D.4 QUALITY ASSURANCE SURVEILLANCE PLAN_01.pdf
PDF 236 KB Posted
- Attached to
- Q522--VISN 19 OKC VAMC IR Physician Services
- Solicitation number
- 36C25926Q0134
About this file
This is a Quality Assurance Surveillance Plan (QASP) for a federal contract with the Oklahoma City VA Health Care System under VISN 19. The QASP establishes a systematic framework for evaluating contractor performance against specified standards, with the Contracting Officer (CO) from VISN 19 NCO and Contracting Officer's Representative (COR) Soraya Summers from Oklahoma City VA Health Care System responsible for oversight and surveillance activities. The document specifies that the COR maintains a quality assurance file and coordinates quarterly progress reports to the CO, while the contractor retains responsibility for management and quality control actions to meet contract terms. The QASP is designated as a "living document" subject to regular review and revision through contract modification with contractor coordination.
The QASP defines eight performance standards for contractor physician evaluation: Provider Quality Performance (97% acceptable quality level with periodic inspection), Qualifications of Key Personnel requiring 100% board certification per ACR Standards for Interventional Radiology, Scope of Practice/Privileging (98% compliance through periodic inspection or random sampling), Patient Access (95% on-time availability through periodic inspection or random sampling), Patient Safety (100% incident reporting within 24 hours with zero acceptable deviation), Maintains Licensing/Registration/Certification (100% currency with zero acceptable deviation), Mandatory Training (98% on-time completion with zero active overdue), and Privacy/Confidentiality/HIPAA (100% compliance with zero acceptable deviation). Surveillance methods include direct observation (100% coverage), periodic bi-annual inspections, validated user/customer complaints via PATS and email, biannual random file sampling, and contractor-provided verification through OKC VA HCS credentialing. Performance ratings follow the CPARS system (Exceptional, Very Good, Satisfactory, Marginal, Unsatisfactory), with Contract Reports issued when performance fails to meet acceptable quality levels and requiring contractor corrective action plans.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP)
The contractor will be evaluated in accordance with the following:
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
• What will be monitored?
• How will monitoring will take place?
• Who will conduct the monitoring?
• How will monitoring efforts and results be documented?
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor through contract modification. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO:
Organization or Agency: VISN 19 NCO
b. Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: Soraya Summers
Organization or Agency: Oklahoma City VA Health Care System
3. CONTRACTOR REPRESENTATIVES
The following employee(s) of the contractor serve as the contractor’s program manager(s) for this contract.
Primary Program Manager:
Alternate Program Manager:
4. PERFORMANCE STANDARDS
The contractor is responsible for performance of ALL terms and conditions of the contract. CORs will provide contract progress reports quarterly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of contractor performance in the elements defined. Performance standards define desired services. The Government performs surveillance to determine the level of Contractor performance to these standards.
The Performance Requirements are listed below in Section 6. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the contractor on the contract.
5. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. DIRECT OBSERVATION. 100% surveillance
b. PERIODIC INSPECTION. Inspections scheduled and reported bi-annually or as needed. Randomly selected files will be reviewed per inspection period ie FPPE/OPPE. All inspections and reports will be conducted in compliance with VA Privacy and Information security standards.
c. VALIDATED USER/CUSTOMER COMPLAINTS: PATS, E-mail, reports of contact, verbal complaints will be used.
d. RANDOM SAMPLING. Files will be reviewed biannually.
e. VERIFICATION AND/OR DOCUMENTATION PROVIDED BY CONTRACTOR. Contractor will provide information, verified via OKC VA HCS credentialing and privileging.
6. QASP PERFORMANCE REPORT DATE: __________________
Measures PWS
Referen ce
Performance
Requirement
Standard Acceptable Quality Level
Surveillan ce
Method
Met AQL/DID NOT MEET
AQL-
CPARS RATING/ADD
COMMENTS
Provider Quality Performance
4.7.4.1 All contractor’s
physician(s) shall perform in accordance with clinical standards
100% of care provided within clinical standards of care
97% Periodic Inspection
Qualifications of Key Personnel
4.7.4.2 All contractor’s
physician(s) shall be board certified/board eligible in accordance with ACR Standards for Interventional Radiology.
All (100%) contractor’s physician(s) are board certified.
100% Verification and/or documenta tion provided by the contractor
Scope of Practice/Privileging
4.7.4.3 Contractor’s
physician(s) perform within their individual scopes of practice/privilegin g
All (100%) contractor’s physician(s) perform within their scope of practice/privileg es 100% of the time.
98% contractor’s physician(s) perform within their scope of practice/privileges 100% of the time.
Periodic Inspection or Random Sampling of records.
