1micron_KB_SOW_mirrors_112608.pdf

PDF 107 KB Posted

Attached to
CX1 Mirror System
Solicitation number
CX1
Issued by

About this file

CX1 Mirror System

View the file

Other files

File Type Posted
MIL-PRF-13830B.pdf PDF
1micron_KB_SOW_mechanical_system_112608.pdf PDF
Directly Relevant Documents.doc DOC document
sp3910006400.pdf PDF
fedstd595b.pdf PDF
sp3910002500.pdf PDF
KB1 System - Pre-Qual Documentation_final.doc DOC document
sc7008664701.pdf PDF
sp39100065-1_1micron_KB_ESD_112608.pdf PDF
sp3910002400.pdf PDF
sp3910001902.pdf PDF
sp39100065-1_1micron_KB_ESD_summary_112608.pdf PDF
ds3910003600.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOW SP-391-001-51 Verify that this is the latest revision.

1 of 4 Check for change orders or requests

STATEMENT OF WORK

(SOW)

Doc. No.

SP-391-001-51 R0

LUSI SUB-SYSTEM

CXI

Statement of Work for the CXI 1 micron KB System, Mirror

Substrates

Prepared by:

Sébastien Boutet Signature Date CXI Instrument Scientist

Reviewed by:

Paul Montanez Signature Date CXI Lead Engineer

Reviewed by:

Signature Date

Approved:

Signature Date

Approved:

Darren Marsh Signature Date Quality Assurance Manager

Approved:

Tom Fornek Signature Date LUSI Project Manager

Revision Date Description of Changes Approved

R0 25NOV08 Initial release

L C L S U L T R A F A S T S C I E N C E I N S T R U M E N T S

SOW SP-391-001-51 CXI 1 micron KB System, Mirror Substrates Statement of Work

1. Introduction The Coherent X-ray Imaging (CXI) instrument to be built at the Linac Coherent Light Source (LCLS) by the LCLS Ultrafast Science Instruments (LUSI) on the SLAC National Accelerator Laboratory site requires a mirror system to produce a 1x1 micron2 FWHM focal spot at the sample. The mirror system shall be made of 2 mirrors each with an elliptical figure and arranged in a Kirkpatrick-Baez (KB) configuration rotated by 45 degrees. The system is known as the CXI 1 Micron KB System or KB1.

The LCLS will produce a laser-like beam of X-rays in the 800 to 8300 eV range for the fundamental energy. Also, the 3rd harmonic will be present at up to 25 keV. The CXI instrument will use the hard X-ray branch which uses 2 offset mirrors that reflect energies between 2 keV and 25 keV.

The KB mirror combination shall reflect more than 75% of the X-rays over the 2-18 keV range. This will be achieved by using and appropriate coating on the mirrors.

These mirrors will be located in an Ultra-High Vacuum (UHV) environment (10-9 Torr).

They require a very precise positioning system with the mirrors located inside a vacuum enclosure which will be mounted on a stable stand.

2. Scope The vendor shall design and fabricate the following devices and components described in SLAC document No. SP-391-000-65.

1. Mirror substrates

The vendor for this part of the project shall design, fabricate and deliver:

o Two mirrors meeting the requirements described in Section 6 of SLAC document No. SP-391-000-65.

o Five test coupons meeting the requirements described in Section 6 of SLAC document No. SP-391-000-65.

o A test substrate meeting the requirements described in Section 6 of SLAC document No. SP-391-000-65.

3. Applicable Documents

• SLAC document No. SP-391-000-25, “Physics Requirements for the CXI 1 micron KB System”

• SLAC document No. SP-391-000-65, “Engineering Specifications for the CXI 1 micron KB System”

• SLAC document No. SP-391-000-19, “Physics Requirements the CXI Instrument”

• SLAC drawing No. DS-391-000-36, “Mechanical Design Standards Supplement”

• SLAC drawing No. SC-700-866-47, “Specification Kly & Vac Machining Fluids”

• Fed-STD-595B, “Colors Used in Government Procurement”

4. Requirements and Specifications All requirements and specifications for the mirror substrates are found in Section 6 of SLAC document No. SP-391-000-65. All specifications in SLAC document No. SP-391- 000-65 shall apply except for those is Sections 7, 8 and 9.

4.1. Delivery times

The suggested and desired time durations between the award of the contract and the delivery of the completed mirror substrates is 12 months.

5. Quality Assurance Requirements All quality assurance requirements for the mirror substrates are found in Section 6 of SLAC document No. SP-391-000-65.

6. Selection Criteria The potential vendors shall submit a Technical Proposal which shall contain no pricing data of any kind; cost and price information shall be included only in a separate volume.

The following sections shall be present in the Technical Proposal and the proposals shall be judged and rank based on the content of each category

6.1. Technical Specifications

The technical proposal will consist of responses to each of the specifications described in SLAC document No. SP-391-000-65. The proposal shall provide written documentation describing how individual specifications are to be met, including substantiating data or schematics where appropriate. An overall layout of the-system, and appropriate detail drawings, shall be included with the proposal.

6.2. Delivery and Milestone Schedule

A delivery and milestone schedule shall be provided. It is preferred that every component of the system be delivered to SLAC by April, 2010. A schedule for installation and acceptance testing of the system at SLAC after delivery, by vendor personnel (if necessary) in conjunction with SLAC personnel, should be provided as well.

6.3. Personnel, Experience and Facilities

Proposer shall provide descriptions of the key technical and management personnel who will be involved in the production, testing, delivery, and acceptance testing of the system, and their relevant experience, A description of production facilities and testing equipment should be provided, A listing of similar systems sold and delivered, and to whom, including sale and delivery dates, should also be provided. If subcontractors are planned to be used, similar information on the subcontractors shall also be included.

6.4. Quality Assurance, Implementation and Performance

Verification

The proposer will provide a quality assurance plan, which includes provision for performance verification of major sub-components of the system. The plans for implementation, performance testing and acceptance testing should be clearly described.

The quality-assurance plan should include the possibility of access to the vendor's facility, and that of any major sub-contractor during production, by SLAC representatives.

Subcontractors should be identified and their quality assurance procedures should also be documented.

6.5. Financial Solvency

The proposer shall provide evidence of financial stability in order to demonstrate its capability to carry the project to its completion.

1. Introduction
2. Scope
3. Applicable Documents
4. Requirements and Specifications
5. Quality Assurance Requirements
6. Selection Criteria