CRFQ DMT2500000001 Construction Drawings-MTA Renovation.pdf
PDF 18 MB Posted
- Solicitation number
- CRFQ-0810-DMT2500000001-6
- Issued by
- Monongalia County, West Virginia
About this file
This document appears to be a Request for Quotation (RFQ) issued by the West Virginia Division of Motor Vehicles (DMV) for construction drawings related to the renovation of a Mass Transit Authority (MTA) facility. The RFQ provides a detailed scope of work, project overview, and technical specifications for the requested construction drawings. The project involves the renovation of the existing MTA facility, and the selected vendor will be responsible for providing comprehensive construction drawings for the project. The RFQ includes response due dates, a mandatory site visit, and information on the evaluation and award process. The contract term is not specified, but there may be an option for renewal.
The RFQ outlines specific pricing requirements, including the need for itemized pricing, and indicates that this procurement may be subject to set-aside requirements. However, the document does not provide details on any incumbent vendors or the current contract environment. The funding source and amount are also not specified in the RFQ.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C
AD
F
IL
E:
THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPERTY OF THE THRASHER GROUP, INC. REPRODUCTION OF THESE DOCUMENTS IN WHOLE, OR IN PART FOR ANY REASON WITHOUT PRIOR WRITTEN PERMISSION IS STRICTLY PROHIBITED. COPYRIGHT © 2023 THE THRASHER GROUP, INC.
VICINITY MAP
FOR AGENCY REVIEW DATE: _________ BY: ________
FOR BIDDING DATE: _________ BY: ________
FOR CONSTRUCTION DATE: _________ BY: ________
GENERAL CODE COMPLIANCES
PROJECT INFORMATION
LEE O. GUSTAFSON
ARCHITECT WV #1500
LGUSTAFSON@THETHRASHERGROUP.COM
304.326.6103
U
SE
R
PL
O
T D
AT
E/
TI
M
E:
OWNER INFORMATIONPROJECT DATA
CONSULTANT INFORMATION
600 WHITE OAKS BLVD.
BRIDGEPORT, WV 26330
PROJECT ARCHITECT:
CIVIL
ARCHITECTURE
2018 INTERNATIONAL BUILDING CODE
2018 INTERNATIONAL PLUMBING CODE
2018 INTERNATIONAL MECHANICAL CODE
2021 NFPA 101 - LIFE SAFETY CODE
2020 NFPA 70 - NATIONAL ELECTRIC CODE
2017 ICC A117.1 STANDARD FOR ACCESSIBLE
AND USABLE BUILDINGS AND FACILITIES
ASHRAE 90.1-2013 ENERGY STANDARD FOR
BUILDINGS
WV STATE FIRE CODE - ADOPTED AUG. 1, 2022
WV STATE BUILDING CODE - ADOPTED AUG 1, 2022
6/ 9/
:5
7:
P M
C :\U se rs
\m be ns on
\O ne
D riv e
- T hr as he r E ng in ee rin g G ro up
\D oc um en ts \2
4_ M
TA
S um m er sv ille _C
D
_C M
_m be ns on
-T
TG
.rv t
Au th or
PROJECT NUMBER: T60-11019.00
MOUNTAIN TRANSIT
AUTHORITY ADDITION
SUMMERSVILLE, WV
JUNE 2023
SHEET INDEX
MEP LEGEND & NOTES
P1.01 PLUMBING PLANS
P3.01 PLUMBING SCHEDULES AND DETAILS
M1.01 HVAC PLAN
M3.01 MECHANICAL SCHEDULES
E1.01 LIGHTING PLAN
E2.01 POWER PLAN
E3.01 SYSTEMS PLAN
E4.01 ELECTRICAL DETAILS
E4.02 ELECTRICAL DETAILS
SHEET INDEX
C1.00 GENERAL NOTES
C2.00 CIVIL EXISTING SITE AND DEMO PLAN
C2.01 CIVIL SITE PLAN
C3.00 DETAILS
C3.01 DETAILS
C3.02 DETAILS
C3.03 DETAILS
S-0.00 GENERAL NOTES
S-0.01 GENERAL NOTES
S-0.02 SPECIAL INSPECTIONS
S-1.01 FOUNDATION / FIRST FLOOR SLAB PLAN
S-1.02 ROOF FRAMING PLAN
S-3.00 SECTIONS
S-3.01 SECTIONS
S-5.00 STRUCTURAL DETAILS
S-5.01 STRUCTURAL DETAILS
G1.01 GENERAL INFORMATION
G1.02 ACCESSIBILITY REQUIREMENTS
D1.01 DEMOLITION PLAN
A1.01 FLOOR PLAN
A1.02 ROOF PLAN
A1.03 RCP
A2.01 BUILDING ELEVATIONS
A2.02 BUILDING ELEVATIONS
A2.03 BUILDING ELEVATIONS
A3.01 BUILDING SECTIONS
A3.02 WALL SECTIONS - BACK ADDITION
A3.03 WALL SECTIONS - FRONT ADDITION
A3.04 ENTRANCE PARAPET DETAILS
A4.01 ENLARGED PLAN VIEWS & INT. ELEVATIONS
A4.02 ENLARGED PLAN VIEWS & INT. ELEVATIONS
A5.01 DETAILS
A5.02 DETAILS
A5.03 DETAILS
A6.01 SCHEDULES & DIAGRAMS
CONSTRUCTION DRAWINGS FOR
RENOVATING INTERIOR AREAS OF EXISTING
OFFICE SPACE AND BUILDING NEW FRONT AND
BACK ADDITION TO THE EXISTING MTA BUILDING.
IBC CONSTRUCTION TYPE: TYPE IIA
IBC OCCUPANCY TYPE: BUSINESS
NFPA CONSTRUCTION TYPE: TYPE II (111)
NFPA OCCUPANCY GROUP: BUSINESS
FULLY SPRINKLED: NO
TOTAL OCCUPANCY AREA: 3,981 SQ. FT.
RENOVATION: 1,745 SQ. FT.
FRONT ADDITION: 1,054 SQ. FT.
BACK ADDITION: 1,182 SQ. FT.
PROJECT
LOCATION
MOUNTAIN TRANSIT AUTHORITY
1096 BROAD STREET
SUMMERSVILLE, WV 26651
304.872.5872
TIM THOMAS
HARPER ENGINEERING
52 B STREET
ST. ALBANS, WV 25177
304.722.3602
MEP ENGINEER:
JASON HARPER
JASON@HARPERENGWV.COM
PROJECT MANAGER:
MARSHA BENSON
MBENSON@THETHRASHERGROUP.COM
304.848.7842
PROJECT MANAGER:
JEFF GOLA
JGOLA@THETHRASHERGROUP.COM
304.326.6109
ARROW ENGINEERING
1459 N. WILLEY ST.
MORGANTOWN, WV 26505
304.276.1296
STRUCTURAL ENGINEER:
MICHAEL HOWELL
MIKE@ARWCG.COM
MAINTENANCE AND INSPECTION NOTES
1. THE CONTRACTOR SHALL CLEAN OUT SEDIMENT
BEHIND INLET PROTECTION MEASURES ONCE IT
IS ONE THIRD OF THE HEIGHT OF THE SOCKS.
SEDIMENT WILL BE CLEANED OUT OF THE
THREE BASINS PRIOR TO CONVERTING TO
DETENTION BASINS. THE SEDIMENT SHALL BE
INCORPORATED INTO THE FILL WITHIN THE
DISTURBED AREA.
2. ALL EROSION AND SEDIMENT CONTROL
MEASURES SHALL BE INSPECTED, AT MINIMUM,
ONCE EVERY 4 CALENDAR DAYS AND WITHIN
24-HOURS AFTER ANY STORM GREATER THAN
0.25-INCHES PER 24-HOUR PERIOD. ANY
REQUIRED REPAIRS OR MAINTENANCE SHALL BE
MADE IMMEDIATELY.
3. CONTRACTOR TO INSTALL RAIN GAUGE ON SITE
PRIOR TO EXCAVATION
1. TEMPORARY STABILIZATION
DATES: MARCH 1 THROUGH JUNE 15
SEED: OATS @ 168 LB/AC
DATES: AUGUST 15 THROUGH NOVEMBER 1
SEED: RYE @ 120 LB/AC
FERTILIZER: 10-10-10 @ 400 LB/AC
FOR STABILIZATION OUTSIDE SEEDING DATES, USE HAY OR STRAW
MULCH AT 3 TONS/AC OR AT 2 TONS/AC IF ASPHALT EMULSION IS
APPLIED AT 100 GAL/AC.
