This addendum document is issued by the New York State Office of Parks, Recreation and Historic Preservation's Hudson Valley District for the Grafton Lakes State Park Beach Area Site Improvements project (Project ID SA-GL-2025-001), which involves two separate contracts: D006603 for General Construction and D006604 for Electrical Construction. The addendum clarifies contractor responsibilities regarding utility trenching and backfill work, specifies that the Electrical Contractor is responsible for all interior electrical work, exterior wiring, and trenching and backfill for electrical conduit, while the General Contractor handles demolition of existing exterior electrical work. The document addresses existing utility conditions, noting that plumbing lines are encased in concrete near the women's restroom and that electrical lines run beneath concrete in specific areas near the lifeguard utility room and women's restroom. The addendum includes revised specifications for Section 015000 (Construction Facilities & Temporary Controls) and Section 323300 (Site Furnishings), along with revisions to multiple drawing sheets including layout plans, grading plans, and site details. Key site furnishings specified include recycled plastic lumber benches, limestone quarry block benches, outdoor showers by Most Dependable Fountains, Inc., cast iron tree grates, and 25-foot aluminum flagpoles with internal halyard systems.
The revised Construction Facilities & Temporary Controls specifications mandate that contractors provide portable electric sources and temporary water sources, establish temporary toilet facilities based on workforce size (minimum one toilet for up to 20 employees), and maintain barriers to protect the site and existing facilities. Contractors must implement comprehensive protection measures for trees and plants, maintain watertight building conditions, prevent cementitious materials from entering drainage systems, and conduct daily cleanup with rubbish removal at least weekly. Fire prevention requirements include maintaining 20-pound multi-class fire extinguishers at welding locations and proper fuel storage in UL-approved containers. Site furnishings installation requires all items to be set plumb and level per manufacturer specifications, with equipment such as outdoor showers featuring 1.5 GPM spray heads at 60 PSI and one-year warranties. The document does not identify specific pricing terms, set-asides, incumbents, or funding sources within the addendum itself, though the related contract opportunity indicates MBE participation goals of 13 percent and WBE goals of 17 percent for the general construction contract, with MBE goals of 10 percent and WBE goals of 20 percent for the electrical contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| D006603-04_Addendum_3.pdf | ||
| D006603-04_Addendum_1.pdf | ||
| D006603-04 NTB.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HUDSON VALLEY DISTRICT ADDENDUM # 02
New York State Office of Parks, Recreation and Historic Preservation
Taconic Region • 9 Old Post Road, Staatsburg, New York 12580 • (845) 889-4100 Palisades Region • Palisades Interstate Parkway, Bear Mountain, NY 10911 • (845) 786-2701
Saratoga Region • 19 Roosevelt Drive, Saratoga Springs, NY 12866 • (518) 584-2535
THIS DOCUMENT contains (15) pages, including attachments
Grafton Lakes State Park Beach Area Site Improvements 06/03/2026
Project ID#: SA-GL-2025-001 Contract Numbers: D006603 General Construction; D006604 Electrical Construction
General Information:
1. Read All Plans, Specifications, and Addenda Carefully.
2. IMPORTANT: Acknowledge receipt of all addenda on the bid form when submitting your bid.
3. This Addendum is part of the Contract Documents in accordance with the “Instructions to Bidders.”
4. This Addendum includes both newly added specifications and revisions to previously issued specifications.
Pre-Bid RFIs:
Question 1: Will GC be responsible for trenching & backfill of electrical contract? Including any ductbank requirements?
Answer 1: The General Contractor is responsible for demolition of existing exterior electrical work.
Question 2: Confirm EC is responsible for all electrical demolition, including digging and backfill for existing electrical removal as sown on ED101.
Answer 2: Electrical Contractor is responsible for all interior electrical work, replacement of conduit, exterior wiring as well as trenching and backfill for electrical conduit.
Question 3: Please confirm if & what existing utilities are encased in concrete.
Answer 3: The extent to which existing utilities are encased in concrete is currently unknown. However, a few summers ago, a water leak occurred immediately outside the women’s restroom. During the excavation and repair work, it was discovered that the plumbing lines had been installed and subsequently covered with concrete. As a result, the crew had to remove sections of concrete until an undamaged portion of the line was located for a proper tie-in. Following the repair, the concrete was poured over the top of the lines.
To our knowledge, electrical lines have generally not been observed directly beneath the concrete pavement, and we therefore assume they are installed at a greater depth.
Exceptions include the area associated with repairs to the women’s changing room, where
HUDSON VALLEY DISTRICT ADDENDUM # 02
New York State Office of Parks, Recreation and Historic Preservation
Taconic Region • 9 Old Post Road, Staatsburg, New York 12580 • (845) 889-4100 Palisades Region • Palisades Interstate Parkway, Bear Mountain, NY 10911 • (845) 786-2701
Saratoga Region • 19 Roosevelt Drive, Saratoga Springs, NY 12866 • (518) 584-2535 a 120V electrical line in conduit is embedded within the concrete between the women’s restroom and the changing room.
In addition, the solar electrical line is located directly beneath the concrete and runs from the lifeguard utility room to the women’s restroom. The remainder of this line follows the building perimeter and is routed under the brick drip drains.
Question 4: Please confirm the use of the CU Structural Soil per callout on DWG L301. If confirmed use please confirm depth of material to be installed. Would a crushed stone structural fill material be acceptable in these areas?
Answer 4: Please see Detail B3 on Sheet L602. Depth of CU Structural Soil Material is 3’.
Crushed stone structural fill material is not acceptable in these areas. Please see specification section 312000 for information.
Revised Specifications:
1. Delete Section 015000 – Temporary Facilities and Controls and Replace with the attached
Section 015000 – Construction Facilities Temporary Controls.
2. Section 323300 – Added flagpole specifications.
Revised Drawing Sheets:
The following revisions have been made to the construction documents. Please replace the existing drawings with the attached revised sheets.
1. Drawing CVR – Revision to drawing title.
2. Drawing L101 – Revisions to parking sign locations.
3. Drawing L301 – Revisions to callouts.
4. Drawing L401 – Clarifications on flush curb installation.
5. Drawing L601 – Revisions to detail A2, B1, B3, B5, C4 and C5.
6. Drawing L602 – Revision to detail B3.
CONSTRUCTION FACILITIES &
SA-GL-2025-001 015000-1 TEMPORARY CONTROLS
SECTION 015000
CONSTRUCTION FACILITIES & TEMPORARY CONTROLS
1.1 PROJECT CONDITIONS
A. Provide construction facilities and temporary controls necessary for the Work.
1.2 TEMPORARY LIGHT AND POWER
A. Electric energy for temporary light and power will not be made available at the Project Site.
Provide portable electric source as required for the Work.
B. Provide temporary wiring and equipment in conformance with the National Electrical Code.
1.3 TEMPORARY WATER
A. Water will not be made available at the Project Site. Provide temporary water source as required for the Work.
B. Prevent waste of water.
1.4 TEMPORARY TOILETS
A. Provide temporary toilet facilities for Contractor’s and subcontractors employees engaged on the project. Locate toilets where directed and maintain them in a sanitary condition.
NUMBER OF EMPLOYEES MINIMUM NUMBER OF FACILITIES*
20 or less 1 toilet 20 or more 1 toilet and 1 urinal per 40 employees 200 or more 1 toilet and 1 urinal per 50 employees
*Toilet/Urinal combinations shall count as only one facility.
1. Locate toilet facilities no more than 1000 feet from any work location.
a. Exception: Mobile crews having readily available transportation to nearby toilet facilities.
1.5 BARRIERS AND ENCLOSURES
A. Provide barriers during performance of the Work to:
1. Prevent unauthorized entry to work areas.
SA-GL-2025-001 015000-2 TEMPORARY CONTROLS
2. Allow for State’s access to the Site.
3. Protect existing facilities and adjacent properties from damage.
4. Protect vehicular and pedestrian traffic.
1.6 PROTECTION OF WORK AND EXISTING PROPERTY
A. Protect installed Work and existing construction and finishes during performance of the Work.
B. Maintain the building in a watertight condition during performance of the Work.
C. Provide temporary and removable protection for installed products. Control activity in immediate work area to prevent damage.
D. Protect existing trees and plants during performance of the Work unless otherwise indicated. Box trees and plants within the grading limit lines. Do not deposit excavated materials or store building materials around trees or plants. Do not attach guy wires to trees.
E. Prohibit traffic from landscaped areas.
F. Cleaning tools of cementitious and other insoluble materials:
1. Do not wash tools in sinks or other sanitary drainage systems. Protect all drainage systems from debris that can clog or damage piping and fixtures.