Patient Access 4.7.4.4 The Contractor shall provide Contractor’s physician(s) in accordance with
All (100%) contractor’s physician(s) are on time and available to
95% on-time perform services
Periodic Inspection or Random of Time the operating hours and VA clinical schedule outlined in this
PWS
perform services.
and Attendance Sheets
Patient Safety 4.7.4.5 Patient safety incidents shall to be reported using Patient Safety Report. All incidents reported immediately (within 24 hours.)
All (100%) of patient safety incidents are reported using Patient Safety Report within 24 hours of incident.
100 % of patient safety incidents are reported using Patient Safety Report within 24 hours of incident.
No acceptable deviation.
Periodic Inspection or Random
Maintains licensing, registration, and certification
4.7.4.6 Updated
Licensing, registration and certification shall be provided as they are renewed.
Licensing and registration information kept current.
All (100%) licensing, registration(s) and certification(s) for contractor’s physician(s) shall be provided as they are renewed.
Licensing and registration information kept current.
100 % licensing, registration(s) and certification(s) for contractor’s physician(s) shall be provided as they are renewed.
Licensing and registration information kept current. No acceptable deviation.
Periodic Inspection or Random
Mandatory Training 4.7.4.7 Contractor shall complete all required training on time per facility policy
All (100%) of required training is complete on time by contract physician(s).
98% on-time; 0 active overdue
Verification and/or documents provided by the contractor
Privacy, Confidentiality and HIPAA
4.7.4.8 Contractor is
aware of all laws, regulations, policies and procedures relating to Privacy, Confidentiality and HIPAA and complies with all standards Zero breaches of privacy or confidentiality
All (100%) contractor physician(s) comply with all laws, regulations, policies and procedures relating to Privacy, Confidentiality and HIPAA
100 % compliance;
Periodic Inspection;
Contractor shall provide evidence of annual training required by the facility, reports violations per VA Handbook 6500.6.
7. CPARS RATINGS ASSIGNED TO QASP ITEMS:
Metrics and methods are designed to determine rating for a given standard and acceptable quality level. The following ratings shall be used (Reference: CPARS User Manual https://www.cpars.gov/documents/CPARS- Guidance.pdf:
EXCEPTIONAL: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT.
However a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also there should have been NO significant weaknesses identified.
VERY GOOD:
Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also there should have been NO significant weaknesses identified.
SATISFACTORY:
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract.
Also there should have been NO significant weaknesses identified.
MARGINAL:
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g.
Management, Quality, Safety or Environmental Deficiency Report or letter).
UNSATISFACTO
RY:
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it https://www.cpars.gov/documents/CPARS-Guidance.pdf https://www.cpars.gov/documents/CPARS-Guidance.pdf impacted the GOVERNMENT. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g. Management, Quality, Safety or Environmental Deficiency Reports, or letters).
8. DOCUMENTING PERFORMANCE
a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (CPARS).
b. If contractor performance does not meet the Acceptable Quality level, the CO shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and place it in the contract file. When the COR and the CO determines formal written communication is required, the COR shall prepare a Contract Report (CR), and present it to CO. The CO will in turn review and will present to the contractor's program manager for corrective action.
The contractor shall acknowledge receipt of the CR in writing. The CR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CR will also state how long after receipt the contractor has to present this corrective action plan to the CO. The Government shall review the contractor's corrective action plan to determine acceptability. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance and the acceptability of the Contractor’s corrective action plan.
Any CRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO. See Sample CR below.
9. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP
SIGNED:
COR NAME/TITLE DATE
SIGNED:
CONTRACTOR NAME/TITLE DATE
CONTRACT REPORT
1. CONTRACT NUMBER 2. REPORT NUMBER
3. TO: (Contracting Officer) 4. FROM: (Name of COR)
5. DATES
a. CR PREPARED
b. RETURNED BY
CONTRACTOR:
c. ACTION COMPLETE
6. Issue Identified (Describe in detail. Include reference to PWS Directive; attach continuation sheet if necessary.)
7. SIGNATURE OF COR Date:
8. SIGNATURE OF CONTRACTING OFFICER Date:
9a. TO (Contracting Officer) 9a. FROM (Contractor)
10. CONTRACTOR RESPONSE AS TO CAUSE AND ACTIONS TO PREVENT
RECURRENCE. (Cite applicable quality control program procedures or new procedures.
Attach continuation sheet(s) if necessary.)
11. SIGNATURE OF CONTRACTOR REPRESENTATIVE Date:
12. GOVERNMENT EVALUATION.
13. GOVERNMENT ACTIONS
14. CLOSE OUT
NAME TITLE SIGNATURE DATE
CONTRACTOR
NOTIFIED
COR
CONTRACTING
OFFICER
File details come from the government source that posted it. Updated .