About this file

This is a Standard Form 1449 and associated Statement of Work for a 5-year Single Award IDIQ contract for boiler plant testing and inspections at the Sioux Falls VA Health Care System. The solicitation (36C26325Q0155) is a 100% SDVOSB set-aside with a NAICS code of 238220 and $19M size standard.

The contract requires inspection, safety device testing, and calibration services for boiler plant burners, controls, instruments and inspection of boilers and feedwater deaerators. Work includes both scheduled preventive maintenance and unscheduled emergent maintenance, with services to be performed Monday-Friday 8:00am-4:30pm except federal holidays. The contractor must provide personnel within 10 calendar days of request and respond to inquiries within 1 day. Key requirements include spring and winter safety device testing, boiler tune-ups, internal inspections, fuel oil and natural gas setup, post-inspection tuning, and calibration of various devices and instruments. The solicitation has a response deadline of December 27, 2024 at 4:00pm CST. Questions must be submitted 72 hours before the response deadline to the listed contracting officers. The maximum contract value is set at $700,000 with a guaranteed minimum of $10,000.

View the file

Other files for this federal contract opportunity

Other files attached to J044--SF Boiler Plant Testing Inspections IDIQ, newest first.
File Type Posted
36C26325Q0155 A0002.pdf PDF
36C26325Q0155 A0002_1.docx DOCX document
36C26325Q0155 A0001_1.docx DOCX document
36C26325Q0155 A0001.pdf PDF
D.5 Service Contract Act WD 2015-5369.pdf PDF
D.1 VHA Boiler and Associated Plant Safety Device Testing Manual.pdf PDF
D.6 36C26325Q0155 Line Item Template.xlsx XLSX spreadsheet
D.4 National Board Form- 7.pdf PDF
D.2 Boiler and Boiler Plant Operations Directive 1810.pdf PDF
36C26325Q0155_1.docx DOCX document
D.3 National Board Form- 6.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE 1 OF 1. REQUISITION NO.

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NO. 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

a. NAME b. TELEPHONE NO. (No Collect Calls) 8. OFFER DUE DATE/LOCAL

TIME

9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS:

SIZE STANDARD:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ IFB RFP

15. DELIVER TO CODE 16. ADMINISTERED BY CODE

17a. CONTRACTOR/OFFEROR CODE FACILITY CODE 18a. PAYMENT WILL BE MADE BY CODE

TELEPHONE NO. UEI: EFT:

PHONE: FAX:

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED

SEE ADDENDUM

19. 20. 21. 22. 23. 24.

ITEM NO. SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________ 29. AWARD OF CONTRACT: REF. ___________________________________ OFFER

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DATED ________________________________. YOUR OFFER ON SOLICITATION

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION (REV. NOV 2021)

PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212

7. FOR SOLICITATION

INFORMATION CALL:

STANDARD FORM 1449

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

36C26325Q0155 12-12-2024

Jennifer Watkins-Schoenig 319-688-3631 12-27-2024

4:00 PM CST

Department of Veterans Affairs

NETWORK 23 CONTRACTING OFFICE

1303 5th St

Suite 300

Coralville IA 52241

X 100

X

238220

$19 Million

N/A

X

Department of Veterans Affairs

Sioux Falls VAHCS

2501 W 22nd Street

Sioux Falls SD 57105

Department of Veterans Affairs

NETWORK 23 CONTRACTING OFFICE

1303 5th St, Suite 300

Coralville IA 52241

Department of Veterans Affairs

FMS-VA-2(101)

Financial Services Center

PO Box 149971

Austin TX 78714-9971

X

See CONTINUATION Page

NCO 23 plans to award a 5 year, Single Award, IDIQ for

Boiler Plant Testing and Inspections for the Sioux Falls SD

VAHCS.

See the Statement of Work in Section B.2

See the Schedule of Services in Section B.3

Total SDVOSB Set Aside

FAR 13.5 Simplified Acquisition Procedures

Comparative Evaluation, see provision 52.212-2 for items required to be submitted with proposals

FOR CONSIDERATION, ALL QUESTIONS MUST BE RECEIVED 72 HOURS

BEFORE DATE STIPULATED IN BLOCK 8 OF THE SF1449 FORM.

EMAIL ALL QUESTIONS AND RESPONSES TO:

JENNIFER.WATKINS-SCHOENIG@VA.GOV AND JOSHUA.IMDACHA@VA.GOV

SIGN SF1449 AND RETURN ALL PAGES WITH OFFER SUBMISSION

Department of Labor Wage Determination WD 15-5369 applies to services performed, see the attached document: WD 15-5369

See CONTINUATION Page

To be funded by task orders

X X

X 1

Joshua Imdacha

Contracting Officer

36C26325Q0155

Table of Contents

SECTION A

A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS

AND COMMERCIAL SERVICES

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

B.2 STATEMENT OF WORK

B.3 PRICE/COST SCHEDULE

SECTION C - CONTRACT CLAUSES

C.1 IT CONTRACT SECURITY

C.2 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS

AND COMMERCIAL SERVICES (NOV 2023)

C.3 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

C.4 52.216-18 ORDERING (AUG 2020)

C.5 52.216-19 ORDER LIMITATIONS (OCT 1995)

C.6 52.216-22 INDEFINITE QUANTITY (OCT 1995)

