D.6 36C26325Q0155 Line Item Template.xlsx
XLSX spreadsheet 464 KB Posted
- Attached to
- J044--SF Boiler Plant Testing Inspections IDIQ Federal contract opportunity
- Solicitation number
- 36C26325Q0155
About this file
This is a line item template spreadsheet for a VA contract (36C26325Q0155) for boiler plant testing and inspections at the Sioux Falls VA Healthcare System. The template outlines a 5-year IDIQ contract structure with a base period (2/1/25-1/31/26) and four one-year ordering periods extending through 1/31/30.
The line items cover recurring services including boiler inspections (3 per period), internal deaerator tank inspections (1 per period), fuel oil and natural gas setup from factory (1 each per period), post-inspection tuning (3 per period), and calibration of various devices (2 per period). Additional line items detail calibration requirements for specific components like steam flow transmitters, oxygen sampling systems, temperature transmitters, pressure controllers, and water level controllers. The contract uses NAICS code 238220 (Plumbing, Heating, and Air-Conditioning Contractors) and Product Service Code J044. Most line items are priced per EA (each) with some items marked as NSP (Not Separately Priced).
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26325Q0155 A0002.pdf | ||
| 36C26325Q0155 A0002_1.docx | DOCX document | |
| 36C26325Q0155 A0001.pdf | ||
| 36C26325Q0155 A0001_1.docx | DOCX document | |
| D.1 VHA Boiler and Associated Plant Safety Device Testing Manual.pdf | ||
| D.5 Service Contract Act WD 2015-5369.pdf | ||
| 36C26325Q0155.pdf | ||
| 36C26325Q0155_1.docx | DOCX document | |
| D.3 National Board Form- 6.pdf | ||
| D.4 National Board Form- 7.pdf | ||
| D.2 Boiler and Boiler Plant Operations Directive 1810.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Action Line Item Information
| Action Type Name | Primary ID | Secondary ID | Mod Number | Title | Order Discount Type Name | Order Discount Type | Order Discount |
| RFQ | VA69D-14-Q-0161 | Percent | 0 |
KB Version: FY22.12A
Items
| Item Number | SLIN | Description | Ref CLIN | Comment | Include Comments in Document | Ordering Period 3 | Pop Begin | Pop End | Quantity | Unit of Measure | Packaging Multiple | Receipt Type | Line Item Is | Unit Price | Item Discount Type Name | Item Discount | Date Updated | Address1 | Address2 | Address3 | City | State | Zip | Zip4 | Country | Mark For | Contact Name | Contact Phone | Contact Email | Delivery Date | FOB | Special Instructions | Include Instructions/Comments in Document | Include Data Values in Document | PRINCIPAL NAICS CODE | PRODUCT/SERVICE CODE | UNSPSC | SIC CODE | MANUFACTURER PART NUMBER (MPN) | NATIONAL STOCK NUMBER | LOCAL STOCK NUMBER | DM DOC ID | DELIVERY REF. COUNTER | UNIT TEXT/DESCRIPTION | DELIVERY REFERENCE | ITEM MASTER FILE NUMBER | EXPENDABLE/NON-EXPENDABLE | QUANTITY REQUESTED | UNIT OF PURCHASE CODE |
| 0001 | VHA Boiler and Plant Safety Device Testing | Base | 2/1/25 | 1/31/26 | 1 | JB | Priced | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 0001 | AA | Boilers | Base | 2/1/25 | 1/31/26 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 0001 | AB | Condensate Tank | Base | 2/1/25 | 1/31/26 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 0001 | AC | Deaerator Tank | Base | 2/1/25 | 1/31/26 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 0002 | Boiler Inspection | Base | 2/1/25 | 1/31/26 | 3 | EA | Priced | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 0003 | Internal Inspection of Deaerator Tank | Base | 2/1/25 | 1/31/26 | 1 | EA | Priced | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 0004 | Fuel Oil Set Up from Factory | Base | 2/1/25 | 1/31/26 | 1 | EA | Priced | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 0005 | Natural Gas Set Up from Factory | Base | 2/1/25 | 1/31/26 | 1 | EA | Priced | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 0006 | Post Boiler Inspection Natural Gas and Fuel Oil Tuning | Base | 2/1/25 | 1/31/26 | 3 | EA | Priced | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 0007 | Calibration of Devices | Base | 2/1/25 | 1/31/26 | 2 | EA | Priced | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 0007 | AA | Steam Flow Transmitters (all) | Base | 2/1/25 | 1/31/26 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 0007 | AB | Steam Flow Recorders/Computer Readout (all) | Base | 2/1/25 | 1/31/26 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 0007 | AC | Flue Gas Oxygen Sampling, Analyzing, and Recorder/Computer Readout (all) | Base | 2/1/25 | 1/31/26 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 