D.1 PERFORMANCE REQUIREMENTS.pdf
PDF 411 KB Posted
- Attached to
- F108--VISN 1 Hazardous Waste Disposal Services
- Solicitation number
- 36C24123Q0025
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24123Q0025 0005.docx | DOCX document | |
| 36C24123Q0025 0004.docx | DOCX document | |
| Revised E.7 Addendum to _52.212-2.docx | DOCX document | |
| Revised D.6 ATTACHMENT 3 PRICING SPREADSHEET.xlsx | XLSX spreadsheet | |
| 36C24123Q0025 0003.docx | DOCX document | |
| Revised Performance Work Statement.docx | DOCX document | |
| 36C24123Q0025 0002.docx | DOCX document | |
| 36C24123Q0025 0001.docx | DOCX document | |
| D.6 ATTACHMENT 3 PRICING SPREADSHEET.xlsx | XLSX spreadsheet | |
| D.5 ATTACHMENT 2 SATELLITE AND MAIN ACCUMULATION AREAS.docx | DOCX document | |
| D.4 ATTACHMENT 1 GENERATORS - SCHEDULE - POCs.docx | DOCX document | |
| 36C24123Q0025.docx | DOCX document | |
| P07 WL 1996-0223 Rev 58 dated 12-27-2022.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D.1 PERFORMANCE REQUIREMENTS SUMMARY:
Task Performance Requirement(s)
PWS
Reference(s)
Acceptable Quality Level(s) Monitoring Method(s)
Sampling, Testing and Analysis
Conduct routine sampling or provide sample containers and conduct sample pickup and laboratory delivery services for requesting VA facilities within specified timeframes
2.1.d 95% of sample collection services meet specified timeframes
Direct observation and 100% inspection
Provide preliminary and final laboratory analytical results with written certificates of analysis within specified time frames
2.1.f and h, 4.b
95% of required sample result reports are received within specified timeframes
100% of sample results are accompanied by certificate of analysis
External audits/ inspections of SAAs and records
Validated facility complaints
Provide complete Chain-of-Custody documentation for all samples submitted for laboratory analysis
2.1.i, 4.b 100% of required documentation provided as required
Documents are 98% error free
PWS
Waste Management, Removal and Disposal
Visit each SAA at required frequency to move hazardous/non-hazardous waste to the designated MAA. If unable to access, notify
GEMS
Coordinator and document.
2.2.b 98% of movement conducted within required timeframe
100% of movement conducted within two (2) calendar days of end of required timeframe periodic inspection
Conduct weekly SAA inspections (and weekly
MAA
inspections if requested) and document findings.
Document and correct all deficiencies.
Provide electronic copies of all
SAA
inspections.
2.2.c 100% of inspections conducted within required timeframe
100% of deficiencies corrected within 24 hours of identification
No repeat discrepancies at same location within contract period of performance
Removal and Disposal
Label hazardous/non-hazardous waste correctly for storage in
MAA.
2.2.b, c and e 95% of labeling performed correctly
100% of deficiencies corrected at time of identification
No repeat discrepancies at same location within contract period of performance
PWS
Schedule shipment of material within 7 calendar days of written/oral request
2.2.g 95% of shipments scheduled within 7 calendar days
Direct observation and 100% inspection
Make pickup of material within 14 calendar days of written/oral request
2.2.g 95% of waste pickups made within 14 calendar days
Direct observation and 100% inspection
Provide notification to GEMS PM or designee and the COR within 24 hours of determination that pickup cannot be scheduled as requested or made as scheduled
2.2.g 100% notification within required timeframe
Direct observation
When requested provide electronic copies of manifests no later than 48 hours prior to providing onsite services
2.2.i 95% of manifests are received within specified timeframe
PWS
Removal and Disposal
Prior to removal and transport of hazardous, universal, and non-hazardous waste generated by the VA, obtain approval and signature for each manifest from the VA facility’s GEMS PM or designee and provide copies of all manifests, land bans and lab pack documentation
2.2.i and j, 4.c
100% compliance Direct observation and
Signed Designated Facility copy of each waste manifest returned to generator within 30 calendar days of date waste is accepted by initial transporter
2.2.j, 4.c 95% of signed designated facility copies returned within 30 calendar days
100% of signed designated facility copies returned within 45 calendar days
Removal and Disposal
Provide Certificates of Disposal/ Recycling for the contents of each container received at the TSDF to the generator within 375 calendar days of shipment date
2.2.m, 4.c 90% of Certificates of Disposal/Recycling provided to generator within 375 calendar days of shipment date
100% of Certificates of Disposal/Recycling provided to generator within 390 calendar days
PWS
Provide waste management and disposal reports in accordance with specified content requirements and timeframes
4.g and h 95% of reports and related documents provided within specified timeframes
Training
Provide all requested training within 60 calendar days of receiving request
2.3.a 95% of training provided within required timeframe
Direct observation and 100% inspection
Provide draft and final training plans for requested training within specified timeframes.
4.d 95% compliance for draft training plans and related documents
100% compliance for final training plans and related documents
Emergency Response
Respond within two (2) hours of notification to spill incidents at each medical center and
CBOC.
2.4.b 100% of responses within required response times
PWS
Provide documentation of all emergency response actions taken and pricing for emergency services rendered within twenty-four (24) hours of termination of emergency response-related activities
2.4.e 95% of manifests are received within specified timeframe
Minimization
Evaluate the VA’s waste streams annually for opportunities for waste management efficiency and minimization and provide the VA with a written report.
2.5, 4.h 95% compliance for draft reports and related documents
100% compliance for final reports and related documents
Direct observation and 100% inspection
Removal and Disposal
Emergency Response
Provide daily timesheets for all onsite work performed at each VA facility to the facility GEMS PM or designee by the end of the business day in which the work took place
4.e 95% of daily timesheets meet specified timeframes