CS 2027-001 Caleb Smith State Park Plan Set_SS_07012026.pdf
PDF 11 MB Posted
- Solicitation number
- 2137966
- Issued by
- Suffolk County, New York
About this file
This is a plan set document prepared by the New York State Office of State Parks, Recreation and Historic Preservation (OPRHP) for the removal of an underground petroleum bulk storage (PBS) tank and installation of a new propane system at Caleb Smith State Park. The project encompasses six primary scope items: furnishing and installing a new 1,000-gallon propane tank with associated excavation, soil disposal, pea gravel bedding, concrete pad, reinforcing steel, tank placement and anchorage, backfill and grading, and testing and commissioning; removing the existing oil tank system including piping, valves, and appurtenances with proper disposal; furnishing and installing a new burner conversion system with associated gas piping, valves, regulators, controls, and connections; installing approximately 152 linear feet of temporary construction fencing; constructing a concrete tank pad foundation; and furnishing site restoration labor and materials. The project scope of work is detailed across eight sealed and signed engineering drawings titled "Caleb Smith State Park PBS Tank Removal and Propane Tank Installation."
The plan set provides the technical specifications and construction details necessary for contractors to accurately quote and perform the removal and installation work. No specific pricing terms, set-asides, award dates, contract term information, funding sources, or response deadlines are included in this document, as it serves primarily as a technical reference and design guide for the proposed project scope.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CALEB SMITH
STATE PARK
N N
---- 01
JUNE 4, 2026
LI-008
581 WEST JERICHO TURNPIKE
SMITHTOWN, NY 11787
CALEB SMITH STATE PARK
PBS TANK REMOVAL AND PROPANE TANK INSTALLATION
CONTRACT DOCUMENTS
NOT TO SCALE
LOCATION PLAN
NOT TO SCALE
AERIAL PHOTO/
EX. SITE/ STRUCTURE
KATHY HOCUL
Governor
KATHY MOSER
Commissioner
PROJECT ID:
SUBMISSION:
RFQ #:
ADDRESS:
DATE:
TOM ALWORTH
EXECUTIVE DEPUTY COMMISSIONER
BEVIN COLLINS, RA, LEED AP
DEPUTY COMMISSIONER, CAPITAL PROJECTS
GEORGE GORMAN, JR.
LONG ISLAND REGIONAL DIRECTOR
VESNA HADZIBABIC, PE, LEED AP BD+C
LONG ISLAND STATE PARKS CAPITAL DISTRICT MANAGER
CONSULTANTS:
Greenman-Pedersen, Inc.
175 Pinelawn Road, Suite 400 Melville, NY 11747
SHEET
OF
ENGINEER/ARCHITECT OF RECORD SEAL:
DATE:
NAME: KEVIN PAPASIAN, P.E. LICENSE #: 089302
SIGNATURE & DATE:
LONG ISLAND CAPITAL DISTRICT
625 BELMONT AVENUE
WEST BABYLON, NY 11704
JUNE 30, 2026
SITE
N
KP
JF
KP
GENERAL NOTES
JM
G-001
JUNE 4 2026BID SET
JUNE 4, 2026
LI-008
581 WEST JERICHO TURNPIKE
SMITHTOWN, NY 11787
CALEB SMITH STATE PARK
PBS TANK REMOVAL AND PROPANE TANK INSTALLATION
Filename:O:\2021\BAB-2021100.09 PBS CBS STORAGE TANKS\CADD\CONTRACT PLANS\BAB-2021100.09_CS_C-002.DWG Plot Date: 6/30/2026 1:40 PM Plotted By: JOE MONTALDO
Description Date:No
CONSULTANTS:
Greenman-Pedersen, Inc.
175 Pinelawn Road, Suite 400 Melville, NY 11747
123456789
89 123467 5
A
B
D
E
F
G
H
C
KATHY HOCHUL
Governor
KATHY MOSER
Commissioner
LONG ISLAND DISTRICT
625 BELMONT AVE
WEST BABYLON, NY 11704
TOM ALWORTH
EXECUTIVE DEPUTY COMMISSIONER
BEVIN COLLINS, RA, LEED AP
DEPUTY COMMISSIONER, CAPITAL PROJECTS
GEORGE GORMAN, JR.
LONG ISLAND REGIONAL DIRECTOR
VESNA HADZIBABIC, PE, LEED AP BD+C
LONG ISLAND CAPITAL DISTRICT MANAGER
Drawn By:
Design By:
Checked By:
Submission Date:
Approved By:
Sheet:Project ID:
Sheet Title:
Drawing Number:
Project Title:
Project Location:
IT IS A VIOLATION OF STATE EDUCATION LAW FOR ANY PERSON,
UNLESS UNDER THE DIRECTION OF A LICENSED ARCHITECT/ENGINEER
TO ALTER THIS DOCUMENT IN ANYWAY. ALTERATIONS MUST HAVE THE
SEAL AFFIXED ALONG WITH A DESCRIPTION OF THE ALTERATIONS,
DATE AND ARCHITECT'S/ENGINEER'S SIGNATURE. COPYRIGHT © 2022
KEY PLAN:
RFQ #:
SUBMISSIONS/ REVISIONS
OF
1. THE GENERAL CONTRACTOR MUST CONDUCT A PRE-CONSTRUCTION MEETING AND SITE WALK
THROUGH WITH THE NYS PARKS REPRESENTATIVE AND OWNER PRIOR TO COMMENCEMENT OF
ANY DEMOLITION OR REMOVAL OF MATERIALS UNLESS OTHERWISE NOTIFIED. ITEMS TO BE
REMOVED AND SALVAGED OR DISCARDED SHALL BE IDENTIFIED.
2. ALL SALVAGED MATERIALS, WHETHER RETAINED FOR REINSTALLATION OR REFERENCED DURING
FABRICATION OF REPLACEMENTS, SHALL BE STORED AT A SECURE, DRY, AND
WEATHER-PROTECTED FACILITY.
3. REFER TO THE CONTRACT SPECIFICATIONS FOR ADDITIONAL DEMOLITION AND WASTE
REQUIREMENTS.
4. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF ADJACENT
PROPERTY AND ANY ITEMS THAT MAY BE ADVERSELY AFFECTED BY THE DEMOLITION
EQUIPMENT, DEBRIS, AND DUST.
5. THE CONTRACTOR SHALL DEMOLISH AND REMOVE FROM PROJECT WORK AREA ALL ITEMS
DESIGNATED IN THE CONTRACT DOCUMENTS AND AS DIRECTED BY THE NYS PARKS
REPRESENTATIVE.
6. DISPOSE OF DEMOLITION MATERIAL IN A MANNER APPROVED BY NYS CODES AND PARKS
MANAGEMENT IMMEDIATELY FOLLOWING DEMOLITION UNLESS OTHERWISE INSTRUCTED BY
ARCHITECT.
7. ALL MATERIALS NOTED FOR DEMOLITION BECOME PROPERTY OF THE CONTRACTOR UNLESS
SPECIFICALLY NOTED OTHERWISE. WHERE SUITABLE, REUSE MATERIALS WITH NYS PARKS
REPRESENTATIVE'S PERMISSION.
8. ALL AREAS INDICATED FOR REMOVALS WITH ADJACENT SURFACES TO REMAIN SHALL BE "NEAT
CUT".
PROJECT SCOPE SUMMARY
LF LINEAR FEET
MUTCD MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES
NYS NEW YORK STATE
OPRHP OFFICE OF PARKS, RECREATION,
AND HISTORIC PRESERVATION
VIF VERIFY IN FIELD
MATERIAL LEGEND
ABBREVIATIONS
STAGING AREA
1. THE CONTRACTOR SHALL INSPECT EXISTING CONDITIONS AT JOB SITE BEFORE SUBMITTING BID.
THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL CONDITIONS ON SITE WHETHER INDICATED ON
DRAWINGS OR NOT.
2. THE CONTRACTOR'S WORK SHALL COMPLY WITH ALL APPLICABLE SECTIONS OF THE CURRENT NEW YORK STATE BUILDING CODE AND ALL OTHER APPLICABLE CODES, ORDINANCES, AND STANDARDS.