0007 | AD | All Boiler and Economizer Stack Temperature Transmitters and Recorder/Computer Readout (all) | Base | 2/1/25 | 1/31/26 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 0007 | AE | Master Steam Pressure and Combustion Controllers | Base | 2/1/25 | 1/31/26 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 0007 | AF | Boiler Outlet Draft Controllers | Base | 2/1/25 | 1/31/26 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 0007 | AG | Boiler Water Level Controllers (all) | Base | 2/1/25 | 1/31/26 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 0007 | AH | Feedwater Deaerator and Condensate Storage Tank Water Level Controllers Including Overflow | Base | 2/1/25 | 1/31/26 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 0007 | AI | Pressure and Temperature Sensors and Transmitters (all) | Base | 2/1/25 | 1/31/26 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 0007 | AJ | Signal Processing and Readout Devices (all) | Base | 2/1/25 | 1/31/26 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 0008 | Parts for Repair | Base | 2/1/25 | 1/31/26 | EA | NSP | 238220 | J044 | |||||||||||||||||||||||||||||||||||||||||
| 1001 | VHA Boiler and Plant Safety Device Testing | Ordering Period 1 | 2/1/26 | 1/31/27 | 1 | JB | Priced | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 1001 | AA | Boilers | Ordering Period 1 | 2/1/26 | 1/31/27 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 1001 | AB | Condensate Tank | Ordering Period 1 | 2/1/26 | 1/31/27 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 1001 | AC | Deaerator Tank | Ordering Period 1 | 2/1/26 | 1/31/27 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 1002 | Boiler Inspection | Ordering Period 1 | 2/1/26 | 1/31/27 | 3 | EA | Priced | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 1003 | Internal Inspection of Deaerator Tank | Ordering Period 1 | 2/1/26 | 1/31/27 | 1 | EA | Priced | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 1004 | Fuel Oil Set Up from Factory | Ordering Period 1 | 2/1/26 | 1/31/27 | 1 | EA | Priced | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 1005 | Natural Gas Set Up from Factory | Ordering Period 1 | 2/1/26 | 1/31/27 | 1 | EA | Priced | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 1006 | Post Boiler Inspection Natural Gas and Fuel Oil Tuning | Ordering Period 1 | 2/1/26 | 1/31/27 | 3 | EA | Priced | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 1007 | Calibration of Devices | Ordering Period 1 | 2/1/26 | 1/31/27 | 2 | EA | Priced | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 1007 | AA | Steam Flow Transmitters (all) | Ordering Period 1 | 2/1/26 | 1/31/27 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 1007 | AB | Steam Flow Recorders/Computer Readout (all) | Ordering Period 1 | 2/1/26 | 1/31/27 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 1007 | AC | Flue Gas Oxygen Sampling, Analyzing, and Recorder/Computer Readout (all) | Ordering Period 1 | 2/1/26 | 1/31/27 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 1007 | AD | All Boiler and Economizer Stack Temperature Transmitters and Recorder/Computer Readout (all) | Ordering Period 1 | 2/1/26 | 1/31/27 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 1007 | AE | Master Steam Pressure and Combustion Controllers | Ordering Period 1 | 2/1/26 | 1/31/27 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 1007 | AF | Boiler Outlet Draft Controllers | Ordering Period 1 | 2/1/26 | 1/31/27 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 1007 | AG | Boiler Water Level Controllers (all) | Ordering Period 1 | 2/1/26 | 1/31/27 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 1007 | AH | Feedwater Deaerator and Condensate Storage Tank Water Level Controllers Including Overflow | Ordering Period 1 | 2/1/26 | 1/31/27 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 1007 | AI | Pressure and Temperature Sensors and Transmitters (all) | Ordering Period 1 | 2/1/26 | 1/31/27 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 1007 | AJ | Signal Processing and Readout Devices (all) | Ordering Period 1 | 2/1/26 | 1/31/27 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 1008 | Parts for Repair | Ordering Period 1 | 2/1/26 | 1/31/27 | EA | NSP | 238220 | J044 | |||||||||||||||||||||||||||||||||||||||||
