This solicitation is for maintenance dredging of the Long Island Intracoastal Waterway Federal Navigation Project at Moriches Bay in Suffolk County, New York. The solicitation includes specifications for dredging an estimated 150,000 cubic yards of material from navigational channels to authorized project depths and transporting dredged material to designated placement areas. Bids are due by 1:00 PM local time on April 20, 2023. The contract is expected to be awarded by May 15, 2023, with work to be completed within 120 calendar days of the notice to proceed. The solicitation is not set aside for small businesses. The agency issuing this solicitation is the Department of the Army Corps of Engineers New York District.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Abstract W912DS23B0015.pdf | ||
| Amendment 0004.pdf | ||
| amendment 0003.pdf | ||
| W912DS23B0015 Amendment 2.pdf | ||
| W912DS23B0015 Amendment 1.pdf | ||
| W912DS23B0015 22June2023 Solicitation.pdf | ||
| c - LIIW23 Plans 230420 reduced.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
New York District THIS IS AN UNRESTRICTED PROCUREMENT AISC CODE 237990
SAFETY PAYS
MAINTENANCE DREDGING
of
LONG ISLAND INTRACOASTAL WATERWAY
FEDERAL NAVIGATION CHANNEL
Solicitation &
Specifications
IFB No. W912DS-23-B-0015
Maintenance Dredging of Long Island Intracoastal Waterway, NY LIIW23
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 00 01 COVER SHEET
00 00 02 CHECK LIST FOR BIDDERS
00 01 15 LIST OF DRAWINGS
00 10 00 SF 1442 AND BIDDING SCHEDULE
00 21 16 INSTRUCTIONS, CONDITIONS, AND NOTICE TO BIDDERS
00 45 00 REPRESENTATION AND CERTIFICATION
00 72 00 CONTRACT CLAUSES
00 90 00 WAGE RATES
00 90 01 LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
00 90 02 WATER QUALITY CERTIFICATES
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 20 00.00 20 PRICE AND PAYMENT PROCEDURES
01 22 00.00 10 MEASUREMENT AND PAYMENT
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 20 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGER SYSTEM (RMS)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 58 00 PROJECT IDENTIFICATION
01 78 00 CLOSEOUT SUBMITTAL
DIVISION 31 - EARTHWORK
31 24 00.00 18 BEACH FILL PLACEMENT
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 20 23 DREDGING
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 00 01
COVER SHEET
PART 1 GENERAL
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
DOCUMENT 00 00 01 Page 1
SECTION 00 00 01
COVER SHEET
PART 1 GENERAL
NEW YORK DISTRICT
CORPS OF ENGINEERS
NEW YORK, NEW YORK 10278-0090
INVITATION FOR BIDS
FOR
MAINTENANCE DREDGING
LONG ISLAND INTRACOASTAL WATERWAY
FEDERAL NAVIGATION CHANNEL
SUFFOLK COUNTY, NEW YORK
1. Attached is INVITATION FOR BIDS (IFB) NO. W912DS-23-B-0015.
2. BIDS MUST SET FORTH full, accurate, and complete information as requested by this Invitation for Bids, including attachments. The penalty for making false statements in bids is prescribed in Title 18, United States Code, Section 1001.
3. SUBMISSION OF BIDS: Complete details concerning proper submission of bids are contained in the INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS (Section 00 21 16).
4. Note the REQUIREMENT FOR AFFIRMATIVE ACTION of the EQUAL OPPORTUNITY clause as it applies to the contract resulting from this solicitation. (See paragraph NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY in Section 00 72 00 of this IFB.)
5. NOTE THE CERTIFICATION OF NONSEGREGATED FACILITIES IN THIS
SOLICITATION. Bidders, Offerors, and applicants are cautioned to note the "Certification of Nonsegregated Facilities" in the solicitation.
Failure of bidder or offeror to agree to the certification will render his bid or offer non-responsive to the terms of solicitation involving awards of contracts exceeding $10,000, which are not exempt from the provisions of Equal Opportunity Clause. (1984 APR)
6. REPRESENTATIONS AND CERTIFICATIONS- SECTION 00 45 00
Bidders and Offerors are required to complete the REPRESENTATIONS AND CERTIFICATIONS and submit them with their bids.
7. THIS IS A CIVIL WORKS PROGRAM PROCUREMENT AND IS NOT FUNDED BY THE
DEPARTMENT OF DEFENSE. BUY AMERICAN ACT - CONSTRUCTION MATERIALS (MAY
1993) IN ACCORDANCE WITH FAR 52.225-9 APPLIES.