2. PERMANENT STABILIZATION
DATES: MARCH, APRIL, AUGUST, & AUGUST
SEED: KY-31 TALL FESCUE @ 50 LB/AC
FERTILIZER: 10-20-10 @ 1000 LB/AC
LIME: 3 TONS/AC OR PER SOIL TEST RESULTS
MULCH: HAY OR STRAW @ 2 TONS/AC OR @ 1.5 TONS/AC WITH
ASPHALT EMULSION @ 125 GAL/AC
3. SEEDBED PREPARATION: AREAS TO BE SEEDED SHALL BE FREE OF
ROCKS AND STONES, DISKED TO A DEPTH OF 4-IN TO 6-IN, AND
SMOOTHLY GRADED.
4. SEEDING METHOD: SEED MAY BE BROADCAST BY HYDROSEEDER OR
MANUALLY AS FOLLOWS: BY HAND WITH A CYCLONE SEEDER, OR
FERTILIZER SPREADER. IF A MANUAL METHOD IS USED, DIVIDE THE
SEED INTO TWO LOTS AND BROADCAST THE SECOND PERPENDICULAR
TO THE FIRST.
5. TOPSOIL SHALL BE REDISTRIBUTED ON ALL DISTURBED AREAS TO BE
STABILIZED PRIOR TO SEEDING.
6. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS
PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION
ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO
CASE MORE THAN 7 DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT
PORTION OF THE SITE HAS PERMANENTLY CEASED.
7. WHERE THE INITIATION OF STABILIZATION MEASURES WITHIN 7 DAYS
AFTER CONSTRUCTION ACTIVITY TEMPORARILY OR PERMANENTLY
CEASES IS PRECLUDED BY SNOW COVER, STABILIZATION MEASURES
SHALL BE INITIATED AS SOON AS CONDITIONS ALLOW.
8. WHERE CONSTRUCTION ACTIVITY WILL RESUME ON A PORTION OF THE
SITE WITHIN 14 DAYS FROM WHEN ACTIVITIES CEASED (e.g., THE TOTAL
TIME PERIOD THAT CONSTRUCTION ACTIVITY IS TEMPORARILY HALTED
IS LESS THAN 14 DAYS), THEN STABILIZATION MEASURES DO NOT HAVE
TO BE INITIATED ON THAT PORTION OF THE SITE BY THE SEVENTH DAY
AFTER CONSTRUCTION ACTIVITIES HAVE TEMPORARILY CEASED.
9. AREAS WHERE THE SEED HAS FAILED TO GERMINATE ADEQUATELY
(UNIFORM PERENNIAL VEGETATIVE COVER WITH A DENSITY OF 70%)
WITHIN 30 DAYS AFTER SEEDING AND MULCHING MUST BE RE-SEEDED
IMMEDIATELY, OR AS SOON AS WEATHER CONDITIONS ALLOW.
SEEDING AND MULCHING
EROSION AND SEDIMENT CONTROL NOTES
OVERALL LEGEND
EXISTING MAJOR CONTOURS
EXISTING PAVED ROAD EDGE
EXISTING TREE LINE
PROPOSED MAJOR CONTOURS
PROPERTY LINE
EXISTING DRAINAGE PIPE
PROPOSED MINOR CONTOURS
PROPOSED SEED AND MULCHING
EXISTING GAS LINE
EXISTING MINOR CONTOURS
EXISTING STREAM
EXISTING WATER LINE
EXISTING UNDER GROUND CONDUIT
PROPOSED SANITARY SEWER
PROPOSED WATERLINE
PROPOSED DRAINAGE PIPE
CIVIL/SITE GENERAL NOTES
EXISTING DUMP ROCK GUTTER
EXISTING GUARDRAIL
1. ANY CONSTRUCTION METHOD OR MATERIAL THAT IS NOT COVERED IN THESE CONTRACT
DOCUMENTS WILL BE COVERED BY WEST VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION, WEST VIRGINIA DEPARTMENT OF TRANSPORTATION, DIVISION OF HIGHWAYS STANDARD
SPECIFICATIONS, ROADS AND BRIDGES, ADOPTED 2023 AND LATEST STANDARD DETAILS. THE
CONTRACT DOCUMENTS AND CONTRACT PLANS ARE THE GOVERNING PROVISIONS APPLICABLE TO
THIS PROJECT.
2. THE CONTRACTOR SHALL LOCATE AND PROTECT EXISTING UTILITIES AND FACILITIES FROM
DAMAGE BY EQUIPMENT OR PERSONNEL. THE CONTRACTOR SHALL CONTACT ALL UTILITY AND
FACILITY AGENCIES FOR FIELD MARKING PRIOR TO BEGINNING CONSTRUCTION. THE LOCATIONS OF
EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT
BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE EXISTING UTILITY
INFORMATION IS THE BEST AVAILABLE AND MAY NOT BE COMPLETELY ACCURATE OR
REPRESENTATIVE OF ACTUAL CONDITIONS. THE CONTRACTOR SHALL DETERMINE THE EXACT
LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT OCCUR TO THE UNDERGROUND UTILITIES.
THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND/OR OWNER IN WRITING, OF ANY EXISTING DAMAGED UTILITIES PRIOR TO BEGINNING CONSTRUCTION. ANY UTILITIES OR FACILITIES DAMAGED DURING THE PROJECT BY THE CONTRACTOR OR EQUIPMENT SHALL BE PROMPTLY REPAIRED AT THE
CONTRACTOR'S EXPENSE. HAND DIGGING TO PROTECT UTILITIES FROM DAMAGE SHOULD BE
ANTICIPATED.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING A VALID STATE CONTRACTOR'S LICENSE
AND PAYING ALL STATE AND LOCAL B&O TAXES. ALL PERMITS MUST BE SECURED PRIOR TO
CONSTRUCTION. PERMITS PERTAINING TO THE WASTE SITE SHALL ALSO BE ACQUIRED BY THE
CONTRACTOR. OWNER WILL OBTAIN WVDEP STORMWATER CONSTRUCTION PERMIT.
4. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL PLAN AND ELEVATION
DIMENSIONS OF THE VARIOUS WORK ITEMS ON THIS PROJECT.
5. THE CONSTRUCTION DRAWINGS REPRESENT THE PROPOSED LINES, GRADES, CROSS SECTIONS, AND APPURTENANCES TO ACCOMPLISH THE INTENT OF THE SCOPE OF WORK. CERTAIN INCIDENTAL ITEMS
TO COMPLETE THE SCOPE OF WORK MAY NOT BE SHOWN.
6. ALL WORK PERFORMED AND ALL MATERIAL FURNISHED SHALL CONFORM TO THE LINES, GRADES, CROSS SECTIONS, DIMENSIONS, AND MATERIAL REQUIREMENTS SHOWN ON THE CONSTRUCTION
DRAWINGS. THE CONSTRUCTION DRAWINGS SHOW THE CONSTRUCTION LINES, GRADES, DEPTHS AND DIMENSIONS ON WHICH ESTIMATED QUANTITIES ARE BASED. THE CONSTRUCTION LINES, GRADES, DEPTHS AND DIMENSIONS ARE SUBJECT TO VARIATION NECESSARY TO OBTAIN SUBGRADE AND/OR
FINAL GRADE SATISFACTORY TO THE ENGINEER.
7. THE CONTRACTOR SHALL HAVE ON THE SITE AT ALL TIMES A COMPETENT SUPERINTENDENT
CAPABLE OF READING AND UNDERSTANDING THE CONSTRUCTION DOCUMENTS AND THOROUGHLY
EXPERIENCED IN THE TYPE OF WORK BEING PERFORMED, AND SHALL BE ABLE TO COORDINATE
WITH THE ENGINEER.
8. ALL BROKEN CONCRETE & ASPHALT, TRASH, RUBBISH, ORGANICS & OTHER UNSUITABLE AND EXCESS MATERIAL SHALL BE DISPOSED OF OFF-SITE BY THE CONTRACTOR. THE CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN ANY AND ALL NECESSARY PERMITS FOR OFF-SITE DISPOSAL / WASTE
AREAS.
9. THE OWNER RESERVES THE RIGHT TO CONTRACT TO AND PERFORM OTHER OR ADDITIONAL WORK
ADJACENT TO AND WITHIN THE WORK AREA COVERED BY THIS CONTRACT. WHEN SEPARATE
CONTRACTS ARE LET WITHIN THE LIMITS OF ANY ONE PROJECT, EACH CONTRACTOR SHALL
CONDUCT HIS WORK SO AS NOT TO INTERFERE WITH OR HINDER THE PROGRESS OR THE
COMPLETION OF THE WORK BEING COMPLETED BY OTHER CONTRACTORS. THE CONTRACTORS
WORKING ON THE SAME PROJECT SHALL COOPERATE WITH EACH OTHER AS ORDERED BY THE
OWNER AND/OR ENGINEER.