2. Take all precautions necessary to prevent cementitious and other insoluble materials from flowing into floor drains.
3. Dispose of excess cementitious and other insoluble debris with the other rubbish.
1.7 SECURITY
A. Promptly relock doors and security screens located in access routes, storage areas, and work areas after use.
1.8 WATER CONTROLS
A. Provide and maintain pumping equipment necessary to keep the work areas free from water.
Discharge water into existing storm drainage systems or otherwise disperse as directed.
1.9 FIRE PREVENTION
A. Take precautions necessary to prevent fires.
B. Fuel for cutting and heating torches shall be gas only and shall be contained in Underwriters Laboratory approved containers.
C. Furnish and maintain a currently inspected 20 pound capacity multi-class A B C fire extinguisher in the immediate vicinity where welding tools or torches are in use.
SA-GL-2025-001 015000-3 TEMPORARY CONTROLS
D. Furnish and maintain a currently inspected fire extinguisher of the appropriate class and size whenever the temporary storage of materials changes that areas classification of fire load or life safety.
1.10 ACCESS ROADS
A. Routes of ingress and egress on the premises to the location of the Work shall be as directed.
B. Keep designated access roads clear of dirt and debris resulting from the Work.
C. Provide means of removing mud from vehicle wheels before entering paved roads.
1.11 PARKING
A. Parking areas shall be where designated by the Director’s Representative.
1. Keep designated parking areas clear of dirt and debris resulting from the Work.
2. Remove ignition key from unattended vehicles and lock doors.
1.12 RUBBISH REMOVAL
A. Clean up and containerize the rubbish (refuse, debris, waste materials, and removed materials and equipment) resulting from the Work at the end of each work day and leave work areas broom clean, except where more stringent cleaning is specified. Locate containerized rubbish where directed.
B. Remove rubbish from State property at least once a week and more often if the rubbish presents a hazard. Properly dispose of rubbish.
C. Burning of rubbish will not be permitted.
1.13 RELOCATION AND REMOVALS
A. Should a change in location of any construction facilities and temporary controls be necessary in order to progress the Work properly, remove and relocate such items as directed.
B. Remove the construction facilities and temporary controls when they are no longer required.
Restore permanent facilities used for or connected to temporary facilities to their original condition or better.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 015000
SA-GL-2025-001 323300 - 1 SITE FURNISHINGS
SECTION 323300
SITE FURNISHINGS
PART 1 - GENERAL
1.1 SUMMARY
A. This section includes the following:
1. Benches
2. Quarry Block Benches
3. Outdoor Showers
4. Tree Grate
5. Flag Pole
1.2 QUALITY ASSURANCE
A. Installer Qualification: An experienced installer who has completed installation of site furnishings and whose work has resulted in construction with a record of successful in-service performance.
B. Manufacturer/ Fabricator Qualifications: Experienced product manufacturer for more than 30 years.
1.3 SUBMITTALS
A. Product Data: Include physical characteristics such as shape, dimensions, and finish for building materials.
B. Shop Drawings: Provide dimensional drawings and installation instructions for all products.
C. Samples for Verification: For the following product, provide samples for all material finishes.
1. Stone Benches
D. Maintenance Data: For each product.
1.4 DELIVERY, STORAGE, AND HANDLING
A. Store products in original undamaged packaging in a dry location until ready for installation.
B. Handle products carefully to prevent any damage to the finishes.
SA-GL-2025-001 323300 - 2 SITE FURNISHINGS
PART 2 - PRODUCTS
2.1 Bench
A. Recycled plastic lumber bench to match existing site benches: Contour Bench by Jamestown
Advanced Products or approved equal.
1. Product Number: #11641
2. Mounting: Pad Mount
3. Overall Length: Six-feet.
4. Installation Method: Pad Mount
5. Frame and Finish: 2.5” square tube frame with 3/8” x 4” steel bar stock mounting brackets, black powder coat with rust inhibiting primer
6. Recycled plastic lumber 3”x4”x72” nominal size.
7. Center frame required for recycled plastic lumber benches
2.2 Quarry Block Benches
1. Limestone quarry blocks
2. Finish: finishes as per detail C3/L-601
3. Size: 18” H x 18”D X 4’-0”L
4. Tolerance +/- 1” in each dimension
5. Placement: as per plans, Top of bench 17”-19” above adjacent finish grade
2.3 Outdoor Shower
A. Outdoor Shower by: Most Dependable Fountains, Inc.
1. Model Number” 564 SMSS – Accessible shower with on metered head at 72” and a foot wash on one side and one metered accessible head at 49” on back side with 2 grab bars.
2. Mounting: Surface mount as per manufacturer’s recommendations, Marine grade stainless steel pedestal
3. Push bar: 304 stainless steel
4. Spray Heads: 1.5 GPM at 60 PSI
5. Control Valves: Less than 5lbs operation, design for 30 to 80 PSI, ideal operation at 60
PSI
6. Finish Color: Green
7. Installation: Surface mount, with surface mount carrier
8. Winterization: Shut-off water and drain down
9. Warranty: 1 year
10. Options
a. Surface Carrier
b. Cut-off valve and low point drain
2.4 Cast Iron Tree Grate
A. Neenah Foundary model #R-8880-A, or approved equal
1. Component No’s:
a. Grate: 8880-0003
b. Frame: 9992-7238
SA-GL-2025-001 323300 - 3 SITE FURNISHINGS
2. Size: 72” Diameter
3. Material:
a. Grate: Cast Iron, ASTM A-48, Class 35B
b. Frame: Hot rolled mild steel angle (L1 ¾ x 1 ¼ x 3/16)
4. Finish: Not painted
2.5 Flag Pole
A. 25’ Aluminum Flag Pole
1. 25’ aluminum flag pole
2. One-piece tapered, ground set, seamless spun 6063-T3 aluminum
3. Internal Halyard, with winch system, metal cable and removable crank
4. Butt diameter 5” – Top diameter 3”
5. Wall thickness .125
6. Min. wind rating 104 MPH flagged
7. Satin aluminum finish
8. 5” gold anodized aluminum ball at top
9. 1 year warranty
10. Mount and install as per manufacturer’s recommendations
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine areas and conditions, with Installer present, for compliance with requirements for correct and level finished grade, mounting surfaces, installation tolerances, and other conditions affecting performance.
1. Proceed with installation only after unsatisfactory conditions have been corrected.
B. INSTALLATION
1. Install each item in accordance with component manufacturer's instructions.
2. Contractor shall provide a crane or fork-lift intended for the weight of the Portable Building and gates. Manufacturer will assist the Owner by providing correct minimum lifting capacity and by locating lift points and recommended lifting capacities.
3. Set all items Plumb and level
4. The two sides of the Vehicular Swing Gate at the southern entrance shall be at equal elevation.
3.2 ADJUSTING AND CLEANING
A. After completing site furnishing installation, inspect components. Remove spots, dirt, and debris.
Repair damaged finishes to match original finish or replace components.
SA-GL-2025-001 323300 - 4 SITE FURNISHINGS
B. Adjust gates, salt shed components, and all hardware to operate smoothly, easily, properly, and without binding. Confirm that locks engage accurately and securely without forcing or binding.