C.7 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

C.8 52.232-18 AVAILABILITY OF FUNDS (APR 1984)

C.9 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022)

C.10 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)

C.11 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED

SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023)

(DEVIATION)

C.12 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—

CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023)

(DEVIATION)

C.13 SUPPLEMENTAL INSURANCE REQUIREMENTS

C.14 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS

(NOV 2018)

C.15 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) ..53

C.16 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT

STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES (MAY 2024)

SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS

D.1 VHA Boiler and Associated Plant Safety Device Testing Manual

D.2 Boiler and boiler plant operations directive 1810

D.3 National Board Form- 6

D.4 National Board Form- 7

D.5 Service Contract Act WD 2015-5369

D.6 36C26325Q0155 Line Item Template

SECTION E - SOLICITATION PROVISIONS

E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES (SEP 2023)

E.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS

AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

E.3 52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT

ORDERS—REPRESENTATION AND DISCLOSURES (DEC 2023)

E.4 52.233-2 SERVICE OF PROTEST (SEP 2006)

E.5 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB

1998)

E.6 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION

(OCT 2018)

E.7 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)

E.8 VAAR 852.239-75 INFORMATION AND COMMUNICATION TECHNOLOGY

ACCESSIBILITY NOTICE (FEB 2023)

E.9 52.212-2 EVALUATION—COMMERCIAL PRODUCTS AND COMMERCIAL

SERVICES (NOV 2021)

ADDENDUM to 52.212-2 EVALUATION—COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES

E.10 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—

COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAY 2024)

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

1. Contract Administration: All contract administration matters will be handled by the following individuals:

a. CONTRACTOR:

b. GOVERNMENT: Contracting Officer 36C263

Department of Veterans Affairs

NETWORK 23 CONTRACTING OFFICE

1303 5th St

Suite 300

Coralville IA 52241

2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:

[X] 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or

[] 52.232-36, Payment by Third Party

3. INVOICES: Invoices shall be submitted in arrears:

a. Quarterly []

b. Semi-Annually []

c. Other [X] Monthly

4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment

Requests.

http://www.tungsten-network.com/

ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:

AMENDMENT NO DATE

B.2 STATEMENT OF WORK

I. Title: Procurement of Indefinite Deliverable Indefinite Quantity (IDIQ) service agreement for Inspection, Safety Device Testing and Calibration of Boiler Plant Burners, Controls, Instruments, and Inspection of Boilers and Feedwater Deaerators. This contract shall cover scheduled (preventive maintenance) and unscheduled (emergent) maintenance.

All parts, labor, and travel shall be included.

II. General Overview: The Department of Veterans Affairs, Sioux Falls VA Health Care

System (SFVAHCS) located on 2501 W. 22nd Street, Sioux Falls, South Dakota.

The contractor’s technician shall report to the VA representative office building 17 prior to starting work. The Contractor’s technician shall prepare a written service ticket explaining the work for the day, a listing of which parts are to be used, the price of each part and the total price of multiple parts. The ticket shall be given to the VA representative for approval.

III. Definitions or Acronyms:

a. CO – Contracting Officer

b. COR – Contracting Officer’s Representative

c. SFVAHCS – Sioux Falls VA Health Care System

IV. HOURS OF SERVICES: The Contractor shall perform the services as specified herein Monday through Friday except for National Holidays between the hours of

8:00a.m. – 4:30p.m.

a. Government national holidays: The Contractor is not required to provide services on the following national holidays nor shall the Contractor be paid for these holidays:

New Year’s Day January 1

Martin Luther King ‘s Birthday Third Monday in January

President’s Day Third Monday in February

Memorial Day Last Monday in May

Juneteenth June 19

Independence Day July 4

Labor Day First Monday in September

Columbus Day Second Monday in October

Veterans Day November 11

Thanksgiving Day Fourth Thursday in November

Christmas Day December 25

V. When a holiday falls on a Sunday, the following Monday will be observed as a legal holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a legal holiday by the U.S. Government agencies. Also included, would be any other day specifically declared by the President of the United States of America to be a

National Holiday.

VI. Contractor Responsibilities:

a. Contractor shall coordinate a work schedule with the VA contact. Work may be required to be performed outside of normal duty hours if mutually agreed upon by the

COR or designate and Contractor. Any work resulting in hours outside of 8:00am to

4:30pm CT because of operational impacts shall occur at no additional expense to the Government.

b. The Contractor shall provide personnel on-site at the SFVAHCS to perform services under this Statement of Work within 10 calendar days of request.

c. Contractor shall respond within one (1) calendar day to SFVAHCS inquiries or questions and provide revised documents (if necessary).

d. The contractor shall provide all labor, resources, and travel necessary to complete the services as required within this statement of work.

e. Technicians shall provide all tools and labor necessary to perform inspection, tuning, testing, calibrating, and adjustments of burners and boiler and boiler plant controls as specified below.

f. Non-destructive testing of pressure vessels shall be performed by certified non-destructive testing technicians as defined below under the guidance of the Qualified

Professional Inspector.

g. All work contained in the SOW must follow most current version of Directive 1810 and current VHA Boiler and Associated Plant Safety Device Testing Manual for tests, test procedures, and test equipment.