3. THE CONTRACTOR SHALL SUPPLY ALL LABOR, TOOLS, MATERIALS AND EQUIPMENT NECESSARY TO
COMPLETE THE WORK AS CALLED FOR ON THE DRAWINGS AND SPECIFICATIONS.
4. ALL MATERIALS AND EQUIPMENT NOTED ON DRAWINGS ARE NEW UNLESS INDICATED AS EXISTING.
5. OMISSIONS FROM THE DRAWINGS, SPECIFICATIONS, OR THE MISDESCRIPTION OF DETAILS OF WORK
WHICH ARE MANIFESTLY NECESSARY TO CARRY OUT THE INTENT OF THE DRAWINGS AND
SPECIFICATIONS, OR WHICH ARE CUSTOMARILY PERFORMED, SHALL NOT RELIEVE THE
CONTRACTOR FROM PERFORMING SUCH WORK, BUT SHALL BE PERFORMED AS IF CORRECTLY SET
FORTH AND DESCRIBED TO FURNISH A COMPLETE INSTALLATION IN ACCEPTABLE CONDITION TO THE AGENCY. THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ALL TRADES AT THE SITE, WHETHER PART OF THIS CONTRACT OR UNDER A SEPARATE CONTRACT.
6. ALL DIMENSIONS SHOWN ON DRAWINGS SHALL BE VERIFIED IN FIELD BEFORE WORK PROGRESSES.
DO NOT SCALE DRAWING.
7. ANY DISCREPANCIES NOTICED IN THE DRAWINGS OR SPECIFICATIONS SHALL BE BROUGHT TO THE
ATTENTION OF THE ARCHITECT BEFORE PROCEEDING WITH CONSTRUCTION.
8. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD PRIOR TO COMMENCING WORK, AND SHALL REPORT ANY DISCREPANCIES BETWEEN DRAWINGS AND FIELD CONDITIONS TO
THE NYS PARKS REPRESENTATIVE.
9. A WALK-THROUGH OF THE SITE WITH THE CONTRACTOR AND THE NYS PARKS REPRESENTATIVE IN
ATTENDANCE SHALL BE PERFORMED BEFORE ANY WORK COMMENCES.
10. CONTRACTOR SHALL PROVIDE INFORMATIONAL SUBMITTALS, INCLUDING BUT NOT LIMITED TO
PROTECTION MEASURE DRAWINGS AND REPORT AND PRE-DEMOLITION PHOTOGRAPHIC
DOCUMENTATION, IN ACCORDANCE WITH SPECIFICATION SECTION 024119 1.5.
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL CONDITIONS AND
MATERIALS WITHIN THE PROPOSED CONSTRUCTION AREA. THE CONTRACTOR SHALL DESIGN AND
INSTALL ADEQUATE SHORING AND BRACING FOR ALL STRUCTURAL OR REMOVAL TASKS. THE
CONTRACTOR SHALL HAVE SOLE RESPONSIBILITY FOR ANY DAMAGE OR INJURIES CAUSED BY OR
DURING THE EXECUTION OF THE WORK.
12. THE CONTRACTOR SHALL PROTECT ALL ADJACENT EXISTING ELEMENTS TO REMAIN.
13. PEDESTRIANS SHALL BE PROTECTED DURING CONSTRUCTION AND DEMOLITION ACTIVITIES AS
REQUIRED BY NYS BC 1501.6. SIGNS SHALL BE PROVIDED TO DIRECT PEDESTRIAN TRAFFIC.
14. A WALKWAY SHALL BE PROVIDED FOR PEDESTRIAN TRAVEL IN FRONT OF EVERY CONSTRUCTION
AND DEMOLITION SITE PER 1501.6.1.
15. PEDESTRIAN TRAFFIC SHALL BE PROTECTED BY A DIRECTIONAL BARRICADE WHERE THE WALKWAY
EXTENDS INTO THE STREET PER NYS BC 1501.6.2.
16. REQUIRED EXITS, EXISTING STRUCTURAL ELEMENTS, FIRE PROTECTION DEVICES AND SANITARY
SAFEGUARDS SHALL BE MAINTAINED AT ALL TIMES PER NYS BC 1501.3.
17. CONTRACTOR SHALL COORDINATE WITH OCCUPANTS AND OTHER CONTRACTORS PER SECTION
011000 1.7 A, B, AND C.
18. SANITARY FACILITIES SHALL BE PROVIDED DURING CONSTRUCTION AND DEMOLITION ACTIVITIES IN
ACCORDANCE WITH THE PLUMBING CODE. REFER TO SPECIFICATION SECTION 015000 3.2 D FOR
REQUIREMENTS.
19. ALL REMOVALS, INCIDENTAL TO AND NECESSARY, SHALL BE DISPOSED OF PROPERLY OFF THE PROJECT SITE. REMOVE EXISTING FEATURES IN THEIR ENTIRETY UNLESS OTHERWISE INDICATED. DO NOT ALLOW DEBRIS TO ACCUMULATE ON SITE. PROMPTLY AND LEGALLY DISPOSE OF DEMOLISHED
MATERIALS AND TRASH OFF SITE. LITTER AND DEBRIS SHALL BE CLEANED UP FROM THE
CONSTRUCTION SITE DAILY.
20. HAZARDOUS MATERIALS MAY BE ENCOUNTERED DURING CONSTRUCTION OPERATIONS, INCLUDING
ASBESTOS AND LEAD. COMPLY WITH ALL APPLICABLE REGULATIONS, LAWS, AND ORDINANCES
CONCERNING THE REMOVAL, HANDLING, AND PROTECTION AGAINST EXPOSURE OR ENVIRONMENTAL
POLLUTION.
21. CONTRACTOR SHALL PROVIDE ALL PUBLIC NOTIFICATIONS FROM AGENCIES HAVING JURISDICTION
FOR ALL HAZARDOUS MATERIALS ABATEMENT.
22. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THEIR WORK, FOR THE COORDINATION BETWEEN THEIR RESPECTIVE SUBCONTRACTORS AND THEIR PORTION OF WORK, AND ANY OF THE OWNER'S
CONTRACTORS OR SUBCONTRACTORS.
23. THE CONTRACTOR IS RESPONSIBLE FOR MARK-OUT OF EXISTING UTILITIES PRIOR TO EXCAVATION.
24. ALL APPROPRIATE EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED PRIOR TO
ANY SITE DISTURBANCE, INCLUDING DEMOLITIONS, AND THEY SHALL REMAIN IN PLACE UNTIL ALL
DISTURBED AREAS ARE STABILIZED.
25. ALL SOIL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL CONFORM TO THE LATEST EDITION OF THE NYS STANDARDS AND SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL.
INSTALL AND MAINTAIN ALL MEASURES TO EFFECTIVELY CONTAIN ALL SOIL MATERIAL WITHIN THE
PROJECT LIMITS.
26. STOCKPILES SHALL BE PLACED WHERE EROSION AND SEDIMENTATION WILL NOT OCCUR.
27. UTILIZE DUST CONTROL AS NEEDED AND AS DIRECTED BY THE NYS PARKS REPRESENTATIVE.
28. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE MAINTENANCE AND CONTROL OF TRAFFIC IN
CONFORMANCE WITH THE LATEST NATIONAL MUTCD AND NEW YORK STATE SUPPLEMENT TO THE
MUTCD.
29. ANY VEHICLES OR EQUIPMENT TRAVELING OUTSIDE THE CONTRACT LIMIT LINE MUST NOT TRACK
SEDIMENT OR OTHER MATERIALS; THIS MAY REQUIRE THE WASHING OFF OF VEHICLES AND
EQUIPMENT PRIOR TO TRAVELING OUTSIDE THE CONTRACT LIMIT LINE.