8. THIS PROJECT IS NOT A SMALL BUSINESS SET-ASIDE.
DOCUMENT 00 00 01 Page 2
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section --
DOCUMENT 00 00 01 Page 3
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 00 02
CHECK LIST FOR BIDDERS
PART 1 GENERAL
DOCUMENT 00 00 02 Page 1
SECTION 00 00 02
CHECK LIST FOR BIDDERS
PART 1 GENERAL
ATTACHED IS IFB FOR
MAINTENANCE DREDGING of
LONG ISLAND INTRACOASTAL WATERWAY
FEDERAL NAVIGATION CHANNEL
SUFFOLK COUNTY, NEW YORK
ALL INFORMATION REQUIRED BY THE TERMS OF THIS SOLICITATION MUST BE
FURNISHED. MISTAKES OR OMISSIONS MAY RENDER YOUR BID INELIGIBLE FOR AWARD.
IMPORTANT ITEMS FOR YOU TO CHECK ARE
INCLUDED IN BUT NOT LIMITED TO THOSE LISTED BELOW. THIS
INFORMATION IS FURNISHED ONLY TO ASSIST YOU IN SUBMITTING A
PROPER BID.
__ HAVE YOU ACKNOWLEDGED ALL AMENDMENTS?
__ HAVE YOU COMPLETED THE "REPRESENTATIONS AND CERTIFICATIONS" (SECTION 00
45 00) PORTION OF THE SOLICITATION?
__ IS YOUR DUNS NUMBER LISTED ON THE STANDARD FORM 1442?
__ IS YOUR BID PROPERLY SIGNED?
__ A BID BOND IS REQUIRED. HAS YOUR SURETY PROVIDED YOU WITH A BID BOND ON
STANDARD FORM 24 OR A SIMILAR FORM CONTAINING THE SAME LANGUAGE AS A
STANDARD FORM 24?
__ IS YOUR BID GUARANTEE IN THE PROPER AMOUNT?
__ IS YOUR BID GUARANTEE PROPERLY SIGNED BY BOTH THE BIDDER AND SURETY AND
ARE ALL REQUIRED SEALS AFFIXED?
__ IS THE NAME IN WHICH YOU SUBMITTED THE BID THE SAME ON YOUR BID AS ON
THE BID BOND?
__ IS YOUR BID BOND INCLUDED WITH YOUR BID? (A LATE BID GUARANTEE IS
TREATED THE SAME AS A LATE BID)
__ HAVE YOU ENSURED THAT YOU HAVE NOT RESTRICTED YOUR BID BY ALTERING THE
PROVISIONS OF THE SOLICITATION?
__ WHEN REQUIRED, HAVE YOU ENTERED A UNIT PRICE FOR EACH BID ITEM? (THE
SOLICITATION SPECIFICALLY STATES WHEN THIS IS NECESSARY.)
__ ARE DECIMALS IN YOUR PRICES IN THE PROPER PLACE? ARE YOUR FIGURES
LEGIBLE?
__ IF YOU HAVE MADE ERASURES OR CORRECTIONS ON YOUR BID, ARE THEY INITIALED
BY THE PERSON SIGNING THE BID?
DOCUMENT 00 00 02 Page 2
__ DOES THE ENVELOPE CONTAINING YOUR BID PROPERLY IDENTIFY THAT IT IS A
SEALED BID AND DOES IT CONTAIN THE CORRECT SOLICITATION NUMBER AND BID
OPENING TIME?
__ WILL YOUR BID ARRIVE ON TIME? (SEE PARAGRAPH ENTITLED "LATE SUBMISSIONS,
MODIFICATIONS, AND WITHDRAWALS OF BIDS" IN THE INSTRUCTIONS, CONDITIONS,
AND NOTICES TO BIDDERS, SECTION 00 21 16 OF THE SOLICITATION.)
BIDDER IS RESPOSIBLE TO ENSURE BID IS SUBMITTED ON TIME.