| 2001 | VHA Boiler and Plant Safety Device Testing | Ordering Period 2 | 2/1/27 | 1/31/28 | 1 | JB | Priced | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 2001 | AA | Boilers | Ordering Period 2 | 2/1/27 | 1/31/28 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 2001 | AB | Condensate Tank | Ordering Period 2 | 2/1/27 | 1/31/28 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 2001 | AC | Deaerator Tank | Ordering Period 2 | 2/1/27 | 1/31/28 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 2002 | Boiler Inspection | Ordering Period 2 | 2/1/27 | 1/31/28 | 3 | EA | Priced | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 2003 | Internal Inspection of Deaerator Tank | Ordering Period 2 | 2/1/27 | 1/31/28 | 1 | EA | Priced | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 2004 | Fuel Oil Set Up from Factory | Ordering Period 2 | 2/1/27 | 1/31/28 | 1 | EA | Priced | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 2005 | Natural Gas Set Up from Factory | Ordering Period 2 | 2/1/27 | 1/31/28 | 1 | EA | Priced | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 2006 | Post Boiler Inspection Natural Gas and Fuel Oil Tuning | Ordering Period 2 | 2/1/27 | 1/31/28 | 3 | EA | Priced | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 2007 | Calibration of Devices | Ordering Period 2 | 2/1/27 | 1/31/28 | 2 | EA | Priced | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 2007 | AA | Steam Flow Transmitters (all) | Ordering Period 2 | 2/1/27 | 1/31/28 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 2007 | AB | Steam Flow Recorders/Computer Readout (all) | Ordering Period 2 | 2/1/27 | 1/31/28 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 2007 | AC | Flue Gas Oxygen Sampling, Analyzing, and Recorder/Computer Readout (all) | Ordering Period 2 | 2/1/27 | 1/31/28 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 2007 | AD | All Boiler and Economizer Stack Temperature Transmitters and Recorder/Computer Readout (all) | Ordering Period 2 | 2/1/27 | 1/31/28 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 2007 | AE | Master Steam Pressure and Combustion Controllers | Ordering Period 2 | 2/1/27 | 1/31/28 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 2007 | AF | Boiler Outlet Draft Controllers | Ordering Period 2 | 2/1/27 | 1/31/28 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 2007 | AG | Boiler Water Level Controllers (all) | Ordering Period 2 | 2/1/27 | 1/31/28 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 2007 | AH | Feedwater Deaerator and Condensate Storage Tank Water Level Controllers Including Overflow | Ordering Period 2 | 2/1/27 | 1/31/28 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 2007 | AI | Pressure and Temperature Sensors and Transmitters (all) | Ordering Period 2 | 2/1/27 | 1/31/28 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 2007 | AJ | Signal Processing and Readout Devices (all) | Ordering Period 2 | 2/1/27 | 1/31/28 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 2008 | Parts for Repair | Ordering Period 2 | 2/1/27 | 1/31/28 | EA | NSP | 238220 | J044 | |||||||||||||||||||||||||||||||||||||||||
| 3001 | VHA Boiler and Plant Safety Device Testing | Ordering Period 3 | 2/1/28 | 1/31/29 | 1 | JB | Priced | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 3001 | AA | Boilers | Ordering Period 3 | 2/1/28 | 1/31/29 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 3001 | AB | Condensate Tank | Ordering Period 3 | 2/1/28 | 1/31/29 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 3001 | AC | Deaerator Tank | Ordering Period 3 | 2/1/28 | 1/31/29 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 3002 | Boiler Inspection | Ordering Period 3 | 2/1/28 | 1/31/29 | 3 | EA | Priced | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 3003 | Internal Inspection of Deaerator Tank | Ordering Period 3 | 2/1/28 | 1/31/29 | 1 | EA | Priced | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 3004 | Fuel Oil Set Up from Factory | Ordering Period 3 | 2/1/28 | 1/31/29 | 1 | EA | Priced | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 3005 | Natural Gas Set Up from Factory | Ordering Period 3 | 2/1/28 | 1/31/29 | 1 | EA | Priced | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 3006 | Post Boiler Inspection Natural Gas and Fuel Oil Tuning | Ordering Period 3 | 2/1/28 | 1/31/29 | 3 | EA | Priced | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 3007 | Calibration of Devices | Ordering Period 3 | 2/1/28 | 1/31/29 | 2 | EA | Priced | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 3007 | AA | Steam Flow Transmitters (all) | Ordering Period 3 | 2/1/28 | 1/31/29 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 3007 | AB | Steam Flow Recorders/Computer Readout (all) | Ordering Period 3 | 2/1/28 | 1/31/29 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 3007 | AC | Flue