10. PREVIOUSLY STOCKPILED TOPSOIL FROM THE MASS EARTH PROJECT CAN BE UTILIZED IN THE
PROPOSED LANDSCAPED AREAS.
11. PRIOR TO PLACEMENT OF FILL, THE EXPOSED SURFACE SHALL BE COMPACTED AND/OR PROOF
ROLLED UNTIL A RELATIVELY UNYIELDING SURFACE IS ACHIEVED.
12. STOCKPILE EXCAVATED MATERIALS CLASSIFIED AS SATISFACTORY SOIL MATERIAL WITHIN LIMIT
OF DISTURBANCE, SHAPE THE STOCKPILES FOR PROPER DRAINAGE.
13. WHERE THE SUBGRADE OR LAYER OF SOIL MATERIAL MUST BE MOISTURE CONDITIONED BEFORE COMPACTION, UNIFORMLY APPLY WATER TO THE SURFACE OF THE SUBGRADE, OR LAYER OF SOIL
MATERIAL, TO PREVENT FREE WATER APPEARING ON THE SURFACE DURING OR SUBSEQUENT TO
COMPACTION OPERATIONS.
14. REMOVE AND REPLACE, OR SCARIFY AND AIR DRY, SOIL MATERIAL THAT IS TOO WET TO PERMIT COMPACTION TO SPECIFIED DENSITY. SOIL MATERIAL THAT HAS BEEN REMOVED BECAUSE IT IS TOO
WET TO PERMIT COMPACTION MAY BE STOCKPILED OR SPREAD AND ALLOWED TO DRY. ASSIST
DRYING BY DISKING, HARROWING OR PULVERIZING, UNTIL THE MOISTURE CONTENT IS REDUCED TO
A SATISFACTORY VALUE, AS DETERMINED BY MOISTURE-DENSITY RELATION TESTS.
15. IN THE EVENT AN ERROR WITH THE PLANS SEEMS APPARENT, THE MATTER MUST BE TAKEN UP WITH
THE ENGINEER FOR CAREFUL REVIEW BEFORE PROCEEDING WITH CONSTRUCTION.
19. IN AREAS TO RECEIVE FILL AND AT THE FINAL CUT SUBGRADE, PROOF ROLL AND COMPACT THE
EXPOSED GROUND SURFACE FOLLOWING CLEARING AND GRUBBING AND ANY REQUIRED
EXCAVATION WITH A MINIMUM OF FOUR PASSES OF AN APPROVED COMPACTOR. PROOF ROLLING
SHALL BE UNDER THE OBSERVATION OF THE ENGINEER AS DESCRIBED HEREIN. IMMEDIATELY
FOLLOWING THE COMPLETION OF EXCAVATION TO PROPOSED SUBGRADES IN CUT AREAS, PROOF
ROLLING SHALL BE PERFORMED AS SPECIFIED. ANY AREAS WHICH DEFLECT, RUT, OR PUMP UNDER
THE LOADED DUMP TRUCK SHALL BE UNDERCUT AND REPLACED WITH COMPACTED FILL
MATERIAL OR STONE BASE COURSE AS DIRECTED BY THE ENGINEER. IF UNDERCUT IS REQUIRED
BEFORE PLACEMENT OF INITIAL FILL LIFT, THE CONTRACTOR SHALL CONTACT OWNER AND
ARCHITECT TO DISCUSS COMPENSATION BEFORE PROCEEDING.
20. STABILIZATION MEASURES, INCLUDING BUT NOT LIMITED TO PERMANENT SEEDING AND
MULCHING SHALL BE INITIATED AS SOON AS PRACTICAL IN PORTIONS OF THE SITE WHERE
CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CLOSE, BUT IN NO CASE MORE THAN SEVEN (7) DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS
TEMPORARILY OR PERMANENTLY CLOSED.
21. WHERE THE INITIATION OF STABILIZATION MEASURES BY THE SEVENTH DAY AFTER
CONSTRUCTION ACTIVITY TEMPORARILY OR PERMANENTLY CEASES IS PRECLUDED BY SNOW
COVER, STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS CONDITIONS ALLOW.
22. WHERE CONSTRUCTION ACTIVITY WILL RESUME ON A PORTION OF THE SITE WITHIN 14 DAYS FROM
WHEN ACTIVITIES CEASED (E.G. THE TOTAL TIME PERIOD THAT CONSTRUCTION ACTIVITY IS
TEMPORARILY HALTED IS LESS THAN 14 DAYS), THEN STABILIZATION MEASURES ARE NOT
REQUIRED TO BE INITIATED ON THAT PORTION OF THE SITE BY THE SEVENTH DAY AFTER
CONSTRUCTION ACTIVITIES HAVE TEMPORARILY CEASED.
23. AREAS WHERE THE SEED HAS FAILED TO GERMINATE ADEQUATELY (UNIFORM PERENNIAL
VEGETATIVE COVER WITH A DENSITY OF 70%) WITHIN 30 DAYS AFTER SEEDING AND MULCHING
MUST BE RE-SEEDED IMMEDIATELY, OR AS SOON AS WEATHER CONDITIONS ALLOW.
24. THE CONTRACTOR SHALL PROVIDE TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES
AND OTHER ACTIONS AS REQUIRED BY LOCAL AND STATE REGULATIONS OR REQUESTED BY
ENGINEER. THE CONTRACTOR WILL BE RESPONSIBLE FOR MAINTAINING OR MODIFYING SEDIMENT
CONTROL MEASURES DURING CONSTRUCTION IN ORDER TO PREVENT EROSION.
25. EROSION AND SEDIMENT CONTROL DETAILS NOT SHOWN IN THE PLANS SHALL BE IN
ACCORDANCE WITH THE WEST VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION
EROSION AND SEDIMENT CONTROL MANUAL, LATEST EDITION.
26. ALL QUALITY CONTROL TESTING AND INSPECTION SHALL BE PERFORMED BY A QUALIFIED
TESTING AGENCY AND WILL BE PAID FOR BY THE OWNER. TESTING SHALL BE PERFORMED FOR
SOILS, SUBGRADE, AGGREGATE BASE COURSE, CONCRETE, AND ASPHALT.
27. ALL SUBCONTRACTORS SHALL BE RESPONSIBLE FOR COORDINATING THEIR ITEMS OF WORK AND
COMPLETION SCHEDULES WITH EACH OTHER AS WELL AS THE GENERAL CONTRACTOR
28. CITY OF SUMMERSVILLE SHALL BE NOTIFIED PRIOR TO TYING INTO THEIR EXISTING SEWER
SYSTEM.
29. CONTRACTOR SHALL COORDINATE WITH HOPE GAS ON THE RELOCATION OF THE EXISTING
NATURAL GAS METER AND REGULATOR.
CONTACTS
MISS UTILITY
1-800-245-4848 http://www.muwv.org
WATER/SANITARY SEWER
CITY OF SUMMERVILLE
ELECTRIC
FIRST ENERGY
GAS
HOPE GAS
AMBULANCE, FIRE, LAW ENFORCEMENT
EXISTING SANITARY SEWER
EXISTING DRAINAGE INLET
EXISTING WINGWALL
EXISTING SANITARY MANHOLE
PROPOSED SANITARY MANHOLE
PROPOSED COMMUNICATION CONDUIT
CONDUIT BANK (BY OTHERS)
PROPOSED ELECTRICAL CONDUIT
JUNCTION BOX (BY OTHERS)
PROPOSED WINGWALL
PROPOSED DRAINAGE INLET
PROPOSED DUMP ROCK GUTTER
EXISTING SILT FENCE
PROPOSED INLET PROTECTION
ELECTRICAL CONDUIT (BY OTHERS)
LIGHT POLES (BY OTHERS)
PROPOSED SANITARY SEWER
P (304) 624-4108
600 WHITE OAKS BLVD,
P.O. BOX 940
BRIDGEPORT, WV 26330
www.thethrashergroup.com
F (304) 624-7831
60-11019
JU
N
E 9, PR
EL
IM
IN
AR
Y
PL
AN
S
M O
U N
TA
IN
T R
A N
SI
T
A U
TH
O
R
IT
Y
B R
O
AD
S T, S U
M M
ER
SV
IL
LE
W V
C1.00
GENERAL NOTES
R
EF.