DOCUMENT 00 00 02 Page 3
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 01 15
LIST OF DRAWINGS
PART 1 GENERAL
1.1 SUMMARY
1.2 CONTRACT DRAWINGS, MAPS, & SPECIFICATIONS
PART 2 PRODUCTS
PART 3 EXECUTION
DOCUMENT 00 01 15 Page 1
SECTION 00 01 15
LIST OF DRAWINGS
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS, MAPS, & SPECIFICATIONS
Contract drawings are as follows:
a. The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
b. The Contractor shall:
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer or Contracting Officer's Representative of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
c. In general:
(1) Large-scale drawings shall in general govern over small-scale drawings. Information and data provided in contract specifications shall govern over similar information and data specified in contract drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
d. Omissions from the drawings or specifications or the misdescription of details of work which are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
e. The work shall conform to the following contract drawings and maps, all of which form a part of these specifications and are
DOCUMENT 00 01 15 Page 2 available in the office of the District Engineer, U.S. Army Corps of Engineers, New York District, 26 Federal Plaza, New York, N.Y.
10278-0090:
Maintenance Dredging of
Long Island Intracoastal Waterway Federal Navigation Channel Suffolk County, New York
SHEET NO. TITLE
1 Index Sheet
2 Location Map and Detail Sheet
3 NOAA Chart
4 Dredging Limit
5 Dredging Limit
6 Dredging Limit
7 Dredging Limit
8 Dredging Limit
9 Dredging Limit
10 Cupsogue Beach County Park Placement Area
11 Smith Point County Park Placement Area
f. The Contractor shall check all drawings furnished to him immediately upon their receipt and shall promptly notify the Contracting Officer or Contracting Officer's Representative of any discrepancies. Figures marked on drawings shall in general be followed in preference to scale measurements unless dimensions are specified.
Large-scale drawings shall in general govern over small-scale drawings. Information and data provided in contract specifications shall govern over similar information and data specified in contract drawings. The Contractor shall compare all drawings and verify the figures before laying out the work and will be responsible for any errors which might have thereby been avoided (DOD FAR Suppl.
52.236-7002).
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
DOCUMENT 00 01 15 Page 3
DOCUMENT 00 01 15 Page 4
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 10 00
SF 1442 AND BIDDING SCHEDULE
PART 1 GENERAL
1.1 SF 1442 SOLICITATION, OFFER, AND AWARD
1.2 BID SCHEDULE
PART 2 PRODUCTS
PART 3 EXECUTION
DOCUMENT 00 10 00 Page 1
SECTION 00 10 00
SF 1442 AND BIDDING SCHEDULE
PART 1 GENERAL
1.1 SF 1442 SOLICITATION, OFFER, AND AWARD
To be provided by Contracting Division.
1.2 BID SCHEDULE
To be provided by Contracting Division.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
DOCUMENT 00 10 00 Page 2
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 21 16
INSTRUCTIONS, CONDITIONS, AND NOTICE TO BIDDERS
PART 1 GENERAL
DOCUMENT 00 21 16 Page 1
SECTION 00 21 16
INSTRUCTIONS, CONDITIONS, AND NOTICE TO BIDDERS
PART 1 GENERAL
To be provided by Contracting
DOCUMENT 00 21 16 Page 2
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 45 00
REPRESENTATION AND CERTIFICATION
PART 1 GENERAL
PART 2 PRODUCTS
PART 3 EXECUTION
DOCUMENT 00 45 00 Page 1
SECTION 00 45 00
REPRESENTATION AND CERTIFICATION
PART 1 GENERAL
TO BE PROVIDED BY CONTRACTING DIVISION
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
DOCUMENT 00 45 00 Page 2
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 72 00
CONTRACT CLAUSES
PART 1 GENERAL
PART 2 PRODUCTS
PART 3 EXECUTION
DOCUMENT 00 72 00 Page 1
SECTION 00 72 00
CONTRACT CLAUSES
PART 1 GENERAL
To be provided by Contracting Division.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
DOCUMENT 00 72 00 Page 2
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 90 00
WAGE RATES
PART 1 GENERAL
1.1 NOTES
PART 2 PRODUCTS
PART 3 EXECUTION
DOCUMENT 00 90 00 Page 1
SECTION 00 90 00
WAGE RATES
01/20
PART 1 GENERAL
1.1 NOTES
Wage rates provided by Contracting Division.
A copy of the wage rate shall be displayed at a highly visible location on the dredge at all times for the duration of the project.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Not Used.
DOCUMENT 00 90 00 Page 2
NY20230001 01/06/2023
Affirmative Action GOALS:
Suffolk County, NY For Minorities: 5.8% For Women: 6.9%
2. Please verify with the undersigned, a minimum of 10 days prior to bid opening/proposal receipt, that the rates provided on this date are still in effect. Any changes will have to be incorporated into the solicitation by amendment. It is recommended that the "wage rate in effect" be confirmed at the time of any amendment.