30. MOTOR VEHICLES AND MACHINERY SHALL NOT BE LEAKING OIL OR ANY OTHER FLUIDS.
31. THE CONTRACTOR SHALL GUARANTEE ALL WORK PERFORMED UNDER THIS CONTRACT FOR A
PERIOD OF ONE YEAR AFTER COMPLETION AND FINAL ACCEPTANCE BY THE OWNER UNLESS
OTHERWISE INDICATED IN CONTRACT DOCUMENTS.
32. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL INSPECTIONS AND FINAL APPROVALS FROM ALL GOVERNING AGENCIES, INCLUDING BUT NOT LIMITED TO THE CERTIFICATE OF OCCUPANCY AND
PUBLIC ASSEMBLY PERMITS.
33. RESTORE TO THEIR ORIGINAL CONDITION ALL EXISTING PHYSICAL FEATURES DAMAGED BY THE UNAUTHORIZED ACT OR OMISSION OF THE CONTRACTOR. ORIGINAL CONDITION SHALL MEAN THE
CONDITION IN WHICH THE FEATURE WAS FOUND AT THE START OF WORK.
1. THE CONTRACTOR SHALL COORDINATE ALL OPERATIONS WITH THE NYS PARKS
REPRESENTATIVE. THIS SHALL INCLUDE BUT NOT BE LIMITED TO AREAS FOR MATERIAL
STORAGE, ACCESS TO AND FROM WORK AREA, TIMING AND SEQUENCE OF WORK,
SPECIAL CONSIDERATIONS OF NOISY, DUSTY, OR VAPORED OPERATIONS, AND/OR
UTILITY INTERRUPTIONS.
2. EXTREME CARE MUST BE TAKEN DURING ALTERATION AND NEW CONSTRUCTION SO AS
NOT TO DAMAGE EXISTING INSTALLATIONS. IN CONNECTION TO OR ALTERING
EXISTING STRUCTURE, THE CONTRACTOR SHALL SUPPLY BRACING, SHORING AND
OTHER SUPPORTS FOR EXISTING MEMBERS AS REQUIRED TO ASSURE THEIR
STRUCTURAL INTEGRITY AND STABILITY. WHERE EXISTING FINISHES ARE BROKEN OR
DAMAGED THEY SHALL BE RESTORED TO THEIR ORIGINAL STATE AFTER STRUCTURE IS
IN PLACE.
3. THE CONTRACTOR SHALL PROPERLY SHORE, UNDERPIN, SHEET, BRACE, AND MAKE
SAFE ALL FLOORS, SIDEWALKS, WALLS, FOOTING, FOUNDATIONS, EARTH CUTS, AND
ADJACENT PROPERTY AS THE JOB CONDITIONS WARRANT.
4. THE CONTRACTOR SHALL MAKE NO DEVIATION FROM THE DRAWINGS WITHOUT
WRITTEN APPROVAL OF THE NYS PARKS REPRESENTATIVE.
5. ALL PAVED WALKS, SURFACES, AND AREAWAYS SHALL BE DRAINED ADEQUATELY
WITHIN THE SITE.
6. ON SITE STORAGE OF ALL NEW CONSTRUCTION MATERIALS SHALL BE IN A DRY,
SECURE LOCATION AS DIRECTED BY THE NYS PARKS REPRESENTATIVE.
7. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN TEMPORARY ENCLOSURES OR
FACILITIES FOR THE PROTECTION OF NEW WORK WHEN DEEMED NECESSARY BY NYS
PARKS REPRESENTATIVE AND SHALL REMOVE TEMPORARY FACILITIES WHEN NO
LONGER REQUIRED.
8. COMPLY WITH NY CODES RULES AND REGULATIONS 23-5.3 GENERAL PROVISIONS FOR
METAL SCAFFOLDS AND SPECIFICATION SECTION 015008 3.8A.
9. DO NOT ATTACH SCAFFOLDING TO THE BUILDING WITHOUT WRITTEN PERMISSION
FROM NYS OPRHP.
10. THE CONTRACTOR SHALL KEEP THE PREMISES FREE FROM ACCUMULATION OF WASTE
MATERIALS OF HIS WORK. UPON COMPLETION EACH WORK DAY, THE CONTRACTOR
SHALL REMOVE ALL DEBRIS AND LEAVE THE AREA IN A "BROOM CLEAN" CONDITION.
11. ALL REMOVED MATERIAL AND DEBRIS SHALL BE LEGALLY DISPOSED AWAY FROM THE
PREMISES.
12. AT THE CONCLUSION OF JOB, THE CONTRACTOR SHALL REMOVE CONSTRUCTION
FENCE AND REPLACE ALL DAMAGED PAVING, LANDSCAPING, ETC. AT NO ADDITIONAL
COST TO THE STATE.
GENERAL NOTES
CONSTRUCTION NOTES
GENERAL DEMOLITION/
REMOVAL NOTES
T-001 TITLE PAGE
G-001 GENERAL NOTES
G-002 CALEB SMITH STATE PARK PROPANE TANK SPECIFICATIONS 1
G-003 CALEB SMITH STATE PARK PROPANE TANK SPECIFICATIONS 2
G-004 CALEB SMITH STATE PARK PROPANE TANK SPECIFICATIONS 3
C-101 CALEB SMITH STATE PARK PBS TANK REMOVAL AND EROSION
AND SEDIMENT CONTROL PLAN AND DEMOLITION.
C-102 CALEB SMITH STATE PARK SITE PLAN AND PROPOSED INSTALLATION
C-501 CALEB SMITH STATE PARK PROPANE TANK DETAILS
LIST OF DRAWINGS
PROJECT/ BUILDING PERMITTING NOTES /
REQUIREMENTS
1. ENVIRONMENTAL PERMIT - N/A
2. NYS DEC PERMIT - N/A
3. USCE PERMIT - N/A
4. SHPO/LPC PERMIT/LETTER - N/A
5. CONSTRUCTION PERMIT - N/A
6. COUNTY PERMIT - N/A
7. D.O.T. PERMIT - N/A
PROJECT REQUIRED SPECIAL INSPECTION
D
AT
E
IS
SU
ED
F O
R
DISCIPLINE
(CIVIL)
S D
S
ET
0%
P R
O G
R
ES
S
PR
IN
T
JU
N
E 4, M
AY
JA
N
U
AR
Y
SHPO/LPC STATEMENT:
XX
/X
X/
XX
XX
BI
D
S
ET
XX
/X
X/
XX
XX
AD
D
EN
D
U M
XX
/X
X/
XX
XX
C O
N
FO
R M
AN
C
E
SE
T
XX
/X
X/
XX
XX
BU
LL
ET
IN
AS
-B
U
IL
T
1. REMOVAL AND PROPER DISPOSAL OF EXCESS FUEL OIL WITHIN EXISTING TANK 2,400 GALLON
UNDERGROUND FUEL STORAGE TANK.
2. REMOVAL OF ONE (1) EXISTING 2,400 GALLON UNDERGROUND FUEL OIL STORAGE TANK AND
ASSOCIATED APPURTENANCES AS SHOWN ON PLANS PROVIDED.
3. INSTALLATION OF ONE (1) 1,000 GALLON UNDERGROUND PROPANE TANK, 1.5" AND 1.25" PRODUCT PIPING AND ASSOCIATED SECOND STAGE REGULATOR TO BE CONNECTED TO A NEW CARLIN 201GAS
120 VAC, 60HZ 1-PHASE GAS BURNER.
4. REMOVE INTERIOR MECHANICAL PIPING AS PER PLANS.
5. INSTALL NEW INTERIOR MECHANICAL PIPING AS PER PLANS.
6. INSTALL NEW NEW CARLIN 201GAS 120 VAC, 60HZ 1-PHASE GAS BURNER.
7. CONTRACTOR TO INSTALL MIN. 8" DIAMETER DOUBLE WALL STAINLESS STEEL CHIMNEY FLUE IN
ACCORDANCE WITH ALL APPLICABLE STATE AND LOCAL CODES. CONTRACTOR TO VERIFY DIAMETER OF
CHIMNEY PRIOR TO ORDERING CHIMNEY PIPE.
