D.6 QASP final.docx
DOCX document 24 KB Posted
- Solicitation number
- 36C24222Q0821
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24222Q0821 0003 s.pdf | ||
| Revised Schedule of HCR Services 07262022.pdf | ||
| Amendment 0002 36C24222Q0821 s.pdf | ||
| PWS 07262022.pdf | ||
| S02 36C24222Q0821v2 07112011.pdf | ||
| Revised Schedule of HCR Services.pdf | ||
| VA10230 (1) COVID 07072022.pdf | ||
| Amendment 001 36C24222Q0821.pdf | ||
| S02 36C24222Q0821.docx | DOCX document | |
| D.1 Active Equipment List.pdf | ||
| D.4 Key Personnel.docx | DOCX document | |
| D.3 Immigration.docx | DOCX document | |
| D.7 CertificationVaccinationPRAv7.pdf | ||
| D.5 CDR.docx | DOCX document | |
| D.2 Org Conflict of Interest.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The contractor will be evaluated in accordance with the following:
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored?
· How monitoring will take place.
· Who will conduct the monitoring?
· How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor through contract modification. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO:
Organization or Agency:
b. Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: Luis-Enrique Davila Organization or Agency: James J. Peters VA Medical Center, Bronx, VAMC, 10468
3. CONTRACTOR REPRESENTATIVES
The following employee(s) of the contractor serve as the contractor’s program manager(s) for this contract.
Primary: Luis-Enrique Davila Alternate: William Schimmer
4. PERFORMANCE STANDARDS
The contractor is responsible for performance of ALL terms and conditions of the contract. CORs will provide contract progress reports quarterly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of contractor performance in the elements defined. Performance standards define desired services. The Government performs surveillance to determine the level of Contractor performance to these standards.
The Performance Requirements are listed below in Section 6. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the contractor on the contract.
5. INCENTIVES/DEDUCTS
The Government shall use past performance as incentives. Incentives shall be based on ratings received on the performance standards (Inclusion of any monetary incentives requires approval through the Department’s Senior Procurement Executive (SPE).
6. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. DIRECT OBSERVATION. 100% surveillance: (if this method is used, define how surveillance will be accomplished.)
b. PERIODIC INSPECTION. Inspections scheduled and reported quarterly per COR delegation or as needed. (Define what and how often it will be inspected. For example, ten (10) randomly selected patient files will be reviewed per inspection period. All inspections and reports will be conducted in compliance with VA Privacy and Information security standards.)
c. VALIDATED USER/CUSTOMER COMPLAINTS. If this method is used, explain how data will be collected and reported.
d. RANDOM SAMPLING. If this method is used, what and how often it will be sampled. (For example, ten (10) randomly selected patient files will be reviewed per quarter. All reviews and reports will be conducted in compliance with VA Privacy and Information security standards.)
e. Verification and/or documentation provided by Contractor. Review PWS and if this method of surveillance is selected, define how documentation will be verified and how assessment will be conducted. (For example, off-site contracts may require the contractor to provide information on services provided to patients).
PERFORMANCE MEASURES
| Measures |
| PWS |
Reference Performance Requirement
| Standard |
| Acceptable Quality Level |
| Surveillance |
Method Incentive
| Provider Quality Performance |
| Pg. 7, 11, 19, 27, and 29 |
| All Contractor’s Diagnostic Medical Physicist shall perform in accordance with clinical standards. Reports for regulatory bodies are completed timely and compliant with requirements. |
| 100% |
| 100% |
| Direct Observation, inspection reports email, and phone correspondence. Review of submitted reports. |
Favorable contactor performance evaluation.
| Availability of Key Personnel |
| Pg. 7 and 27 |
| Performance Requirement: Both the Diagnostic Medical Physicist and support staff will be available during all work hours, when needed or required. The technician will be on site performing required tasks for required number of hours per month. All Contractor’s Diagnostic Medical Physicist shall be required to adhere to the terms and conditions of the Veterans Health Administration (VHA) MML agreement with the Nuclear Regulatory Commission (NCR). |
| 100% |
| 95% |
| Direct observation, inspection reports, time and attendance logs, invoices, email, and phone correspondence |
Favorable contactor performance evaluation.
| Billing and Invoicing |
| Pg. 27, 30, and 31 |
| Contractor will submit invoices within seven (7) calendar days of the end of each month along with all supporting documentation. |
| 100% |
| 90% |
| COR monthly invoice certifications, COR quarterly reporting, and CO random inspections. |
7. RATINGS
Metrics and methods are designed to determine rating for a given standard and acceptable quality level. The following ratings shall be used:
| EXCEPTIONAL: |
| Performance meets contractual requirements and exceeds many to the |
Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT. However a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also there should have been NO significant weaknesses identified.
| VERY GOOD: |
| Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective. |
Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also there should have been NO significant weaknesses identified.
| SATISFACTORY: |
| Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory. |
Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. Also there should have been NO significant weaknesses identified.
| MARGINAL: | |
| Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented. | |
| Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of the | contractual deficiency (e.g. Management, Quality, Safety or Environmental Deficiency Report or letter). |
| UNSATISFACTORY: |
| Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective. |
Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g. Management, Quality, Safety or Environmental Deficiency Reports, or letters).
File details come from the government source that posted it. Updated .