C. Lubricate hardware and other moving parts.
D. After completing installation, inspect exposed finishes and repair damaged finishes.
END OF SECTION 323300
BEACH AREA SITE IMPROVEMENTS
254 GRAFTON LAKES STATE PARK WAY
GRAFTON, NEW YORK 12082
SITE LOCATION MAP
PROJECT LOCATION MAP
CVR
G-000 G-011
COVER SHEET
SITE KEY PLAN
EXISTING CONDITIONS PLAN
GRAFTON LAKES STATE PARK
LIST OF DRAWINGS
GENERAL :
C-101 C-102 C-201 C-202 C-301 C-302 C-401 C-402
DEMOLITION PLAN (1 of 2) DEMOLITION PLAN (2 of 2) DRAINAGE PLAN (1 of 2) DRAINAGE PLAN (2 of 2) UTILITY PLAN (1 of 2) UTILITY PLAN (2 of 2) EROSION AND SEDIMENT CONTROL PLAN (1 of 2) EROSION AND SEDIMENT CONTROL PLAN (2 of 2)
CIVIL / SITE :
L-101 L-102 L-203 L-301 L-302 L-401 L-402 L-501 L-502 L-601 L-602 L-603 L-604 L-605 L-606
LAYOUT PLAN (1 of 2) LAYOUT PLAN (2 of 2)
CONCRETE SCORING PLAN
MATERIALS PLAN (1 of 2) MATERIALS PLAN (2 of 2) GRADING PLAN (1 of 2) GRADING PLAN (2 of 2) PLANTING PLAN (1 of 2) PLANTING PLAN (2 of 2)
SITE DETAILS
SITE DETAILS
SIGN DETAILS
EROSION AND SEDIMENT CONTROL DETAILS
UTILITY DETAILS
UTILITY DETAILS
LANDSCAPE :
PROJECT LOCATION
SITE LOCATION
A-101 SELECTIVE DEMOLITION & NEW CONSTRUCTION
ARCHITECTURE :
E-001
ED-101
EP-101
EP-501
EP-601
ELECTRICAL NOTES AND LEGENDS
ELECTRICAL DEMOLITION PLAN
ELECTRICAL PLAN
ELECTRICAL DETAILS
ELECTRICAL SCHEDULES
ELECTRICAL :
NORTH
WATER TANK LOCATION
CT-001
CT-100
CT-120
CT-300
CT-301
CT-500
CT-501
GENERAL NOTES
WATER STORAGE TANK EXISTING CONDITIONS AND REMOVALS PLAN
WATER STORAGE TANK GRADING, MATERIALS, AND EROSION CONTROL PLAN
WATER STORAGE TANK SITE PLAN
WATER STORAGE TANK PLAN AND SECTION
CONSTRUCTION DETAILS (1 OF 2)
CONSTRUCTION DETAILS (2 OF 2)
CIVIL / WATER TANK :
100% BID DRAWNGS
PROJECT ID: SA-GL-2025-01
D006603 GENERAL CONSTRUCTION
D006604 ELECTRICAL CONSTRUCTION
Description Date:
REVISIONS
Rev No
Drawn By:
Design By:
Checked By:
Date:
Approved By:
Sheet:Project Number:
Sheet Title: Drawing Number:
FISHER ASSOCIATES
1001 W. SENECA ST. STE. 201
ITHACA, NEW YORK 14850
Landscape Architecture/ Civil Engineering
Project Title:
Project Location:
Governor Kathy Hochul Acting Commissioner Kathy Moser
19 Roosevelt Drive Saratoga Springs, NY 12866
(518) 584-2000 Regional Director: Alane Ball Chinian
NYS Parks, Recreation, and Historic Preservation Saratoga-Capital Region:
ENCORUS GROUP
23 MECHANIC ST.
SPRINGVILLE, NEW YORK, 14141
MEP Engineering
Seal and Signature
IT IS A VIOLATION OF STATE EDUCATION LAW FOR ANY PERSON, UNLESS UNDER THE DIRECTION OF A LICENSED ARCHITECT/ENGINEER/LANDSCAPE ARCHITECT TO ALTER THIS DOCUMENT IN ANYWAY.
ALTERATIONS MUST HAVE THE SEAL AFFIXED ALONG WITH A DESCRIPTION OF THE ALTERATIONS, DATE, AND ARCHITECT'S/ENGINEER'S/LANDSCAPE ARCHITECT'S SIGNATURE.
ARCHITECTURAL RESOURCES
303 WEST 13TH ST.
NEW YORK, NEW YORK, 10014
Architecture
A
B
C
D
5 4 3 2 1
SA-GL-2025-001
100% BID
DRAWINGS
MJ ENGINEERING, ARCHITECTURE, LANDSCAPE ARCHITECTURE, AND
LAND SURVEYING, P.C.
21 CORPORATE DRIVE
CLIFTON PARK, NEW YORK, 12065
Water Tank Civil Engineer
CVR
COVER
SHEET
04.10.2026
BS
JG
JG
BS
GRAFTON LAKES STATE PARK
254 GRAFTON LAKES STATE PARK
WAY, GRAFTON, NY 12082
BEACH AREA SITE IMPROVEMENTS
1 Revision to drawing title. 06/02/2026
AFahrner Stamp
ADD ALTERNATE #1
SEE NOTE
8.00'
8.00'
6.0 0'
30.00'
13.00'
10.00'
8.00'
8.00'
8.00'
6.0 0'
24.00'
30.00'
ALIGN TO
EXISTING WALKWAY
2.00' 3.00'
R75.00'
R40.00'
12.00'
MEET EXISTING
WALKWAY
R2.50'
R2.50'
6.00'
9.00'
R2 .00
R2 .00
R12 .00
R10.00'
R2.50'
8.00'
8.7 2'
12.26'
R10.00' R10.00'
±0.93'
R2.50'
R2.50'
R12.00'
R14.00'
R8.00'
6.0 0'
6.0 0'
5.0 0'
5.0 0'
CENTER STAIRS
ON DOORWAY
CENTER STAIRS
ON DOORWAY
8.0 0'
R40.00'
.88
.87
R2.5 0'
R2 .50
R2.50'
MINIMUM OFFSET FROM
CORNER OF BUILDING 1.00'
11.00'
CENTER ENTRY WALK ON
DOORWAY AND RUN
CENTERLINE OF WALKWAY
PERPENDICULAR TO THIS
BUILDING FACE
10.00'
USE THIS BUILDING FACE TO
ESTABLISH CENTERLINE OF WALKWAY
AND MAINTAIN CENTERLINE PARALLEL
ALIGN EDGE OF PAD
TO CORNER OF
BUILDING
R2 .50
ALIGN EDGE OF
WALKWAY TO CORNER
OF BUILDING
25.00'
.00
ALIGN EDGE OF
CONCRETE PAD AND
BEGINNING OF
SIDEWALK PARALLEL
TO THIS BUILDING
FACE
R20.00' L25.07'
R410.00 L70.37
R410.00 L105.33
38.24'
5.17' (+/-)
R130.00' L87.53'
R26.50' L37.25'
R100.00' L113.57'
R100.00' L38.03'
ALIGN CONCRETE PAD
PARALLEL AND
PERPENDICULAR TO
THIS BUILDING FACE
CENTERLINE SHOULD
FOLLOW APPROXIMATE
ALIGNMENT OF EXISTING
PATH
R2.50'
22.00'
5.0 0'
R2.50'
R2.50'
R2.50'
EXISTING
CORNER OF
CONCRETE
PAD
ALIGN EDGE
OF ENTRY
WALK TO
CORNER OF
BUILDING
R76.00' L50.00'(+/-)
USE BUILDING
CORNER TO
ESTABLISH
CENTERLINE OF
CIRCULAR WALKWAY
.00
.00
CENTER
TREE PIT ON
BUILDING
FACE
CENTER
TREE PIT ON
BUILDING
FACE
CENTER SIGNS ON
PARKING STALLS, TYP.
10.00'
10.00'
.00
12.00'
R2.50'
R2.50'
8.00'
4.0 0'
1.00' 12.00'
16.00'
16.00'
20.00'
4.0 0'
15.00'
EQ
EQ
ALIGN EDGE OF
DRIVE TO CORNER
OF PAD
8.00'
3.50'
26.00'
10.00'
3.50'
.50
SET BENCHES 3'
APART AND
CENTERED IN PAD
CENTER BENCH
IN PAD
PLACE BENCHES 2'
APART AND CENTER
ON BUILDING FACE
CENTER BENCHES ON
PAD AND SPACE EVENLY
POINT OF TANGENCY
POINT OF TANGENCY
POINT OF TANGENCY
CENTER BLOCK
BETWEEN SHOWERS
CENTER BLOCKS
AND ALIGN WITH
CORNERS
8.00'
MEET EXISTING WALKWAY
ALIGN BLOCKS
TO CORNER
9.00'
12.00'
12.
00'
R52.00' L15.50'(+/-)
R2.50' R2.50'
POINT OF
TANGENCY
POINT OF
TANGENCY
MEET EXISTING
WALKWAY
MEET EXISTING
WALKWAY 5.0
0'
2.0 0'
3.00'
2.0 0' 5.00'
3.00'
3.00'
3.00'
3.00'
3.00'
3.00'
3.00'
2.00'
5.0 0'
2.00'
0 20' 40'
Scale: 1" = 20'-0"
NORTH
MA
TC
HL
IN
E, 2/
L-
2 LAYOUT NOTES
1. GENERAL CONTRACTOR SHALL NOTIFY ALL UTILITY OWNERS HAVING UNDERGROUND UTILITIES
ON SITE PRIOR TO EXCAVATION.
2. CONTRACTOR SHALL CONTACT UTILITY LOCATING COMPANY AND LOCATE ALL UTILITIES PRIOR
TO ANY EXCAVATION.
3. VERIFY DIMENSIONS AND ACCEPT CONDITIONS BEFORE PROCEEDING WITH WORK. REPORT
ANY DISCREPANCIES TO LANDSCAPE ARCHITECT BEFORE PROCEEDING.