h. Safety Requirements: The Contractor shall be responsible for providing safety measures to conduct the work. The Contractor shall comply with all VA and OSHA safety and security measure such as, the lock-out-tag program and special work permits. The contractor is also required to coordinate with the COR or designee to gain access to the specific work area along with obtaining identification badges for all personnel prior to commencement of services. Additional Requirements:

i. It shall be understood that, throughout performance of the contract, the Contractor’s personnel, while on VA property, shall adhere to all requirements and regulations that govern the VA Health Care System and its property.

j. Among all other requirements, the VA Health Care System and its property is entirely smoke-free.

k. Contractor and their personnel shall follow all U.S. Department of Veterans Affairs

(VA) policies, standard operating procedures, applicable laws, and applicable regulations while on VA property. Violations of this may result in citation and disciplinary measures for persons violating the law.

l. Contractor and their personnel shall wear visible identification at all times while they are on premises.

m. Possession of weapons is prohibited.

n. Contractor shall take all reasonable precautions necessary to protect persons and property from injury or damage during the performance of this contract.

VII. SFVAHCS Responsibilities:

a. Will complete boiler shut downs and cooled down for contractor work in advance.

b. SFVAHCS will have the boilers that are to be serviced prepared for the technicians upon their scheduled arrival. This includes having the boilers clean of soot and loose scale; fully warmed and at normal steam pressure; steam exhaust silencer system operable; all boiler, burner and fuel train pressure gages and thermometers calibrated; fuel meters in accurate operation (pressure/temperature correction factors provided, if applicable); boiler steam flow, stack temperature and flue gas oxygen instruments operating.

c. SFVAHCS will comply with any other requirements of the contractor personnel that are considered reasonable by SFVAHCS and have been presented in writing at least two weeks prior to the scheduled testing.

d. CONTRACTOR PERSONNEL ACCEPTANCE: The Government reserves the right to accept or reject Contractor’s staff for the rendering of services. Complaints concerning Contract Personnel’s performance or conduct shall be dealt with by the

Contractor, VA representative and the final decision made by the Contracting Officer.

VIII. Place of Performance: Sioux Falls VA Health Care System

2501 West 26th Street Sioux Falls, SD 57105

Table 1: Equipment List

DESCRIPTION TYPE MAKE SERIAL YEAR

Boiler #1 Fire Tube Johnston S-4579 1980

Boiler #2 Fire Tube Johnston S-4579 1980

Boiler #3 Fire Tube Johnston S-4579 1980

Boiler #4 Fire Tube (500 HP) TBD TBD TBD

Boiler #5 Fire Tube (500 HP) TBD TBD TBD

Boiler #6 Fire Tube (500 HP) TBD TBD TBD

Deaerator DA PMI 12146 1993

Deaerator TRAY TBD TBD TBD

Condensate Tank

Burner CMAX MCR9B-GO-30

Burner TBD TBD TBD TBD

Note: Equipment may be added to this list.

IX. Contract Line Items:

1. Safety device testing (Current Edition VHA boiler and associated plant safety device testing manual

a. INCLUDES

i. All trips to campus to complete work.

ii. Spring and winter safety device testing for complete plant

1. 3 boilers, condensate tank, deaerator tank.

iii. Two boiler tune times for all 3 boilers

b. The contractor shall provide all materials, labor, travel, and equipment required to perform the inspections, safety device testing and calibration for boiler plant burners, controls, instruments, and data management.

Table 2: Safety Inspections and Calibration.

Inspections, Safety Device Testing and Calibration

Boiler Plant Burners, Controls, Instruments, and Data Management

DESCRIPTION TYPE MAKE

SERIA

L

YEA

R TESTING MONTH

Boiler #1 Fire Tube Johnsto n

S- 4579 1980

Coordinate hot month and cold month with COR

Boiler #2 Fire Tube Johnsto n

S- 4579 1980

Coordinate hot month and cold month with COR

Boiler #3 Fire Tube Johnsto n

S- 4579 1980

Coordinate hot month and cold month with COR

Boiler #4 Fire Tube (500 HP) TBD TBD TBD Coordinate hot month and cold month with COR

Boiler #5 Fire Tube (500 HP) TBD TBD TBD Coordinate hot month and cold month with COR

Boiler #6 Fire Tube (500 HP) TBD TBD TBD Coordinate hot month and cold month with COR

Deaerator Coordinate hot month and cold month with COR

Deaerator Coordinate hot month and cold month with COR

Condensate Tank Coordinate hot month and cold month with COR

Condensate Tank Coordinate hot month and cold month with COR

c. Components:

i. Boilers

ii. Condensate Tank

iii. Deaerator Tanks

d. A summary of the work is as follows:

i. Review boiler plant log sheets and alarm and trouble reports.

ii. Review records that show combustion performance (flue gas oxygen and carbon monoxide).

iii. Perform overall visual inspection of systems. Verify that systems comply with referenced codes and SFVAHCS requirements stated in this contract.

iv. Test and record the operation and set points of all burner/boiler safety interlock devices. Refer to list below. Verify that the set points and operating points are within the most current edition of operating parameters. Make adjustments as necessary and record the new settings. The operation of a device must result in burner shutdown and/or proper alarm operation.

i. Operate burner(s) on each fuel from low fire to high fire and back to low fire in at least six increments and record combustion performance (flue gas oxygen, carbon monoxide, NOx where applicable), fuel train pressures, atomizing train pressures, burner pressures, stack temperatures, boiler steam output.

ii. Compare the combustion performance data with requirements and previous readings. If necessary, adjust the fuel flow and combustion air controllers, control valves and dampers to obtain the required performance. Record the new performance data.

iii. Verify accuracy of instrumentation listed below. Verify that all devices are properly selected for the application in terms of type, size, set point range, performance, code approval. Calibrate all instruments that are not within manufacturer’s specifications for accuracy.

iv. Immediately inform COR of any recommended repairs or modifications.