WH
523 SF
NEW OFFICE
450 SF
DRIVERS AREA
106 SF
NEW OFFICE
106 SF
NEW OFFICE
84 SF
TRAINING RM
107 SF
MECHANICAL
208 SF
NEW OFFICE
OFFICE
FISCAL
139 SF
DISPATCH
MENSWOMENS
MECHANIC
RESTROOM
NEW PARTS ROOM
STORAGE STORAGE
17 SF
UNIFORM
CONF. ROOM
MECH
WORK BAYS
STORAGE
375 SF
VESTIBULE
U E
U E
U E
U E
DEMO CONCRETE SIDEWALK
DEMO MEP PADS AND
RELOCATE EQUIPMENT
BROAD ST
SU
M
M
ER
S V
IL
LA
G E
D R
P (304) 624-4108
600 WHITE OAKS BLVD,
P.O.BOX 940
BRIDGEPORT, WV 26330
www.thethrashergroup.com
F (304) 624-7831
60-11019
JU
N
E 9, PR
EL
IM
IN
AR
Y
PL
AN
S
M O
U N
TA
IN
T R
A N
SI
T
A U
TH
O
R
IT
Y
B R
O
AD
S T, S U
M M
ER
SV
IL
LE
W V
C2.00
CIVIL EXISTING SITE
AND DEMO PLAN
EF.
WH
523 SF
NEW OFFICE
450 SF
DRIVERS AREA
106 SF
NEW OFFICE
106 SF
NEW OFFICE
84 SF
TRAINING RM
107 SF
MECHANICAL
208 SF
NEW OFFICE
OFFICE
FISCAL
139 SF
DISPATCH
MENSWOMENS
MECHANIC
RESTROOM
NEW PARTS ROOM
STORAGE STORAGE
17 SF
UNIFORM
CONF. ROOM
MECH
WORK BAYS
STORAGE
375 SF
VESTIBULE
U E
U E
U E
U E
NEW STRADDLE SEWER MANHOLE
EXISTING MANHOLE ABANDONED
CONCRETE SIDEWALK
18.0'
9.
0'
SEWER MANHOLE
STRADDLE SEWER MANHOLE
R3.0'
10' TALL FENCE
WITH 16' WIDE
DOUBLE SWING GATE
10' TALL FENCE WITH
16' WIDE AUTOMATIC
SLIDE GATE
RELOCATE GAS
MEP EQUIPMENT PAD
20.0'
.0
PAINT STRIPING
6.
0'
ADA RAMP
ASPHALT TRENCH REPAIR
100 LF OF 4" SDR-35
140 LF OF 4" SDR-35
SEWER CLEANOUT
EXISTING SEWER
BROAD ST
SU
M
M
ER
S V
IL
LA
G E
D R
P (304) 624-4108
600 WHITE OAKS BLVD,
P.O.BOX 940
BRIDGEPORT, WV 26330
www.thethrashergroup.com
F (304) 624-7831
60-11019
JU
N
E 9, PR
EL
IM
IN
AR
Y
PL
AN
S
M O
U N
TA
IN
T R
A N
SI
T
A U
TH
O
R
IT
Y
B R
O
AD
S T, S U
M M
ER
SV
IL
LE
W V
C2.01
CIVIL SITE PLAN
ELECTRIC
GAS - 6" WIDE
TELEPHONE
WATER
SEWER
RED
YELLOW
ORANGE
BLUE
GREEN
BEDDING FOR STORM SEWER PIPE
TYPICAL CROSS SECTION OF TRENCHES
NOT TO SCALE
BEDDING FOR GAS PIPE
EXCAVATED MATERIAL
< 8" IN SIZE OR SELECT
BACKFILL
3' -0
" M
IN
EXCAVATED MATERIAL
< 2" IN SIZE OR SELECT
BACKFILL
C O
M
PA
C
TE
D B
A C
K
FI
LL
R 6"
R
BEDDING FOR SEWER PIPE
EXCAVATED MATERIAL
< 8" IN SIZE OR SELECT
BACKFILL
3' -0
" M
IN
.EXCAVATED MATERIAL
< 2" IN SIZE OR SELECT
BACKFILL
C O
M
PA
C
TE
D B
A C
K
FI
LL
R 6"
R
EXCAVATED MATERIAL
< 8" IN SIZE OR SELECT
BACKFILL
V A
R
IE
S (S
EE
P
LA
N
EXCAVATED MATERIAL
< 2" IN SIZE OR SELECT
BACKFILL
C O
M
PA
C
TE
D B
A C
K
FI
LL
R 6"
R
UTILITY MAGNETIC WARNING TAPE
C O
M
PA
C
TE
D B
A C
K
FI
LL
MAGNETIC
WARNING TAPE
M A
X
COLOR CODES FOR UTILITY LOCATING
MAGNETIC WARNING TAPE
BEDDING FOR CONDUIT
EXCAVATED MATERIAL
< 2" IN SIZE OR SELECT
BACKFILL
SCH. 40 CONDUIT
C O
M
PA
C
TE
D B
A C
K
FI
LL 24
1. PROVIDE NYLON PULL
STRINGS IN EACH CONDUIT
2. MIN. 12" SEPARATION
BETWEEN ELECTRIC AND
COMMUNICATIONS
NOTE:
YELLOW #12 AWG TRACER
WIRE WITH THERMOPLASTIC
COATING WITH PIPE
(GRAVITY LINE)
NOT TO SCALE
TERMINAL CLEANOUT DETAIL
6"
6"
CAST IRON CLEANOUT
FRAME & COVER LABELED
AS SEWER
INSTALLATION IN HMA
STREET OR ROAD
INSTALLATION IN
GRASS AREAS
3000 PSI
CONCRETE
NOTES: 1) RISER WYE, BEND, AND TYPE SHALL MATCH
MAIN LINE DIAMETER AND MATERIAL.
RISER PIPE TO
MATCH LINE
DIAMETER
LINE TYPE AND
SIZE
NOTE: BURY MANHOLES & CLEANOUTS
1' MIN. UNDER WVDOH
ROADWAY DITCHES & 6" MIN. IN
THE SHOULDER AREAS.
4" MIN. (TYP)
PLUG
6"
SDR-35 GASKETED CAP,
FOR LINE TYPE AND
SIZE OR RECONNECT
EXISTING SERVICE
LATERAL
BUILDING SILT FENCE - STEP BY STEP PROCEDURE
NOT TO SCALE
1.
2. 3.
ATTACH FILTER FABRIC
ALLOWING EXTENSION
INTO TRENCH AS SHOWN
BACKFILL AND COMPACT
EXCAVATED SOIL
SET POSTS AND EXCAVATE TRENCH
FLOW
BELTED SILT RETENTION FENCE - (BSRF)
PRIORITY 1 - GREEN BAND
NOT TO SCALE
4" CRUSHER
RUN
4" CRUSHER
RUN
P (304) 624-4108
600 WHITE OAKS BLVD,
P.O. BOX 940
BRIDGEPORT, WV 26330
www.thethrashergroup.com
F (304) 624-7831
60-11019
JU
N
E 9, PR
EL
IM
IN
AR
Y
PL
AN
S
M O
U N
TA
IN
T R
A N
SI
T
A U
TH
O
R
IT
Y
B R
O
AD
S T, S U
M M
ER
SV
IL
LE
W V
C3.00
DETAILS
SH
A
PE
D
C H
A N
N
EL
7"
8" 8"
M A
N H
O
LE
H
EI
G H
T V
A R
IE
S
48" DIA.
5"
" C
/C
1/2 EFFLUENT
PIPE DIAMETER
WATERTIGHT FRAME &
COVER w/24" CLEAR
OPENING AND BOLTED LID
1/4" DIA.
POLYISOPRENE
CORD. GASKET26"
24"
28 1/2"
33" 36"
REGULAR MANHOLE
NOT TO SCALE
1/
2"
CASTING TO BE ANCHORED
w/STAINLESS STEEL BOLTS
JOINTS SHALL BE SEALED
WITH TWO 1" DIA. RINGS OF
PREMIUM GRADE BUTYL
SEALANT OR EQUAL
REINFORCED
PLASTIC STEPS
SLOPE
MIN. 12.5% POURED IN
PLACE INVERT
CHANNEL WIDTH SHALL
BE EQUAL TO EFFLUENT
PIPE DIAMETERAASHTO #57 STONE
4-10"
JOINTS SHALL BE SEALED
WITH TWO 1" DIA. RINGS OF
PREMIUM GRADE BUTYL
BASED SEALANT OR EQUAL
EXTERIOR PROTECTIVE
COATING SHALL BE A
BITUMINOUS COATING EQUAL
TO A 10 MIL. MIN. THICKNESS
1. MANHOLES & CLEANOUTS TO BE BURIED 1' MIN. UNDER WVDOH
ROADWAY DITCHES & 6" MIN. IN THE SHOULDER AREAS.