4. DO NOT SCALE FROM MEASURING DRAWINGS.
5. WALKS, DRIVES AND WALLS TO BE STAKED OUT IN THE FIELD BY A LICENSED SURVEYOR.
6. LAYOUT DIMENSIONS AND RADII TO WALLS, CURBS, AND OTHER FEATURES ARE TO EXPOSED
FACES UNLESS OTHERWISE NOTED.
7. PATH CENTERLINES TO BE LAID OUT WITH SMOOTH TANGENTIAL CURVES.
8. ALL PAVEMENT RADII ARE 5' UNLESS OTHERWISE NOTED ON PLAN.
9. INSTALL SIGNS PER MUTCD Sec. 2A.18. SIGN LOCATIONS TO BE STAKED OUT BY CONTRACTOR
AND APPROVED BY OWNER PRIOR TO INSTALLATION. SIGNS TO BE LOCATED A MINIMUM OF
TWO FEET FROM ALL PAVEMENT EDGES.
10. REFERENCE COORDINATE SYSTEM ARE REFERENCED TO THE NEW YORK STATE PLANE
COORDINATE SYSTEM, (NAD83-NY EAST ZONE) UTILIZING GNSS OBSERVATIONS ON THE NYSDOT RTN NETWORK, NAVD88, GEOID 18, AS INDICATED IN THE "EXISTING CONDITIONS" DRAWINGS
COMPLETED BY LABELLA (2024), ELEVATIONS REFERENCED TO NAVD88.
11. ADD ALTERNATE 1 INCLUDES ALL DEMOLITION, TREE REMOVAL, GRADING, AND CONSTRUCTION
OF THE NEW PAVEMENT AND CONCESSIONS BUILDING PARKING WITHIN THE BOUNDARY. ADD
ALTERNATE 1 DOES NOT INCLUDE UTILITY WORK, LIGHTING, AND SIGNAGE.
LAYOUT LEGEND
KEY DETAIL
CONTRACT LIMIT LINE
Description Date:
REVISIONS
Rev No
Drawn By:
Design By:
Checked By:
Date:
Approved By:
Sheet:Project Number:
Sheet Title: Drawing Number:
FISHER ASSOCIATES
1001 W. SENECA ST. STE. 201
ITHACA, NEW YORK 14850
Landscape Architecture/ Civil Engineering
Project Title:
Project Location:
Governor Kathy Hochul Acting Commissioner Kathy Moser
19 Roosevelt Drive Saratoga Springs, NY 12866
(518) 584-2000 Regional Director: Alane Ball Chinian
NYS Parks, Recreation, and Historic Preservation Saratoga-Capital Region:
ENCORUS GROUP
23 MECHANIC ST.
SPRINGVILLE, NEW YORK, 14141
MEP Engineering
Seal and Signature
IT IS A VIOLATION OF STATE EDUCATION LAW FOR ANY PERSON, UNLESS UNDER THE DIRECTION OF A LICENSED ARCHITECT/ENGINEER/LANDSCAPE ARCHITECT TO ALTER THIS DOCUMENT IN ANYWAY.
ALTERATIONS MUST HAVE THE SEAL AFFIXED ALONG WITH A DESCRIPTION OF THE ALTERATIONS, DATE, AND ARCHITECT'S/ENGINEER'S/LANDSCAPE ARCHITECT'S SIGNATURE.
ARCHITECTURAL RESOURCES
303 WEST 13TH ST.
NEW YORK, NEW YORK, 10014
Architecture
A
B
C
D
5 4 3 2 1
SA-GL-2025-001
100% BID
DRAWINGS
MJ ENGINEERING, ARCHITECTURE, LANDSCAPE ARCHITECTURE, AND
LAND SURVEYING, P.C.
21 CORPORATE DRIVE
CLIFTON PARK, NEW YORK, 12065
Water Tank Civil Engineer
L-101
LAYOUT
PLAN (1 of 2)
04.10.2026
BS
LS
LS
BS
GRAFTON LAKES STATE PARK
254 GRAFTON LAKES STATE PARK
WAY, GRAFTON, NY 12082
BEACH AREA SITE IMPROVEMENTS
1 Sign locations revised 05/19/2026
A4 L-601
ASPHALT PATCH
B1 L-601
ADA PARKING SIGNS
A2 L-601
MEDIUM DUTY CONCRETE
C3 L-601
QUARRY BLOCK BENCH
B3 L-601
ADA PAVEMENT MARKING
(2) 25' FLAG POLES, SEE SPECIFICATIONS
EXISTING PAVEMENT TO REMAIN, TYP.
5' DIA CAST IRON TREE
GRATE, SEE
SPECIFICATIONS, TYP.
ADD ALTERNATE #1
SEE NOTE
A3 L-601
ASPHALT PAVING - MEDIUM DUTY
A2 L-601
MEDIUM DUTY CONCRETE
SALVAGED BENCH, SEE
SPECIFICATIONS, TYP.
OUTDOOR SHOWERS,
SEE SPECIFICATIONS
EXTENT OF CU
STRUCTURAL SOIL, SEE
SPECIFICATIONS, TYP.
B5 L-601
FLUSH CONCRETE CURB
BENCH, SEE
SPECIFICATIONS, TYP.
C5 L-601
CONCRETE STAIR
D3 L-605
TRENCH DRAIN, TYP.
A5 L-604
UNDERDRAIN, TYP.
C5 L-601
CONCRETE STAIR
A3 L-606
DOMED
GRATE, TYP.
A2 L-603
S15, SIGN TYPE P1
A3 L-603
S2, SIGN TYPE P2
B5 L-603
S8, SIGN TYPE P3 - FOUR POSTS
D3 L-603
S10, BUILDING
MOUNTED
SIGN (BMS)
S14, BMS, TYP.
S13, BMS, TYP.
S12, BMS, TYP.
S11, BMS, TYP.
S6, PORTABLE SIGN,
FRAME PROVIDED
BY OWNER
S7, PORTABLE SIGN,
FRAME PROVIDED BY OWNER
S7B, PORTABLE SIGN,
FRAME PROVIDED BY OWNER
S1, SIGN TYPE P1, TYP.
S16, SIGN TYPE P2, TYP.
S3, SIGN TYPE P3 -
FOUR POSTS, TYP.
S4, SIGN TYPE P3 -
FOUR POSTS, TYP.
B2 L-603
S9, SIGN TYPE P3 -
ONE POST
S5, SIGN TYPE P3 -
ONE POST, TYP.
REINSTALL SALVAGED FOUNTAIN,
SEE SPECIFICATIONS
B5 L-605
SHOWER DRAIN, TYP.
SHOWER DRAIN, TYP.
0 20' 40'
Scale: 1" = 20'-0"
NORTH
MA
TC
HL
IN
E, 2/
L-
Description Date:
REVISIONS
Rev No
Drawn By:
Design By:
Checked By:
Date:
Approved By:
Sheet:Project Number:
Sheet Title: Drawing Number:
FISHER ASSOCIATES
1001 W. SENECA ST. STE. 201
ITHACA, NEW YORK 14850
Landscape Architecture/ Civil Engineering
Project Title:
Project Location:
Governor Kathy Hochul Acting Commissioner Kathy Moser
19 Roosevelt Drive Saratoga Springs, NY 12866
(518) 584-2000 Regional Director: Alane Ball Chinian
NYS Parks, Recreation, and Historic Preservation Saratoga-Capital Region:
ENCORUS GROUP
23 MECHANIC ST.
SPRINGVILLE, NEW YORK, 14141
MEP Engineering
Seal and Signature
IT IS A VIOLATION OF STATE EDUCATION LAW FOR ANY PERSON, UNLESS UNDER THE DIRECTION OF A LICENSED ARCHITECT/ENGINEER/LANDSCAPE ARCHITECT TO ALTER THIS DOCUMENT IN ANYWAY.
ALTERATIONS MUST HAVE THE SEAL AFFIXED ALONG WITH A DESCRIPTION OF THE ALTERATIONS, DATE, AND ARCHITECT'S/ENGINEER'S/LANDSCAPE ARCHITECT'S SIGNATURE.
ARCHITECTURAL RESOURCES
303 WEST 13TH ST.
NEW YORK, NEW YORK, 10014
Architecture
A
B
C
D
5 4 3 2 1
SA-GL-2025-001
100% BID
DRAWINGS
MJ ENGINEERING, ARCHITECTURE, LANDSCAPE ARCHITECTURE, AND
LAND SURVEYING, P.C.