3. Note that in negotiated procurements, the wage rates in effect on the date of contract award (not at proposal due date or FPR date) are the ones to be incorporated in the contract Also note that the then current wage decision is to be incorporated into the instant contract at exercise of any option period regardless of the method of solicitation (IFB, RFQ or RFP).
4. Please ensure that this decision is incorporated into the applicable solicitation and its resultant contract as set forth in FAR 22.404-6.
5. The solicitation and resultant contract must state that this project is classified as Maintenance Dredging of Long Island Intracoastal Waterway Federal Navigation Channel, Suffolk County, NY Wage Rates are applicable.
"General Decision Number: NY20230001 01/06/2023
Superseded General Decision Number: NY20220001
State: New York MY 04/11/2023
Construction Type: Heavy Dredging
Counties: New York Statewide.
STATEWIDE
New York
All dredging, except self-propelled hopper dredges, on the Atlantic Coast and tributary waters emptying into the Atlantic Ocean.
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2023. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2023
ENGI0025-001 10/01/2022
STATEWIDE
Rates Fringes
Dredging:
CLASS A1....................$ 43.94 14.49+a+b
CLASS A2....................$ 39.16 14.20+a+b CLASS B1....................$ 38.00 14.13+a+b CLASS B2....................$ 35.77 14.00+a+b CLASS C1....................$ 34.79 13.69+a+b CLASS C2....................$ 33.67 13.62+a+b CLASS D.....................$ 27.97 13.28+a+b
CLASSIFICATIONS:
CLASS A1: Deck Captain; Mechanical Dredge Operator, Leverman, Licensed Tug Operator over 1000 HP.
CLASS A2: Crane Operator (360 swing).
CLASS B1: Derrick Operator (180 swing), Spider/Spill Barge Operator, Engineer, Electrician, Chief Welder, Chief Mate, Fill Placer, Operator II, Maintenance Engineer, Licensed Boat Operator, Licensed Crew Boat Operator.
CLASS B2: Certified Welder.
http://www.dol.gov/whd/govcontracts
CLASS C1: Mate, Drag Barge Operator, Assistant Fill Placer, Welder, Steward.
CLASS C2: Boat Operator.
CLASS D: Oiler, Deckhand, Shoreman, Rodman, Scowman, Cook, Messman, Porter/Janitor.
INCENTIVE PAY: (Add to Hourly Rate) Operator (NCCCO License/Certification) $1.80 Licensed Tug Operator over 1000 HP (Assigned as Master) (USCG licensed Master of Towing Vessels (MOTV) $1.80; Licensed Boat Operator (Assigned as lead boat captain) USCG licensed boat operator $1.30; Engineer (QMED and Tankerman endorsement or licensed engineer (USCG) $1.80 Oiler (QMED and Tankerman endorsement (USCG) $1.80; All classifications (Tankerman endorsement only) USCG $1.55;
Deckhand or Mate (AB with Lifeboatman endorsement (USCG) $1.80; All classifications (lifeboatman endorsement only (USCG) $1.55; Welder (ABS certification) $1.55
FOOTNOTES APPLICABLE TO ABOVE CRAFTS:
a. PAID HOLIDAYS: New Year's Day, Martin Luther King, Jr.'s Birthday, Memorial Day, Good Friday, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and Christmas Day
b. VACATION: Eight percent (8%) of the straight time rate, multiplied by the total hours worked.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the
EO
is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers.
indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of https://www.dol.gov/agencies/whd/government-contracts the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISIO"
"General Decision Number: NY20230012 04/07/2023
Superseded General Decision Number: NY20220012
State: New York
Construction Types: Building, Heavy, Highway and Residential
Counties: Nassau and Suffolk Counties in New York.