1. CONTRACTOR TO VERIFY ALL UNDERGROUND UTILITIES PRIOR TO START OF WORK. CONTRACTOR TO PROVIDE UTILITY LOCATING/MARK-OUT SERVICES PRIOR TO ANY SITE WORK TO VERIFY THAT NO
EXISTING UNDERGROUND UTILITIES WILL BE IMPACTED BY THE WORK OF THIS PROJECT.
2. ALL ELECTRICAL RELATED REMOVAL AND CAPPING SHALL BE PERFORMED TO ADHERE TO NATIONAL ELECTRICAL CODE (NEC) AND NATIONAL FIRE PROTECTION GROUP (NFPA) AS REQUIRED BY CURRENT
NYS BUILDING CODE.
3. THROUGHOUT ALL PHASES OF THE WORK, THE FACILITY SHALL REMAIN IN FULL AND CONTINUOUS
OPERATION. CONTRACTOR SHALL TAKE ALL MEASURES NECESSARY TO ENSURE THAT NO WORK
AFFECTS ANY FACILITY OPERATION.
4. CONTRACTOR TO REMOVE TANK EQUIPMENT AS SHOWN, AND OTHER NOTED ITEMS, IN THEIR ENTIRETY AND AS NEEDED TO COMPLETE THE WORK ALL IN ACCORDANCE WITH NYSDEC AND ALL GOVERNING
AGENCIES' JURISDICTION, AND TO THE SATISFACTION OF NY STATE PARKS.
5. PROVIDE DUMPSTER FOR USE BY ALL CONTRACTORS AND SUB-CONTRACTORS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOADING RUBBISH OR DEMOLITION ITEMS IN A NEAT AND ORDERLY WAY SO AS TO MAXIMIZE DUMPSTER CAPACITY. DUMPSTER LOCATION SHALL BE COORDINATED WITH THE
PARK REPRESENTATIVE.
6. CONTRACTOR TO ADHERE TO ALL OSHA GUIDELINES AND IS RESPONSIBLE FOR THE SAFETY OF
HIS/HER AND ANY SUB-CONTRACTOR'S CREW AND FOR PREVENTING ANY CONDITION WHICH MAY
ADVERSELY AFFECT THE FACILITY OR ITS OCCUPANTS. THE CONTRACTOR SHALL TAKE ALL
PRECAUTIONS TO PREVENT INJURY OR DAMAGE TO ANY PERSON OR PROPERTY.
7. THE CONTRACTOR SHALL FULLY COORDINATE ANY NECESSARY SERVICE SHUT-DOWN PERFORMED AS
PART OF THIS PROJECT WITH THE PARK REPRESENTATIVE AT LEAST 72 HOURS IN ADVANCE.
8. THE CONTRACTOR SHALL MAKE ALL EFFORTS TO LIMIT ANY DAMAGE TO EXISTING SURFACES OR SERVICE DURING THE COURSE OF THIS PROJECT. REPLACE ANY ITEM OR SERVICE AFFECTED BY THE WORK TO MATCH THE EXISTING ADJACENT SURFACES OR INTEGRATE INTO THE EXISTING SYSTEMS, IN
A TIMELY MANNER AT NO ADDITIONAL COST TO NYS PARKS.
9. ALLOWABLE WORK DAYS AND TIMES SHALL BE COORDINATED WITH PARK REPRESENTATIVE.
10. REMOVE ALL DEBRIS AND MATERIALS GENERATED BY THIS WORK, UNLESS OTHERWISE NOTED OR
DIRECTED, FROM THE SITE AND DISPOSE OF LEGALLY.
11. THE CONTRACTOR SHALL PROVIDE A MINIMUM OF 30 DAY NOTICE PRIOR TO THE START OF SCHEDULED
WORK TO ALLOW THE OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION (OPRHP) TO NOTIFY THE NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION (NYSDEC) OF TANK CLOSURE AND SUBMIT PRE-WORK NOTIFICATION AND PETROLEUM BULK STORAGE (PBS) REGISTRATION
DOCUMENTS.
12. DURING REMOVAL OF THE EXISTING 2,400 GALLON UNDERGROUND OIL TANK, THE CONTRACTOR SHALL TEST IF RESIDUAL OIL OR PETROLEUM PRODUCT ARE ENCOUNTERED WITHIN THE EXCAVATION AREA. IF CONTAMINANTS ARE ENCOUNTERED THE CONTRACTOR SHALL CONTACT PARK REPRESENTATIVE AND
STOP ALL OPERATION.
STOCKPILING AREA
NEW TOPSOIL AND SEED AREAS
1. THERE IS NO WORK ON THE HISTORIC STRUCTURE OF THIS FACILITY.
PROJECT SPECIFIC NOTES
1. THIS PROJECT WILL HAVE CONSTRUCTION INSPECTION PERFORMED BY A NYS OPRHP CODE
ENFORCEMENT OFFICIAL PER SECTION 105.3 OF THE BCNYS.
1. THE GENERAL CONTRACTOR MUST CONDUCT A PRE-CONSTRUCTION MEETING AND SITE WALK THROUGH WITH THE NYS PARKS REPRESENTATIVE AND OWNER PRIOR TO COMMENCEMENT OF ANY DEMOLITION OR REMOVAL OF MATERIALS UNLESS OTHERWISE NOTIFIED. ITEMS TO BE REMOVED AND SALVAGED OR DISCARDED SHALL BE
IDENTIFIED.
2. ALL SALVAGED MATERIALS, WHETHER RETAINED FOR REINSTALLATION OR REFERENCED DURING FABRICATION OF REPLACEMENTS, SHALL BE STORED AT A SECURE, DRY, AND WEATHER-PROTECTED FACILITY.
3. REFER TO THE CONTRACT SPECIFICATIONS FOR ADDITIONAL DEMOLITION AND WASTE REQUIREMENTS.
4. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF ADJACENT PROPERTY AND ANY ITEMS THAT MAY BE ADVERSELY AFFECTED BY THE DEMOLITION
EQUIPMENT, DEBRIS, AND DUST.
5. THE CONTRACTOR SHALL DEMOLISH AND REMOVE FROM PROJECT WORK AREA ALL ITEMS DESIGNATED IN THE CONTRACT DOCUMENTS AND AS DIRECTED BY THE NYS
PARKS REPRESENTATIVE.
6. DISPOSE OF DEMOLITION MATERIAL IN A MANNER APPROVED BY NYS CODES AND PARKS MANAGEMENT IMMEDIATELY FOLLOWING DEMOLITION UNLESS OTHERWISE
INSTRUCTED BY ARCHITECT.
7. ALL MATERIALS NOTED FOR DEMOLITION BECOME PROPERTY OF THE CONTRACTOR UNLESS SPECIFICALLY NOTED OTHERWISE. WHERE SUITABLE, REUSE MATERIALS WITH
NYS PARKS REPRESENTATIVE'S PERMISSION.
8. ALL AREAS INDICATED FOR REMOVALS WITH ADJACENT SURFACES TO REMAIN SHALL BE "NEAT CUT".
9. ALL APPROPRIATE EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED PRIOR TO ANY SITE DISTURBANCE, AND SHALL REMAIN IN PLACE UNTIL ALL
DISTURBED AREAS ARE STABILIZED.
MECHANICAL REMOVAL NOTES
DRAWING LIST
CULTURED STONE LANDSCAPING BED
EQUIPMENT SPECIFICATIONS NOTE
1. CONTRACTOR SHALL PROVIDE ALL EQUIPMENT AS LISTED TO MEET THE MANUFACTURER'S
SPECIFICATIONS PROVIDED OR APPROVED EQUAL.
Filename:O:\2021\BAB-2021100.09 PBS CBS STORAGE TANKS\CADD\CONTRACT PLANS\BAB-2021100.09_CS_C-501.DWG Plot Date: 6/30/2026 1:41 PM Plotted By: JOE MONTALDO
Description Date:No
CONSULTANTS:
Greenman-Pedersen, Inc.