21 CORPORATE DRIVE
CLIFTON PARK, NEW YORK, 12065
Water Tank Civil Engineer
L-301
MATERIALS
PLAN (1 of 2)
06.01.2026
BS
LS
LS
BS
GRAFTON LAKES STATE PARK
254 GRAFTON LAKES STATE PARK
WAY, GRAFTON, NY 12082
BEACH AREA SITE IMPROVEMENTS
MATERIALS NOTES
1. ADD ALTERNATE 1 INCLUDES ALL DEMOLITION, TREE REMOVAL, GRADING, AND CONSTRUCTION
OF THE NEW PAVEMENT AND CONCESSIONS BUILDING PARKING WITHIN THE BOUNDARY. ADD
ALTERNATE 1 DOES NOT INCLUDE UTILITY WORK, LIGHTING, AND SIGNAGE.
MATERIALS LEGEND
KEY MATERIAL DETAIL
MEDIUM DUTY CONCRETE
ASPHALT PAVING - MEDIUM DUTY
PLANTING BED SOIL
CU STRUCTURAL SOIL EXTENT
QUARRY BLOCK BENCH
BENCH
SALVAGED BENCH
1 Revisions to callouts 06/01/2026
W
W
W
W
ADD ALTERNATE #1
SEE NOTE
±1511.55 (ME)
FFE: 1511.55
EE: 1511.53
1510.28
1510.51
1512.35
1513.10
FFE: 1512.55
TS: 1512.53
FFE: 1512.51
EE: 1512.49
FFE: 1512.58
EE: 1512.56
FFE: 1512.53
EE: 1512.51
FFE: 1512.54
EE: 1512.52
FFE: 1511.97
EE: 1511.95
FFE: 1511.98
EE: 1511.96
FFE: 1512.11
EE: 1512.09
FFE: 1512.02
EE: 1512.00
FFE: 1512.01
TS: 1511.99
FFE: 1511.61
EE: 1511.59
FFE: 1511.54
EE: 1511.52
FFE: 1512.67
FFE: 1512.68
1512.34
1511.98
1506.84
FFE: 1512.67
FFE: 1512.68
BS: 1511.53
(2 STEPS)
±1512.02 (ME)
±1512.08 (ME)
1513.42
1511.77
±1512.43 (ME)
±1513.87 (ME)
BS: 1510.82
(2 STEPS)
1512.48
1513.09
1513.17
1514.15
1512.59 1512.99
1512.77 1512.79
1511.801511.61
1511.81
1511.85
1511.57
1511.46
HP: 1511.63
1510 1511
1511.81
1507.02
4.2
M
AX
±1511.63 (ME)
±1512.48 (ME)
±1512.39 (ME)
±1512.84 (ME)
±1512.61 (ME)
±1513.62 (ME)
±1513.99 (ME)
1511.54
1511.63
1510.16
1511.781511.70
1510.74
1510.63
1510.59
1509.56
1509.76 1510.36
1509.49
±1506.34 (ME)
±1512.06 (ME)
1510.87 1510.90
1510.61
1510.76
1511.55
1510.58 1510.60
1512.35
4.99% MAX SLOPE
1510.86
1510.90
1512.58
1512.68
1512.87
1512.55
1511.50
1511.72
1512.60 1512.60
1513.80
1513.67 1512.01
1512.21
1512.061512.24
1512.02
1512.10
1512.10
1512.42
1512.12
1512.18 1511.89
1511.59
1511.59
1512.51
±1512.07 (ME)
1511.46
1510.76
1512.02
1512.20
1511.84
±1512.12 (ME)
±1512.03 (ME)
1510.66 1510.52
1511.51
1510.42
1509.74
1509.58
1510.28 1510.46
1510.60
1511.56
1512.00
1511.69
1507.39
1511.52
1512.16
1511.91
1511.70
1512.00
1512.42
1511.87 1511.79
1511.29
1511.25
1511.44
1512.42
EX:1511.01
1510.97 1510.83
1511.78
HP:1512.801512.58
+- 1512.28 +- 1512.50
2.0%
SW
ALE
2.0%
SWALE
1510.46
1510.79
1510.51
1510.75
1511.70
1511.87
1510.42
LP:1511.67
LP:1512.32
match existing grade match existing grade
HPS:
1512.35
1511.13
1510.49 1510.03
1510.65
1510.90 1510.85
1511.75
1511.83 1511.28
1511.15
1511.70 1511.81
1511.83
1511.97 1511.95
1512.25 1512.37
1512.66 1512.59
1512.40 1512.30
1512.50
1512.38
1513.42
1510.81
1510.82
1510.67
1511.93
1511.67
1511.96
1510.79
1513.90
1512.06
±1512.56 (ME)
1511.81
1510.37
1510.68
1510.73 1510.81
1507.21 match existingmatch existing
1507.21
1506.77
1506.72
1507.12 1506.97
1506.83
1506.89
1507.41
1506.62
1509.38
±1512.61 (ME)
±1511.96 (ME)
±1509.55 (ME)
1506.74
±1509.78 (ME)
1512.40
1512.19
1512.49
1507.67
1511.57
1507.11
1507.09
1506.97
1506.86
1507.05
1506.92
EQUAL ELEVATION ±1
4"
(PARKING LOT/FLUSH CURB AND NEW WALK)
EQUAL ELEVATION ±1
4"
(PARKING LOT/FLUSH CURB AND NEW WALK)
0 20' 40'
Scale: 1" = 20'-0"
NORTH
GRADING NOTES
1. GENERAL CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES HAVING
UNDERGROUND UTILITIES ON SITE OR IN RIGHT-OF-WAY PRIOR TO
EXCAVATION. CONTRACTOR SHALL CONTACT UTILITY LOCATING COMPANY
AND LOCATE ALL UTILITIES PRIOR TO GRADING START.
2. SITE GRADING SHALL NOT PROCEED UNTIL EROSION CONTROL MEASURES
HAVE BEEN INSTALLED.
3. GRADING AROUND EXISTING TREES TO BE MINIMIZED. SEE TREE PROTECTION
DETAILS.
4. MINIMIZE IMPACT TO EXISTING, REMAINING LANDSCAPE WHILE EXCAVATING.
GREAT CARE IS TO BE TAKEN TO AVOID DISTURBING ROOTS OF EXISTING
TREES. HAND EXCAVATION WILL BE REQUIRED WHERE EXISTING TREE
ROOTS ARE PRESENT OR IN LOCATIONS NEXT TO BUILDINGS.
5. ALL EXISTING UTILITY COVERS AND GRATES WITHIN THE AREA OF
DISTURBANCE ARE TO BE ADJUSTED TO MEET PROPOSED GRADES.
6. MATCH EXISTING GRADE AT ALL EDGES WHERE PROJECT WORK MEETS
EXISTING SITE.
7. SEE ELECTRICAL DRAWINGS FOR PROPOSED ELECTRICAL WORK.
8. ALL WALKWAYS TO HAVE A MAXIMUM 1.99% CROSS SLOPE.
9. ALL ADA ACCESSIBLE ROUTES INDICATED ON PLANS TO HAVE A MAXIMUM
4.99% RUNNING SLOPE AS REQUIRED BY CODE.
10. ADD ALTERNATE 1 INCLUDES ALL DEMOLITION, TREE REMOVAL, GRADING, AND
CONSTRUCTION OF THE NEW PAVEMENT AND CONCESSIONS BUILDING PARKING WITHIN THE
BOUNDARY. ADD ALTERNATE 1 DOES NOT INCLUDE UTILITY WORK, LIGHTING, AND SIGNAGE.
± XXXX.XX
XXXX.XX
EXISTING CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED CONTOUR
CONTRACT LIMIT LINE
GRADE BREAK
PROPOSED SPOT ELEVATION
EXISTING SPOT ELEVATION
CATCH BASIN
FFE = FINISHED FLOOR ELEVATION
EE = ENTRY ELEVATION
TS = TOP OF STAIR
BS = BOTTOM OF STAIR
HP = HIGH POINT
LP = LOW POINT
ME = MATCH EXISTING
GRADING LEGEND
MA
TC
HL
IN
E, 2/
L-
Description Date:
REVISIONS
Rev No
Drawn By:
Design By:
Checked By:
Date:
Approved By:
Sheet:Project Number:
Sheet Title: Drawing Number:
FISHER ASSOCIATES
1001 W. SENECA ST. STE. 201
ITHACA, NEW YORK 14850
Landscape Architecture/ Civil Engineering
Project Title:
Project Location:
Governor Kathy Hochul Acting Commissioner Kathy Moser
19 Roosevelt Drive Saratoga Springs, NY 12866
(518) 584-2000 Regional Director: Alane Ball Chinian
NYS Parks, Recreation, and Historic Preservation Saratoga-Capital Region:
ENCORUS GROUP
23 MECHANIC ST.
SPRINGVILLE, NEW YORK, 14141
MEP Engineering
Seal and Signature
IT IS A VIOLATION OF STATE EDUCATION LAW FOR ANY PERSON, UNLESS UNDER THE DIRECTION OF A LICENSED ARCHITECT/ENGINEER/LANDSCAPE ARCHITECT TO ALTER THIS DOCUMENT IN ANYWAY.