Refer to Deliverables in Statement of Work for Non-Compliant

Components.

v. All of interlocks and safety devices to be inspected and tested on each boiler/burner/equipment, are contained in the Current VHA Boiler Plant

Safety Devices Testing Manual, along with testing procedures.

vi. Vibration analysis of burner fans.

2. Boiler Inspections

a. INCLUDES

i. One trip to campus

ii. 1 boiler

Table 3: Boilers

Inspection of Boilers

Description TYPE MAKE Serial YEAR Testing Month

Boiler #1 Fire Tube Johnston S-4579 1980

As coordinated with COR, generally in warmer a month

Boiler #2 Fire Tube Johnston S-4581 1980

As coordinated with COR, generally in warmer a month

Boiler #3 Fire Tube Johnston S-4580 1980

As coordinated with COR, generally in warmer a month

Boiler #4 Fire Tube TBD TBD TBD

As coordinated with COR, generally in warmer a month

Boiler #5 Fire Tube TBD TBD TBD

As coordinated with COR, generally in warmer a month

Boiler #6 Fire Tube TBD TBD TBD

As coordinated with COR, generally in warmer a month

b. Summary of the minimum inspection requirements:

i. The inspector must completely enter the internal spaces of the boiler or feedwater deaerator and visually inspect all internal surfaces that can be accessed.

ii. Review the boiler history including operating conditions, date of last inspection, current inspection certificate, ASME stamping on boiler, National Board registration number, history of repairs and modifications.

Review boiler logs, water test reports, and reports on tests performed on the burner controls and interlocks.

iii. Assess the external parts of the boilers and boiler accessories and piping and valves for safety, accessibility, proper maintenance and operation, cleanliness, and compliance with codes.

iv. Inspect for evidence of leakage of combustion gases or fluids, externally and internally, including all gaskets.

v. Inspect foundations for signs of stress such as cracking or movement.

vi. Inspect boilers externally and internally for defects including bulges, blisters, cracks, wasted or eroded material, warping, general corrosion, grooving and pitting, damaged insulation.

vii. Inspect all accessible internal surfaces for waterside and fireside deposits, including scaling, sediment, debris, carbon deposits.

viii. Examine all stays and stayed plates.

ix. Inspect gas side baffles.

x. Inspect internal drum surfaces and steam separating internals.

xi. Inspect soot blowers and verify proper alignment.

xii. Inspect tubes, tube ends and tube alignment. Check for sagging tubes.

xiii. Verify that all nozzles of internal piping such as feedwater admission and bottom blowoff collection are clear with no obstructions.

xiv. Inspect seating surfaces of manways and handholes.

xv. Check that boiler structure is plumb and level with no excessive deformations.

xvi. Check for missing items such as bolts and nuts.

xvii. Examine all valve and pipe connections to the pressure vessel.

xviii. Inspect refractory including burner throat, expansion joint, bull ring, furnace seals, furnace walls and floor.

xix. Verify proper alignment of burner assembly.

xx. Inspect furnace for evidence of flame impingement.

xxi. Test operation of water level gage glass.

xxii. Perform mechanical and electrical inspection of disassembled low water cutouts (disassembly by VA). After reinstallation, test operation to the extent possible. Test low water cutouts on hot boilers by lowering water level gradually.

xxiii. Verify that steam pressure gage is properly calibrated.

xxiv. Test operation of high steam pressure cutouts on hot boilers by raising steam pressure.

xxv. Inspect safety valve installations and verify that the valves have proper capacity and set pressure and valves, drains and vents are properly installed. Verify that valve locking seals are not broken. On boilers that are hot, perform an operation test under pressure to confirm operation at proper set pressures. Operate boiler with burner at high fire to verify adequate steam flow capacity of the safety valves (“accumulation test”).

xxvi. Inspect piping connected to the boilers for evidence of leakage, provision for expansion, provision of adequate support, proper alignment, evidence of detrimental conditions.

xxvii. Inspect piping to the water column, low water cutoffs and alarms, gage glass. Verify that interior of piping is clear of obstructions.

xxviii. Inspect valves on boiler feedwater, blowdown, drain and steam systems.

xxix. Provide recommendations for non-destructive testing when the inspections indicate that this is necessary to assure continued safety and reliability under current operating conditions.

3. Internal Inspection for Deaerator Tank

a. INCLUDES

i. One trip to campus

ii. 1 Deaerator

Table 4: Boiler and Feedwater Deaerators

Feedwater Deaerators

DESCRIPTION TYPE MAKE

SERIA

L

YEA

R TESTING MONTH

Deaerator (Internal) DA PMI 12146 1993

As coordinated with COR, generally a warmer month

Summary of the minimum inspection requirements for feedwater deaerators:

1) The boiler and feedwater deaerator inspections shall comply with the guidelines in the current issue of the NATIONAL BOARD INSPECTION CODE, Part RB, Inservice Inspection of Pressure-Retaining Items, and ASME Boiler and Pressure

Vessel Code, Section VI or VII as applicable. In addition to those guidelines, the inspections shall comply with all SFVAHCS requirements as listed in this document.