Gas Oxygen Sampling, Analyzing, and Recorder/Computer Readout (all) | Ordering Period 3 | 2/1/28 | 1/31/29 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 3007 | AD | All Boiler and Economizer Stack Temperature Transmitters and Recorder/Computer Readout (all) | Ordering Period 3 | 2/1/28 | 1/31/29 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 3007 | AE | Master Steam Pressure and Combustion Controllers | Ordering Period 3 | 2/1/28 | 1/31/29 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 3007 | AF | Boiler Outlet Draft Controllers | Ordering Period 3 | 2/1/28 | 1/31/29 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 3007 | AG | Boiler Water Level Controllers (all) | Ordering Period 3 | 2/1/28 | 1/31/29 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 3007 | AH | Feedwater Deaerator and Condensate Storage Tank Water Level Controllers Including Overflow | Ordering Period 3 | 2/1/28 | 1/31/29 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 3007 | AI | Pressure and Temperature Sensors and Transmitters (all) | Ordering Period 3 | 2/1/28 | 1/31/29 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 3007 | AJ | Signal Processing and Readout Devices (all) | Ordering Period 3 | 2/1/28 | 1/31/29 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 3008 | Parts for Repair | Ordering Period 3 | 2/1/28 | 1/31/29 | EA | NSP | 238220 | J044 | |||||||||||||||||||||||||||||||||||||||||
| 4001 | VHA Boiler and Plant Safety Device Testing | Ordering Period 4 | 2/1/29 | 1/31/30 | 1 | JB | Priced | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 4001 | AA | Boilers | Ordering Period 4 | 2/1/29 | 1/31/30 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 4001 | AB | Condensate Tank | Ordering Period 4 | 2/1/29 | 1/31/30 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 4001 | AC | Deaerator Tank | Ordering Period 4 | 2/1/29 | 1/31/30 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 4002 | Boiler Inspection | Ordering Period 4 | 2/1/29 | 1/31/30 | 3 | EA | Priced | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 4003 | Internal Inspection of Deaerator Tank | Ordering Period 4 | 2/1/29 | 1/31/30 | 1 | EA | Priced | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 4004 | Fuel Oil Set Up from Factory | Ordering Period 4 | 2/1/29 | 1/31/30 | 1 | EA | Priced | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 4005 | Natural Gas Set Up from Factory | Ordering Period 4 | 2/1/29 | 1/31/30 | 1 | EA | Priced | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 4006 | Post Boiler Inspection Natural Gas and Fuel Oil Tuning | Ordering Period 4 | 2/1/29 | 1/31/30 | 3 | EA | Priced | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 4007 | Calibration of Devices | Ordering Period 4 | 2/1/29 | 1/31/30 | 2 | EA | Priced | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 4007 | AA | Steam Flow Transmitters (all) | Ordering Period 4 | 2/1/29 | 1/31/30 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 4007 | AB | Steam Flow Recorders/Computer Readout (all) | Ordering Period 4 | 2/1/29 | 1/31/30 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 4007 | AC | Flue Gas Oxygen Sampling, Analyzing, and Recorder/Computer Readout (all) | Ordering Period 4 | 2/1/29 | 1/31/30 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 4007 | AD | All Boiler and Economizer Stack Temperature Transmitters and Recorder/Computer Readout (all) | Ordering Period 4 | 2/1/29 | 1/31/30 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 4007 | AE | Master Steam Pressure and Combustion Controllers | Ordering Period 4 | 2/1/29 | 1/31/30 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 4007 | AF | Boiler Outlet Draft Controllers | Ordering Period 4 | 2/1/29 | 1/31/30 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 4007 | AG | Boiler Water Level Controllers (all) | Ordering Period 4 | 2/1/29 | 1/31/30 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 4007 | AH | Feedwater Deaerator and Condensate Storage Tank Water Level Controllers Including Overflow | Ordering Period 4 | 2/1/29 | 1/31/30 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 4007 | AI | Pressure and Temperature Sensors and Transmitters (all) | Ordering Period 4 | 2/1/29 | 1/31/30 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 4007 | AJ | Signal Processing and Readout Devices (all) | Ordering Period 4 | 2/1/29 | 1/31/30 | EA | NSP | 238220 | J044 | ||||||||||||||||||||||||||||||||||||||||
| 4008 | Parts for Repair | Ordering Period 4 | 2/1/29 | 1/31/30 | EA | NSP | 238220 | J044 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .