batteries must be new (not refurbished), manufacturer-recommended for use, with a minimum three-year full warranty and seven-year pro-rated warranty coverage. The original bid release date was February 19, 2021, with Amendment #2 issued on March 1, 2021, and a bid due date of March 4, 2021, at 2:00 PM. Installation work can be performed during normal business hours (Monday through Friday, 7:00 AM to 5:00 PM). The UPS equipment is located on the first floor of the UWM facility with a loading dock available for delivery.
The amendment addresses 24 questions from prospective bidders regarding delivery logistics, site conditions, and installation requirements. Key site details include the availability of a secure adjacent room for battery storage for up to one week prior to installation, no loading dock restrictions on truck timing or height, no requirement for a lift gate, no pallet jack availability on-site, no floor protection needed, and no obstructions between the loading dock and UPS location. Pallets may be brought to the adjacent room but individual batteries must be manually carried into the UPS room. A department representative will coordinate on-site timing and delivery logistics. No pricing terms, set-asides, incumbent information, or contract term details are specified in this amendment document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| D21-027-OA3.docx | DOCX document | |
| D21-027-OA.docx | DOCX document | |
| D21-027-O.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Wisconsin Department of Administration Chs. 16, 19, 51
DOA-3681 (03/99)
SUPPLEMENTAL STANDARD TERMS AND CONDITIONS
FOR PROCUREMENTS FOR SERVICES
State of Wisconsin – UW-Milwaukee Wis. Statutes s.16.75
DOA-3070 (R08/2003) UWM-3070 (R10-13)
REQUEST FOR BID: D21-027-O
Amendment #2
THIS IS NOT AN ORDER
| For Furnish and Install New Uninterruptible Power Supply Batteries |
| Release date: 2/19/21 |
Name(contact for further information): Donna Lumsden
Email: uwmbids@uwm.edu
See section 3.4 for rules regarding communications during a Bid.
Amendment Release Date: 3/1/21
Due Date: 3/4/21 at 2:00 PM
Available submission methods:
|_| Email (See Section 3.5.1 for instructions)
AMENDMENT #2 issued to provide answers to questions received. See the next page.
All other terms and conditions remain the same.
Return this amendment page, signed, and dated, by due date and time to acknowledge receipt and consideration of the information provided.
| Name of Bidder:: |
| Date: |
| Bidder’s phone number: |
| Address of Bidder: |
| Full name and Title of authorized Bidder’s representative: |
Bidder’s email:
City, State, Zip Code of Bidder:
Signature of authorized Bidder representative Federal Employer Identification No (or social security if sole proprietor) (voluntary)
This form can be made available in accessible formats upon request to qualified individuals with disabilities
AMENDMENT #2 – QUESTIONS/ANSWERS
1. Is there a loading dock for the building to unload/load batteries?
Answer: Yes
2. Is a lift gate needed?
Answer: A lift gate is not required
3. If yes, is there a height restriction for trucks?
Answer: There is no height restriction
4. Is there a restriction on time that the truck can be at the loading dock?
Answer: No restriction on time.
5. What time can the truck arrive at the loading dock?
Answer: This is flexible. Department representative will be the one to show up onsite so this timing can be arranged.
6. Will we be required to deliver the batteries inside and stage them next to the UPS?
Answer: Batteries can be delivered into the adjacent room, BUT will have to be carried individually into the room with the UPS
7. What floor is the UPS on?
Answer: The UPS is on the first floor
8. If not on the first floor, Is there a freight elevator that can fit a pallet of batteries (4ftx 4ft) Answer: Not needed
9. Can we bring pallets to the UPS / Battery cabinets or do the pallets need to be broken down at the loading dock and the batteries have to be carted up?
Answer: Pallets can be brought to the adjacent room.
10. What is the weight limit of the elevator?
Answer: Not needed; Units are on the first floor.
11. Is there a storage area for the batteries to be delivered a day or two before installation? (Each Pallet could weigh up to 3000 lbs.- typically 20 – 24 batteries per pallet) Answer: There is a secure room adjacent to the UPS room
12. If yes, how long could the batteries remain on site prior to installation?
Answer: Preference would be to take delivery no longer than one week prior to the scheduled installation.
13. Do you require a Masonite /floor cover the floor between the elevator and batteries?
Answer: No
14. If needed, do you have a pallet jack?
Answer: There is no pallet jack on site.
15. Would like to know what the model number of the battery you are looking for?
Answer: Exiting batteries are 12HX505-FR 12V506W valve regulated lead acid battery; Replacement batteries; need to be new, not refurbished and recommended for use by the manufacturer. We are looking for a comparable battery. Nominal Volte: 12V; Nominal Ah:119; Max Discharge Current: 913; Watts Cell: 506; Short Circuit Current (A): 4510; Minimum Full Three Year Warranty, Seven Year Pro-rated
16. What type of batteries are being replaced? Solicitation only states 120 batteries for Mitsubishi 9800 750 KVA?
Answer: See the answer to #15
17. Is this to be done during normal business hours? M-F 0700-0500.
Answer: Yes, this can be done during normal business hours. See the answer to #5.
18. Could you please tell me what is the battery model number in the UPS?
Answer: See the answer to #15
19. What is the make and model of the existing batteries?
Answer: See the answer to #15
20. Is there a loading dock for delivered (sic)?
Answer: See the answer to #1
21. IS the UPS on the first floor, if not, is there an elevator for use?
Answer: See the answer to question #7.
22. Are there any obstructions between the loading dock/entry point & the UPS?
Answer: There are no obstructions as far as we understand your question. Please see other answers in this amendment which provides more information regarding the site.
23. Is floor protection needed?
Answer: No
24. Interested in submitting a bid, but would like to know what the model number of the battery you are looking for?
Answer: See the answer to #15