2) The inspector must completely enter the internal spaces of the feedwater deaerator and visually inspect all internal surfaces that can be accessed.

3) Review the feedwater deaerator history including operating conditions, date of last inspection, current inspection certificate, ASME stamping, National Board registration number, materials of construction, extent of postweld heat treatment, history of repairs and modifications.

4) Assess the external parts of the feedwater deaerator and accessories and piping for safety, accessibility, cleanliness. proper operation, and compliance with codes.

5) Inspect for evidence of leakage.

6) Note feedwater deaerator pressure gage and thermometer readings and verify gage and thermometer accuracy.

7) Inspect safety valve installation and verify that the valves have proper set pressure and capacity and are properly installed. Perform an operation test under pressure to confirm operation at proper set pressures. Verify that the deaerator can safety withstand the test pressure prior to testing the valve(s) in-situ.

8) Verify that non-condensable gas vent line is open and proper orifice is provided to permit venting of gases.

9) Inspect support structures for proper integrity and allowance for thermal expansion.

8) Internal inspections (6-year intervals unless otherwise recommended because of welding repairs):

a. Visually inspect all visible pressure vessel surfaces for corrosion, material thinning, deposits, and weld cracking.

b. Inspect spray nozzles and trays.

c. Certified American Society for Non-Destructive Testing (ASNT) Level II technicians shall perform non-destructive tests using the wet fluorescent magnetic particle (WFMT), ultrasonic testing (UT), and any other necessary non-destructive tests.

o Completely examine all accessible welds utilizing the WFMT test method.

Properly prepare the surfaces before testing.

o Determine pressure vessel material thickness by UT. Thickness measurement locations shall be selected by dividing the storage tank heads into quadrants and taking measurements at each quadrant on two imaginary rings in each head (eight measurements total). Measurement locations on the shell shall be on each of the quadrants, on four to six locations along the length of the shell (16 to 24 measurements total). The technician may recommend fewer or more tests to the owner, providing justification.

o Typically, the pressure vessel section containing the deaerator trays and sprays is not accessible for non-destructive testing. The experience is that this section, which is mainly exposed to steam, is less vulnerable to weld failures and material thinning than the storage section which contains condensate and make-up water.

d. Calculate maximum allowable working pressure rating of vessel based on thickness measurements. Calculate depletion rate of material thickness.

4. Fuel Oil Set Up from Factory

a. INCLUDES

i. One trip to campus

ii. 1 burner

b. Tasks

i. Recommission fuel oil burner controls for complete factory reset and start up.

ii. Verify proper operation of burner on fuel oil.

iii. Contractor shall complete setting changes in the 2nd and 3rd burner control levels.

5. Natural Gas Set Up from Factory

a. INCLUDES

i. One trip to campus

ii. 1 burner

b. Tasks

i. Recommission natural gas burner controls for complete factory reset and start up.

ii. Verify proper operation of burner on natural gas.

iii. Contractor shall complete setting changes in the 2nd and 3rd burner control levels.

6. Post boiler inspection Natural gas and Fuel Oil tuning

a. INCLUDES

i. One trip to campus

ii. 1 boiler

b. Tasks

i. Required burner performance (natural gas and fuel oil):

ii. Turndown (ratio of maximum and minimum firing rates): 10/1 8/1 5/1

4/1 (Refer to original burner specification).

iii. Achieve, but do not exceed, boiler maximum steam flow output rating.

Measure fuel input at minimum and maximum firing rates.

iv. Maximum carbon monoxide: 200 parts per million (ppm)

v. Maximum NOx: (Refer to original burner specification). Attachment D

vi. No visible smoke, except on heavy oil fuel maximum opacity is 20%.

Comply with local emissions regulations.

vii. Flames shall be stable with no pulsations, shall be retained near burner, no blowoff or flashbacks, no constant flame impingement on refractory.

viii. Contractor shall complete setting changes in the 1st and 2nd burner control levels.

7. Calibration of devices

a. INCLUDES

i. One trip to campus

b. List of instrumentation and controls to be inspected and calibrated:

i. Steam flow transmitters (all).

1. B1 Steam Flow

2. B2 Steam Flow

3. B3 Steam Flow

4. Plant Steam Flow

5. Steam Header

6. Laundry Steam Flow

7. 6” Hospital Steam Flow

8. 8” Hospital Steam Flow

ii. All Steam flow recorders/computer readout.

iii. All Flue gas oxygen sampling, analyzing and recorder/computer readout.

iv. All Boiler and economizer stack temperature transmitters and recorder/computer readout.

v. Master steam pressure and combustion controllers.

vi. Boiler outlet draft controllers.

vii. Boiler water level controllers.

1. B1 Drum Level

2. B2 Drum Level

3. B3 Drum Level

viii. Feedwater deaerator and condensate storage tank water level controllers including overflow.

ix. All pressure and temperature sensors and transmitters.

x. All signal processing and readout devices.

