This document contains a price schedule and solicitation for drydock repairs to NOAA Ship GORDON GUNTER. The price schedule lists over 50 base line items and estimated quantities for repairs such as drydocking, inspections, overhauls, and preservation work. It also includes growth items with labor and material rates, additional temporary services, and laydays. The solicitation seeks quotations to perform drydocking and repairs in accordance with the RFQ and associated documents. Interested parties must request the solicitation reference documents from the named Contract Specialist and Contracting Officer due to their volume. The solicitation is issued by the Department of Commerce National Oceanic and Atmospheric Administration for FY22 repairs to the named NOAA research vessel.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 0004.pdf | ||
| 0003.pdf | ||
| 0002.pdf | ||
| Amendment 0001.pdf | ||
| D.2. PP Info.docx | DOCX document | |
| D.3 PP Ques.doc | DOC document | |
| D.1. GGSPECRev1.pdf | ||
| D.4 U S DOL POSTER.pdf | ||
| 1305M221QNMAN0088.pdf | ||
| D.5 SUBK PLAN.doc | DOC document | |
| D.7. NOAA AIRS PROCESS.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Prices
| PRICE SCHEDULE | ||||||
| BASE ITEMS | ||||||
| CLIN | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT PRICE | EXTENDED PRICE |
| 2 | General Requirements | 1 | JB | |||
| 3.1 | Temporary Services | 1 | JB | |||
| 3.2 | Dry Docking and Routine Dry Dock Work | 1 | JB | |||
| 3.3 | Overhaul AFT Capstans | 1 | JB | |||
| 3.4 | Inspect/OH Markey CTD (DESH-5) and Markey Bongo (COM-7X) Winches | 1 | JB | |||
| 3.5 | Sea Valve Overhauls | 1 | JB | |||
| 3.6 | Bow Thruster Inspection and Service | 1 | JB | |||
| 3.7 | ABS Special Periodical Survey-Hull 7 | 1 | JB | |||
| 3.8 | Annual Life Raft Inspection | 1 | JB | |||
| 3.9 | Annual Survival Suit Certifications | 1 | JB | |||
| 3.10 | Weight Tests of Lifting Gear | 1 | JB | |||
| 3.11 | Annual Fire Inspection and Certifications | 1 | JB | |||
| 3.12 | Annual Miranda Davit Inspection, Valve Repalcements and FRB Maintenance | 1 | JB | |||
| 3.13 | Main Motor Service | 1 | JB | |||
| 3.14 | Marine Sanitation Device | 1 | JB | |||
| 3.15 | Oily Water Separator | 1 | JB | |||
| 3.16 | Pump/Motor Exhaust | 1 | JB | |||
| 3.17 | Galley Exhaust Duct and Fan Cleaning | 1 | JB | |||
| 3.18 | Generator Room Steel Replace and Preservation | 1 | JB | |||
| 3.19 | Preservation-Propulsion Motor Room Bilges | 1 | JB | |||
| 3.20 | Preservation-HPU Room | 1 | JB | |||
| 3.21 | Piping Repair and Modifications | 1 | JB | |||
| 3.22 | Fuel Tanks 4-72-1, 4-72-2, 4-72-3 and 4-72-4 (ABS) | 1 | JB | |||
| 3.23 | Underwater Hull Preservation and Coating (Maintenance Coat) | 1 | JB | |||
| 3.24 | Ballast Tank Vent Replacement | 1 | JB | |||
| 3.25 | Fan and Motor Overhauls | 1 | JB | |||
| 3.26 | Bulwark Repairs | 1 | JB | |||
| 3.27 | Main Deck Repairs | 1 | JB | |||
| 3.28 | Anchor Windlass | 1 | JB | |||
| 3.29 | Effer Crane (02 Level Deck Crane) Overhaul | 1 | JB | |||
| 3.30 | General Repairs - Top Side | 1 | JB | |||
| 3.31 | General Repairs - Bridge Deck and Above | 1 | JB | |||
| 3.32 | General Repairs - Upper Deck | 1 | JB | |||
| 3.33 | Door Modifications | 1 | JB | |||
| 3.34 | Freeboard Coating | 1 | JB | |||
| 3.35 | HVAC System Cleaning | 1 | JB | |||
| 3.36 | Switchboard Cleaning | 1 | JB | |||
| 3.37 | Stability Test (AKA Inclining Experiment) | 1 | JB | |||
| 3.38 | Dock and Sea Trials) | 1 | JB | |||
| Total Base Items | $0.00 | |||||
| ADDITIONAL ITEMS - GROWTH | ||||||
| ADDITIONAL ITEM REQUESTS (AIRs) These items relate to Growth Work. The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Additional Item Requests (AIRs) are issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered. | ||||||
| CLIN | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT PRICE | EXTENDED PRICE |
| 30000/40000 | 4.1 | AIRS/Growth (estimated) |
**Provide breakdown, as follows:
AIRs/Growth Labor Rate Unit Price: $________; Quantity: 1,000 ; Unit of Issue: Hour; Extended Price: $____________
| HRS | EST. 1,000 | |
| 30000/40000 | 4.1 | AIRs/Growth Material Markup/Handling Fee |
Unit Price: $100,000.00; Quantity: 1; Unit of Issue: Percent ________%;
Extended Price: [$100,000.00 X percentage quoted]: $______________
| % | EST. $100,000 | ||||
| N/A | Additional Temp Services (See CAR CLAUSE 1372.271-86) | Day | EST 1 | ||
| N/A | Laydays (See CAR CLAUSE 1372.271-89 | Day | EST 1 | ||
| Total Growth | $0.00 | ||||
| OPTION ITEMS |
CLIN SPEC
WORK
| ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT |
| PRICE | EXTENDED |
PRICE
| 5.1 | Electrical Modifications | 1 | JB | |
| 5.2 | Ship-Wide Fire Detection System Replacement | 1 | JB | |
| 5.3 | Self-Contained Air Conditioning Unit Installation | 1 | JB | |
| 5.4 | Lounge Modifications | 1 | JB | |
| 5.5 | SSDG Resilient Mounts Replacement | 1 | JB | |
| 5.6 | Valve Modifications and Replacements (ABS) | 1 | JB | |
| 5.7 | Air Conditioning Chiller and Refrigeration Replacement (ABS) | 1 | JB | |
| 5.8 | Refrigeration (Reefer) System Replacement (ABS) | 1 | JB | |
| 5.9 | Marine Growth Prevention System Installation | 1 | JB | |
| 5.10 | Gym Overhead Insulation Replacement | 1 | JB | |
| 5.11 | Mission System Mods | 1 | JB | |
| 5.12 | Main Deck Fan Room 1-67-3-Q | 1 | JB | |
| 5.13 | Preservation - Tanks and Voids | 1 | JB | |
| 5.14 | Preservation - Steering Gear Room, Tunnels and Bosun Workshop Ladder Well | 1 | JB | |
| 5.15 | Preservation - Sewage Tank | 1 | JB | |
| 5.16 | Ballast Tank Conversion (Underdevelopment) | 1 | JB | |
| Total Options | $0.00 |
| BASE |
| BASE + GROWTH |
| BASE+GROWTH+OPTIONS |