CSG_GA0308_18_ARFF_BidTab_061924_Signed.pdf

PDF 231 KB Posted

Attached to
Procurement of Aircraft Rescue and Firefighting (ARFF) Vehicle
Solicitation number
PE-33067-NONST-2024-000000001
Issued by
Muscogee County, Georgia

About this file

This document is a bid tabulation for the procurement of a Class 4, 1,500-Gallon Aircraft Rescue and Firefighting (ARFF) Vehicle for the Columbus Airport (CSG), FAA Project No. TBD. The bid opening was held on June 5, 2024, at 3:00 P.M. (EDT). The base bid includes the procurement of one ARFF vehicle, and the additive bid includes an on-board foam testing system. The proposed procurement time is 550 calendar days after receipt of the order.

The bid tabulation shows that Oshkosh Airport Products submitted the only bid, with a base bid of $961,448.00 and an additive bid of $16,542.00, for a total of $977,990.00. The bid tabulation indicates that there were no math errors in the submitted bid.

View the file

Other files

File Type Posted
00_CSG_ARFF_Veh_Addendum_2.pdf PDF
00_CSG_ARFF_Veh_Addendum_1.pdf PDF
CSG_2024_ARFF_Veh_Advertisement.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COLUMBUS AIRPORT (CSG)

FAA PROJECT NO. TBD

PROCUREMENT OF ARFF VEHICLE

BID TABULATION

Bid Opening: June 5, 2024, at 3:00 P.M. (EDT)

Item # Spec. No. Description QTY UNIT UNIT PRICE AMOUNT

BASE BID

1 CLASS 4 - 1 Class 4, 1,500-Gallon Aircraft Rescue and Firefighting (ARFF) Vehicle 1 L. SUM 961,448.00$ 961,448.00$

BASE BID TOTAL 961,448.00$

ADDITIVE BID NO. 1

1 CLASS 4 - 2 On-board Foam Testing System 1 L. SUM 16,542.00$ 16,542.00$

ADDITIVE BID NO. 1 TOTAL 16,542.00$

MATH ERRORS: N/A

SUMMARY OF TOTALS

BASE BID + ADDITIVE BID NO. 1 TOTAL 977,990.00$

PROPOSED PROCUREMENT TIME

Certified by: Jacob Redwine, P.E.

The attached bid tabulation is an accurate summary of bids received on the subject project. Any discrepancies in unit prices or extended totals have been identified.

550 CALENDAR DAYS AFTER RECEIPT OF ORDER

Oshkosh Airport Products

CSG_GA0308-18_ARFF_Bid Tab.xlsx Page 1 of 1 6/11/2024

File details come from the government source that posted it. Updated .