8. Parts for repair

a. If repairs resultant from inspections, directive change, safety deficiency are identified, the Contractor shall provide all replacement parts needed to keep the failed component in operating condition as originally designed by the manufacturer. Parts may be repaired or replaced, as the contractor deems appropriate, so long as amount listed in CLINs for Parts Repair cited in Section B.2 (Price/Cost Schedule) are not exceeded. No used parts will be used to repair this equipment.

b. For repairs, Contractor shall furnish the COR with a written estimate of the cost to make necessary repairs. Contractor shall also provide a comparison quote to the COR for what that item would have cost for commercial pricing so Government has basis for making price fair and reasonableness determination, or as alternative, Contractor shall provide a quote provided to another federal agency for similar item for determination purposes. If cost exceeds cost listed for applicable line item in Section B.2 (Price/Cost Schedule), the Contracting Officer shall consider issuing a bilateral contract modification to increase funding for this line item per coordination with COR, that includes supporting documentation as cited above.

X. Overall Reporting Requirements:

a. All safety-related deficiencies shall be immediately reported to the COR, Boiler Plant

Supervisor and/or Chief Engineer during the inspection visit.

b. Contractor shall provide calibration reports for equipment and tools used to complete work on campus with every report.

c. The Inspection Report shall be delivered to the COR or designee no later than 14 calendar days after completion of the inspection and testing. The inspection report shall include all deficiencies and recommendations regarding any items in this

Statement of Work. The Inspection Report(s) shall be provided in a digital format along with (1) hard copy.

i. Handwritten notes shall not be submitted with final reports.

d. The inspection report shall include the following in addition to the reporting requirements of the most recent version of the VHA Boiler Safety Device Testing

Manual:

i. Contactors subject matter expert contact information

1. Name

2. Title

3. Email address

4. Phone number (including an after-hours number)

ii. Each component shall have the following minimum information included in the Inspection Report:

1. Compliant or Not Compliant summary.

2. Original and final settings.

3. Each non-Compliant component:

a. Reported immediately following the table of contents in the report.

b. Contractor shall include a bill of materials for equipment, supplies, and components necessary to achieve a compliant device or component.

c. Cut sheets shall be provided for each proposed component including make and model.

d. Contractor estimated cost for all materials and labor to achieve a compliant device or component.

e. A blank portion dedicated to Veterans Health Administration

(VHA) notes.

i. May be used to list Maximo work orders or other methods to achieve compliance.

iii. Minimum two photos of each deficient component.

iv. Recommended corrections, sustainment plans, training courses, or best practices to facilitate continued compliance.

v. Complete record of calibration activities

e. Boiler plant burners, controls, instrumentation, and Data management Report

Requirements:

i. Provide complete written report of the inspection fully describing all tests performed, all findings, and recommendations. The report shall have two sections the first section will be in a table form that with four columns:

1. The first column labeled “FUNCTION” did the device pass or fail.

2. The second column labeled “Device” list the device number and description in accordance with the VHA Boiler Plant Safety Devices

Testing Manual Current Edition.

3. The third labeled “Deficiencies-Recommendations”

4. The fourth column labeled “corrective actions” list any corrective actions taken during the inspection.

ii. The next section shall be in paragraph/bulleted form and list each device individual in accordance to the VHA Boiler Plant Safety Devices Testing

Manual, Current Edition. Plus, the section must reference the correct Master

Specification and Standard Detail for that device. See sample below.

iii. Condensate Storage Tank High Water Alarm

1. Purpose: High water level may be an indication of condensate transfer pump failure that could lead to low water condition in the feedwater deaerator and in the boilers. There may be a failure of make-up water controls.

2. Recommended set point: 4 inches below overflow level and 2/3 of tank height.

3. Potential hazards due to failure of high-water alarm: Feedwater deaerator running dry and, consequently, boiler feed pumps running dry will cause overheating and damage to pumps and potential for plant shut down. Failure of make-up water controls (in open position) could lead to significant cost from waste of water and condensate from the tank overflow if this occurs over a long time period.

4. Recommended type of device: Conductivity probe type switch. Float type switches have high failure rate in this application where they are exposed to flash steam that causes seals to harden and prevent float movement.

5. VA Master Specification section: 23 50 11.

6. www.va.gov/facmgt/standard/

7. VA Standard Detail: SD232111-05.pdf www.va.gov/facmgt/standard/

8. Failure rate of float types: 48% (BEI study of VA boiler plants).

9. Make and Model: Mercoid Float

10. Did it function properly: No

11. Category & Action Time Limit: Upon Failure or Within 5 Years

12. Comments: Float type switches are not allowed for high water alarms.

The VA recommended switch type is a conductivity probe type switch.

Install the VA recommended switch and set to alarm at 2/3 of the tank height. There are valves that can isolate this alarm. These valves must be made lockable only in the operating position.

f. Report Requirements: Inspection of boilers, feedwater deaerators:

i. Provide complete written report fully describing all inspections and tests performed, findings, and recommendations. The condition of all items inspected shall be stated whether acceptable or deficient. All deficiencies shall be fully described along with recommendations for methods of correction. Utilize National Board Forms NB-6 and NB-7.

ii. Include test data and calculations. Show locations and extent of all non-destructive testing by sketches.

iii. All safety-related deficiencies shall be immediately reported to the COR, Boiler Plant Supervisor and/or Chief Engineer during the inspection visit.

iv. Provide recommendations on need for re-inspections after correction of deficiencies. Cost of re-inspections shall be extra cost negotiated with VA

Contracting Officer.

v. Provide hard copies of data sheets and flue gas analyzer “strip” printouts to the COR and Operations Supervisor within timeframe outlined in deliverables section of the SOW.

vi. Provide recommendations on need for re-inspections after correction of deficiencies. Cost of re-inspections shall be extra cost negotiated with VA

Contracting Officer.

XI. Qualifications:

1. Technician Qualifications Inspection, Safety Device Testing and Calibration Boiler Plant Burners, Controls, Instruments, and Data Management:

a. Technicians shall have completed at least a one-year trade school and have five years successful experience in this field. The experience shall be largely with institutional and industrial boiler plants similar in design to the SFVAHCS plant.

b. Technicians shall demonstrate familiarity with and ready access to the current versions of the following references:

NFPA 85, Boiler and Combustion Systems Hazards Code.

VHA Boiler Plant Safety Device Testing Manual, current edition.

c. Technicians shall be equipped with portable electronic flue gas analyzers and other test instruments necessary for the required tests and calibrations, all calibrated within one month of the site visits. Technicians must be capable of programming the controls and have the appropriate hardware and software for this.

d. Proof completing inspections at 3 separate VA sites per Directive 1810.

2. “Qualified Professional Inspector” for Inspection of Boilers, Feedwater Deaerators, condensate tanks is defined as any one or combination of:

a. A boiler inspector who has a valid commission from the National Board of Boiler and Pressure Vessel Inspectors (NB).

b.

A boiler inspector who has qualified by passing a written examination under the laws, rules and regulations of a jurisdiction of a state.

c. A boiler inspector who is regularly employed as a boiler inspector by a jurisdiction which has adopted and administers one or more sections of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code as a legal requirement, and has a representative serving as a member of the ASME Conference Committee.

d. A boiler inspector who is regularly employed by an insurance company which has been licensed or registered by the appropriate authority of a State of the United States to write boiler or pressure vessel insurance.

e. “Qualified Professional Inspectors” as defined below shall perform internal and external inspections on high pressure (over 15 psig) steam boilers and internal inspections on feedwater deaerators and other pressure vessels.

3. Qualifications for Non-Destructive-Testing Technicians:

a. The technicians shall be certified as being qualified Level II technicians in the non-destructive testing methods to be utilized. The certification shall be in accordance with the requirements of the American Society for Non-Destructive Testing (ASNT).

XII. Attachments:

a. Attachment D.1 – Current VHA Boiler Safety Device Testing Manual via website:

http://vaww.hefp.va.gov/topics/boiler

b. Attachment “D.2” – Boiler Plant Operations VHA Directive 1810 Current Version http://vaww.hefp.va.gov/topics/boiler

c. Attachments D.3 - National Board Form NB-6

d. Attachment D.4 – National Board Form NB-7 http://vaww.hefp.va.gov/topics/boiler http://vaww.hefp.va.gov/topics/boiler

B.3 PRICE/COST SCHEDULE

The Department of Veterans Affairs has set the maximum cost limitation for this IDIQ at

$700,000.00 for the lifetime of this contract. The guaranteed minimum value of this contract is set at $10,000.00. Task orders will be placed at the beginning of each ordering period by the contracting officer in accordance with 52.216-18, 52.216-19, 52.216-22.

ITEM

NUMBER

DESCRIPTION OF

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

1.00 JB __________________ __________________

VHA Boiler and Plant Safety Device Testing

Contract Period: Base POP Begin: 02-01-2025 POP End: 01-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

0001AA

0.00

NSP

Boilers

Contract Period: Base POP Begin: 02-01-2025 POP End: 01-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

0001AB

Contract Period: Base POP Begin: 02-01-2025 POP End: 01-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

0001AC

Deaerator Tank

Contract Period: Base POP Begin: 02-01-2025 POP End: 01-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

3.00 EA __________________ __________________

Boiler Inspection

Contract Period: Base POP Begin: 02-01-2025 POP End: 01-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

1.00 EA __________________ __________________

Internal Inspection of Deaerator Tank

Contract Period: Base POP Begin: 02-01-2025 POP End: 01-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

Fuel Oil Set Up from Factory

Contract Period: Base POP Begin: 02-01-2025 POP End: 01-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

Natural Gas Set Up from Factory

Contract Period: Base POP Begin: 02-01-2025 POP End: 01-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

Post Boiler Inspection Natural Gas and Fuel Oil Tuning

Contract Period: Base POP Begin: 02-01-2025 POP End: 01-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

2.00 EA __________________ __________________

Calibration of Devices

Contract Period: Base POP Begin: 02-01-2025 POP End: 01-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

0007AA

Steam Flow Transmitters (all)

Contract Period: Base POP Begin: 02-01-2025 POP End: 01-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

0007AB

Steam Flow Recorders/Computer Readout (all)

Contract Period: Base POP Begin: 02-01-2025 POP End: 01-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

0007AC

Flue Gas Oxygen Sampling, Analyzing, and Recorder/Computer Readout (all)

Contract Period: Base POP Begin: 02-01-2025 POP End: 01-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

0007AD

All Boiler and Economizer Stack Temperature Transmitters and Recorder/Computer Readout (all)

Contract Period: Base POP Begin: 02-01-2025 POP End: 01-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