BUILDING CONSTRUCTION PROJECTS, RESIDENTIAL CONSTRUCTION
PROJECTS (including single family homes and apartments up to and including 4 stories), HEAVY CONSTRUCTION PROJECTS, HIGHWAY
CONSTRUCTION PROJECTS
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at |
|after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2023. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2023 1 01/13/2023 2 02/24/2023 3 04/07/2023
ASBE0012-001 06/01/2022
Rates Fringes
Asbestos Workers/Insulator Includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.....................$ 70.01 35.16
HAZARDOUS MATERIAL HANDLER.......$ 40.50 15.95
BOIL0005-001 01/01/2021
Rates Fringes
BOILERMAKER......................$ 63.38 33%+47.22+a
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Thanksgiving Day, Memorial Day, Independence Day, Labor Day and Good Friday, Friday after Thanksgiving, Christmas Eve Day and New Year's Eve
BRNY0001-001 07/01/2022
Rates Fringes
BRICKLAYER.......................$ 65.53 31.60
MASON - STONE....................$ 69.72 38.67
CARP0290-001 07/01/2021
Rates Fringes
Carpenters:
Building
Nassau County (Portion of county that lies west of Seaford Creek and south of the Southern State Parkway)...................$ 52.50 46.28 Nassau County (Remainder of County) and Suffolk County.....................$ 50.16 33.48
Heavy & Highway.............$ 50.16 33.48 Residential.................$ 32.63 21.83
CARP0740-001 07/01/2022
Rates Fringes
MILLWRIGHT.......................$ 57.80 55.96
CARP1556-008 07/01/2022
Rates Fringes
Carpenters:
DIVERS TENDERS..............$ 52.57 53.56
DIVERS......................$ 73.03 53.56
DOCKBUILDERS................$ 58.16 53.56
PILEDRIVERMAN...............$ 58.16 53.56
CARP1556-011 07/01/2022
Rates Fringes
Carpenters:
TIMBERMEN...................$ 53.05 53.94
CARP2287-003 07/01/2022
Rates Fringes
CARPENTER
Soft Floor Layers...........$ 55.05 47.83
ELEC0025-001 10/29/2022
Rates Fringes
ELECTRICIAN......................$ 57.50 17%+31.95
ELEC0025-002 04/30/2022
Rates Fringes
Electricians:
Maintenance Unit............$ 45.79 13.5%+21.69 Telephone Unit..............$ 39.68 17.50%+21.39 Wiring for single or multiple family dwellings and apartments up to and including 3 stories.........$ 37.25 13%+18.92
ELEC1049-002 04/03/2022
Rates Fringes
Line Construction:
Substation and Switching structures pipe type cable installation and maintenance jobs or projects; Railroad electrical distribution/ transmission systems maintenance (when work is not performed by railroad employees) Overhead and Underground transmission/distribution line work. Fiber optic, telephone cable and equipment;
Groundman..................$ 37.92 26.49 Heavy Equipment Operator...$ 50.56 30.51 Lineman & Cable Splicer....$ 63.20 34.52 Material Man...............$ 54.98 31.91
ELEV0001-002 03/17/2022
Rates Fringes
ELEVATOR MECHANIC
Elevator Constructor........$ 75.14 47.446+a+b Modernization and Repair....$ 59.09 45.564+a+b
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Good Friday, President's Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.
b. PAID VACATION: An employee who has worked less than 5 years shall recieve vacation pay credit on the basis of 4% of his hourly rate for all hours worked; an employee who has worked 5 to 15 years shall receive vacation pay credit on the basis of 6% of his hourly rate for all hours worked;
an employee who has worked 15 or more years shall receive vacation pay credit on the basis of 8% of his hourly rate for all hours worked.
ENGI0138-001 06/01/2022
BUILDING CONSTRUCTION
Power equipment operators:
GROUP 1.....................$ 72.61 38.80+a GROUP 2.....................$ 68.95 38.80+a GROUP 3.....................$ 66.53 38.80+a GROUP 4.....................$ 50.70 38.80+a GROUP 5.....................$ 48.55 38.80+a
NOTES:
Hazmat premiums:
Level A 3.50 Level B 2.50 Level C 1.50 Level D 1.00
Oiler on truck cranes with boom length of 100 ft. or more .25
FOOTNOTE:
a. Paid Holidays: New Year's Day, Lincoln's Birthday, Washington's Birthday or President's Day (in lieu of Lincoln's or Washington's Birthday), Good Friday, Memorial Day, Indpendence Day, Labor Day, Veteran's Day, Thanksgiving Day, Christmas Day or days celebrated as such.
Any holiday that falls on a Saturday will be celebrated on Friday.
