Technical Specifications Summary: Computed Tomography (CT) Test System
This document contains technical specifications for a federal procurement of a Computed Tomography (CT) test system for the Defense Logistics Agency (DLA) Product Test Center, Mechanical Lab, located in Columbus, Ohio. The DLA Weapons Support (Columbus) facility is the requiring activity, with DLA Contracting Services in Columbus serving as the contracting activity. The contractor must provide a new CT inspection system with comprehensive installation, training, and maintenance services. Delivery must be completed within 120 days of contract award.
The CT scanner system must meet specific technical criteria including a scan volume of at least 5.3 inches diameter by 6.7 inches, high magnification volume of at least 0.08 inches diameter by 0.3 inches, high resolution volume of at least 0.43 inches diameter by 0.59 inches, and minimum resolvable features less than 0.0004 inches. The system must be new (not refurbished), include an operator's manual, operate on standard 110V/20A power, and function without internet access or utilize government secure cloud-based software with permanent licensing. Key deliverables include the CT inspection system with supporting hardware/software, on-site installation and setup, three days of on-site training for up to four participants, and a three-year preventative maintenance and calibration contract including consumables beginning after installation. The contractor must furnish a 12-month warranty or standard OEM commercial warranty, whichever is greater. Installation, setup, and training must occur between 7:00 a.m. and 4:00 p.m., Monday through Friday, with no work on weekends or federal holidays. The contractor is responsible for all shipping costs to the delivery address in Columbus and for trainer travel to the training location. Invoicing must be submitted to the Wide Area Workflow (WAWF) system within 10 workdays after service conclusion using DoDAAC SL0702. Contractor personnel must pass security vetting through the local security office no less than one week prior to service start, with names provided to the designated point of contact.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical Specifications
Computed Tomography (CT) Test System
DLA Product Test Center, Mechanical Lab, VTM
1. Title – CT Test System
Requiring Activity: DLA Product Test Center Division, Mechanical Lab, located at Columbus, Ohio. Contracting Activity: DLA Contracting Services located in
Columbus, Ohio.
2. Introduction
The Mechanical Product Test Center (MPTC) is looking to acquire a new CT system. The new system will expand the lab’s capabilities to test coatings, measure dimensions, and examine the internals of parts & assemblies.
3. Background
The MPTC frequently receives test exhibits that are in the finished state including having the coatings applied and assembly completed. Technical requirements on drawing may be applicable before coatings were applied or may be inaccessible after assembly of multiple components. The CT system will allow measurement through coatings to allow dimensional inspection of coated exhibits, dimensional inspection of components in the assembled configuration, inspection of the internal soundness of parts, and inspection of the coatings themselves.
4. Scope
The contractor is responsible for the shipment, delivery and setup of the new CT system. The contractor shall conduct training at the place of performance listed below.
5. Performance Requirements and deliverables
I. The contractor shall provide all labor, tools, transportation, supplies, supervision, etc.
(except as noted), necessary to provide one (1) CT Inspection System to the Defense Supply
Center Columbus (DSCC), DLA Weapons Support (Columbus), Mechanical Product Test Center, Columbus, Ohio. The inspection system shall meet the following criteria:
A. CT Scanner System with the following criteria:
1. Shall be new, not refurbished.
2. It shall be supplied with an Operators Manual.
3. Scan volume of at least Ø5.3 inches x 6.7 inches.
4. High magnification volume of at least Ø0.08 inches x 0.3 inches.
5. High Resolution Volume of at least Ø0.43 inches x 0.59 inches.
6. Minimum Resolvable Feature <0.0004 inches.
7. Standard power outlet of 110V and 20A.
8. The system and computer provided must be fully operational without access to the internet, or utilize a government secure cloud-based software, and come with a permanent license for said software.
B. A minimum of 3 days of training on site for up to 4 participants must also be provided for the system listed in Criteria A
C. A 3-year preventative maintenance service and calibration contract, including any consumables, that starts after the system is installed.
D. The contractor will be responsible for on-site installation and initial start-up, including powering on, running diagnostics and verification, and demonstrating the system’s capability meets the inspections lists in Criteria A.
E. The cost of delivery must be included.
F. Delivery must be completed within 120 days of the contract award date.
G. Contractor shall contact to schedule delivery and installation.
6. Warranty
The contractor shall furnish a 12-month warranty or the standard OEM commercial warranty; whichever is greater, on all parts and labor.
7. Period of Performance
The period of performance shall be within 120 days of award.
8. Work Schedule
Installation, setup and training shall be performed between 7:00 a.m. and 4:00 p.m., Monday through Friday. No work shall be performed during the weekend or federal holidays. Government will not be paying overtime to the contractor. Work hours are subject to change after award per customer request.
9. Recognized Holidays
The following are recognized US holidays. The contractor shall not perform services on these days.
Dates Holidays
January 1 New Year’s Day
Third Monday in January Birthday of Martin Luther King, Jr.
Third Monday in February Washington’s Birthday
Last Monday in May Memorial Day
June 19th Juneteenth
July 3rd, 2026 (observed) Independence Day
First Monday in September Labor Day
Second Monday in October Columbus Day
November 11th Veteran’s Day
Fourth Thursday in November Thanksgiving Day
December 25th Christmas Day
10. Security Requirements
Contractor and all associated sub-contractor’s employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by Security Office. Contractor workforce shall comply with all personal identity verification requirements as directed by DOD, HQDA, and/or local policy. Should the Force Protection Condition (FPCON) change, the
Government may require changes in contractor security matters or processes.
11. Applicable Directives
None.
12. Deliverables
• CT Inspection System and required supporting hardware/software
• Installation and setup
• Training Session for 3 days for 4 PTC associates
13. Place of Performance
Delivery shall be to:
Defense Supply Center Columbus (DSCC)
300 North James Road, Bldg 17-3
Mark For: DLA Product Test Center, Building 9-2 (VTM Lab)
Columbus, Ohio 43218-3990
Training shall be conducted at:
DLA Weapons Support (Columbus) Product Test Center, 3990 E. Broad St., Columbus OH, Building 9, Section 2
14. Travel (if applicable)
The contractor is responsible for shipping to delivery address described in Place of Performance section. The contractor is responsible for travel to/from training location described in Place of Performance.
15. Invoicing
Payment of invoices will be accomplished by payment through the Defense
Finance and Accounting Service. Invoices will be submitted to the Wide Area Workflow
(WAWF) system in accordance with DFARS 252.232-7003 Electronics Submission of
Payment Requests and Receiving Reports and DFARS 252.232-7006 Wide Area
Workflow Payment Instructions within 10 workdays after the conclusion of the service.
16. WAWF Acceptance DoDAAC
SL0702
17. Contractor Manpower Reporting
The contractor shall report all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the
Defense Logistics Agency via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address:
http://www.sam.gov/. Reporting input will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through
September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk at: http://www.sam.gov/.
18. Common Access Card (CAC): Common Access Card (CAC) Not Required
Prior to gaining access to any DLA facility, contractor personnel must be vetted through the local security office. Due to DoD security requirements, foreign nationals and illegal aliens will not be permitted access to any DLA facility.
Individuals with outstanding warrants or certain convictions also will be denied access. Contractor personnel must ensure they have the appropriate identification required to access DLA facilities. Contractor personnel entering a DLA facility should anticipate their vehicle will undergo a security check by DLA Security, and should ensure that no drugs, alcohol, or weapons of any kind are found within the vehicle. It is the contractor’s responsibility to ensure the personnel performing under this contract can and will meet these requirements for accessing DLA facilities. Names of contractor personnel will be provided to the local POC for vetting purposes no less than one week prior to the service start date.
19. Points of Contact
The Government Contracting Officer:
TBD
The Government Contract Officer Representative (COR):
The Government Technical Representative/Project Manager: