The document is a bid schedule for the Cushing Street Skatepark Project, issued by the City of Tucson Parks and Recreation Department in Arizona. The project involves the construction of a skatepark located at Cushing Street and I-10, with Invitation for Bid (IFB) number 250051. The bid schedule itemizes various construction activities including removal of structures, excavation, concrete work, storm drain installation, utility connections, and potable water infrastructure. The bid schedule includes multiple line items with designated units of measurement, though the current document shows zero quantities for each item, suggesting this may be a template or preliminary document.
The bid schedule does not explicitly detail pricing terms, funding sources, or contract specifics beyond the itemized construction activities. The project appears to be a municipal infrastructure development focused on creating a skatepark, with the City of Tucson seeking a general contractor to complete the proposed work. While the current document provides a structured framework for potential bidders, it lacks comprehensive details about project budget, specific site requirements, or precise scope of work. Additional documentation would be needed to provide a full understanding of the project's financial and operational parameters.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1 Project Description : Cushing St. Skatepark Project Location : Cushing Street and I-10 IFB 250051 - Cushing Street Skatepark
| ITEM DESCRIPTION | UNIT | UNIT PRICE | QUANTITY | AMOUNT | |
| REMOVAL OF STRUCTURES AND OBSTRUCTIONS | L SUM | 1 | 0 | ||
| REMOVAL OF CURB | L.F. | 12 | 0 | ||
| REMOVAL OF PORTLAND CEMENT CONCRETE PAVEMENT | S.Y. | 70 | 0 | ||
| EXCAVATION | C.Y. | 16 | 0 | ||
| BORROW | C.Y. | 142 | 0 | ||
| PORTLAND CEMENT CONCRETE PAVEMENT | S.Y. | 70 | 0 | ||
| STORM DRAIN PIPE, 6" | L.F. | 35 | 0 | ||
| SEWER SERVICE CONNECTION | L SUM | 1 | 0 | ||
| FLOW MANAGEMENT PLAN NO. 1 | L SUM | 1 | 0 | ||
| POTABLE WATER, STUBS (S), 3/4" | EA | 1 | 0 | ||
| POTABLE WATER, NEW METER BOX, #2 | EA | 1 | 0 | ||
| UTILITY POTHOLING, DEPTH <12" | EA | 3 | 0 | ||
| UTILITY IMPACT ALLOWANCE | USD | $ 1.00 | 3,500 | $ 3,500 | |
| AZPDES/NPDES (ORIGINAL) | L SUM | 1 | 0 | ||
| AZPDES/NPDES ALLOWANCE (MODIFIED) | FA | $ 1.00 | 3,000 | $ 3,000 | |
| MOBILIZATION | L SUM | 1 | 0 | ||
| CONSTRUCTION SURVEY AND LAYOUT | L SUM | 1 | 0 | ||
| TRAFFIC CONTROL | L SUM | 1 | 0 | ||
| CONCRETE CURB AND GUTTER (C-05.10)(TYPE D) | L.F. | 12 | 0 | ||
| 3/4" BACKFLOW PREVENTION ASSEMBLY WITH ENCLOSURE (COT STD. DTL 30) | EA | 1 | 0 | ||
| PULL BOX (IRRIGATION) | EA | 1 | 0 | ||
| CONTROLLER (AUTOMATIC)(CITY)(NEW)(CONVENTIONAL WIRE)(GROUNDING CABLE) | EA | 1 | 0 | ||
| PIPE (PVC) (2") (SCHEDULE 40) (SLEEVE) | L.F. | 7 | 0 | ||
| PIPE (PVC) (1") (SCHEDULE 40) (MAINLINE) | L.F. | 15 | 0 | ||
| PIPE (PVC) (3/4") (SCHEDULE 40) (LATERAL LINE) | L.F. | 394 | 0 | ||
| BACKFLOW PREVENTION UNIT (3/4")(REDUCED PRESSURE) | EA | 1 | 0 | ||
| FLOW SENSOR | EA | 1 | 0 | ||
| VALVE MASTER (1 INCH) | EA | 1 | 0 | ||
| 125A/2P CIRCUIT BREATKER IN EXISTING SERVICE | EA | 1 | 0 | ||
| 1 1/2" PVC CIRCUIT | L.F. | 1 | 0 | ||
| #1 COPPER WIRE | CFL | 1 | 0 | ||
| 240V/1P SINGLE PHASE PANEL BOARD | EA | 1 | 0 | ||
| 20A/1P CIRCUIT BREAKER | EA | 18 | 0 | ||
| 20A/2P CIRCUIT BREAKER | EA | 3 | 0 | ||
| MISC POWER | L SUM | 1 | 0 | ||
| CABLE TESTING | EA | 1 | 0 | ||
| SITE GROUNDING (1/C #3/O BARE CU) | L.F. | 200 | 0 | ||
