D.6 36C26325Q0155 Line Item Template.xlsx

XLSX spreadsheet 464 KB Posted

Attached to
J044--SF Boiler Plant Testing Inspections IDIQ Federal contract opportunity
Solicitation number
36C26325Q0155
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 23

About this file

This is a line item template spreadsheet for a VA contract (36C26325Q0155) for boiler plant testing and inspections at the Sioux Falls VA Healthcare System. The template outlines a 5-year IDIQ contract structure with a base period (2/1/25-1/31/26) and four one-year ordering periods extending through 1/31/30.

The line items cover recurring services including boiler inspections (3 per period), internal deaerator tank inspections (1 per period), fuel oil and natural gas setup from factory (1 each per period), post-inspection tuning (3 per period), and calibration of various devices (2 per period). Additional line items detail calibration requirements for specific components like steam flow transmitters, oxygen sampling systems, temperature transmitters, pressure controllers, and water level controllers. The contract uses NAICS code 238220 (Plumbing, Heating, and Air-Conditioning Contractors) and Product Service Code J044. Most line items are priced per EA (each) with some items marked as NSP (Not Separately Priced).

View the file

Other files for this federal contract opportunity

Other files attached to J044--SF Boiler Plant Testing Inspections IDIQ, newest first.
File Type Posted
36C26325Q0155 A0002.pdf PDF
36C26325Q0155 A0002_1.docx DOCX document
36C26325Q0155 A0001.pdf PDF
36C26325Q0155 A0001_1.docx DOCX document
D.1 VHA Boiler and Associated Plant Safety Device Testing Manual.pdf PDF
D.5 Service Contract Act WD 2015-5369.pdf PDF
36C26325Q0155.pdf PDF
36C26325Q0155_1.docx DOCX document
D.3 National Board Form- 6.pdf PDF
D.4 National Board Form- 7.pdf PDF
D.2 Boiler and Boiler Plant Operations Directive 1810.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Action Line Item Information

Action Type NamePrimary IDSecondary IDMod NumberTitleOrder Discount Type NameOrder Discount TypeOrder Discount
RFQVA69D-14-Q-0161Percent0

