This is Amendment A0002 to solicitation 36C26325Q0155 for boiler plant testing and inspections at the Sioux Falls VA Healthcare System. The amendment extends the proposal deadline to January 16, 2025 at 12:00 PM CST and provides answers to seven contractor questions.
The amendment clarifies technical details about the equipment, including the presence of three drum level transmitters (Azbil AT9000), three boiler steam flow transmitters (Azbil AT9000), five steam flow transmitters (DPharp EJA 110A), and two header pressure transmitters. It specifies requirements for burner fan vibration testing using tri-axial accelerometers and details two equipment groupings: Group 1 consisting of 3 Johnston Boilers, 1 PMI Deaerator, 1 condensate tank, and 3 CMAX burners; or Group 2 with 3-500 HP boilers, 1-Tray deaerator, 1 condensate tank, and 3-TBD Burners. The amendment also clarifies that the last 6-year magnetic testing was performed in May 2021 and addresses questions about burner commissioning requirements for both fuel oil and natural gas.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26325Q0155 A0002_1.docx | DOCX document | |
| 36C26325Q0155 A0001.pdf | ||
| 36C26325Q0155 A0001_1.docx | DOCX document | |
| D.6 36C26325Q0155 Line Item Template.xlsx | XLSX spreadsheet | |
| D.4 National Board Form- 7.pdf | ||
| D.2 Boiler and Boiler Plant Operations Directive 1810.pdf | ||
| D.1 VHA Boiler and Associated Plant Safety Device Testing Manual.pdf | ||
| 36C26325Q0155.pdf | ||
| 36C26325Q0155_1.docx | DOCX document | |
| D.3 National Board Form- 6.pdf | ||
| D.5 Service Contract Act WD 2015-5369.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 4
A0002 01-03-2025
Unchanged
Department of Veterans Affairs
NETWORK 23 CONTRACTING OFFICE
1303 5th St
Suite 300
Coralville IA 52241
Department of Veterans Affairs
NETWORK 23 CONTRACTING OFFICE
1303 5th St, Suite 300
Coralville IA 52241
36C26325Q0155
12-12-2025
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 01-16-2025 12:00 PM CST
See CONTINUATION Page
Unchanged
1 1
The purpose of this amendment is to:
1. Answer questions received from contractors regarding the statement of work. See pages 2-4.
2. Extend the deadline for the solicitation to 1/16/2025 at 12:00 PM CST.
3. All other terms and conditions remain unchanged.
Joshua Imdacha
Contracting Officer
CONTINUATION PAGE
Questions Received from Offerors:
Question 1.
Provide a list of meters and devices, including manufacture and model/part number, for all equipment.
Answer 1.
Transmitters in the plant
3 drum level transmitters. North side of each boiler.
-Azbil AT9000 Advanced Transmitter (in H2O).
3 Boiler steam flow transmitters. North side of the #1 boiler.
-Azbil AT9000 Advanced Transmitter (in H2O).
5 Steam flow transmitters. By the pit. (Plus 3 for the gray boxes for the 6”/8”/2” lines)
-DPharp Transmitter, Model EJA 110A, Style S1.
2 Header pressure transmitters. Inside the control cabinet.
-Azbil AT9000 Advanced Transmitter (in PSI)
(Plus, a Johnson Controls Penn sensor and a United Electric Controls Co. for the
Annunciator Panel)
Question 2.
What is the acceptable method of testing burner fans vibration?
Answer 2.
Contractor shall complete industry standard vibration analysis on burner fans. Each burner fan and every bearing shall be tested. Vibration analysis test shall involve mounting a tri-axial accelerometer on the fan housing near the bearings, allowing it to measure vibrations in the horizontal, vertical, and axial directions while the fan operates at its design speed, with the collected data then analyzed to identify any unusual vibration peaks and diagnose potential issues like imbalance, misalignment, bearing problems, or structural damage; this analysis shall be conducted using specialized software. Results of tests shall be provided with inspection reports.
Question 3.
If a fan blade assembly requires additional cleaning, replacement, or balancing, we would provide a proposal to correct the issue found through visual and audible or from the process of a combustion efficiency tuning.
Answer 3.
Corrective actions proposals procedure is outlined in the “Parts for repair” language in the SOW.
Question 4.
In what calendar year was the last 6-year magnetic testing performed?
Answer 4.
May 2021
Question 5.
Item #4 (page 8-9) - Is this referring to the new boilers 4,5,6. In other words the awarded contractor is required to commission the new boilers on fuel oil?
Answer 5.
Pages 8-9 detail work associated with the safety device testing for a complete boiler plant as part of line item 1. Contract line item offer grouping is as follows: GROUP 1: 3-
Johnston Boilers, 1 PMI Deaerator, 1 condensate tank, and 3 CMAX burner OR GROUP
2: 3-500 HP boilers, 1-Tray deaerator, 1 condensate tank, and 3-TBD Burners. (TBD burners shall be assumed to match performance and inspection requires as the existing
CMAX burners). Page 15 outlines the requirements for setup on fuel oil as a separate line item.
Question 6.
Item #5 (page 9) - Is this referring to the new boilers 4,5,6. In other words the awarded contractor is required to commission the new boilers on natural gas?
Answer 6.
Page 9 details work associated with the safety device testing for a complete boiler plant as part of line item 1. Contract line item offer grouping is as follows: GROUP 1: 3-
Johnston Boilers, 1 PMI Deaerator, 1 condensate tank, and 3 CMAX burner OR GROUP
2: 3-500 HP boilers, 1-Tray deaerator, 1 condensate tank, and 3-TBD Burners. Page 15 outlines the requirements for setup on natural gas as a separate line item.
Question 7.
Factory ONLY Set up the burner on either fuel. This requirement is usually used when a new burner is installed to ensure burners will operate as what the factory has designed it to do. This also ensures that factory warranty is achieved. Most service personnel have multiple factory training certificates on tuning the burners to the factory settings. Stating to have FACTORY ONLY, puts extra cost in the job.
Answer 7.
Page 15 of the contract SOW includes a work description for tasks required to reestablish burner performance from an “out of the box” state. There is no requirement to include or exclude a factory representative as part of this work. The naming convention of the line items beginning on page 22 is a short description of the work.