ALTERATIONS MUST HAVE THE SEAL AFFIXED ALONG WITH A DESCRIPTION OF THE ALTERATIONS, DATE, AND ARCHITECT'S/ENGINEER'S/LANDSCAPE ARCHITECT'S SIGNATURE.
ARCHITECTURAL RESOURCES
303 WEST 13TH ST.
NEW YORK, NEW YORK, 10014
Architecture
A
B
C
D
5 4 3 2 1
SA-GL-2025-001
100% BID
DRAWINGS
MJ ENGINEERING, ARCHITECTURE, LANDSCAPE ARCHITECTURE, AND
LAND SURVEYING, P.C.
21 CORPORATE DRIVE
CLIFTON PARK, NEW YORK, 12065
Water Tank Civil Engineer
L-401
GRADING
PLAN (1 of 2)
04.10.2026
BS
AF
AF
BS
GRAFTON LAKES STATE PARK
254 GRAFTON LAKES STATE PARK
WAY, GRAFTON, NY 12082
BEACH AREA SITE IMPROVEMENTS
1 Note about flush curbs added 05/19/2026
2" M
IN
. C
LR
SPECIFIED JOINT FILLER
1/2" x 24" DOWEL W/ PLASTIC
SLEEVE AT 18" O.C.
CONCRETE PAVEMENT, DEPTH
VARIES.HAUNCH CONCRETE AS
NECESSARY TO ACHIEVE
MINIMUM CLEARANCE
SUBBASE
COMPACTED SUBGRADE
1" DEEP TOOL JOINT (TJ) W/ 14"
RADIUS
SPECIFIED REINFORCEMENT
EXPANSION JOINT (EJ) &
CONSTRUCTION JOINT (CJ)
TOOL JOINT
(TJ)
BACKER ROD
2" EXPANSION JOINT WITH
SEALANT
SAWCUT RESURFACE LIMIT LOCATION AS
SHOWN ON PLANS
BITUMINOUS SEALER
EXISTING ASPHALT
EXISTING SUBBASE
TOP COURSE PER ASPHALT PAVING DETAIL
1'-6"
SUBBASE COURSE - DEPTH PER ASPHALT
PAVING DETAIL OR PER EXISTING SUBBASE,
WHICHEVER IS DEEPER
NEW ADJACENT FULL DEPTH ASPHALT
PER ASPHALT DETAIL
11 2"
NYSDOT 9.5 F3 TOP COURSE, 80 SERIES
COMPACTION
SUBBASE. EXTEND 12" PAST THE EDGE OF
PAVEMENT
COMPACTED SUBGRADE
11 2" 8"
3"
SEPARATION FABRIC TO WRAP 24" PAST EDGE
OF SUBBASE UNDER ASPHALT.
TAMP EDGES
NYSDOT 19 F9 BINDER COURSE, 80 SERIES
COMPACTION
1'-0"1'-0"
CONCRETE
6 x 6 - W2.9 x W 2.9 WELDED WIRE MESH.
FLAT SHEETS SET ON CHAIRS.
2" MINIMUM CONCRETE COVERAGE ON
ALL SIDES.
COMPACTED SUBGRADE
WIDTH AS SHOWN ON PLAN
CROSS SLOPE AS SHOWN
ON GRADING PLAN
5" 8"
3"
COMPACTED SUBBASE
NOTES:
1. SEE PLANS FOR LOCATION AND TYPE OF SCORE JOINTS.
2. BROOM PERPENDICULAR TO LINE OF TRAFFIC.
WIDTH AS SHOWN ON PLAN
TOOLED EDGE AROUND EACH SCORE JOINT
AND EACH EXPANSION JOINT
W
ID
TH
A
S
SH
OW
N
ON
P
LA
N
MEDIUM BROOM FINISH. BROOM
PERPENDICULAR TO LINE OF TRAFFIC.
NOTES:
1. REFER TO LAYOUT PLAN FOR TRAFFIC SIGN LAYOUT.
45.0°
'-0
MI
N.
9'-0"
MIN.
9'-0"
MIN.
9'-0"
MIN.
2'-0
2'- 0"
TRAFFIC BLUE PAINT
TRAFFIC WHITE PAINT
NYS DYNAMIC ACCESSIBILITY SYMBOL MARKING
TRAFFIC WHITE 4" WIDE PAINT LINE TYP.
BACK OF CURB
"NO PARKING" SIGNS ALIGN CENTERED ON SPACE AS
SHOWN ON PLANS
ADA PARKING SIGNS ALIGN CENTERED ON SPACE AS
SHOWN ON PLANS
8"
4'-0" 2'-0"
B5 L-601
FLUSH CONCRETE CURB
6'- 0"
RESERVED
PARKING
3'- 0"
7'- 0"
C
LE
AR
NOTES:
1. ADA SIGNS TO BE REMOVED FROM EXISTING POSTS AND REUSED ON NEW POSTS.
2. IF SIGNS ARE IN POOR CONDITION, CONTRACTOR SHALL PROVIDE ADA PARKING SIGNS, AS PER CODE
REQUIREMENTS.
3. POSTS AND MOUNTING HARDWARE SHALL BE GALVANIZED TAMPER RESISTANT BOLTS, LENGTH AS
NECESSARY.
GALVANIZED 2LB/FT U-CHANNEL
POSTWITH BREAKAWAY BASE
ADJACENT SURFACE
8" Ø CONCRETE FOOTING
(2,500 MIN. PSI)
DYNAMIC ACCESSIBLE SYMBOL
4'- 0"
RESERVED
PARKING
VAN
ACCESSIBLE
BACKER ROD
BUILDING FOUNDATION
D D/
CONCRETE PAVEMENT, DEPTH VARIES.
HAUNCH CONCRETE AS SHOWN TO RECEIVE
DOWEL
EXPANSION JOINT
2" EXPANSION JOINT WITH SEALENT
6 x 6 - W2.9 x W 2.9 WELDED WIRE MESH.
FLAT SHEETS SET ON CHAIRS.
2" MINIMUM CONCRETE COVERAGE ON
ALL SIDES.
NOTES:
1. LENGTH OF BLOCK SEGMENTS VARIES, REFER TO MATERIAL PLANS AND SPECIFICATIONS FOR SIZES.
2. ALL VERTICAL EXPOSED FACES TO BE SPLIT FACE. TOP TO BE SAWN AND SANDBLASTED.
3. SAW CUT ABUTTING FACES TO ACHIEVE 12" JOINT, TOOL EDGES TO PROVIDE SMOOTH CONTINUOUS
SURFACE AT JOINTS.
1'6
1- 0"
OVERALL LENGTH VARIES, SEE SPECIFICATIONS
3"
3"
2" MAX
1- 6"
3" M
IN
12" SUITABLE FILL
LIMESTONE QUARRY BLOCK
SAW CUT TO ACHIEVE 12" MAX JOINT (±1
8").
HAND TOOL EXPOSED EDGES TO ACHIEVE
TIGHT FIT AND APPEARANCE. EXPOSED
SAWN FACES SHALL NOT BE PERMITTED.
EMBED 3" BELOW FINISHED GRADE, MIN.
1" LIMESTONE SCREENING LEVELING COURSE
GEOTEXTILE SEPARATION FABRIC12" SUITABLE FILL
LIMESTONE QUARRY
BLOCK
1" LIMESTONE
SCREENING
LEVELING COURSE
GEOTEXTILE
SEPARATION FABRIC
LIMESTONE SCREENING
JOINT, 12" MAX WIDTH
ADJACENT LAWN OR
PLANTING
COMPACTED SUBGRADE
SUBGRADE
FINISHED GRADE
1'- 0"
7" MIN
6"
6"
ADJACENT PAVING
1/2" RADIUS, 1/4" MAX. REVEAL
ADJACENT PAVING OR PLANTING
CONCRETE CURB
COMPACTED SUBBASE
COMPACTED SUBGRADE
EQUAL ELEVATION ±1
4"
2.0%
8"
1'-0"
7"
(3) #4 REBAR
4500 PSI CONCRETE FOOTER
COMPACTED SUBGRADE
8"
EXPANSION JOINT
#4 EPOXY COATED NOSING BAR
ADJACENT BUILDING
6" COMPACTED SUBBASE
4'- 0"
MI
N.
T
YP
A1 L-601
CONCRETE JOINTS
#4 SUPPORT BARS 12" OC.
#4 REBAR 12" O.C. HORIZONTAL
#5 REBAR, 12" O.C. VERT.
#5 @ 12" O.C.
#4 @ 12" O.C.
1/2" X 24" DOWEL W/PLASTIC SLEEVE AT 18" O.C.
1" = 1'-0"
CONCRETE JOINTSA11" = 1'-0"
ASPHALT PATCHA4 1" = 1'-0"
ASPHALT PAVING - MEDIUM DUTYA3 1" = 1'-0"
MEDIUM DUTY CONCRETEA2
1/8" = 1'-0"
ADA PAVEMENT MARKINGB3 1/4" = 1'-0"
ADA PARKING SIGNSB13/4" = 1'-0"
CONCRETE SIDEWALK BROOM FINISHB41" = 1'-0"
FLUSH CONCRETE CURBB5
1" = 1'-0"
QUARRY BLOCK BENCHC31" = 1'-0"
EXPANSION JOINT AT BUILDING THRESHOLDC41/2" = 1'-0"
CONCRETE STAIRC5
Description Date:
REVISIONS
Rev No
Drawn By:
Design By:
Checked By:
Date:
Approved By:
Sheet:Project Number:
Sheet Title: Drawing Number:
FISHER ASSOCIATES
1001 W. SENECA ST. STE. 201
ITHACA, NEW YORK 14850
Landscape Architecture/ Civil Engineering
Project Title:
Project Location:
Governor Kathy Hochul Acting Commissioner Kathy Moser
19 Roosevelt Drive Saratoga Springs, NY 12866
(518) 584-2000 Regional Director: Alane Ball Chinian
NYS Parks, Recreation, and Historic Preservation Saratoga-Capital Region:
ENCORUS GROUP
23 MECHANIC ST.
SPRINGVILLE, NEW YORK, 14141
MEP Engineering
Seal and Signature
IT IS A VIOLATION OF STATE EDUCATION LAW FOR ANY PERSON, UNLESS UNDER THE DIRECTION OF A LICENSED ARCHITECT/ENGINEER/LANDSCAPE ARCHITECT TO ALTER THIS DOCUMENT IN ANYWAY.
ALTERATIONS MUST HAVE THE SEAL AFFIXED ALONG WITH A DESCRIPTION OF THE ALTERATIONS, DATE, AND ARCHITECT'S/ENGINEER'S/LANDSCAPE ARCHITECT'S SIGNATURE.
ARCHITECTURAL RESOURCES
303 WEST 13TH ST.
NEW YORK, NEW YORK, 10014
Architecture
A
B
C
D
5 4 3 2 1
SA-GL-2025-001
100% BID
DRAWINGS
MJ ENGINEERING, ARCHITECTURE, LANDSCAPE ARCHITECTURE, AND
LAND SURVEYING, P.C.
21 CORPORATE DRIVE
CLIFTON PARK, NEW YORK, 12065
Water Tank Civil Engineer
L-601
SITE
DETAILS
06.01.2026
BS
AF
AF
BS
GRAFTON LAKES STATE PARK
254 GRAFTON LAKES STATE PARK
WAY, GRAFTON, NY 12082
BEACH AREA SITE IMPROVEMENTS
1 Revisions to details - C5, C4, B5, B3, B1, A2 05/19/2026
NOTES:
1. PLANT AT SAME DEPTH AS PREVIOUSLY PLANTED IN NURSERY OR CONTAINER
2. PROVIDE COMPACTED BASE UNDER ROOT BALL ONLY TO PREVENT SETTLING
3. ENTIRE BED TO BE EXCAVATED AND BACKFILLED WITH PLANTING MIX
4. PLACE SOILS IN LIFTS PER SPECIFICATIONS
5. COMPACT PLACED SOILS PER SPECIFICATIONS
SHREDDED BARK MULCH,
EXTENT OF BEDLINE,
-4" FOR SHRUBS
-3" FOR PERENNIALS AND
BULBS
UNTIE AND ROLL BACK
BURLAP FROM MIN. 1/3 OF
ROOT BALL. SYNTHETIC
WRAP IS UNACCEPTABLE.
CUT WIRE BASKETS AND
REMOVE.
SPECIFIED PLANTING SOIL
OR STRIPPED AND
STOCKPILED NATIVE SOIL.
SPADED BED EDGE
UNDISTURBED SUBGRADE
" M
IN
, S
EE
S
OI
L
AN
D
MU
LC
H
PL
AN
SCARIFY SIDES AND
BOTTOM OF HOLE TO
PREVENT GLAZING OF
SUBGRADE.
PLANT CENTER
ON CENTER (O.C.) SPACING
ROW SPACING
'D'
'D'
'D'
'D' = O.C. SPACING AS INDICATED IN
THE PLANT SCHEDULE
60°
PLANT SPACING
RO
W
SP
AC
IN
G
PLANT CENTER
STAGGER ROWS UNLESS INDICATED
OTHERWISE ON PLANS
8' WIDE MINIMUM ROOT PROTECTION MATS
TREE PROTECTION FENCE
NOTES:
1. IN LOCATIONS WHERE VEHICULAR TRAFFIC
WILL OCCUR OVER CRITICAL ROOT ZONE
(CRZ), CONTRACTOR SHALL PROVIDE ROOT
PROTECTION MATS AS SHOWN.
PRUNE TREE BRANCHES THAT OBSTRUCT
CONSTRUCTION ACTIVITY BY CERTIFIED
ARBORIST.
5" SHREDDED BARK MULCH INSIDE OF TREE
PROTECTION FENCE
8"-12" SHREDDED BARK MULCH ON VEHICULAR
ROAD
SEPARATION FABRIC
KEEP OUT
TREE
PROTECTION
AREA
5" THICK LAYER OF MULCH. KEEP MULCH 4"
FROM TRUNK OF TREE.4'-
0" 2'-
0"
6' MIN.
EXTEND OUT TO DRIPLINE
OR AS INDICATED ON DEMOLITION PLAN.
TREE PROTECTION FENCE: 4' HIGH
GALVANIZED CHAIN LINK MESH SET WITH
DRIVEN 2"Ø X 6' L GALVANIZED STEEL POSTS
MAINTAIN EXISTING GRADE WITH
TREE PROTECTION FENCE
18" x 24" SIGN LAMINATED IN PLASTIC SPACED
EVERY 50' ALONG FENCE. MINIMUM OF 1 PER
TREE PROTECTION AREA.
NOTES:
1. TREE PROTECTION TO BE PLACED AROUND
SINGLE TREES OR GROUPS OF TREES AS
SHOWN ON PLAN.
10' MAX.
KEEP OUT
TREE
PROTECTION
AREA
PLANTING MIX TO EXTEND
FULL WIDTH OF TREE PIT
3'- 0"
SEE SOILS PLAN FOR EXTENTS
OF STRUCTURAL SOIL
NOTES:
1. PLACE SOILS IN LIFTS PER SPECIFICATIONS
2. COMPACT PLACED SOILS PER SPECIFICATIONS
DUCKBILL UNDERGROUND TREE
STAKING SYSTEM
STRUCTURAL SOIL
SEPARATION FABRIC
UNTIE AND ROLL BACK BURLAP FROM
MIN. 1/3 OF ROOT BALL. SYNTHETIC
WRAP IS UNACCEPTABLE. CUT WIRE
BASKETS AND REMOVE.
SPECIFIED PLANTING MIX:
CAST IRON TREE GRATE. 72" ROUND
MODEL # R-8880-A. INSTALL PER
MANUFACTURERS SPECIFICATIONS
12" X 8" CONCRETE BORDER CONTINUOUS
AROUND TREE GRATE
ADJACENT PAVEMENT, SEE PLANS
4" SPECIFIED SHREDDED BARK MULCH.
KEEP MULCH AWAY FROM TRUNK AND
TRUNK FLARE.
PLANT SHALL BE SET AT OR SLIGHTLY ABOVE
THE ESTABLISHED FINISH GRADE
4" SPECIFIED SHREDDED BARK MULCH
UNTIE AND ROLL BACK BURLAP FROM 1/3 MIN.
OF ROOT BALL. SYNTHETIC WRAP IS
UNACCEPTABLE. CUT AND REMOVE
EVERYTHING EXCEPT BURLAP.
SPECIFIED PLANTING SOIL
SPADE EDGE OF MULCH PERIMETER
SCARIFY SIDES AND BOTTOM OF TREE PIT TO
PREVENT GLAZING OF SUBGRADE.
3X WIDTH OF ROOT BALL (7' MIN.)