0007AE

Master Steam Pressure and Combustion Controllers

Contract Period: Base POP Begin: 02-01-2025 POP End: 01-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

0007AF

Boiler Outlet Draft Controllers

Contract Period: Base POP Begin: 02-01-2025 POP End: 01-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

0007AG

Boiler Water Level Controllers (all)

Contract Period: Base POP Begin: 02-01-2025 POP End: 01-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

0007AH

Feedwater Deaerator and Condensate Storage Tank Water Level Controllers Including Overflow

Contract Period: Base POP Begin: 02-01-2025 POP End: 01-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

0007AI

Pressure and Temperature Sensors and Transmitters (all)

Contract Period: Base POP Begin: 02-01-2025 POP End: 01-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

0007AJ

Signal Processing and Readout Devices (all)

Contract Period: Base POP Begin: 02-01-2025 POP End: 01-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

Parts for Repair

Contract Period: Base POP Begin: 02-01-2025 POP End: 01-31-2026 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

Contract Period: Option 1 POP Begin: 02-01-2026 POP End: 01-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

1001AA

Contract Period: Option 1 POP Begin: 02-01-2026 POP End: 01-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

1001AB

Contract Period: Option 1 POP Begin: 02-01-2026 POP End: 01-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

1001AC

Contract Period: Option 1 POP Begin: 02-01-2026 POP End: 01-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

Contract Period: Option 1 POP Begin: 02-01-2026 POP End: 01-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

Contract Period: Option 1 POP Begin: 02-01-2026 POP End: 01-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

Contract Period: Option 1 POP Begin: 02-01-2026 POP End: 01-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

Contract Period: Option 1 POP Begin: 02-01-2026 POP End: 01-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

Contract Period: Option 1 POP Begin: 02-01-2026 POP End: 01-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

Contract Period: Option 1 POP Begin: 02-01-2026 POP End: 01-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

1007AA

Contract Period: Option 1 POP Begin: 02-01-2026 POP End: 01-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

1007AB

Contract Period: Option 1 POP Begin: 02-01-2026 POP End: 01-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

1007AC

Contract Period: Option 1 POP Begin: 02-01-2026 POP End: 01-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

1007AD

Contract Period: Option 1 POP Begin: 02-01-2026 POP End: 01-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

1007AE

Contract Period: Option 1 POP Begin: 02-01-2026 POP End: 01-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

1007AF

Contract Period: Option 1 POP Begin: 02-01-2026 POP End: 01-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

1007AG

Contract Period: Option 1 POP Begin: 02-01-2026 POP End: 01-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

1007AH

Contract Period: Option 1 POP Begin: 02-01-2026 POP End: 01-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

1007AI

Contract Period: Option 1 POP Begin: 02-01-2026 POP End: 01-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

1007AJ

Contract Period: Option 1 POP Begin: 02-01-2026 POP End: 01-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

Contract Period: Option 1 POP Begin: 02-01-2026 POP End: 01-31-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

Contract Period: Option 2 POP Begin: 02-01-2027 POP End: 01-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

2001AA

Contract Period: Option 2 POP Begin: 02-01-2027 POP End: 01-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

2001AB

Contract Period: Option 2 POP Begin: 02-01-2027 POP End: 01-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

2001AC

Contract Period: Option 2 POP Begin: 02-01-2027 POP End: 01-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

Contract Period: Option 2 POP Begin: 02-01-2027 POP End: 01-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

Contract Period: Option 2 POP Begin: 02-01-2027 POP End: 01-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

Contract Period: Option 2 POP Begin: 02-01-2027 POP End: 01-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

Contract Period: Option 2 POP Begin: 02-01-2027 POP End: 01-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

Contract Period: Option 2 POP Begin: 02-01-2027 POP End: 01-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

Contract Period: Option 2 POP Begin: 02-01-2027 POP End: 01-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

2007AA

Contract Period: Option 2 POP Begin: 02-01-2027 POP End: 01-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

2007AB

Contract Period: Option 2 POP Begin: 02-01-2027 POP End: 01-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

2007AC

Contract Period: Option 2 POP Begin: 02-01-2027 POP End: 01-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

2007AD

Contract Period: Option 2 POP Begin: 02-01-2027 POP End: 01-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

2007AE

Contract Period: Option 2 POP Begin: 02-01-2027 POP End: 01-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

2007AF

Contract Period: Option 2 POP Begin: 02-01-2027 POP End: 01-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

2007AG

Contract Period: Option 2 POP Begin: 02-01-2027 POP End: 01-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

2007AH

Contract Period: Option 2 POP Begin: 02-01-2027 POP End: 01-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

2007AI

Contract Period: Option 2 POP Begin: 02-01-2027 POP End: 01-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

2007AJ

Contract Period: Option 2 POP Begin: 02-01-2027 POP End: 01-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

Contract Period: Option 2 POP Begin: 02-01-2027 POP End: 01-31-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors

Contract Period: Option 3 POP Begin: 02-01-2028 POP End: 01-31-2029 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J044 - Maintenance, Repair, and Rebuilding of Equipment - Furnace, Steam Plant, and Drying Equipment;

Nuclear Reactors

3001AA

Contract Period: Option 3 POP Begin: 02-01-2028 POP End: 01-31-2029 PRINCIPAL NAICS…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .