This is Addendum No. 03 to a Centralized Request for Quote (CRFQ) issued by the State of West Virginia, Department of Administration Purchasing Division, for the Public Service Commission (PSC). The solicitation (CRFQ PSC27-03) seeks contractor services for HVAC Upgrade and Ceiling Replacement at PSC office buildings A and B in Charleston, West Virginia. The addendum, issued November 6, 2026, extends the bid opening date from November 10, 2026, to November 17, 2026, at 1:30 PM. The document includes revised drawings dated November 5, 2026, and responses to 43 vendor questions addressing project scope clarifications, construction methodology, scheduling, material specifications, and facility coordination requirements. Key project elements include phased construction with concurrent work permitted in Buildings A and B, HVAC system replacement with Direct Digital Control (DDC) systems, ceiling demolition and reinstallation, ductwork modifications, lighting fixture removal and reinstallation, and two-year post-completion HVAC maintenance and service. The contractor bears responsibility for furniture handling, dust protection, and final detailed cleaning, with partial parking lot use permitted for lay-down and contractor staging areas subject to owner approval.
Pricing terms and contract funding sources are not specified in this addendum. The document confirms that Building A contains an active Firestone roof manufacturer's warranty requiring adherence to warranty requirements for all penetrations and flashings, while Building A has no active warranty. The existing chilled water system contains glycol requiring proper disposal per specifications. Existing ductwork is internally lined, with new ductwork to be insulated per specification schedules. The contractor must provide temporary support for existing low voltage and communications wiring during ceiling work and restore all construction staging areas to original conditions prior to substantial completion. Vendors must acknowledge receipt of all addenda, including Addendum No. 1 and No. 2, and submit the acknowledgement form with their bid to avoid disqualification. No set-asides are identified in this procurement document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date Printed: Nov 6, 2026 Page: 1 FORM ID: WV-PRC-CRFQ-002 2020/05
Department of Administration Purchasing Division 2019 Washington Street East Post Office Box 50130 Charleston, WV 25305-0130
State of West Virginia Centralized Request for Quote
Construction
Proc Folder: 2076891 Reason for Modification:
Doc Description: HVAC Upgrade and Ceiling Replacement Addendum No. 03
Proc Type: Central Purchase Order
Date Issued Solicitation Closes Solicitation No Version
2026-11-06 2026-11-17 13:30 CRFQ 0926 PSC2700000003 4
BID RECEIVING LOCATION
BID CLERK
DEPARTMENT OF ADMINISTRATION
PURCHASING DIVISION
2019 WASHINGTON ST E
CHARLESTON WV 25305
US
VENDOR
Vendor Customer Code:
Vendor Name :
Address :
Street :
City :
State : Country : Zip :
Principal Contact :
Vendor Contact Phone: Extension:
FOR INFORMATION CONTACT THE BUYER
Larry D McDonnell 304-558-2063 larry.d.mcdonnell@wv.gov
Vendor Signature X FEIN# DATE
All offers subject to all terms and conditions contained in this solicitation
Date Printed: Nov 6, 2026 Page: 2 FORM ID: WV-PRC-CRFQ-002 2020/05
ADDITIONAL INFORMATION
Addendum No. 03 To attach answers to vendor questions.
To attach revised drawings dated 11/05/2026.
Bid opening date has been extended from November 10, 2026, to November 17, 2026.
Bid opening time still remains at 1:30PM.
No other changes
INVOICE TO SHIP TO
PUBLIC SERVICE
COMMISSION
PUBLIC SERVICE
COMMISSION
201 BROOKS ST 201 BROOKS ST
CHARLESTON WV CHARLESTON WV
US US
Line Comm Ln Desc Qty Unit Issue Unit Price Total Price 1 HVAC Upgrade and Ceiling Replacement
Comm Code Manufacturer Specification Model #
72151207
Extended Description:
See attached documentation for further details.
SCHEDULE OF EVENTS
Line Event Event Date
SOLICITATION NUMBER: CRFQ PSC27*03
Addendum Number: 03
The purpose of this addendum is to modify the solicitation identified as (“Solicitation”) to reflect the change(s) identified and described below.
Applicable Addendum Category:
[ ] Modify bid opening date and time
[ ] Modify specifications of product or service being sought
[X] Attachment of vendor questions and responses
[ ] Attachment of pre-bid sign-in sheet
[ ] Correction of error
[X] Other
Description of Modification to Solicitation:
To attach answers to vendor questions.
To attach revised drawings dated 11/05/2026.
Bid opening date has been extended from November 10, 2026, to November 17, 2026.
Bid opening time still remains at 1:30PM.
No other changes
Additional Documentation: Documentation related to this Addendum (if any) has been included herewith as Attachment A and is specifically incorporated herein by reference.
Terms and Conditions:
1. All provisions of the Solicitation and other addenda not modified herein shall remain in full force and effect.
2. Vendor should acknowledge receipt of all addenda issued for this Solicitation by completing an Addendum Acknowledgment, a copy of which is included herewith. Failure to acknowledge addenda may result in bid disqualification. The addendum acknowledgement should be submitted with the bid to expedite document processing.
Answers to Vendor Questions CRFQ PSC27*03 - HVAC Upgrade and Ceiling Replacement
Question No. 1: A-Series Sheets, like A121-A, states removal and re-installation of lighting fixtures and to refer to the electrical drawings. However, there are no light fixtures being removed or installed on the electricals. Can you confirm we are to include the demo and re-install of light fixtures into our bid?
Response No. 1: Confirmed, Contractor shall remove and re-reinstall as required for new work.
Question No. 2: Is Building B work to complete under Phase 1 or Phase 2 or by a separate schedule?
Response No. 2: Work in building shall will be conducted while the building is occupied. The construction schedule shall be in Phase 2.
Question No. 3: Provide a specification for HVAC Controls/Building Automation.
Response No. 3: Specification Section 250923 “Direct Digital Control (DDC) System for HVAC” is included in Addendum No. 2.
Question No. 4: What HVAC control system is currently in place?
Response No. 4: Reference Addendum No. 2., Specification 250923
Question No. 5: Please clarify roof manufacturer and if warranty is still on EPDM roof.
Response No. 5: Building ‘A’ does not have an active roof manufacturer’s warranty. All penetrations, flashings, and openings, etc. are to be made with compatible components and materials to maintain a weatherproof barrier. Building ‘B’ has an active Firestone Roof Manufacturer’s warranty. All penetrations, flashings, and openings, etc. are to be made according to roof manufacturer’s warranty requirements.
Question No. 6: Duct cleaning is listed in the specifications, please clarify if this is only for duct to remain in service on Building A only or if Building B is included in that.
Response No. 6: Duct cleaning is for existing ductwork to remain in building ‘B’.
Question No. 7: Can the timeline be structured to do Phase 1 (30-days) then Phase 2 (120-Days) total time 150-days? Can this timeline be extended by 30-days.?
Response No. 7: No.
Question No. 8: Who will be responsible for moving, isolating and protecting office furniture and personal items located in all the offices? Much of the furniture and desks will likely need moved to allow for ceiling demo-install, ductwork to take place.
Response No. 8: Much of the furniture may need to be removed to allow for ceiling and ductwork demolition to proceed. Contractor is to remove and temporarily store furniture as needed and as coordinated with Owner. Contractor is to protect and work around existing furniture left in place as required. Contractor is to cover all existing furniture to prevent dust accumulation. Contractor is to provide final detailed cleaning prior to substantial completion.
Question No. 9: Please confirm if the chilled water system has glycol and what percentage.
Response No. 9: The existing system has glycol. Contractor shall dispose of it in accordance with specifications.
Question No. 10: Please confirm main parking lot can be used for lay-down, dumpsters, contractor parking.
Response No. 10: Partial use of the existing parking lot may be used for lay-down area. Final laydown area will need to be approved by the Owner after award of project. Contractor shall provide photo documentation for the parking lot and laydown area prior to any work. Contractor shall restore laydown area back to existing conditions prior to substantial completion.
Question No. 11: Plenum space has substantial amount of low voltage, comm wire, etc – Confirm if contractor is supposed to temporarily support until ceilings are re-installed or if we are to install permanent hangers and raceways for this.
Response No. 11: Contractor shall provide temporary support for the existing low voltage, comm wire, etc.
Question No. 12: Should non-penetrating handrail be added at the perimeter edge on the (2) large rooftops – service personnel will be within 6’ of un-protected edge when servicing rooftop equipment?
Response No. 12: Rooftop equipment is located over 10’ away from the edge of the roof. No railings will be required.
Question No. 13: Confirm underground chilled water piping is to be abandoned in place and all exposed is to be removed and capped.
Response No. 13: There is no underground chilled water piping.
Question No. 14: Can you confirm if existing high pressure duct to be re-used is internally insulated? Is new low pressure/high pressure to match existing or be insulated per schedule in specifications?
Response No. 14: The existing ductwork is internally lined. The new ductwork shall be insulated per the schedule in the specifications.
Question No. 15: Can you provide insulation schedule and weatherproofing details for exterior duct on the roof.
Response No. 15: Refer to the following:
a. Details on drawings: A141-A, M510-A, M5-11-A
b. See Keyed Notes on Drawing M162-A
Question No. 16: Can "Megapress" be used on gas piping?
Response No. 16: No
Question No. 17: Drawing M310A Detail 4 Note 3-Should line be labeled " City Water" Instead of HWR?
Response No. 17: No
Question No. 18: Can you elaborate on how contractors will handle desks and furnishings in the construction areas?
Response No. 18: See Answer to question #8.
Question No. 19: Does the concrete pad for existing chiller get removed ?
Response No. 19: No.
Question No. 20: Can a spec section or schedule be provided for DH-1 shown on M131-B?
Response No. 20: See Addendum #2.
Question No. 21: Dwg M131-A, Key Note #1 is labeled in drawing, but is not listed. What does Key Note #1 refer to?
Response No. 21: Sheet M131-A KEYED NOTES, ADD “1. Provide 1/2"x1/2” Welded wire mesh on opening.” See attached revised drawing.
Question No. 22: Who is the current BAS/HVAC Controls contractor for these PSC Bldgs?
Response No. 22 : See Addendum #2.
Question No. 23: Who will be responsible for moving Owner furnishings?
Response No. 23: See question & Answer #8 Above.
Question No. 24: Since Bldg. “A” will be completely renovated, where will Owner furnishings be moved to?
Response No. 24: See question & Answer #8 Above.
Question No. 25: Will Bldg. “A” be occupied at any time after Notice to Proceed? If so which areas?
Response No. 25: See Sheet A100-A.
Question No. 26: We understand that Bldg. “A” Phase I, 1st Floor Public Hearing Room, is to be completed first. Will this area be occupied after Substantial Completion of Phase I?
Response No. 26: See Sheet A1001-A.
Question No. 27: Can construction Phase I and Phase II run concurrently?
Response No. 27: Yes
Question No. 28: Can Bldg. “B” be completed prior to start of Bldg. “A”?
Response No. 28: Yes
Question No. 29: Can construction work in Bldg “A” and “B” run concurrently?
Response No. 29: Yes
Question No. 30: Specification 015000, section 2.5.A & B note a Temporary Field Office is required. Is a portable field office with hookups required, or can a portion of the existing building be used for this requirement?
Response No. 30: A portion of the existing building can be used for this requirement. Vendor must request permission from Owner on the location of this space after an award is made.
Contractor shall photo-document the condition of the existing space prior to occupying and return it to original condition prior to substantial completion.
Question No. 31: Can existing building restrooms be utilized in lieu of temporary sanitary facilities?
Response No. 31: Yes. Contractor shall photo-document the condition of the existing space prior to occupying and return it to original condition prior to substantial completion.
Question No. 32: A project sign was referenced in Div 1 specifications. Is a project sign required for this job?
Response No. 32: Yes.
Question No. 33: Specification 200500, section 1.15, states 2-Year HVAC Maintenance and Service, after substantial completion, is required as part of this project. Is 2-Year HVAC Maintenance an Owner requested requirement for this project?
Response No. 33: Yes
Question No. 34: Dwg. M512-A, what does the reference to “Bldgs 5 & 7” refer to?
Response No. 34: Sheet M512-A Schematic #1. DELETE “#5 & #7” from the title. See attached revised drawing.
Question No. 35: Does all CHW interconnecting piping between the existing Chiller and Bldg “A” get demolished? The drawing does not show the full run to scale. Does this include all piping in the parking garage area?
Response No. 35: Yes
Question No. 36: Does the existing hydronic system contain glycol?
Response No. 36: Yes
Question No. 37: An “AS-1 Air Separator” shows on M512-A Schematic, but it is not scheduled.
Is a new AS-1 Air Separator required? If so, please provide schedule and specification.
Response No. 37: Refer to Addendum No. 2.
Question No. 38: A “Filter Feeder” shows on M512-A Schematic, but it is not scheduled. Is a new Filter Feeder required? If so, please provide schedule and specification.
Response No. 38: Refer to Addendum No. 2.
Question No. 39: Will existing electrical lights be reused, or is new lighting to be provided and installed?
Response No. 39: The design intent is for the existing lighting to be reinstalled.
Question No. 40: Dwg. A132-A, Key Note #3 states “Refer to Electrical Plans for Reinstallation of Existing Lighting Fixtures (typical)”, but nothing is found on the Electrical drawings addressing this. Specification 011000 Summary, 1.5.B.5 states “Associated mechanical, and electrical renovations including new lighting? These are conflicting statements. Can clarification be giving on the Electrical Lighting scope?
Response No. 40: The design intent is for the existing lighting to be reinstalled.
Question No. 41: Is the PSC Buildings A & B complex fully gated? Will these gates remain operational during the construction timeframe?
Response No. 41: No, the buildings are not fully gated.
Question No. 42: Specification 235216 Condensing Boilers, both fire-tube and water-tube condensing boilers are specified, with approved manufacturers for each type. Are both types allowed, or is there a specified preference?
Response No. 42: The design intent is to allow both. Provided they are MFRs that are listed in the specifications.
Question No. 43: Can the technical question deadline be extended to next Tuesday, 11/3/26? This could allow from additional time for questions.
Response No. 43: No.
A
B
D
E F
G
C
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
"x
S A
10"ø3
215 CFM
(TYP. OF 2)
10"ø17
200 CFM
(TYP. OF 4)
12"ø SA
"ø
S A
24"x20" EX
"x
E X
S A
"x
S A
"x
S A
"x
S A
"x
S A
"x
S A
"x
S A
"x
S A
20"x10" SA
10"ø15
240 CFM
(TYP. OF 4)
6"ø SA
26"/20" SA
"x
S A
"x
S A
"x
S A
"x
S A
16"x12" RA
"x
R A
"x
S A
"x
S A
"x
S A
10"ø8
145 CFM
(TYP. OF 4)
8"x8" EX
16"ø SA
8"ø SA
24"/20" SA 18"ø SA
"ø
S A
9"ø SA
"ø
S A
"ø
S A
"ø
S A
"x
E X
8"ø SA
31"/18" SA
22"/18" SA18"ø SA
10"ø SA
9" ø
S
7"ø SA
8"
7"
14"x12" SA16"x12" SA
S A
24"x24" EX
10"x8" TA
8"x10" EX
10"x10" EX
14"x8" SA
14"x8" SA
14"x8" SA
6"ø16
270 CFM
(TYP. OF 3)
6"ø16
250 CFM
"ø
S A
10"ø15
210 CFM
(TYP. OF 2)
10"ø17
270 CFM
(TYP. OF 3)
6"ø17
165 CFM
(TYP. OF 7)10"ø15
165 CFM
10"x10" EX
14"ø SA
8"ø SA 20"ø SA
10"ø8
130 CFM
10"ø8
130 CFM
10"ø8
135 CFM
10"ø8
135 CFM
9"ø SA
14"x14"9
8"x8"11
250 CFM
12"x8" SA
6"
8"x8" SA
8"x10" SA
6"ø SA
12"x10" SA
5"ø SA 8"ø SA
14"x13" SA9"ø SA
6"ø SA
8"ø SA
8"x10" SA
6"ø SA
8"x8" SA
6"ø SA
8"x10" SA
6"ø SA
12"x8" SA
12"x10" SA
8" x1 0"
8"
"x
S
A
6"ø SA
6"ø SA
6"ø SA
12"x10" SA 8"ø SA
7"ø SA6"
8"
12"x10" SA
8"
6"ø SA
10"x10" SA
8"ø SA8"ø SA
12"x8" SA
12"x8" SA
8"ø SA
6"ø SA
12"x10" SA
12"x10" SA
12"x10" SA 6"
6"ø SA
6"ø SA
"ø
S A
12"x8" SA6"ø SA6"ø SA
6"ø SA
10"x10" SA
8" x8
S
A
8"ø SA
6"ø SA
6"ø SA
6"ø SA
8" x8
S
A
"x
S A
7"ø SA
12"x10" SA
9"
8"ø EX
E
X
9"ø SA
14"ø SA
6"øS3
100 CFM
TYP. OF 3
6"øS3
100 CFM
6"øS3
100 CFM
6"øS2
100 CFM
8"øS3
110 CFM
6"øS3
95 CFM
6"øS3
95 CFM
6"øS3
90 CFM
TYP. OF 2
V A
V 2-
VAV2-9
V A
V 2-
VAV2-6
VAV2-3
6"øS3
155 CFM
TYP. OF 2
6"øS3
140 CFM
TYP. OF 2
6"øS3
95 CFM
TYP. OF 4
VAV2-2
8"øS3
175 CFM
8"øS3
135 CFM
V A
V 2-
V A
V 1-
VAV2-
32"x16" RA
VAV1-3
8"øS3
170 CFM
10"x10"E1
240 CFM
max 240 cfm
10"x10"E1
240 CFM
6"øS3
145 CFM
6"øS3
185 CFM
TYP. OF 2
V A
V 2-
6"øS3
90 CFM
6"øS3
75 CFM
VAV2-4
VAV3-4
8"øS3
165 CFM
TYP. OF 4
VAV3-5
6"øS3
115 CFM
TYP. OF 2
BD
6"øS3
85 CFM
TYP. OF 4
VAV3-6
VAV3-7
6"øS3
115 CFM
TYP. OF 2
V A
V 3-
V A
V 3-
26"øS3
95 CFM
TYP. OF 4
6"øS3
140 CFM
6"øS3
140 CFM
V A
V 3-
VAV3-8
6"øS3
155 CFM
TYP. OF 2
6"øS3
120 CFM
TYP. OF 2
VAV3-12
8"øS3
210 CFM
VAV3-11
6"øS3
95 CFM
TYP. OF 3
VAV3-10
8"øS3
145 CFM
8"øS3
175 CFM
6"øS1
80 CFM
BD
VAV1-2
24"x18" SA
BD
BD
BD
BD
BD
BD
BD
BD
BD
BD
BDBD
BD
BD
BD
BDBDBD
BD BD BD BD
BD BD
BD
BD
BD
BD BD
BD
BD
BD
BD
BD
BD
BD
BD
BD
BD
BD
BD
BD BD BD BD
BD
BD BD
BD
BD BD
BD
BD
BD
BD
BD
BD
H
H
T
T
T
T
T
EH-1
EH-2
EH-3
EH-4
8"øS3
120 CFM
"x
42"x7" SA
8"øS1
100 CFM
6"øS3
145 CFM
TYP. OF 3
V A
V 3-
EH-7
BD BD
T
VAV1-3
H
VAV1-2
VAV1-1
T
VAV1-4
H
T
H
VAV2-11 &
VAV2-48
TVAV2-8
VAV2-9
VAV2-10
H
VAV2-6
TH
VAV2-5
T
VAV2-1
TT
VAV2-2VAV2-3
T VAV3-4
H T
VAV3-5
T
VAV2-4
T
VAV3-7
T
VAV3-1
TT
VAV3-3 VAV3-2
T H
VAV3-8
T
VAV3-9
T VAV3-11
T
VAV3-10
T
VAV3-12
6"øS3
95 CFM
TYP. OF 4
6"øS3
95 CFM
TYP. OF 4
4"ø SA
8"ø SA
4"ø SA
6"ø SA
8"ø SA
6"ø SA
22"x22"R1 22"x22"R1
22"x22"R1
22"x22"R1
22"x22"R1
22"x22"R1
22"x22"R1
22"x22"R1
22"x22"R1
22"x22"R122"x22"R1
22"x22"R1
22"x22"R1
22"x22"R1
22"x22"R1
22"x22"R1
22"x22"R1
22"x22"R1
22"x22"R1
22"x22"R1
22"x22"R1
22"x22"R1
22"x22"R1
22"x22"R1
22"x22"R1 22"x22"R1
22"x22"R1
22"x22"R1
22"x22"R1
22"x22"R1
22"x22"R1
22"x22"R1
22"x22"R1
22"x22"R1
22"x22"R1
22"x22"R1
22"x22"R1
22"x22"R1
22"x22"R1
22"x22"R1
TYP. OF 4
TYP. OF 4
TYP. OF 4
10"x10"T1 10"x10"T1
M310-A
M310-A
K
Space
107b
A
VESTIBULE
CORR-1
103-1
WOMEN
MEN
E
A
A
A
119a
A
ELEC.
MECH.
ELEV.
E
A
A
ELEC.
EQUIP.
STAIR-1
#2-1
E
A
A
CORR-2
103-2
CORR-3
103-3
Space
D
ELEC
CORR-1
103-1
CORR-1
103-1
F
F
F
F
Space
STOR.
CORR.
169A
A
A
A
A
A
A
OPEN
A
A
A
A
A
A
A
A
A
A
A
A
OPEN
A
A
A
A
A
A
A
A
A
A
OPEN
A
A
A
124a
CORR-1
103-1 CORR-1
103-1
A
CORR.
A
OPEN
VESTIBULE
STAIR-1
#1-1
A
E
107aMECH.
ROOM
Space
342-3
K
M310-A
36"x36"R2
CUH-1 CUH-2 CUH-3
CUH-4 CUH-5 CUH-6
EF-4
E X
"x
E X
VAV1-5
CAP
EH-10
c by ZMM LLC.
222 Lee Street, West
Charleston, West Virginia 25302
Phone: 304.342.0159
Fax: 304.345.8144 www.zmm.com
CHECKED
DATE
COMM. NO.
DRAWN
ARCHITECTS
ENGINEERS
/5
/2
:2 :2
P
M C
U s e rs
\l o w ry j\ D o c u m e n ts
\2 W
V P
S C
H V
A C
M lo w ry j@ z m m .c o m
.r v t
M131-A
25095
09.23.2026
FIRST FLOOR -
HVAC PLAN
R E
N O
V A
T
IO
N S
A N
D H
V A
C R
E P
L A
C E
M E
N T
F O
R
O F
F
IC
E B
U
IL
D
IN
G S
P U
B L
IC
S
E R
V
IC
E C
O M
M
IS
S
IO
N O
F W
E S
T V
IR
G
IN
IA
C H
A R
L E
S T
O N
W
V
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
PAS JWL
KEYED NOTES
1/8" = 1'-0"
FIRST FLOOR - HVAC PLAN
KEY PLAN
NOT TO SCALE
N
R E
V
IS
IO
N
S
N O
D
E S
C R
IP
T
IO
N
D A
T E
A
D D
E N
D U
M N o
/0 /2
1 PROVIDE 1/2"x1/2” WELDED WIRE MESH ON OPENING.
Revised Drawings as of 11/05/2026
BLR-2
AS-1
HWP-1
ET-1
2" HWS
2" HWR
2 HWR
BP-2
2" H
W R
2" HWS
LOCKABLE
BALL VALVE
1" DCW
ROUTE TO
FLOOR DRAIN
ROUTE TO
FLOOR DRAIN
ROUTE TO
FLOOR DRAIN
1" HWS
ROUTE TO
FLOOR DRAIN
ROUTE TO 1" DCW LINE
3/ 4"
H W
S
3/4" HWS
ROUTE TO
FLOOR DRAIN
MAKE-UP WATER
FLOW METER
FILTER/FEEDER
2" H
W R
2" HWR
2" HWS
2" HWR
TO AREA SYSTEM
MAKE UP WATER ASSEMBLY
VALVED AND CAPPED
DRAIN (TYP)
THERMOMETER WITH
BULB WELL, 0-200°F (TYP)
PRESSURE GAUGE WITH
SNUBBED (TYP)
BOILER PUMP
HEATING
WATER
RETURN
AUTOMATIC AIR
VENTS (TYP)
BOILER CONDENSATE DRAIN, PIPE
BOILER DRAIN TO NEAREST OPEN TOP
FLOOR DRAIN AND TERMINATE WITH
DOWN-TURNED 90
PIPE DISCHARGE TO NEAREST
OPEN TOP FLOOR DRAIN AND
TERMINATE WITH DOWN-TURNED 90
ASME SAFETY RELIEF
VALVE SET AT 160 PSIG
HEATING
WATER
SUPPLY
AUTOMATIC AIR
VENTS (TYP)
THERMOMETER WITH
BULB WELL, 0-200°F (TYP)
PRESSURE GAUGE WITH
SNUBBER (TYP)
PRESSURE AND
TEMPERATURE
PORT (TYP)
PRESSURE AND
TEMPERATURE
PORT (TYP)
UNION OR FLANGED
CONNECTION
VALVED AND
CAPPED DRAIN
(TYP)
NOTES:
1. PROVIDE ADEQUATE MEANS TO VENT AND DRAIN ALL PIPING.
2. COORDINATE WITH BOILER MANUFACTURE INSTALLATION REQUIRMENTS AND PROVIDED PIPING AS
REQUIRED BY THE MFR.
ACID NEUTRALIZER
c by ZMM LLC.
222 Lee Street, West
Charleston, West Virginia 25302
Phone: 304.342.0159
Fax: 304.345.8144 www.zmm.com
CHECKED
DATE
COMM. NO.
DRAWN
ARCHITECTS
ENGINEERS
/5
/2
:2 :2
P
M C
U s e rs
\l o w ry j\ D o c u m e n ts
\2 W
V P
S C
H V
A C
M lo w ry j@ z m m .c o m
.r v t
M512-A
25095
09.23.2026
DETAILS
R E
N O
V A
T
IO
N S
A N
D H
V A
C R
E P
L A
C E
M E
N T
F O
R
O F
F
IC
E B
U
IL
D
IN
G S
P U
B L
IC
S
E R
V
IC
E C
O M
M
IS
S
IO
N O
F W
E S
T V
IR
G
IN
IA
C H
A R
L E
S T
O N
W
V
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
JWL JWL
NO SCALE
1 BUILDING HOT WATER SCHEMATIC
NO SCALE
2 TYPICAL BOILER PIPING DETAIL
R E
V
IS
IO
N
S
N O
D
E S
C R
IP
T
IO
N
D A
T E
A
D D
E N
D U
M N o
/0 /2
Revised Drawings as of 11/05/2026
ADDENDUM ACKNOWLEDGEMENT FORM
SOLICITATION NO.: CRFQ PSC27*03
Instructions: Please acknowledge receipt of all addenda issued with this solicitation by completing this addendum acknowledgment form. Check the box next to each addendum received and sign below.
Failure to acknowledge addenda may result in bid disqualification.
Acknowledgment: I hereby acknowledge receipt of the following addenda and have made the necessary revisions to my proposal, plans and/or specification, etc.
Addendum Numbers Received:
(Check the box next to each addendum received)
[ ] Addendum No. 1 [ ] Addendum No. 6
[ ] Addendum No. 2 [ ] Addendum No. 7
[ ] Addendum No. 3 [ ] Addendum No. 8
[ ] Addendum No. 4 [ ] Addendum No. 9
[ ] Addendum No. 5 [ ] Addendum No. 10
I understand that failure to confirm the receipt of addenda may be cause for rejection of this bid. I further understand that that any verbal representation made or assumed to be made during any oral discussion held between Vendor’s representatives and any state personnel is not binding. Only the information issued in writing and added to the specifications by an official addendum is binding.
Company
Authorized Signature
Date
NOTE: This addendum acknowledgement should be submitted with the bid to expedite document processing.