KB Version: FY22.12A

Items

Item NumberSLINDescriptionRef CLINCommentInclude Comments in DocumentOrdering Period 3Pop BeginPop EndQuantityUnit of MeasurePackaging MultipleReceipt TypeLine Item IsUnit PriceItem Discount Type NameItem DiscountDate UpdatedAddress1Address2Address3CityStateZipZip4CountryMark ForContact NameContact PhoneContact EmailDelivery DateFOBSpecial InstructionsInclude Instructions/Comments in DocumentInclude Data Values in DocumentPRINCIPAL NAICS CODEPRODUCT/SERVICE CODEUNSPSCSIC CODEMANUFACTURER PART NUMBER (MPN)NATIONAL STOCK NUMBERLOCAL STOCK NUMBERDM DOC IDDELIVERY REF. COUNTERUNIT TEXT/DESCRIPTIONDELIVERY REFERENCEITEM MASTER FILE NUMBEREXPENDABLE/NON-EXPENDABLEQUANTITY REQUESTEDUNIT OF PURCHASE CODE
0001VHA Boiler and Plant Safety Device TestingBase2/1/251/31/261JBPriced238220J044
0001AABoilersBase2/1/251/31/26EANSP238220J044
0001ABCondensate TankBase2/1/251/31/26EANSP238220J044
0001ACDeaerator TankBase2/1/251/31/26EANSP238220J044
0002Boiler InspectionBase2/1/251/31/263EAPriced238220J044
0003Internal Inspection of Deaerator TankBase2/1/251/31/261EAPriced238220J044
0004Fuel Oil Set Up from FactoryBase2/1/251/31/261EAPriced238220J044
0005Natural Gas Set Up from FactoryBase2/1/251/31/261EAPriced238220J044
0006Post Boiler Inspection Natural Gas and Fuel Oil TuningBase2/1/251/31/263EAPriced238220J044
0007Calibration of DevicesBase2/1/251/31/262EAPriced238220J044
0007AASteam Flow Transmitters (all)Base2/1/251/31/26EANSP238220J044
0007ABSteam Flow Recorders/Computer Readout (all)Base2/1/251/31/26EANSP238220J044
0007ACFlue Gas Oxygen Sampling, Analyzing, and Recorder/Computer Readout (all)Base2/1/251/31/26EANSP238220J044
0007ADAll Boiler and Economizer Stack Temperature Transmitters and Recorder/Computer Readout (all)Base2/1/251/31/26EANSP238220J044
0007AEMaster Steam Pressure and Combustion ControllersBase2/1/251/31/26EANSP238220J044
0007AFBoiler Outlet Draft ControllersBase2/1/251/31/26EANSP238220J044
0007AGBoiler Water Level Controllers (all)Base2/1/251/31/26EANSP238220J044
0007AHFeedwater Deaerator and Condensate Storage Tank Water Level Controllers Including OverflowBase2/1/251/31/26EANSP238220J044
0007AIPressure and Temperature Sensors and Transmitters (all)Base2/1/251/31/26EANSP238220J044
0007AJSignal Processing and Readout Devices (all)Base2/1/251/31/26EANSP238220J044
0008Parts for RepairBase2/1/251/31/26EANSP238220J044
1001VHA Boiler and Plant Safety Device TestingOrdering Period 12/1/261/31/271JBPriced238220J044
1001AABoilersOrdering Period 12/1/261/31/27EANSP238220J044
1001ABCondensate TankOrdering Period 12/1/261/31/27EANSP238220J044
1001ACDeaerator TankOrdering Period 12/1/261/31/27EANSP238220J044
1002Boiler InspectionOrdering Period 12/1/261/31/273EAPriced238220J044
1003Internal Inspection of Deaerator TankOrdering Period 12/1/261/31/271EAPriced238220J044
1004Fuel Oil Set Up from FactoryOrdering Period 12/1/261/31/271EAPriced238220J044
1005Natural Gas Set Up from FactoryOrdering Period 12/1/261/31/271EAPriced238220J044
1006Post Boiler Inspection Natural Gas and Fuel Oil TuningOrdering Period 12/1/261/31/273EAPriced238220J044
1007Calibration of DevicesOrdering Period 12/1/261/31/272EAPriced238220J044
1007AASteam Flow Transmitters (all)Ordering Period 12/1/261/31/27EANSP238220J044
1007ABSteam Flow Recorders/Computer Readout (all)Ordering Period 12/1/261/31/27EANSP238220J044
1007ACFlue Gas Oxygen Sampling, Analyzing, and Recorder/Computer Readout (all)Ordering Period 12/1/261/31/27EANSP238220J044
1007ADAll Boiler and Economizer Stack Temperature Transmitters and Recorder/Computer Readout (all)Ordering Period 12/1/261/31/27EANSP238220J044
1007AEMaster Steam Pressure and Combustion ControllersOrdering Period 12/1/261/31/27EANSP238220J044
1007AFBoiler Outlet Draft ControllersOrdering Period 12/1/261/31/27EANSP238220J044
1007AGBoiler Water Level Controllers (all)Ordering Period 12/1/261/31/27EANSP238220J044
1007AHFeedwater Deaerator and Condensate Storage Tank Water Level Controllers Including OverflowOrdering Period 12/1/261/31/27EANSP238220J044
1007AIPressure and Temperature Sensors and Transmitters (all)Ordering Period 12/1/261/31/27EANSP238220J044
1007AJSignal Processing and Readout Devices (all)Ordering Period 12/1/261/31/27EANSP238220J044
1008Parts for RepairOrdering Period 12/1/261/31/27EANSP238220J044
2001VHA Boiler and Plant Safety Device TestingOrdering Period 22/1/271/31/281JBPriced238220J044
2001AABoilersOrdering Period 22/1/271/31/28EANSP238220J044
2001ABCondensate TankOrdering Period 22/1/271/31/28EANSP238220J044
2001ACDeaerator TankOrdering Period 22/1/271/31/28EANSP238220J044
2002Boiler InspectionOrdering Period 22/1/271/31/283EAPriced238220J044
2003Internal Inspection of Deaerator TankOrdering Period 22/1/271/31/281EAPriced238220J044
2004Fuel Oil Set Up from FactoryOrdering Period 22/1/271/31/281EAPriced238220J044
2005Natural Gas Set Up from FactoryOrdering Period 22/1/271/31/281EAPriced238220J044
2006Post Boiler Inspection Natural Gas and Fuel Oil TuningOrdering Period 22/1/271/31/283EAPriced238220J044