POWER EQUIPMENT OPERATOR CASSIFICATIONS
GROUP 1: Asphalt spreader, backhoe crawler capacity over cater- piller 225 and lomatsu 300, Boiler (thermoplastic), Cherry picker, over 50 tons, CMI or maxim spreader, concrete pump (with oiler), crane (crawler truck), crane (on barge), crane (stone setting), crane (structural steel), crane (with clam shell), derrick, dragline, dredge, gradall, grader, hoist (3 drum), loading machine (bucket) cap of 10 yds or over micro-trap, with compressor (negative air machine), milling machine, large pile driver, power winch, Stone setting/structural steel, power winch (truck mounted/stone steel) powerhouse, road paver scoop, carry-all, scraper in tandem shovel, sideboom tractor, sideboom tractor (used in tank work), stone spreader (self propelled tank work), zamboni (ice machine)
GROUP 2: Backhoe, boom truck, bulldozer, cherypicker, conveyor (multi), dinky locomotive, forklift, hoist, 2 drum, loading machine, loading machine (front end) mechanical compactors, (machine drawn), mulch machine (machine-fed), mechanic, power winch, other than stone/structural steel, power winch (truck mounted other than stone steel) pump (hydraulic, with boring machine), roller, (asphalt), scoop (carry-all scraper), tower crane (maintenance man), trenching machine
GROUP 3: Comrpessor (structural steel), Compressor (2 or more in battery), concrete finishing mchine, concrete spreader, conveyor, curb machine (asphalt or concrete), curing machine, fireman, hoist (1 drum), micro-trap, (self contained, negative air machine), pump (4 inches or over), pump (hydraulic), pump (jet), pump (sumbersible), pump (well point), pulvi-mixer, ridge cutter, roller (dirt), striping machine, vac-all, welding and burning, welding machine (pile work), welding machine (structural steel)
GROUP 4: Compressor, compressor (on crane), compressor (pile work), compressor (stone setting), concrete breaker, concrete saw or cutter, forklift (walk behind, power operated), generator-pile work, generator, hydra hammer, mechanical compactors (hand operated), oiler (truck crane), pin puller, portable heaters, powerbroom, power buggies, pump (double action diaphgrgm), pump (gypsum), trench machine (hand), welding machine
GROUP 5: Batching plant (on site of job), generator (small), mixer (with skip), mixer (2 small with or without skip), mixer (2 bag or over, with or without skip), mulch machine, oiler, pump (centrifugal, up to 3 inches), root cutter, stump chipper, tower crane (oiler), tractor (caterpillar or wheel vibrator)
ENGI0138-002 06/01/2022
HEAVY & HIGHWAY
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 76.52 39.05+a GROUP 2.....................$ 71.60 39.05+a GROUP 3.....................$ 69.09 39.05+a GROUP 4.....................$ 52.88 39.05+a GROUP 5.....................$ 50.68 39.05+a GROUP 6.....................$ 39.30 12.50+a
NOTES:
Hazmat premiums:
Level A 3.50 Level B 2.50 Level C 1.50 Level D 1.00
Truck and Crawler Cranes long boom premiums:
boom lengths (including jib) 100-149 ft 1.00 boom lenghts (including jib) 150-249 ft 1.50 boom lenghts (including jib) 250-349 ft 2.00 boom lengths (including jib) 350 ft 3.00
Cranes using clamshell buckets .25 Front end loader 10 yds and above .25 Oiler on truck cranes with boom length of 100 ft. or more .25
FOOTNOTE:
a. Paid Holidays: New Years Day, Lincoln's Birthday, Washington's Birthday or Presidents Day (in lieu of Lincoln's or Washington's Birthday, Good Friday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day, Christmas Day or days celebrated as such. Any holiday that falls on Saturday will be celebrated on Friday.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt spreader, backhoe crawler (capacity over caterpiller 225 and komatsu 300), boiler (thermoplastic), boring machine (post hole), cgherry picker (over 50 ton), CMI or maxim spreader, concrete pump, with oiler, crane (crawler truck), crane (on barge), crane (stone setting) crane (structural steel), crane (with clam shell), derrick, dragline, dredge, gradall, grader, hoist (3 drums), loading machine (bucket) capacity of 10 yards or over, micro-trap (with compressor-negative air machine), milling machine (large), piledriver, power winch (stone setting structural steel), power winch (truck mounted/stone steel), power-house, road paver, scoop, carry all (scraper in tandem), shovel, sideboom tractor, sideboom tractor (used in tank work), stone spreader (self-propelled), tank work, tower crane
GROUP 2: Bulldozer, Backhoe, Boom Truck, Boring machine/augur, Cherrypicker, Conveyor (multi), Dinky Locomotive, Forklift, Hoist (2 drum), Loading Machine, Loading Machine (front end), Mechanical Compactor (machine drawn), Mechanic, Mulch Machine (machine- fed), Power Winch (other than stone/structural steel), Power Winch (truck mounted/other than stone steel), Pump Hydraulic (with boring machine), Roller (asphalt), Scoop (carry-all, scraper), Tower Crane (maintenance man), Trenching Machine, Vermeer Cutter, Work Boat
GROUP 3: Curb Machine (asphalt or concrete), Maintenance Engineer (small equipment), Maintenance engineer (well-point) Mechanic (fieldman), Micro-Trap (self contained, negative air machine), Milling Machine (small), Pulvi-mixer, Pump (4 inches or over), Pump Hydraulic, Pump Jet, Pump Submersible, Pump (well point), Roller Dirt, Vac-All, Welding and burning, Compressor (structural steel), Compressor (2 or more battery), Concrete Finishing Machine, Concrete Spreader, Conveyor, Curing Machine, Fireman, Hoist (one drum), Ridge Cutter, Striping Machine, Welding Machine (pile work), Welding Machine (structural Steel).