175 Pinelawn Road, Suite 400 Melville, NY 11747
123456789
89 123467 5
A
B
D
E
F
G
H
C
KATHY HOCHUL
Governor
KATHY MOSER
Commissioner
LONG ISLAND DISTRICT
625 BELMONT AVE
WEST BABYLON, NY 11702
TOM ALWORTH
EXECUTIVE DEPUTY COMMISSIONER
BEVIN COLLINS, RA, LEED AP
DEPUTY COMMISSIONER, CAPITAL PROJECTS
GEORGE GORMAN, JR.
LONG ISLAND REGIONAL DIRECTOR
VESNA HADZIBABIC, PE, LEED AP BD+C
LONG ISLAND CAPITAL DISTRICT MANAGER
Drawn By:
Design By:
Checked By:
Submission Date:
Approved By:
Sheet:Project ID:
Sheet Title:
Drawing Number:
Project Title:
Project Location:
IT IS A VIOLATION OF STATE EDUCATION LAW FOR ANY PERSON,
UNLESS UNDER THE DIRECTION OF A LICENSED ARCHITECT/ENGINEER
TO ALTER THIS DOCUMENT IN ANYWAY. ALTERATIONS MUST HAVE THE
SEAL AFFIXED ALONG WITH A DESCRIPTION OF THE ALTERATIONS,
DATE AND ARCHITECT'S/ENGINEER'S SIGNATURE. COPYRIGHT © 2022
KEY PLAN:
RFQ #
SUBMISSIONS/ REVISIONS
OF
KP
JF
KP
CALEB SMITH STATE PARK
PROPANE TANK
SPECIFICATIONS 1
JM
G-002
LI-008
581 WEST JERICHO TURNPIKE
SMITHTOWN, NY 11787
CALEB SMITH STATE PARK
PBS TANK REMOVAL AND PROPANE TANK INSTALLATION
NOTE:
CONTRACTOR SHALL PROVIDE ALL
EQUIPMENT AS LISTED TO MEET THE
MANUFACTURER'S SPECIFICATIONS
PROVIDED OR APPROVED EQUAL
Filename:O:\2021\BAB-2021100.09 PBS CBS STORAGE TANKS\CADD\CONTRACT PLANS\BAB-2021100.09_CS_C-501.DWG Plot Date: 6/30/2026 1:41 PM Plotted By: JOE MONTALDO
Description Date:No
CONSULTANTS:
Greenman-Pedersen, Inc.
175 Pinelawn Road, Suite 400 Melville, NY 11747
123456789
89 123467 5
A
B
D
E
F
G
H
C
KATHY HOCHUL
Governor
KATHY MOSER
Commissioner
LONG ISLAND DISTRICT
625 BELMONT AVE
WEST BABYLON, NY 11702
TOM ALWORTH
EXECUTIVE DEPUTY COMMISSIONER
BEVIN COLLINS, RA, LEED AP
DEPUTY COMMISSIONER, CAPITAL PROJECTS
GEORGE GORMAN, JR.
LONG ISLAND REGIONAL DIRECTOR
VESNA HADZIBABIC, PE, LEED AP BD+C
LONG ISLAND CAPITAL DISTRICT MANAGER
Drawn By:
Design By:
Checked By:
Submission Date:
Approved By:
Sheet:Project ID:
Sheet Title:
Drawing Number:
Project Title:
Project Location:
IT IS A VIOLATION OF STATE EDUCATION LAW FOR ANY PERSON,
UNLESS UNDER THE DIRECTION OF A LICENSED ARCHITECT/ENGINEER
TO ALTER THIS DOCUMENT IN ANYWAY. ALTERATIONS MUST HAVE THE
SEAL AFFIXED ALONG WITH A DESCRIPTION OF THE ALTERATIONS,
DATE AND ARCHITECT'S/ENGINEER'S SIGNATURE. COPYRIGHT © 2022
KEY PLAN:
RFQ #
SUBMISSIONS/ REVISIONS
OF
KP
JF
KP
CALEB SMITH STATE PARK
SPECIFICATIONS 2
G-003
LI-008
581 WEST JERICHO TURNPIKE
SMITHTOWN, NY 11787
CALEB SMITH STATE PARK
PBS TANK REMOVAL AND PROPANE TANK INSTALLATION
NOTE:
CONTRACTOR SHALL PROVIDE ALL EQUIPMENT AS LISTED
TO MEET THE MANUFACTURER'S SPECIFICATIONS
Filename:O:\2021\BAB-2021100.09 PBS CBS STORAGE TANKS\CADD\CONTRACT PLANS\BAB-2021100.09_CS_C-501.DWG Plot Date: 6/30/2026 1:41 PM Plotted By: JOE MONTALDO
Description Date:No
CONSULTANTS:
Greenman-Pedersen, Inc.
175 Pinelawn Road, Suite 400 Melville, NY 11747
123456789
89 123467 5
A
B
D
E
F
G
H
C
KATHY HOCHUL
Governor
KATHY MOSER
Commissioner
LONG ISLAND DISTRICT
625 BELMONT AVE
WEST BABYLON, NY 11702
TOM ALWORTH
EXECUTIVE DEPUTY COMMISSIONER
BEVIN COLLINS, RA, LEED AP
DEPUTY COMMISSIONER, CAPITAL PROJECTS
GEORGE GORMAN, JR.
LONG ISLAND REGIONAL DIRECTOR
VESNA HADZIBABIC, PE, LEED AP BD+C
LONG ISLAND CAPITAL DISTRICT MANAGER
Drawn By:
Design By:
Checked By:
Submission Date:
Approved By:
Sheet:Project ID:
Sheet Title:
Drawing Number:
Project Title:
Project Location:
IT IS A VIOLATION OF STATE EDUCATION LAW FOR ANY PERSON,
UNLESS UNDER THE DIRECTION OF A LICENSED ARCHITECT/ENGINEER
TO ALTER THIS DOCUMENT IN ANYWAY. ALTERATIONS MUST HAVE THE
SEAL AFFIXED ALONG WITH A DESCRIPTION OF THE ALTERATIONS,
DATE AND ARCHITECT'S/ENGINEER'S SIGNATURE. COPYRIGHT © 2022
KEY PLAN:
RFQ #
SUBMISSIONS/ REVISIONS
OF
KP
JF
KP
CALEB SMITH STATE PARK
SPECIFICATIONS 3
G-004
LI-008
581 WEST JERICHO TURNPIKE
SMITHTOWN, NY 11787
CALEB SMITH STATE PARK
PBS TANK REMOVAL AND PROPANE TANK INSTALLATION
NOTE:
CONTRACTOR SHALL PROVIDE ALL EQUIPMENT AS LISTED
TO MEET THE MANUFACTURER'S SPECIFICATIONS
EXISTING UNDERGROUND TANK #15
PETROLEUM BULK STORAGE (PBS)
2,400 GALLON TANK TO BE REMOVED
34 35
NATURE MUSEUM
EXISTING FUEL LINE TO REMOVED
EXISTING TANK VENT AND OVERFILL
ALARM/LIGHT TO BE REMOVED
FOR PIPING WITHIN THE
BASEMENT SEE BASEMENT
REMOVAL PLAN ON THIS SHEET
FOR DETAILS
INSTALL 129 LF OF 6' HIGH CHAIN LINK
FENCE PANELS CONSTRUCTION FENCE
(TYP.)
EXISTING FLAG POLE TO REMAIN
APPROXIMATE LOCATION OF
STAGING AREA
FINAL LOCATIONS TO BE
COORDINATED WITH PARK
MANAGER
INSTALL SILT FENCE PER NEW YORK
STATE STANDARDS AND
SPECIFICATIONS FOR EROSION AND
SEDIMENT CONTROL
(TYP.)
AREA FOR SOIL STOCKPILE DURING
REMOVALS
CONTRACTOR TO INSTALL TREE
PROTECTION AROUND ALL EXISTING
TREES WITHIN 20' FROM WORK AREA.
(TYP.)
PEDESTRIAN ACCESS TO BE RESTRICTED
DURING CONSTRUCTION ACTIVITIES.