2007Calibration of DevicesOrdering Period 22/1/271/31/282EAPriced238220J044
2007AASteam Flow Transmitters (all)Ordering Period 22/1/271/31/28EANSP238220J044
2007ABSteam Flow Recorders/Computer Readout (all)Ordering Period 22/1/271/31/28EANSP238220J044
2007ACFlue Gas Oxygen Sampling, Analyzing, and Recorder/Computer Readout (all)Ordering Period 22/1/271/31/28EANSP238220J044
2007ADAll Boiler and Economizer Stack Temperature Transmitters and Recorder/Computer Readout (all)Ordering Period 22/1/271/31/28EANSP238220J044
2007AEMaster Steam Pressure and Combustion ControllersOrdering Period 22/1/271/31/28EANSP238220J044
2007AFBoiler Outlet Draft ControllersOrdering Period 22/1/271/31/28EANSP238220J044
2007AGBoiler Water Level Controllers (all)Ordering Period 22/1/271/31/28EANSP238220J044
2007AHFeedwater Deaerator and Condensate Storage Tank Water Level Controllers Including OverflowOrdering Period 22/1/271/31/28EANSP238220J044
2007AIPressure and Temperature Sensors and Transmitters (all)Ordering Period 22/1/271/31/28EANSP238220J044
2007AJSignal Processing and Readout Devices (all)Ordering Period 22/1/271/31/28EANSP238220J044
2008Parts for RepairOrdering Period 22/1/271/31/28EANSP238220J044
3001VHA Boiler and Plant Safety Device TestingOrdering Period 32/1/281/31/291JBPriced238220J044
3001AABoilersOrdering Period 32/1/281/31/29EANSP238220J044
3001ABCondensate TankOrdering Period 32/1/281/31/29EANSP238220J044
3001ACDeaerator TankOrdering Period 32/1/281/31/29EANSP238220J044
3002Boiler InspectionOrdering Period 32/1/281/31/293EAPriced238220J044
3003Internal Inspection of Deaerator TankOrdering Period 32/1/281/31/291EAPriced238220J044
3004Fuel Oil Set Up from FactoryOrdering Period 32/1/281/31/291EAPriced238220J044
3005Natural Gas Set Up from FactoryOrdering Period 32/1/281/31/291EAPriced238220J044
3006Post Boiler Inspection Natural Gas and Fuel Oil TuningOrdering Period 32/1/281/31/293EAPriced238220J044
3007Calibration of DevicesOrdering Period 32/1/281/31/292EAPriced238220J044
3007AASteam Flow Transmitters (all)Ordering Period 32/1/281/31/29EANSP238220J044
3007ABSteam Flow Recorders/Computer Readout (all)Ordering Period 32/1/281/31/29EANSP238220J044
3007ACFlue Gas Oxygen Sampling, Analyzing, and Recorder/Computer Readout (all)Ordering Period 32/1/281/31/29EANSP238220J044
3007ADAll Boiler and Economizer Stack Temperature Transmitters and Recorder/Computer Readout (all)Ordering Period 32/1/281/31/29EANSP238220J044
3007AEMaster Steam Pressure and Combustion ControllersOrdering Period 32/1/281/31/29EANSP238220J044
3007AFBoiler Outlet Draft ControllersOrdering Period 32/1/281/31/29EANSP238220J044
3007AGBoiler Water Level Controllers (all)Ordering Period 32/1/281/31/29EANSP238220J044
3007AHFeedwater Deaerator and Condensate Storage Tank Water Level Controllers Including OverflowOrdering Period 32/1/281/31/29EANSP238220J044
3007AIPressure and Temperature Sensors and Transmitters (all)Ordering Period 32/1/281/31/29EANSP238220J044
3007AJSignal Processing and Readout Devices (all)Ordering Period 32/1/281/31/29EANSP238220J044
3008Parts for RepairOrdering Period 32/1/281/31/29EANSP238220J044
4001VHA Boiler and Plant Safety Device TestingOrdering Period 42/1/291/31/301JBPriced238220J044
4001AABoilersOrdering Period 42/1/291/31/30EANSP238220J044
4001ABCondensate TankOrdering Period 42/1/291/31/30EANSP238220J044
4001ACDeaerator TankOrdering Period 42/1/291/31/30EANSP238220J044
4002Boiler InspectionOrdering Period 42/1/291/31/303EAPriced238220J044
4003Internal Inspection of Deaerator TankOrdering Period 42/1/291/31/301EAPriced238220J044
4004Fuel Oil Set Up from FactoryOrdering Period 42/1/291/31/301EAPriced238220J044
4005Natural Gas Set Up from FactoryOrdering Period 42/1/291/31/301EAPriced238220J044
4006Post Boiler Inspection Natural Gas and Fuel Oil TuningOrdering Period 42/1/291/31/303EAPriced238220J044
4007Calibration of DevicesOrdering Period 42/1/291/31/302EAPriced238220J044
4007AASteam Flow Transmitters (all)Ordering Period 42/1/291/31/30EANSP238220J044
4007ABSteam Flow Recorders/Computer Readout (all)Ordering Period 42/1/291/31/30EANSP238220J044
4007ACFlue Gas Oxygen Sampling, Analyzing, and Recorder/Computer Readout (all)Ordering Period 42/1/291/31/30EANSP238220J044
4007ADAll Boiler and Economizer Stack Temperature Transmitters and Recorder/Computer Readout (all)Ordering Period 42/1/291/31/30EANSP238220J044
4007AEMaster Steam Pressure and Combustion ControllersOrdering Period 42/1/291/31/30EANSP238220J044
4007AFBoiler Outlet Draft ControllersOrdering Period 42/1/291/31/30EANSP238220J044
4007AGBoiler Water Level Controllers (all)Ordering Period 42/1/291/31/30EANSP238220J044
4007AHFeedwater Deaerator and Condensate Storage Tank Water Level Controllers Including OverflowOrdering Period 42/1/291/31/30EANSP238220J044
4007AIPressure and Temperature Sensors and Transmitters (all)Ordering Period 42/1/291/31/30EANSP238220J044
4007AJSignal Processing and Readout Devices (all)Ordering Period 42/1/291/31/30EANSP238220J044
4008Parts for RepairOrdering Period 42/1/291/31/30EANSP238220J044