GROUP 4: Compressor, Compressor on crane, Compressor (pile work), Compressor (stone setting), Concrete Breaker, Concrete Saw or Cutter, Fork Lift (walk behind, power operated), Generator- Pile Work, Generator, Hydra Hammer, Mechanical Compoactors (hand operated), Oiler (truck crane), Pin Puller, Portable Heaters, Powerbroom, Power buggies, Power Grinders, Pump (double action diaphragm), Pump gypsum, Pump (single action 1 to 3 inches), Trench Machine hand, Welding Machine
GROUP 5: Batching Plant (on site of job), Generator (small), Grinder, Mixer (with skip), Mixer (2 small with or without skip), Mixer (2 bag or over, with or without skip), Mulch Machine, Oiler, Pump (centrifugal, up to 3 inches), Root Cutter, Stump Chipper, Tower Crane (oiler), Track Tamper (2 engineers, each), Tractor (caterpillar or wheel), Vibrator, Work boat (deckhand), GROUP 6: Well drillers
IRON0046-003 07/01/2022
IRONWORKER
METALLIC LATHERS AND
REINFORCING IRONWORKERS.....$ 56.90 27.80
IRON0197-001 07/01/2021
Rates Fringes
IRONWORKER
STONE DERRICKMAN............$ 55.63 55.10
IRON0361-001 07/01/2022
Rates Fringes
IRONWORKER (STRUCTURAL)..........$ 55.70 84.79
IRON0580-001 07/01/2022
Rates Fringes
IRONWORKER, ORNAMENTAL...........$ 46.65 61.62
* LABO0066-001 07/01/2022
BUILDING
Rates Fringes
Laborers:
Laborers....................$ 39.80 34.16 Plasterers Tenders..........$ 40.80 30.04
* LABO0078-001 07/04/2022
Rates Fringes
LABORERS
BUILDING CONSTRUCTION
ASBESTOS (Removal, Abatement, Encapsulation or Decontamination of asbestos); LEAD; &
HAZARDOUS WASTE LABORERS
(Hazardous Waste, Hazardous Materials, Biochemical and Mold Remediation, HVAC, Duct
Cleaning, Re-spray Fireproofing, etc).........$ 38.55 19.35
LABO1298-001 06/01/2022
HEAVY & HIGHWAY
Rates Fringes
Laborers:
Asphalt Rakers; Formsetters.$ 49.93 35.12+a Asphalt Shovelers, Roller Boys & Tampers..............$ 48.46 35.12+a Regular Laborers............$ 43.99 35.12+a
A. FOOTNOTES:
Laborers working in a hazardous material hot zone shall receive an additional 20% premium.
Where the contract provides for night work outside the regular hours of work, the employees shall be paid at straight time plus a 30% night work premium for the 8 hours worked during the night.
Firewatch work performed after regular hours shall be paid an additional 10% premium. Second and Third Shift work will be paid at a 30% premium.
Contractor requesting laborers certified for hazardous material work and/or employed on hazardous material shall be required to pay an additional 10% premium.