2. CHANNEL SLOPES SHALL BE A MIN. OF 0.10 SLOPE FROM PIPE
INVERT THROUGH PIPE INVERT OUT.
3. ALL SEALED JOINTS IN MANHOLE TO BE WATERTIGHT.
4. ALL MANHOLES SHALL BE PRECAST CONSTRUCTION, AND SHALL
INCLUDE CAST IN PLACE FLEXIBLE PIPE TO MANHOLE
CONNECTORS AT ALL PIPE PENETRATIONS.
NOTES:
SLOPE FROM WALL TO
TOP OF CHANNEL
SHALL BE A MIN. 12.5%
A
MANHOLE STEP
NOT TO SCALE
1. MANHOLE STEPS SHALL BE IMPACT
RESISTANT CO-POLYMER POLYPROPYLENE
PLASTIC MOLDED AROUND 1/2" DIAMETER
GRADE 60 REINFORCED STEEL. STEPS SHALL
BE STANDARD BLACK IN COLOR AND SHALL
HAVE NON-SLIP TREAD ON BOTH SIDES.
2. TOP STEP SHALL NOT BE GREATER THAN 2'-0"
FROM TOP OF MANHOLE.
3. LANDING TO BOTTOM STEP SHALL NOT BE
GREATER THAN 2'-0".
4. STEPS MEET: ASTM C-478 / ASTM D-4101 /
ASTM A-615 / AASHTO M-199
NOTES:
A
STEP
INSERT
5 5/8"
SECTION A-A
10 1/8"
11"
7/
8"
1/
8"
1 1/16"1 1/16"
COPOLYMER
POLYPROPYLENE PLASTIC
1/2" GRADE 60 STEEL
REINFORCEMENT
18" MINIMUM
(NOTE 2)
6" ABSOLUTE
MINIMUM
10' MIN. (NOTE 1)
3' ABSOLUTE MINIMUM
SEWER LINE
WATER LINE
WATER LINE
SEWER LINE
AND WATER LINES
NOT TO SCALE
SEPARATION OF SEWER
SPECIAL CONSTRUCTION REQUIREMENTS NOTES FROM
WEST VIRGINIA 64 CSR 47, PAGE 6
1) IN CASES WHERE WATER AND GRAVITY OR PRESSURE
SANITARY SEWER LINES MUST LAY CLOSER THAN TEN (10)
FEET APART, THE SEWER LINE CONSTRUCTION SHALL BE A
MINIMUM OF EIGHTEEN (18) INCHES LOWER THAN THE
WATER LINE AND CONSTRUCTED OF A PRESSURE TYPE
PIPE MEETING REQUIREMENTS FOR WATER LINES. THE
INSTALLATION SHALL UNDERGO HYDRAULIC TESTING
FOR A PERIOD OF NOT LESS THAN TWENTY-FOUR (24)
HOURS AND WILL BE CONSIDERED SATISFACTORY IF
LEAKAGE IS NOT MORE THAN 0.25 GALLONS PER INCH
DIAMETER OF PIPE PER JOINT. IN LIEU OF HYDRAULIC
TESTING, THE SEWER LINE CAN BE AIR TESTED. THE
PLACEMENT OF THE WATER LINE SHALL BE UPON AN
UNDISTURBED EARTH SHELF OR BENCH. BACKFILLING TO
CREATE THE BENCH IS NOT PERMISSIBLE.
2) IF MAINTAINING A VERTICAL CLEARANCE OF EIGHTEEN
(18) INCHES IS NOT POSSIBLE, THE LOCATION OF THE
GRAVITY OR PRESSURE SANITARY SEWER SHALL BE SO
THAT IT CROSSES BETWEEN JOINTS OF THE WATER LINE.
ALSO, CONSTRUCTION OF THE SEWER LINE SHALL BE SO
THAT IT CROSSES UNDER THE WATER LINE AT MID JOINT.
THE CONSTRUCTION OF THE SEWER SHALL BE OF A
PRESSURE TYPE PIPE MEETING THE REQUIREMENTS FOR
WATER LINES AT THE CROSSING. A MINIMUM VERTICAL
CLEARANCE OF SIX (6) INCHES BETWEEN THE SEWER AND
WATER LINES SHALL BE MAINTAINED. THE
CONSTRUCTION OF A GRAVITY OR PRESSURE SANITARY
SEWER LINE, OR BOTH, SHALL NOT BE OVER THE TOP OF A
WATER LINE. ENCASE THE SEWER LINE SO THAT THE
CASING EXTENDS AT LEAST TEN (10) FEET ON EACH SIDE
OF THE CROSSING.
8" 8"
M A
N H
O
LE
H
EI
G H
T V
A R
IE
S
48" DIA.
5"
" C
/C
4'-10"
CASTING TO
BE ANCHORED
W/STAINLESS STEEL BOLTS
JOINTS SHALL BE
SEALED WITH TWO
1" DIA. RINGS OF
PREMIUM
GRADE BUTYL
BASED SEALANT
OR EQUAL
NOTE: ALL SEALED JOINTS IN
MANHOLE SHALL BE
WATERTIGHT.
REINFORCED
PLASTIC STEPS
POURED IN
PLACE INVERT
POURED IN
PLACE BASE
JOINTS SHALL BE
SEALED WITH TWO
1" DIA. RINGS OF
PREMIUM
GRADE BUTYL
BASED SEALANT
OR EQUAL
MANHOLE RISER
SECTION NOTCHED
TO SET OVER
EXISTING LINE
SLOPE MIN. 12.5%
AASHTO #57 STONE
1/2 EFFLUENT
PIPE DIAMETER
SLOPE MIN. 12.5%
EXTERIOR PROTECTIVE
COATING SHALL BE A
BITUMINOUS COATING
EQUAL TO 10 MIL.
MINIMUM THICKNESS
P (304) 624-4108
600 WHITE OAKS BLVD,
P.O. BOX 940
BRIDGEPORT, WV 26330
www.thethrashergroup.com
F (304) 624-7831
60-11019
JU
N
E 9, PR
EL
IM
IN
AR
Y
PL
AN
S
M O
U N
TA
IN
T R
A N
SI
T
A U
TH
O
R
IT
Y
B R
O
AD
S T, S U
M M
ER
SV
IL
LE
W V
C3.01
EXISTING STONE BASE
EXISTING STONE SUBBASE
4" BASE
1/2" WEARING EXISTING PAVEMENT
307-1 CLASS
1 AGGREGATE
SLOPE DOWN
TO CURB
CURB
EDGE OF EXISTING
SAW CUT TO BE SEALED WITH
SEPARATION FABRIC
PROPOSED ASPHALT STREET REPAIR
NOT TO SCALE
JOINT SEALING MATERIAL
3"
3"
INTEGRAL SIDEWALK SECTION
NOT TO SCALE
2% SLOPE MAX.
SEE PLAN WIDTH
4" OF 3500 P.S.I. CONCRETE
W/6" X 6" NO. 6 W.W.F.
1/4" EXPANSION
JOINT FILLER
ROAD SURFACE
14"
8"
135°225°
R = 1/2"
4" OF 307-1 CLASS I AGGREGATE
TYPE I CURB FACE
CURB AND SIDEWALK TRANSITION
@ ADA RAMP
NOT TO SCALE
ADA
ACCESSIBLE
12:1 OR
15' MAX
12:1 OR
15' M
AX
SIDEWALK
SIDEWALK
EX. CURB
EX. CURB
ASPHALT PARKING LOT
MAX2%
MAX2%
MAX2%
MAX2%
DRIVEWAY
WIDTH VARIES
EXISTING PAVEMENT
CURB TRANSITION
@ ADA RAMP
NOT TO SCALE
1. EXPANSION JOINTS SHALL BE 14" WIDE PREFORMED EXPANSION JOINT FILLER AND SEALED
WITH JOINT SEALING MATERIAL AS APPROVED BY OWNER.
2. FINISHING - SIDEWALKS, OUTSIDE EDGES, AND JOINTS SHALL BE EDGED WITH A 12" RADIUS
EDGING TOOL. DUMMY JOINTS SHALL BE 38" DEEP AND 18" WIDE AND SPACED EVERY 5'.
SURFACE SHALL HAVE BROOM FINISH. BROOMING SHALL BE TRANSVERSE TO THE LINE OF
TRAFFIC.
LIMITS OF PAYMENT
TYPE IV CURB
& TYPE III SIDEWALK
LIMITS OF PAYMENT
TYPE I CURB
& 4" SIDEWALK
LIMITS OF PAYMENT
TYPE I CURB
& 4" SIDEWALK
NOTE:
1. IF THE CURBS ARE POURED SEPARATE FROM THE SIDEWALK/CONCRETE PAD, THEN
THE CURBS SHALL BE DOWELED INTO EACH OTHER USING #5 BAR @ 18" MIN.
SPACING.
NOTES:
0"-6"
P (304) 624-4108
600 WHITE OAKS BLVD,
P.O. BOX 940
BRIDGEPORT, WV 26330
www.thethrashergroup.com
F (304) 624-7831
60-11019
JU
N
E 9, PR
EL
IM
IN
AR
Y
PL
AN
S
M O
U N
TA
IN
T R
A N
SI
T
A U
TH
O
R
IT
Y
B R
O
AD
S T, S U
M M
ER
SV
IL
LE
W V
C3.02
AGGREGATE
SUBBASE
PARKING STALL PAINTING
NOT TO SCALE
SOLID WHITE PAINT
STRIPING AS SPECIFIED
9' (TYP)
TY
P)
1. PLACE EXPANSION JOINT WHERE DIFFERENT SIDEWALKS
ABUT, AND AGAINST ANY STRUCTURE.
2. PLACE EXPANSION JOINTS 20' 0.C.
3. PLACE CONTRACTION JOINTS 5' O.C.
4. FINISH SURFACE WITH A NON-SLIP BROOM SWEPT FINISH.
5. BEVEL AT ENTRANCES TO MEET FINISHED FLOOR
ELEVATION WITH A SLOPE NO GREATER THAN 1v:4h.
NOTES:
9' (TYP) 9' (TYP)9'
TY
P)
HANDICAPPED PARKING
NOT TO SCALE
SOLID PAINT
STRIPING
BLUE HANDICAPPED
PARKING SYMBOL
UNLOADING AREA
1. SEE PLAN FOR CONFIGURATION OF AREA SHOWN.
2. PARKING LOT GRADE WITHIN ADA PARKING SPACES AND
LOADING sca SHALL NOT EXCEED 2% IN ANY DIRECTION.
NOTES:
INTERNATIONAL HANDICAP SYMBOL
NOT TO SCALE
2'-10"
3' -3
BLUE PAINTED SHERWIN WILLIAMS SETFAST
ACRYLIC MODIFIED ALKYD TRAFFIC
MARKING PAINT OR APPROVED EQUAL
R=6"
4"
R = 1' -8"
R
2' -0
5°
23°
R7-8P
M.U.T.C.D.
5"
VAN
ACCESSIBLE
PARKING
RESERVED
1/2" R
1 1/2" R 6"
1' -6
4"
1'-0"
6"
USDOT STANDARD R7-8 SIGN
2" 2"
C 1"
2" C
1" 4 7/8"
4 1/4" 4 1/4"
3" 3"
4"
3/ 8"3/
8"
1. PLACE BOTTOM OF SIGN 5'-0" ABOVE GRADE.
2. MOUNT ON STANDARD "T" RAIL WITH BASE POST HAVING A MIN.
WEIGHT OF 6.5 LBS.
NOTES:
VAN ACCESSIBILE SIGNAGE
NOT TO SCALEVAN ACCESSIBLE PARKING SIGN
NOT TO SCALE
12" x 18" x 1/16" ALUMINUM
HANDICAPPED PARKING SIGN TO
READ "RESERVED PARKING"
W/IDENTIFICATION SYMBOL, BOLT
TO CHANNEL W/3/8" CADMIUM
PLATED BOLTS, NUT, AND WASHERS
VAN
ACCESSIBLE
PARKING
RESERVED
TY
P)
EXPANSION JOINT
SIGN CHANNEL
AS SPECIFIED
PAVEMENT
3' -0
6"
1'-0"
COMPACTED
SUBGRADE
PARKING BLOCK
PARKING BLOCK
2'-0"
2'-0"
STEEL BOLLARD
NOT TO SCALE
PIPE COMPLETELY
FILLED WITH CONCRETE
(CONVEX AT TOP TO
SHED WATER)
6" Ø STEEL PIPE
PAINTED YELLOW
1/2" EXPANSION JOINT
CONCRETE FOUNDATION
NOTES:
3' -6
3'
-0 " M
IN
1"
6"
1. SHOULD BE CONCRETE AND PAINTED YELLOW.
RUBBER PARKING
BUMPER @ ADA STALLS
NOT TO SCALE
3-D VIEW
6'-0"
6"
4 1/2"
1. HARDWARE INSTALLATION HOLES ARE DRILLED WITH 1/2" DRILL BIT.
2. USE 14" X 1/2" REBAR SPIKE WITH 5/8" WASHER FOR ASPHALT OR
GRAVEL INSTALLATIONS. 6" X 1/2" LAG SCREW, WASHER AND SHORT
SHIELD FOR CONCRETE INSTALLATIONS.
3. USE 10 OUNCE OF EPOXY OR CONSTRUCTION ADHESIVE (I.E.
POLYURETHANE PL PREMIUM) FOR INSTALLATIONS WHERE NO
HARDWARE IS ALLOWED (I.E. PARKING GARAGES).
NOTES:
END VIEW
4 1/2"
6"
P (304) 624-4108
600 WHITE OAKS BLVD,
P.O. BOX 940
BRIDGEPORT, WV 26330
www.thethrashergroup.com
F (304) 624-7831
60-11019
JU
N
E 9, PR
EL
IM
IN
AR
Y
PL
AN
S
M O
U N
TA
IN
T R
A N
SI
T
A U
TH
O
R
IT
Y
B R
O
AD
S T, S U
M M
ER
SV
IL
LE
W V
C3.03
1. Design Code: International Building Code.
2. No provisions have been made for future horizontal or vertical expansion.
3. General Contractor shall verify all dimensions and conditions related to existing construction, existing services, and the site.
4. Construction loads shall not exceed design live loads. Shoring and re-shoring is the responsibility of the General Contractor.
5. The project is only stable in its completed form. The requirement for any and all bracing, shoring, or temporary supports and the planning sequences requiring them is the responsibility of the contractor.
Arrow Engineering's Scope of Services:
Arrow Engineering has been engaged as the structural engineer of record for this project. All modifications to the structure outside of what is explicitly shown herein, including interpretations of things not detailed on these drawings, must be reviewed by Arrow.
General Notes:
Design Data:
Wind:
Basic Design Wind Speed: V 115 mph
Allowable Stress Design Wind Speed: Vasd 100 mph
Risk Category: Risk Category II
Wind exposure classification: B
Internal Pressure Coefficient: ± 0.18
Exterior C&C Pressure 25 psf
Live Loads:
Commercial:
Assembly Areas and Common Spaces 100 psf
First Floor Corridors 100 psf
Corridors above First Floor 80 psf
Fire Escapes 100 psf
Offices 50 psf
Typical Roof 20 psf
Light Storage 20 psf
Snow Load Data:
Ground Snow Load: Pg 25 psf
Flat Roof Snow Load: Pf 20 psf (min)
Snow Exposure Factor: Ce 1.0
Thermal Factor: Ct 1.0
Snow Load Importance Factor: Is 1.0
Slope Factor(s): Cs 1.0
Drift surcharge load(s): pd where pd+pf>20psf
Width of snow drift: w 2 ft
Seismic Load Data:
Risk Category: Risk Category II
Seismic Importance Factor: IE 1.00
Mapped Spectral Response Accel. Parameters: Ss = 0.167; S1 = 0.062
Mapped Spectral Response Accel. Parameters: SDS= 0.267; SD1= 0.173
Seismic Site Class: D
Seismic Design Class: B
SFRS: Ex. Structure
Structure Weight: Ex. Structure
Response Modification Coefficient: R 3.0
Seismic Response Coefficient: Cs 1.1
Seismic Procedure Used: ELFP
Rain Load Data:
15-Minute Rainfall Intensity: 5.09 in./hr
60-Minute Rainfall Intensity: 2.52 in./hr
1. Masonry work shall conform to the TMS 402/602-16 Building Code
Requirements and Specifications for Masonry Structures, 2016 edition.
2. Maximum lateral deflection is to be limited to L/360.
3. Locate vertical control joints at 15 foot on center, maximum.
4. Mortar shall be ASTM C270, Type S, 2500 PSI minimum.
5. Grout shall conform to ASTM C476. Use fine grout for collar joints 1" wide or less and when grouting cells of hollow masonry units with or without vertical reinforcing. Use coarse grout when grouting bond beams.
6. Below load bearing beams / joists, provide a 32" x 16" section of solid masonry or solid grouted masonry. Below columns provide a 32" wide section of solid masonry or solid grouted masonry from bearing to foundation.
7. Horizontal reinforcing in all non-reinforced walls shall be truss type with 3/16" side rods and #9 gage cross rods. For all reinforced walls, ladder type 3/16 " side rods and #9 gage cross rods. Space reinforcing at 16" OC.
8. All reinforcing bars shall be ASTM A615, Grade 60.
9. Lay each block with full mortar coverage on head, bed (face shells), and webs, unless otherwise noted.
10. All masonry walls shall have a continuous bond beam course set at the top of each wall, at each intersecting floor level, or at 12' maximum spacing. Bond beam shall be comprised of (2) #4 continuous bars unless otherwise noted.
11. Grout solid all air spaces and the cells of all blocks below grade.
12. Any opening in masonry shall have a lintel placed at the top of it and bear a minimum of 4" on each side. All lintels over 24" long shall be steel or shall be engineered for the specific opening requirements. Do not place any openings within 36" of corners or closer than 8" to foundation or floor intersections.
13. Minimum quality assurance requirements shall be per Table1.15.2, ACI
530/ASCE5/TMS402.
14. Lap splices in masonry shall conform to TMS 402/ACI 530/ASCE 5 Section
2.1.9.7.1.1. The minimum length of lap splices for reinforcing bars in tension or compression, ld, shall be:
#3 bar - 11"
#4 bar - 18"
#5 bar - 29"
#6 bar - 41"
#7 bar - 53"
#8 bar - 72"
#9 bar - 92"
15. All reinforcement welding shall conform to AWS D1.4. Welded splices shall be of ASTM A706 steel reinforcement. Reinforcement larger than No. 9 (M #29) shall be spliced using mechanical connections in accordance with section
2.1.9.7.3.
Masonry:
1. Contractor assumes responsibility for job site conditions, including safety of all persons, property, and condition of materials, during the course of work and for the duration of the project. The contractor shall indemnify and hold Owner and Structural Engineer harmless from any and all liability, real or alleged, in connection with the performance of the work on this project, excepting for liability arising from the sole negligence of Owner or Structural Engineer.
2. The structural engineers work as presented in these documents represents the finished structure. Where deemed necessary to convey the intent of the structural engineer's design, information regarding the existing structure may be provided on these documents; however it is the responsibility of the contractor to verify all existing conditions and dimensions. The contractor shall provide all measures necessary to protect the new and existing structure during construction. Such measures shall include, but not be limited to: protection of subgrade from freezing conditions, bracing of elements, shoring for loads due to construction equipment, temporary structures, and partially completed work.
The contractor shall also assume responsibility for all temporary shoring, falsework, or required bracing to accomplish this work.
3. Observation visits to the site by structural engineer shall not include inspection of any item and a third party inspector shall complete all required inspections of the site.
4. The means and methods of construction rest solely in the responsibility of the contractor and the structural engineer has no control over or charge of these items nor shall not be responsible in any way for construction means, methods, techniques, sequences, or procedures, or safety or safety precautions and programs in connection with any construction activities, since these are solely contractor’s responsibility.
5. The structural engineer will not be held responsible for the contractor's schedule or ability to carry out any construction activities in accordance with the contract documents or their own agreed upon timeline with the owner. Nor shall the structural engineer have control over or charge of actions of Contractor, Subcontractor, or any of their Agents, or employees, or any other persons performing portions of any construction activities. All inquiries to the engineer that arise during construction and all submittal reviews shall be allotted 14 days for responses.
Construction Means & Methods:
17. The structural steel fabricator shall provide for vertical and horizontal adjustment of all support assemblies.
18. Anchor bolts must meet ASTM A1554 gr. 36 specifications and be 3/4" diameter (unless otherwise indicated). A minimum of (4) anchor bolts are required at each baseplate unless noted otherwise.
19. Additional miscellaneous structural steel may be required to support other elements specified on the contract drawings. The requirement, design, and inclusion of these members is the responsibility for the General Contractor to coordinate and may not be included on these drawings. This may include shoring or support for other structural materials, equipment supports, miscellaneous embeds, etc. GC to review all the drawing packages of all disciplines for the need of miscellaneous steel.
20. Unless directed by the owner with consideration from Arrow Engineering, the steel fabricator shall be certified under the AISC quality Certification
Program.
21. All shear studs used in composite beams shall be 3/4" diameter and sized to be the height of the deck where they are used plus 1.5".
22. Column schedule is provided for general information only and may not include all columns located on the project.
23. Steel lintels taken from the provided table may be substituted for precast or steel angles of a different size / configuration provided that the alternate design is submitted to the Arrow Engineering for approval prior to construction.
24. Where required, RTU or HVAC equipment may require supports not specified in the structural contract drawings either because that information was not available to the structural engineer during design or was outside the scope of the structural engineer's responsibility. In such cases, the general contractor or the HVAC's engineer shall be responsible for providing framing or support for these units and submitting reaction information to Arrow Engineering for acceptance prior to beginning work.
25. Where required, masonry shall be supported by steel shelf angles designed and detailed to support masonry loads. Shelf angles must not exceed 30 ft and shall not continue beyond masonry, concrete, or building joints. Splices between shelf angles shall be made by complete groove weld or butt weld.
Structural and Miscellaneous Steel:
1. The project manual shall govern all submittal requirements.
2. The general contractor shall review, check, and stamp "Approved" all shop drawings prior to submitting them to the Architect. Shop drawings which have not been stamped "Approved" by the General Contractor do not conform to the requirements of the Contract Documents and will be rejected.
3. The General Contractor shall provide a shop drawing submittal schedule for anticipated submittals at least two weeks prior to submittal of the first set of shop drawings.
4. Submittals including shop drawings must be approved prior to the start of fabrication. All parties proceed at their own risk without approval on submittals.
The maximum turn-around time for shop drawings will be two weeks (ten working days) from the date of receipt to Arrow Engineering to the date of return delivery. The general contractor is encouraged to communicate with
Arrow on the need for faster approval times or when larger amounts of submittals are anticipated. All efforts will be made to expedite approval when requested.
5. Reproducing Arrow's drawings in whole or in part for use in shop drawings is cause for rejection of the entire submittal. All shop drawings and details shall be original and complete.
6. Electronic copies of Arrow's drawings may be available on a case-by-case basis for an additional charge. Requests for files must be submitted with as much lead time as other submittals.
An outline summary of the expected submittals and shop drawings is provided below (the requirements of the project manual, if provided, govern):
- Structural Steel Shop Drawings
- Helical Pile Product Data
- Reinforcement Shop Drawings
- Concrete Mix Design
- Premanufactured Canopy Shop Drawings and Reactions
- Cold-Formed Steel Connectors
Shop Drawing and Submittal Requirements:
1. No provision of any referenced standard specification, manual or code
(whether or not specifically incorporated by reference in the contract documents) shall be effective to change the duties and responsibilities of owner, contractor, engineer, supplier, or any of their consultants, agents, or employees from those set forth in the contract documents. Nor shall it be effective to assign to the structural engineer of record (or any of the structural engineer of record's consultants, agents, or employees) any duty or authority to supervise or direct the furnishing or performance of the work or any duty or authority to undertake responsibilities contrary to the provisions or the contract documents.
2. Contractor shall review the project site and contract documents and warrants that it has the capacity to complete the project as planned for the project budget and within the timeline allotted to the owner.
3. Contract documents include those which are published directly by Arrow
Engineering including by not limited to, the structural documents (drawings and specifications). They do not include shop drawing, vendor drawings, or materials prepared and submitted by the contractor. Any acceptance of shop drawings or vendor supplied documents is for general conformance with Arrow's intent only.
4. Reference to standard specifications or any technical society, organization, or association or to codes of local or state authorities, shall mean the latest standard, code, specification or tentative specification adopted at the date of taking bids, unless specifically stated otherwise.
5. Where a conflict occurs within the contract documents to any recognizable material specification or building code, the strictest requirement shall govern.
6. Contractor shall obtain and coordinate edge of slab and roof deck edge dimensions with other disciplines (which may include vendor supplied information only available after bidding), opening locations and size, depressed slab locations and extents, slab slopes, curb locations, and non-structural wall locations. Architect/Structural engineer shall be notified of any discrepancy or omission. In the event of discrepancies, the non-structural architectural details shall govern.
7. The responsibility for all means, methods, sequences, techniques, and procedures used during construction is the responsibility of the contractor.
8. Contractor has sole responsibility to comply with all OSHA regulations.
9. The following list of items are not the responsibility of Arrow Engineering and have not been included in the scope of work (unless noted otherwise). These items are considered to be a delegated design under the responsibility of the contractors. All work for these items shall be completed under the direction of a licensed Professional Engineer in the state where the work is located and submitted to Arrow Engineering for approval prior to beginning work.
- Steel, concrete pan, or timber framed stairs and their connections
- Guardrail and handrail
- Cold formed metal framing
- Furnishing and finishes
- Storage or shelf systems
- Waterproofing or thermal envelope details below or above grade
- Elevator rail and hoist coordination requirements
Performance and Quality Requirements:
1. Where provided, dimensions related to existing conditions have been provided for general reference only based on assumed data, information from the original documents, previous design work, or information gathered during field investigations by Arrow Engineering. The information shown may not accurately depict all existing conditions related to construction.
2. Contractor shall verify all existing dimensions and elevations and shall notify
Arrow Engineering for any discrepancies.
Existing Conditions:
1. Foundation design is based on the recommendations from the geotechnical report prepared by American Geotech, Inc dated February 2023. The geotechnical report is considered complete and trustworthy for the purpose of the design contained herein. It shall be considered to be part of the construction documents for this project.
2. As excavation occurs on the project site, unforeseen conditions may become evident. Arrow Engineering reserves the right to redesign the foundations as required if unforeseen geotechnical conditions are discovered.
3. The foundations for this project are spread and/or continuous bearing footings at the rear addition and grade beams/helical piles at front addition. If suitable soil is not encountered (suitable being defined as soil of the type and characteristics of that which the foundation recommendations within the
Geotechnical Report are based on), it is required that the contractor over excavate until such bearing can be assured - or as directed by the project's
Geotechnical Engineer of Record - and a lean concrete pad be placed between the strata of suitable soil and the recommended bottom of footing elevation.
Lean concrete used here shall have a minimum 28-day compressive strength of
3,000 PSI or better. The dimension of this pad shall be at least the same dimensions of the footing in question. The spread foundations for this project were designed with an allowable bearing capacity of 2,000 PSF.
4. Contractor is responsible for notifying Arrow Engineering of any unusual soil conditions that are in variance with the test borings which also includes ground water, substandard bearing material, or obstructions.
5. All below grade foundation walls are to be considered stable only when supported at the next floor level and backfilling against them until such framing is in place is prohibited unless otherwise noted. In lieu of connection to the framing above, temporary shoring or bracing may be utilized. The design of such shoring is the responsibility of the contractor and must be approved by Arrow
Engineering prior to its conception. Any shoring used must be designed and sealed by a Professional Engineer in the state where the project is located and evidence of such submitted to Arrow for approval.
6. The backfill behind all foundation walls has been assumed to be 'dry' granular type with a maximum density of 75 pcf. A continuous foundation drain is required behind all below grade walls even if not shown on the structural drawings. Notify engineer if these assumptions are not followed.
7. All recommendations of the Geotechnical Report must be adhered to.
8. "Wet setting" of reinforcing or anchor bolts is prohibited. All reinforcing or anchor bolts must be securely placed prior to pouring.
9. The subgrade under slabs-on-grade and foundations must be compacted to
98% of optimum laboratory density in accordance with ASTM D698 Standard
Proctor Method. Place fill in 6" to 8" lifts and compact with vibratory tamping equipment. The provisions of the geotechnical report govern for any exceptions to this requirement.
10. Contractor shall locate all underground utilities prior to beginning excavation.
11. When excavations approach the ground water level, the water level shall be continuously lowered by an acceptable dewatering system so that the water level is maintained continuously a minimum of 2'-0" below the excavation.
12. Shale containing pyrites must be protected as indicated in the Geotechnical
Report. Structural fill must be screened and shall not contain any pyrites in it.
13. All recommendations and installations for helical piles should meet the requirements set by the manufacturer and the geotechnical report. All brackets, connections, and assemblies is the responsibility of the contractor that the helical piers meet or exceed the capacities noted on the contract documents.
Foundation and Footings:
1. All structural steel work shall be done according to the "Specifications for the
Design, Fabrication, and Erection of Structural Steel Buildings" (14th Edition) of the AISC.
2. Structural steel shall conform to the following:
- Wide flange shapes and WT's: ASTM A992, Fy = 50 ksi
- Channels, Angles, Plates: ASTM A36, Fy = 36 ksi
- HSS Square Tubes: ASTM A500 Gr. C, Fy = 50 ksi
- HSS Round Tubes: ASTM A500 Gr. C, Fy = 46 ksi
- Pipe: ASTM A53, Fy = 35 ksi
3. For any connection not explicitly detailed on the drawings, the responsibility for connection design shall be delegated to the Connection Design Engineer employed by the fabricator or owner. The Connection Design Engineer (CDE) shall be a registered Professional Engineer in good standing licensed in the state where the project is located. The CDE shall be held in responsible charge for the design, detailing, and proper implementation and coordination of all such connections as part of fabricator's preparation of shop drawings. Where connection has not been detailed in these documents, reaction forces have been provided. Where reaction forces have not been provided, CDE shall design connections for shear per the table below. Where there is a conflict or non-specific condition, specific reaction forces will be provided via RFI at the CDE's request.
Connection Shear Reaction Table:
W8's = 10 kips
W10's = 12 kips
W12's = 16 kips
W14's = 18 kips
W16's = 20 kips
W18's = 22 kips
W21's = 24 kips
W24's = 26 kips
4. Connections requiring moment reaction capacity (often designated with a filled triangle near the joint on the plans) shall be designed for specified moment in conjunction with the required shear reaction (either provided or taken from minimums). Where moment reactions are not provided, design shall be based on the moment capacity of the member for the unbraced compression flange dimension.
5. Connections requiring axial reaction capacity shall be designed to develop the limiting axial capacity of the member in either compression or tension.
6. All bolts shall be ASTM A307 or ASTM A325 type per specified connection criteria of either slip-critical or bearing type. All bolts shall be matched with a nut and washer of the appropriate grade and size. Use slip critical connections for all wind bracing connections or connections subject to load reversal. Threads shall be included in the shear plane unless certified by Arrow Engineering or
Connection Design Engineer.
7. The CDE shall submit to the EOR a copy of the sealed design calculations for all delegated connections with the fabricator's shop drawings for approval prior to the fabricator beginning any fabrication work. Shop drawings will not be reviewed if the CDE seal does not accompany the submittal if required.
8. All bolted connections shall be made according to the AISC Manual Part 9. All connections shall be a minimum of half the depth of the beam. Where beams frame into columns, a full depth connection shall be used. Minimum thickness of any connection plate or angle shall be 3/8" unless noted otherwise.
9. Calculations are not needed for simple shear connections if the method used to achieve those connections are pre-qualified from the tables found in Part 10 of the AISC Steel Construction Manual. The steel shop drawings should include all relevant and pertinent information for these connections related to this table including the reference / table number the connection is derived from. A CDE shall still provide a statement certifying compliance for all connections that fall into this category with the shop drawings submittal.
10. When the design of simple shear connections as noted above is required to meet minimum shear reaction loads for composite beam connections, the connection shall be designed for the following shear value:
Beam depth > 21"......................... 1.5 x Reaction
14" < Beam depth < 21"................2.0 x Reaction
Beam depth < 14".......................... 2.5 x Reaction
11. Hangers, kickers, and miscellaneous equipment connections shall be shall be designed by CDE or equipment supplier to provide for the full allowable tensile capacity of the member or attachment to the equipment.
12. The use of slotted holes for bolted connections to aid in erection is permitted in specific locations with explicit approval from Arrow Engineering.
Slotted hole dimensions must be sized per the specification of the AISC manual for long or short slotted holes. Where slotted holes are used, the bolt must be welded into place after erection or must be designed as a slip-critical connection. Requests to change the contract documents once completed to accommodate slip-critical connections where they were originally designed as bearing may incur additional charges.
13. All welding shall be in strict accordance with the standards of the AWS D1.1 and the AISC Manual. Use E70XX electrodes.
14. All steel to be shop primed…
This is the start of the file's text. The full file is on GovTribe.