PER NYS BC 1501, PEDESTRIAN TRAFFIC
SHALL BE PROTECTED BY A DIRECTIONAL
BARRICADE. CONTRACTOR SHALL
CONSULT THE PARKS REPRESENTATIVE
FOR LOCATION OF SIGN FOR LOCATION
OF SIGNAGE.
CONTRACTOR TO INSTALL TREE
PROTECTION AROUND ALL EXISTING
TREES WITHIN 20' FROM WORK AREA.
(TYP.)
CONSTRUCTION ENTRANCE
EXISTING FUEL LINES AND
VALVES TO BE REMOVED
NATURE MUSEUM
BASEMENT
OMNTEC CONTROL PANEL AND
PNEUMERCATOR LIQUID LEVEL
CONTROL SYSTEM TO BE REMOVED.
TAG AND CAP ALL CONDUITS TO
REMAIN FOR POSSIBLE FUTURE
USE.
EXISTING FUEL LINES AND VALVES
TO BE REMOVED
EXISTING BOILER TO REMAIN.
EXISTING BURNER AND RELATED
EQUIPMENT TO BE REMOVED
EXISTING TANK VENT AND OVERFILL
ALARM/LIGHT TO BE REMOVED
FOR CONTINUATION OF
EXISTING FUEL LINE
REMOVAL SEE EXTERIOR
REMOVALS PLAN
SITE
N
0 10' 20'
SCALE IN FEET
N
EXTERIOR REMOVALS AND EROSION CONTROL PLAN
BASEMENT REMOVALS PLAN
SCALE IN FEET
4' 8'
KP
JF
KP
CALEB SMITH STATE PARK PBS
TANK REMOVAL AND EROSION
AND SEDIMENT CONTROL
PLAN AND DEMOLITION
JM
C-101
LI-008
581 WEST JERICHO TURNPIKE
SMITHTOWN, NY 11787
CALEB SMITH STATE PARK
PBS TANK REMOVAL AND PROPANE TANK INSTALLATION
Filename:O:\2021\BAB-2021100.09 PBS CBS STORAGE TANKS\CADD\CONTRACT PLANS\BAB-2021100.09_CS_C-101.DWG Plot Date: 6/30/2026 1:41 PM Plotted By: JOE MONTALDO
Description Date:No
CONSULTANTS:
Greenman-Pedersen, Inc.
175 Pinelawn Road, Suite 400 Melville, NY 11747
123456789
89 123467 5
A
B
D
E
F
G
H
C
KATHY HOCHUL
Governor
KATHY MOSER
Commissioner
LONG ISLAND DISTRICT
625 BELMONT AVE
WEST BABYLON, NY 11702
TOM ALWORTH
EXECUTIVE DEPUTY COMMISSIONER
BEVIN COLLINS, RA, LEED AP
DEPUTY COMMISSIONER, CAPITAL PROJECTS
GEORGE GORMAN, JR.
LONG ISLAND REGIONAL DIRECTOR
VESNA HADZIBABIC, PE, LEED AP BD+C
LONG ISLAND CAPITAL DISTRICT MANAGER
Drawn By:
Design By:
Checked By:
Submission Date:
Approved By:
Sheet:Project ID:
Sheet Title:
Drawing Number:
Project Title:
Project Location:
IT IS A VIOLATION OF STATE EDUCATION LAW FOR ANY PERSON,
UNLESS UNDER THE DIRECTION OF A LICENSED ARCHITECT/ENGINEER
TO ALTER THIS DOCUMENT IN ANYWAY. ALTERATIONS MUST HAVE THE
SEAL AFFIXED ALONG WITH A DESCRIPTION OF THE ALTERATIONS,
DATE AND ARCHITECT'S/ENGINEER'S SIGNATURE. COPYRIGHT © 2022
KEY PLAN:
RFQ #:
SUBMISSIONS/ REVISIONS
OF
AS SHOWN ON PLAN
BOARDS
BOARDS
C.R.Z.
TREES IN PAVING AREA
NATURAL AREAS
GROUP OF TREESINDIVIDUAL TREE
CURB
C.R.Z.
FENCE LOCATION PRIOR TO
CLEARING, GRADING AND PAVING
PERMEABLE
PAVING AREA
TREES NEAR
CONSTRUCTION ACTIVITY
LIMIT OF
CONSTRUCTION LINE
MINIMUM NECESSARY WORK AREA
(WOOD CHIP MULCH 100 TO 150 mm
(4'' TO 6'' DEPTH)
C.R.Z.
CRITICAL ROOT ZONE (C.R.Z.)
RADIUS = 1 FT. PER INCH
OF TRUNK DIAMETER
ADD BOARDS STRAPPED TO TRUNK
DUE TO CLOSENESS OF FENCE
LESS THAN 5' FROM TRUNK.
LINEAR CONSTRUCTION THROUGH TREES
TEMPORARY
ACCESS ROAD,
EXISTING
ROADWAY
OR EASEMENT
AS APPROVED
STEEL OR WOOD FENCE POSTS
MAX. 2.4 m (8') SPACING
STANDARD SYMBOL
FOR SILT FENCE (SF)
FLOW
SILT FENCE FABRIC
150 mm
(6'') MIN.
TRENCH CROSS SECTION
150 mm
(6'') MIN.
FABRIC TOE-IN
TRENCH (BACKFILLED)
2" x 4" WELDED WIRE
BACKING SUPPORT FOR
FABRIC (12.5 GA. WIRE)
1. STEEL OR WOOD POSTS WHICH SUPPORT THE SILT FENCE SHALL BE
INSTALLED ON A SLIGHT ANGLE TOWARD THE ANTICIPATED RUNOFF SOURCE.
POST MUST BE EMBEDDED A MINIMUM OF 300 mm (12 INCHES). IF WOOD POSTS CANNOT ACHIEVE 300 mm (12 inches) DEPTH, USE STEEL POSTS.
2. THE TOE OF THE SILT FENCE SHALL BE TRENCHED IN WITH A SPADE OR
MECHANICAL TRENCHER, SO THAT THE DOWNSLOPE FACE OF THE TRENCH IS
FLAT AND PERPENDICULAR TO THE LINE OF FLOW.
3. THE TRENCH MUST BE A MINIMUM OF 150 mm (6 inches) DEEP AND 150 mm (6 inches) WIDE TO ALLOW FOR THE SILT FENCE FABRIC TO BE LAID IN THE
GROUND AND BACKFILLED WITH COMPACTED MATERIAL.
4. SILT FENCE FABRIC SHOULD BE SECURELY FASTENED TO EACH STEEL OR
WOOD SUPPORT POST OR TO WOVEN WIRE , WHICH IS IN TURN ATTACHED TO
THE STEEL OR WOOD FENCE POST.
5. INSPECTION SHALL BE MADE WEEKLY OR AFTER EACH RAINFALL EVENT AND
REPAIR OR REPLACEMENT SHALL BE MADE PROMPTY AS NEEDED.
6. SILT FENCE SHALL BE REMOVED WHEN THE SITE IS COMPLETELY STABILIZED
SO AS NOT TO BLOCK OR IMPEDE STORM FLOW OR DRAINAGE.
7. ACCUMULATED SILT SHALL BE REMOVED WHEN IT REACHES A DEPTH OF
150 mm (6 inches). THE SILT SHALL BE DISPOSED OF ON AN APPROVED SITE
AND IN SUCH A MANNER THAT WILL NOT CONTRIBUTE TO ADDITIONAL
SILTATION.
TREE PROTECTION DETAIL
NOT TO SCALE
SILT FENCE DETAIL
NOT TO SCALE
FENCE LOCATION
DURING
PERMEABLE PAVING
INSTALLATIONWOOD CHIP MULCH
AREA (4''-6'') DEPTH
NATURE MUSEUM
G G
G
G G
GG
G
G
D R
IV
EW
AY
EX
IS
TI
N
G E
D G
E O
F
AS
PH
AL
T
EX
IS
TI
N
G E
D G
E O
F
AS
PH
AL
T
D R
IV
EW
AY
' F
R O
M P
O R
C H
TO
T
AN
K
' F
R O
M
BA
SE
M
EN
T
TO
T
AN
K
PROPOSED
UNDERGROUND PARACO
1,000 GALLON LP
PROPANE TANK AND
CONCRETE PADS
(SEE SHEET C-501)
PROPOSED DOME COVER
PROPOSED UNDERGROUND 12 " Ø
TYPE K SOFT COPPER GAS TUBE
PROPOSED SECOND STAGE REGULATOR
TO BE INSTALLED ON EXISTING PORCH COLUMN
PROPOSED 1.25" GAS LINE TO BE CAPPED FOR
POSSIBLE FUTURE USE.