PAIN0009-002 11/01/2022
Rates Fringes
PAINTER
GLAZIERS....................$ 47.30 50.52
Painters, Drywall Finishers.$ 43.00 38.11 Spray, Scaffold, Sandblasting................$ 46.00 38.11
PAIN0806-010 10/01/2020
Painters:
Stuctural Steel and Bridge..$ 51.50 49.63
PAIN1974-002 06/28/2022
Rates Fringes
Painters:
DRYWALL TAPERS/POINTERS.....$ 48.47 30.21
PLAS0262-003 08/01/2019
Rates Fringes
PLASTERER........................$ 45.73 30.37
PLAS0780-001 07/01/2018
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 51.97 33.56
PLUM0200-001 05/01/2022
Rates Fringes
PLUMBER
BUILDING CONSTRUCTION:......$ 55.48 43.25
RESIDENTIAL CONSTRUCTION:...$ 29.96 13.41
PLUM0638-001 07/01/2020
Rates Fringes
PLUMBER
SERVICE FITTERS.............$ 41.75 14.00
SPRINKLER FITTERS,
STEAMFITTERS................$ 59.05 58.34
Service Fitter work shall consist of all repair, service and maintenance work on domestic, commercial and industrial refrigeration, air conditioning and air cooling, stoker and oil burner apparatus and heating apparatus etc., including but not exclusively the charging, evacuation, leak testing and assembling for all machines for domestic, commercial and industrial refrigeration, air conditioning and heating apparatus. Also, work shall include adjusting, including capacity adjustments, checking and repairing or replacement of all controls and start up of all machines and repairing all defects that may develop on any system for domestic, commercial and industrial refrigeration and all air conditioning, air cooling, stoker and oil burner apparatus and heating apparatus regardless of size or type.
ROOF0154-001 05/01/2021
Rates Fringes
ROOFER...........................$ 45.25 40.36
SHEE0028-002 07/28/2022
Rates Fringes
SHEET METAL WORKER
BUILDING CONSTRUCTION.......$ 52.10 55.18
RESIDENTIAL CONSTRUCTION....$ 23.84 8.40
TEAM0282-002 07/01/2020
Rates Fringes
TRUCK DRIVER.....................$ 40.005 49.0325+a
FOOTNOTES:
a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Election Day, Veterans' Day (Armistice Day), Thanksgiving Day, Day after Thanksgiving and Christmas Day. Employees working two (2) days in the calendar week in which a holiday falls are to be paid for such holiday, provided that they shape each remaining workday during such calendar week.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
"General Decision Number: NY20230001 01/06/2023
Superseded General Decision Number: NY20220001
State: New York MY 04/11/2023
Construction Type: Heavy Dredging
Counties: New York Statewide.
STATEWIDE
New York
All dredging, except self-propelled hopper dredges, on the Atlantic Coast and tributary waters emptying into the Atlantic Ocean.
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2023. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2023
ENGI0025-001 10/01/2022
STATEWIDE
Rates Fringes
Dredging:
CLASS A1....................$ 43.94 14.49+a+b CLASS A2....................$ 39.16 14.20+a+b CLASS B1....................$ 38.00 14.13+a+b CLASS B2....................$ 35.77 14.00+a+b CLASS C1....................$ 34.79 13.69+a+b CLASS C2....................$ 33.67 13.62+a+b CLASS D.....................$ 27.97 13.28+a+b
CLASSIFICATIONS:
CLASS A1: Deck Captain; Mechanical Dredge Operator, Leverman, Licensed Tug Operator over 1000 HP.
CLASS A2: Crane Operator (360 swing).
CLASS B1: Derrick Operator (180 swing), Spider/Spill Barge Operator, Engineer, Electrician, Chief Welder, Chief Mate, Fill Placer, Operator II, Maintenance Engineer, Licensed Boat Operator, Licensed Crew Boat Operator.
CLASS B2: Certified Welder.
CLASS C1: Mate, Drag Barge Operator, Assistant Fill Placer, Welder, Steward.
CLASS C2: Boat Operator.
CLASS D: Oiler, Deckhand, Shoreman, Rodman, Scowman, Cook, Messman, Porter/Janitor.
INCENTIVE PAY: (Add to Hourly Rate) Operator (NCCCO License/Certification) $1.80 Licensed Tug Operator over 1000 HP (Assigned as Master) (USCG licensed Master of Towing Vessels (MOTV) $1.80; Licensed Boat Operator (Assigned as lead boat captain) USCG licensed boat operator $1.30; Engineer (QMED and Tankerman endorsement or licensed engineer (USCG) $1.80 Oiler (QMED and Tankerman endorsement (USCG) $1.80; All classifications (Tankerman endorsement only) USCG $1.55;
Deckhand or Mate (AB with Lifeboatman endorsement (USCG) $1.80; All classifications (lifeboatman endorsement only (USCG) $1.55; Welder (ABS certification) $1.55
FOOTNOTES APPLICABLE TO ABOVE CRAFTS:
a. PAID HOLIDAYS: New Year's Day, Martin Luther King, Jr.'s Birthday, Memorial Day, Good Friday, Independence Day, Labor Day,…