KEEP MULCH AWAY FROM TRUNK AND TRUNK
FLARE
PRUNE AND REMOVE DEAD AND BROKEN
BRANCHES
BOTTOM OF ROOT BALL TO SIT ON
UNDISTURBED SUBSOIL OR COMPACTED
PLANTING SOIL TO PREVENT FUTURE
SETTLING OF TREE
ADJACENT SURFACE VARIES, SEE LANDSCAPE
PLANS
NOTES:
1. PLACE SOILS IN LIFTS PER SPECIFICATIONS
2. COMPACT PLACED SOILS PER SPECIFICATIONS
WOOD STAKES WITH FLEXIBLE TIES. SEE
SPECIFICATIONS.
1/2" = 1'-0"
SHRUB AND PERENNIAL PLANTINGA2 1/2" = 1'-0"
SHRUB AND PERENNIAL SPACINGA1
1/4" = 1'-0"
ROOT PROTECTIONB5
1/4" = 1'-0"
TREE PROTECTION - CHAINLINK WITH MULCHA5
1/2" = 1'-0"
TREE PLANTING IN STRUCTURAL SOIL WITH TREE GRATE B3 1/2" = 1'-0"
TREE PLANTINGB2
Description Date:
REVISIONS
Rev No
Drawn By:
Design By:
Checked By:
Date:
Approved By:
Sheet:Project Number:
Sheet Title: Drawing Number:
FISHER ASSOCIATES
1001 W. SENECA ST. STE. 201
ITHACA, NEW YORK 14850
Landscape Architecture/ Civil Engineering
Project Title:
Project Location:
Governor Kathy Hochul Acting Commissioner Kathy Moser
19 Roosevelt Drive Saratoga Springs, NY 12866
(518) 584-2000 Regional Director: Alane Ball Chinian
NYS Parks, Recreation, and Historic Preservation Saratoga-Capital Region:
ENCORUS GROUP
23 MECHANIC ST.
SPRINGVILLE, NEW YORK, 14141
MEP Engineering
Seal and Signature
IT IS A VIOLATION OF STATE EDUCATION LAW FOR ANY PERSON, UNLESS UNDER THE DIRECTION OF A LICENSED ARCHITECT/ENGINEER/LANDSCAPE ARCHITECT TO ALTER THIS DOCUMENT IN ANYWAY.
ALTERATIONS MUST HAVE THE SEAL AFFIXED ALONG WITH A DESCRIPTION OF THE ALTERATIONS, DATE, AND ARCHITECT'S/ENGINEER'S/LANDSCAPE ARCHITECT'S SIGNATURE.
ARCHITECTURAL RESOURCES
303 WEST 13TH ST.
NEW YORK, NEW YORK, 10014
Architecture
A
B
C
D
5 4 3 2 1
SA-GL-2025-001
100% BID
DRAWINGS
MJ ENGINEERING, ARCHITECTURE, LANDSCAPE ARCHITECTURE, AND
LAND SURVEYING, P.C.
21 CORPORATE DRIVE
CLIFTON PARK, NEW YORK, 12065
Water Tank Civil Engineer
L-602
SITE
DETAILS
04.10.2026
BS
AF
AF
BS
GRAFTON LAKES STATE PARK
254 GRAFTON LAKES STATE PARK
WAY, GRAFTON, NY 12082
BEACH AREA SITE IMPROVEMENTS
1 Revision to structural soil arrow 06/01/2026
| 00-D006603-04_Addendum_2 |
| 01-015000_ConstructionFacilitiesTemporaryControls_060226 |
| 1.1 PROJECT CONDITIONS |
| A. Provide construction facilities and temporary controls necessary for the Work. |
| 1.2 TEMPORARY LIGHT AND POWER |
| A. Electric energy for temporary light and power will not be made available at the Project Site. Provide portable electric source as required for the Work. |
| B. Provide temporary wiring and equipment in conformance with the National Electrical Code. |
| 1.3 TEMPORARY WATER |
| A. Water will not be made available at the Project Site. Provide temporary water source as required for the Work. |
| B. Prevent waste of water. |
| 1.4 TEMPORARY TOILETS |
| A. Provide temporary toilet facilities for Contractor’s and subcontractors employees engaged on the project. Locate toilets where directed and maintain them in a sanitary condition. |
| 1. Locate toilet facilities no more than 1000 feet from any work location. |
| a. Exception: Mobile crews having readily available transportation to nearby toilet facilities. |
| 1.5 BARRIERS AND ENCLOSURES |
| A. Provide barriers during performance of the Work to: |
| 1. Prevent unauthorized entry to work areas. |
| 2. Allow for State’s access to the Site. |
| 3. Protect existing facilities and adjacent properties from damage. |
| 4. Protect vehicular and pedestrian traffic. |
| 1.6 PROTECTION OF WORK AND EXISTING PROPERTY |
| A. Protect installed Work and existing construction and finishes during performance of the Work. |
| B. Maintain the building in a watertight condition during performance of the Work. |
| C. Provide temporary and removable protection for installed products. Control activity in immediate work area to prevent damage. |
| D. Protect existing trees and plants during performance of the Work unless otherwise indicated. Box trees and plants within the grading limit lines. Do not deposit excavated materials or store building materials around trees or plants. Do not attac... |
| E. Prohibit traffic from landscaped areas. |
| F. Cleaning tools of cementitious and other insoluble materials: |
| 1. Do not wash tools in sinks or other sanitary drainage systems. Protect all drainage systems from debris that can clog or damage piping and fixtures. |
| 2. Take all precautions necessary to prevent cementitious and other insoluble materials from flowing into floor drains. |
| 3. Dispose of excess cementitious and other insoluble debris with the other rubbish. |
| 1.7 SECURITY |
| A. Promptly relock doors and security screens located in access routes, storage areas, and work areas after use. |
| 1.8 WATER CONTROLS |
| A. Provide and maintain pumping equipment necessary to keep the work areas free from water. Discharge water into existing storm drainage systems or otherwise disperse as directed. |
| 1.9 FIRE PREVENTION |
| A. Take precautions necessary to prevent fires. |
| B. Fuel for cutting and heating torches shall be gas only and shall be contained in Underwriters Laboratory approved containers. |
| C. Furnish and maintain a currently inspected 20 pound capacity multi-class A B C fire extinguisher in the immediate vicinity where welding tools or torches are in use. |
| D. Furnish and maintain a currently inspected fire extinguisher of the appropriate class and size whenever the temporary storage of materials changes that areas classification of fire load or life safety. |
| 1.10 ACCESS ROADS |
| A. Routes of ingress and egress on the premises to the location of the Work shall be as directed. |
| B. Keep designated access roads clear of dirt and debris resulting from the Work. |
| C. Provide means of removing mud from vehicle wheels before entering paved roads. |
| 1.11 PARKING |
| A. Parking areas shall be where designated by the Director’s Representative. |
| 1. Keep designated parking areas clear of dirt and debris resulting from the Work. |
| 2. Remove ignition key from unattended vehicles and lock doors. |
| 1.12 RUBBISH REMOVAL |
| A. Clean up and containerize the rubbish (refuse, debris, waste materials, and removed materials and equipment) resulting from the Work at the end of each work day and leave work areas broom clean, except where more stringent cleaning is specified. L... |
| B. Remove rubbish from State property at least once a week and more often if the rubbish presents a hazard. Properly dispose of rubbish. |
| C. Burning of rubbish will not be permitted. |
| 1.13 RELOCATION AND REMOVALS |
| A. Should a change in location of any construction facilities and temporary controls be necessary in order to progress the Work properly, remove and relocate such items as directed. |
| B. Remove the construction facilities and temporary controls when they are no longer required. Restore permanent facilities used for or connected to temporary facilities to their original condition or better. |
| PART 2 - PRODUCTS (Not Used) |
| PART 3 - EXECUTION (Not Used) |
| 02-323300 Site Furnishings_060226 |
| 11-COVER SHEET |
| COVER SHEET |
| 12-L101_LAYOUT PLAN |
| L101 LAYOUT |
| 13-L301 MATERIALS |
| L301 MATERIALS |
| 14-L401 GRADING PLAN |
| L401 GRADING |
| 15-L601 SITE DETAILS |
| L601 SITE DETAILS |
| CONCRETE JOINTS(2) |
| ASPHALT PATCH(2) |
| ASPHALT PAVING - MEDIUM DUTY(2) |
| MEDIUM DUTY CONCRETE(2) |
| CONCRETE SIDEWALK BROOM FINISH(2) |
| ADA PAVEMENT MARKING(2) |
| PARKING SIGNS(2) |
| PIN AT BUILDING THRESHOLD(2) |
| QUARRY BLOCK BENCH(2) |
| CONCRETE CURB(2) |
| CONCRETE STAIR DETAIL(2) |
16-L602 SITE DETAILS