PROPOSED 1.5" GAS LINE TO BE SPLIT INTO
TWO (2) 1.25" GAS LINES.
PROPOSED 1.25" GAS LINE TO BE CONNECTED
TO NEW CARLIN 201GAS 120 VAC, 60Hz
1-PHASE GAS BURNER.
APPROXIMATE LOCATION
OF STAGING AREA
FINAL LOCATIONS TO BE
COORDINATED WITH PARK
MANAGER
TOPSOIL AND SEED AFFECTED AREAS
AS PER NEW YORK STATE DEPARTMENT
OF TRANSPORTATION STANDARD
SPECIFICATIONS SECTION 611
INSTALL GAS LINE AT ORIGINAL
WALL PENETRATION LOCATION
INSTALL NEW MIN. 8" DIA. STAINLESS STEEL
DOUBLE WALL CHIMNEY FLUE; IN
ACCORDANCE WITH ALL APPLICABLE STATE
AND LOCAL CODES.
CONTRACTOR TO VERIFY DIAMETER OF
CHIMNEY PRIOR TO ORDERING CHIMNEY PIPE.
SEE CULTURED STONE
LANDSCAPING DETAIL
(ON THIS SHEET)
CONTRACTOR TO INSTALL TREE
PROTECTION AROUND ALL EXISTING
TREES WITHIN 20' FROM WORK AREA.
(TYP.)
EXISTING FLAG POLE
REFER TO NOTES 13-15
UNDER THE GENERAL NOTES
ON SHEET G-001 FOR
PEDESTRIAN TRAFFIC PER
NYS BC 1501. AS PER PARKS
REPRESENTATIVE.
4" THICK CONCRETE SLAB
UNDER TANK
SITE
N
0 5' 10'
SCALE IN FEET
SITE PLAN
CULTURED STONE LANDSCAPING DETAIL
PROPOSED DOME COVERAGE
PROVIDE TWENTY-FOUR (24) DWARF
FOUNTAIN GRASS
MAX. 12" IN HEIGHT
(FINAL PLANTINGS TO BE COORDINATED
WITH PARKS MANAGER.)
10' DIAMETER CULTURED STONE
LANDSCAPE BED.
(PROVIDE 1' HEIGHT PLANTINGS
WITH 1' OF TOPSOIL)
0 2' 4'
SCALE IN FEET
N
Filename:O:\2021\BAB-2021100.09 PBS CBS STORAGE TANKS\CADD\CONTRACT PLANS\BAB-2021100.09_CS_C-102.DWG Plot Date: 6/30/2026 1:41 PM Plotted By: JOE MONTALDO
Description Date:No
CONSULTANTS:
Greenman-Pedersen, Inc.
175 Pinelawn Road, Suite 400 Melville, NY 11747
123456789
89 123467 5
A
B
D
E
F
G
H
C
KATHY HOCHUL
Governor
KATHY MOSER
Commissioner
LONG ISLAND DISTRICT
625 BELMONT AVE
WEST BABYLON, NY 11702
TOM ALWORTH
EXECUTIVE DEPUTY COMMISSIONER
BEVIN COLLINS, RA, LEED AP
DEPUTY COMMISSIONER, CAPITAL PROJECTS
GEORGE GORMAN, JR.
LONG ISLAND REGIONAL DIRECTOR
VESNA HADZIBABIC, PE, LEED AP BD+C
LONG ISLAND CAPITAL DISTRICT MANAGER
Drawn By:
Design By:
Checked By:
Submission Date:
Approved By:
Sheet:Project ID:
Sheet Title:
Drawing Number:
Project Title:
Project Location:
IT IS A VIOLATION OF STATE EDUCATION LAW FOR ANY PERSON,
UNLESS UNDER THE DIRECTION OF A LICENSED ARCHITECT/ENGINEER
TO ALTER THIS DOCUMENT IN ANYWAY. ALTERATIONS MUST HAVE THE
SEAL AFFIXED ALONG WITH A DESCRIPTION OF THE ALTERATIONS,
DATE AND ARCHITECT'S/ENGINEER'S SIGNATURE. COPYRIGHT © 2022
KEY PLAN:
RFQ #
SUBMISSIONS/ REVISIONS
OF
KP
JF
KP
CALEB SMITH STATE PARK
SITE PLAN
PROPOSED INSTALLATION
JM
C-102
LI-008
581 WEST JERICHO TURNPIKE
SMITHTOWN, NY 11787
CALEB SMITH STATE PARK
PBS TANK REMOVAL AND PROPANE TANK INSTALLATION
1' -9
1'
-9
3' -6
TANK EXCAVATION ELEVATION
SCALE: 1/2"=1'-0"
5"5/8"
1,000 GALLON UNDERGROUND
LP TANK
DETAIL A
SCALE: 1 1/2"=1'-0"
SLOPED GRADE
PROPANE TANK TOP VIEW
SCALE: 1/2" = 1'-0"
SECTION A-A
SCALE: 1 1/2"=1'-0"
FINISHED
GRADE
SIDE ELEVATION
1,000 GALLON UNDERGROUND
LP TANK
7'-0"
3' -5
1 2" 31 2"
5' -6
FINISHED
GRADE
SCALE: 1/2"=1'-0"
GROUND LEVEL
12" DIRT
6" SAND
6" SAND
6"
1' -0
6"
6"
2' -0
WIDTH
MINIMUM
GAS LINE TRENCH SECTION
SCALE: 1/2"=1'-0"
COVERED PORCH
2'-6"
6"
2' -3
LIFTING LUGS
TYP. 4
DOME COVER
3/4 " VENT
ASSEMBLY
FISHER ROSEMOUNT
FIRST STAGE RECULATOR
MODEL R622H
COATING TO EXTEND 6"
ONTO EXPOSED PIPING
2 " Ø TYPE K
SOFT COPPER TUBE
TO SECOND STAGE REGULATOR
BURIED PIPING TO BE COATED TO PREVENT
CORROSION
TOP OF TANK
2 1/2 " MPT
THREADED RISER
DIP TUBE
UP TO 30" LONG
3/4" BAFFLE PIPE
SUPPLIED WITH VAVLE
UP TO 30" LONG
SHERWOOD
2-1/2" FNPT CLUSTER VALVE
FOR ASME UNDERGROUND
PROPANE TANKS
FISHER ROSEMOUNT
PIG TAIL
DOME
SLOT IN BOTTOM
OF DOME RISER
CL OF DOME
TANK RISER
SHERWOOD
2-1/2" FNPT
CLUSTER VALVE
FOR ASME
UNDERGROUND
PROPANE TANKS
LIQUID WITHDRAWAL
VALVE
COATING TO
EXTEND 6" ABOVEGROUND
LIFTING LUGS
FISHER ROSEMOUNT
SECOND STAGE REGULATOR
MODEL R622
TO BE INSTALLED ON
EXISTING PORCH COLUMN
UNDERGROUND
GAS PIPE
YELLOW GAS CAUTION TAPE
JUST UNDER THE SURFACE
BUILDING WALL /
FOUNDATION
INSTALL GAS LINE
AT ORIGINAL
WALL
PENETRATION
LOCATION
PORCH COLUMN
6" 1'
-9 "2' -3
2'-6"2'-6"
12'-7" 10'-1" 1'-3"1'-3"
16'-0"
6'-3" 6'-4"
21'-0"
6' -4
2'-6"
1' -9
FITTING LAYOUT
11-1/2"
CENTER
CIRCUMFERENTIAL
WELD SEAM
9-1/4"
1'-6"
8' -0
12'-7"
16'-0"
6'-3" 6'-4"
21'-0"
6" PEA GRAVEL COMPACTED TO 2000LBS PER SF
3"
#4 BARS AT 12" O.C. EACH
DIRECTION (TYP.)
4" REINFORCED CONCRETE
#4 BARS AT 12" O.C. EACH
DIRECTION (TYP.)
4" REINFORCED CONCRETE
6" PEA GRAVEL
COMPACTED TO 2000LBS
PER SF
8" TO 12" NUMBER
8 PROCESSED
AGGREGATE
PEA GRAVEL
(ASTM C33 FOR
STRUCTURAL
USE)
4" CONCRETE SLAB WITH
#4 BARS AT 12" O.C. EACH DIRECTION
6 - 3/4" GALVANIZED EYE
HOOKS
1,000 GALLON
UNDERGROUND LP
TANK
8" TO 12" NUMBER
8 PROCESSED
AGGREGATE
PEA GRAVEL
(ASTM C33 FOR
STRUCTURAL
USE)
2" PLASTIC COATED
GALVANIZED CABLE TO
TIE DOWN THE TANKS
(TYP.)
8" TO 12" NUMBER
8 PROCESSED
AGGREGATE
PEA GRAVEL
(ASTM C33 FOR
STRUCTURAL
USE)
6" 6"
20'-0"
FILLER VALVE
SCALE: 1/2"=1'-0"
SITE
N
SITE
N
TANK INSTALLATION NOTES:
1. ALL BURIED PROPANE PIPING SHALL BE CONSTRUCTED OF POLYETHYLENE PLASTIC. POLYETHYLENE PLASTIC PIPE, TUBING, AND FITTINGS SHALL CONFORM TO ASTM D 2513 AND SHALL BE MARKED "GAS" AND "ASTM D 2513". POLYVINYL CHLORIDE (PVC) AND CHLORINATED POLYVINYL CHLORIDE
(CPVC) PLASTIC PIPE, TUBING, AND FITTINGS SHALL NOT BE USED TO SUPPLY FUEL GAS.
2. BURIED PROPANE PIPING SHALL HAVE A MINIMUM COVER OF 18-INCHES. PROVIDE TRENCH WITH 6-INCH DEEP SAND BED FOR SUPPORT OF PIPE.
COORDINATE ROUTING WITH INSTILLATION OF UNDERGROUND UTILITIES BY OTHER TRADES. PROVIDE A MINIMUM SEPARATION DISTANCE OF
6-INCHES BETWEEN PROPANE PIPING AND ELECTRICAL LINES.
3. INSTALL A YELLOW INSULATED COPPER TRACER WIRE ADJACENT TO UNDERGROUND NONMETALLIC PIPING. TRACER WIRE SHALL TERMINATE ABOVE GROUND AT EACH END OF THE NONMETALLIC PIPING. TRACER WIRE SIZE SHALL NOT BE LESS THAN 18 AWG AND THE INSULATION TYPE
SHALL BE SUITABLE FOR DIRECT BURIAL.
4. ALL ABOVE GROUND PROPANE PIPING SHALL BE CONSTRUCTED OF ASTM A53/A53M SCHEDULE 40 GALVANIZED STEEL. PLASTIC PIPE SHALL NOT BE PERMITTED ABOVE GROUND EXCEPT WHERE INSTALLED IN PRE-MANUFACTURED ANODELESS RISERS OR SERVICE HEAD ADAPTER RISERS.
PROVIDE ANODELESS RISER AT TRANSITIONS FROM BURIED TO ABOVE GROUND PIPING. INSTALL ANODELESS RISERS IN ACCORDANCE WITH THE
MANUFACTURER'S RECOMMENDATIONS.
5. PROVIDE ELECTRIC UNIONS AT CONNECTIONS OF DISSIMILAR METALS.
6. EXPOSED PIPING SHALL BE IDENTIFIED BY A YELLOW LABEL MARKED "GAS" IN BLACK LETTERS. PIPE MARKERS SHALL BE SPACED AT INTERVALS NOT
EXCEEDING 5 FEET.
7. PRESSURE TEST PIPE WITH AIR, NITROGEN, CARBON DIOXIDE, OR AN INERT GAS (OXYGEN SHALL NOT BE USED). TEST PRESSURE SHALL NOT BE LESS THAN 1.5 TIMES THE PROPOSED MAXIMUM WORKING PRESSURE, BUT NOT LESS THAN 3 PSIG. TEST DURATION SHALL NOT BE LESS THAN ONE-HALF HOUR FOR EACH 500 CUBIC FEET OF PIPE VOLUME. WHEN TESTING A SYSTEM HAVING A VOLUME LESS THAN 10 CUBIC FEET THE DURATION SHALL NOT BE LESS THAN 10 MINUTES. TEST DURATION SHALL NOT BE REQUIRED TO EXCEED 24 HOURS.
8. OBTAIN A MARK-OUT OF ALL BURIED UTILITIES PRIOR TO THE START OF ANY EXCAVATION WORK.
9. SAWCUT, TRENCH, BACKFILL, AND RESTORE EXISTING SITE AS REQUIRED FOR THE INSTALLATION OF NEW PROPANE PIPING.
10. CORE DRILL ALL NEW WALL PENETRATIONS AND SEAL ANNULAR SPACES WITH NON-SHRINK, NON METALLIC GROUT.
11. ALL WORK ON THIS SHEET SHALL BE PERFORMED BY CONTRACT 'P' UNLESS OTHERWISE NOTED.
Filename:O:\2021\BAB-2021100.09 PBS CBS STORAGE TANKS\CADD\CONTRACT PLANS\BAB-2021100.09_CS_C-501.DWG Plot Date: 6/30/2026 2:38 PM Plotted By: JOE MONTALDO
Description Date:No
CONSULTANTS:
Greenman-Pedersen, Inc.
175 Pinelawn Road, Suite 400 Melville, NY 11747
123456789
89 123467 5
A
B
D
E
F
G
H
C
KATHY HOCHUL
Governor
KATHY MOSER
Commissioner
LONG ISLAND DISTRICT
625 BELMONT AVE
WEST BABYLON, NY 11702
TOM ALWORTH
EXECUTIVE DEPUTY COMMISSIONER
BEVIN COLLINS, RA, LEED AP
DEPUTY COMMISSIONER, CAPITAL PROJECTS
GEORGE GORMAN, JR.
LONG ISLAND REGIONAL DIRECTOR
VESNA HADZIBABIC, PE, LEED AP BD+C
LONG ISLAND CAPITAL DISTRICT MANAGER
Drawn By:
Design By:
Checked By:
Submission Date:
Approved By:
Sheet:Project ID:
Sheet Title:
Drawing Number:
Project Title:
Project Location:
IT IS A VIOLATION OF STATE EDUCATION LAW FOR ANY PERSON,
UNLESS UNDER THE DIRECTION OF A LICENSED ARCHITECT/ENGINEER
TO ALTER THIS DOCUMENT IN ANYWAY. ALTERATIONS MUST HAVE THE
SEAL AFFIXED ALONG WITH A DESCRIPTION OF THE ALTERATIONS,
DATE AND ARCHITECT'S/ENGINEER'S SIGNATURE. COPYRIGHT © 2022
KEY PLAN:
RFQ #
SUBMISSIONS/ REVISIONS
OF
KP
JF
KP
CALEB SMITH STATE PARK
PROPANE TANK DETAIL
MJ
C-501
LI-008
581 WEST JERICHO TURNPIKE
SMITHTOWN, NY 11787
CALEB SMITH STATE PARK
PBS TANK REMOVAL AND PROPANE TANK INSTALLATION
| Sheets and Views |
| 01 C-001-COVER SHEET |
| 02 G-001_GENERAL NOTES |
| 03 G-002- specifications |
| 04 G-003- specifications 2 |
| 05 G-004- specifications 3 |
| 06 C-101_REMOVAL |
| 07 C-102 -SITE PLAN |
| 08 C-501- SITE DETAILS |
File details come from the government source that posted it. Updated .