| GROUND RODS (3/4" x 10 FT LONG) | EA | 24 | 0 | ||
| SKATEPARK LIGHTING, ASSOCIATE COMPONENTS, CONTROLS, AND PROGRAMMING NOT INCLUDING | |||||
| RGB LIGHTING | L SUM | 1 | 0 | ||
| COMFORT STATION POWER AND LIGHTING (COST BASED ON TYPICAL COMFORT STATION) | L SUM | 1 | 0 | ||
| 1" RGS CONDUIT | L.F. | 1,141 | 0 | ||
| 1" PVC CONDUIT | L.F. | 484 | 0 | ||
| #8 COPPER WIRE | CLF | 3 | 0 | ||
| #10 COPPER WIRE | CLF | 2 | 0 | ||
| LANDSCAPE GRADING (WATER HARVESTING) | S.Y. | 54 | 0 | ||
| ROCK MULCH (SALVAGED) | L SUM | 1 | 0 | ||
| STEEL FENCE (SPECIAL)(PAINTED) | L FT | 343 | 0 | ||
| FENCE GATE (12')(SPECIAL)(PAINTED) | EA | 1 | 0 | ||
| FENCE GATE (4')(SPECIAL)(PAINTED) | EA | 2 | 0 | ||
| BIKE RACK | EA | 3 | 0 | ||
| TRASH RECEPTACLE (IN GROUND) | EA | 2 | 0 | ||
| 79" BENCH (W/BACK)(SURFACE MOUNT)(LAVA GREY)(SINGLE BEAM)(STREETLIFE) | EA | 3 | 0 | ||
| 118" BENCH (W/BACK)(SURFACE MOUNT)(LAVA GREY)(DOUBLE BEAM)(STREETLIFE) | EA | 2 | 0 | ||
| 7' SKATEBOARD MEMORIAL BENCH) | EA | 1 | 0 | ||
| CONCRETE SIDEWALK (SMOOTH FINISH) | S.F. | 556 | 0 | ||
| SKATEPARK (GENERAL CONDITIONS) | L SUM | 1 | 0 | ||
| SKATEPARK (FINE GRADING) | L SUM | 1 | 0 | ||
| SKATEPARK (AGGREGATE BASE) | L SUM | 1 | 0 | ||
| SKATEPARK (FORMWORK/LUMBER/MISC HARDWARE) | L SUM | 1 | 0 | ||
| SKATEPARK (STEEL REINFORCING) | L SUM | 1 | 0 | ||
| SKATEPARK (COPING/EDGING) | L SUM | 1 | 0 | ||
| SKATEPARK (SHOTCRETE & CONCRETE) | L SUM | 1 | 0 | ||
| SKATEPARK (RETAINING WALL & FOOTERS) | L SUM | 1 | 0 | ||
| SKATEPARK (GUARDRAIL) | L SUM | 1 | 0 | ||
| MISCELLANEOUS WORK (SIGNS) | L SUM | 1 | 0 | ||
| MISCELLANEOUS WORK (PRE-FABRICATED RESTROOM & EQUIPMENT BUILDING) | L SUM | 1 | 0 | ||
| BASE BID CONSTRUCTION TOTAL | $6,500.00 |
| PROJECT ADD-ALTERNATIVE (PHASE 2) | UNIT | UNIT PRICE | QUANTITY | AMOUNT |
| MOBILIZATION | L SUM | 1 | 0 | |
| TRAFFIC CONTROL | L SUM | 1 | 0 | |
| CONCRETE SIDEWALK (SMOOTH FINISH) | S.F. | 1,177 | 0 | |
| SKATEPARK (GENERAL CONDITIONS) | L SUM | 1 | 0 | |
| SKATEPARK (FINE GRADING) | L SUM | 1 | 0 | |
| SKATEPARK (AGGREGATE BASE) | L SUM | 1 | 0 | |
| SKATEPARK (FORMWORK/LUMBER/MISC HARDWARE) | L SUM | 1 | 0 | |
| SKATEPARK (STEEL REINFORCING) | L SUM | 1 | 0 | |
| SKATEPARK (COPING/EDGING) | L SUM | 1 | 0 | |
| SKATEPARK (SHOTCRETE & CONCRETE) | L SUM | 1 | 0 | |
| SKATEPARK (RETAINING WALL & FOOTERS) | L SUM | 1 | 0 | |
| SKATEPARK (GUARDRAIL) | L SUM | 1 | 0 | |
| ORGANIC WOODY MULCH | C.Y. | 4 | 0 | |
| DECORATIVE BOULDERS (2') | EA | 9 | 0 | |
| DECORATIVE BOULDERS (1') | EA | 9 | 0 | |
| TREE (15 GALLON) | EA | 1 | 0 | |
| TREE STAKING AND GUYING (2 STAKES PER TREE) | EA | 1 | 0 | |
| SHRUB (ONE GALLON) | EA | 15 | 0 | |
| SHRUB (FIVE GALLON) | EA | 11 | 0 | |
| CATUS (SAGUARO) (3'-4' IN HEIGHT) | EA | 2 | 0 | |
| BARREL CACTUS (12" MIN) | EA | 4 | 0 | |
| OCOTILLO (15 GALLON) | EA | 3 | 0 | |
| EMITTER (ASSEMBLY)(MULTI-OUTLET) | EA | 13 | 0 | |
| CONTROL VALVE (REMOTE)(ELECTRICAL)(1")(W/FILTER, REGULATOR) | EA | 2 | 0 | |
| ADD-ALTERNATIVE CONSTRUCTION TOTAL | $ - 0 |
| PROJECT ADD-ALTERNATIVE (RGB LIGHTING) | UNIT | UNIT PRICE | QUANTITY | AMOUNT | |
| SKATEPARK RGB LIGHTING, INCLUDING FIXTURE TYPE SC, ASSOCIATED COMPONENTS, CONTROLS | |||||
| AND PROGRAMMING | L SUM | 1 | 0 | ||
| 1" RGS CONDUIT | L.F. | 1,031 | 0 | ||
| 1" PVC CONDUIT | L.F. | 650 | 0 | ||
| #8 COPPER WIRE | CLF | 4 | 0 | ||
| #10 COPPER WIRE | CLF | 1 | 0 | ||
| ADD-ALTERNATIVE CONSTRUCTION TOTAL | $ - 0 |