Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A0001.pdf | ||
| Sandstone_ProjectAreaMap_NoSites.pdf | ||
| TeddyCreek_ProjectAreaMap.pdf | ||
| SuppSpecsTeddyCreek.docx | DOCX document | |
| WD 2015-5437 CO r.13.pdf | ||
| WD 2015-5413 WY r.12.pdf | ||
| WD 2015-5357 NE r.14.pdf | ||
| Sandstone TO VicinityMap.pdf | ||
| SuppSpecs_Sandstone.docx | DOCX document | |
| Vulcan_ProjectArea.pdf | ||
| TeddyCreek_VicinityMap.pdf | ||
| CR_East Hog CR_SuppSpecs (bd).docx | DOCX document | |
| BKF_MBTB_NNF _2021_Heritage IDIQ_- RFP Final.pdf | ||
| WD 2015-5439 CO r.13.pdf | ||
| WD 2015-5377 SD r.14.pdf | ||
| WD 2015-5355 NE r.14.pdf | ||
| Vulcan_VicinityMap.pdf | ||
| EastHogTO_ProjectArea.pdf | ||
| EastHogTO_VicinityMap.pdf | ||
| PWS.pdf | ||
| WD 2015-5367 SD r.14.pdf | ||
| WD 2015-5411 WY r.12.pdf |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TASK ORDER NUMBER: 03-2021-CR
HERITAGE IDIQ TASK ORDER
TASK ORDER NUMBER: 03-2021-CR
TASK ORDER NAME:
Vulcan Vegetation Management Heritage Survey
All terms and conditions of the master Heritage IDIQ are hereby included by reference and are a part of this task order.
· Final Report Due: 09/30/2021 Work will be performed in Carbon County of Wyoming.
GENERAL SPECIFICATIONS:
The purpose of this order is to secure services to conduct a Level/Class III Survey (as defined in Section C.6 of the Performance Work Statement) on Brush Creek Hayden Ranger District, Medicine Bow – Routt National Forests, Thunder Basin National Grassland. The contractor shall provide all material, personnel, equipment, and supplies to conduct the survey listed under this order.
PROJECT LOCATION:
The project areas are located approximately 72 miles west southwest of Laramie, WY. Project areas are 11 miles northwest of Encampment, Wyoming, north of Hwy 70 by 4 miles (see attached vicinity and project location map). To access the project areas from Encampment, WY head west on Wyoming Highway 70 for 6 miles. Then head north on National Forest System Route (NFSR) 443, Jerry Accord Road. Follow NFSR 443 for approximately 12 miles. NFSR 443 bisects the southernmost portion of the project areas. Total driving miles from Laramie to project areas are about 119 miles.
Legal Locations for Bid Item 3:
Township 15 N Range 86 W Sections 13, 24 – 26, 35, 36 Township 15 N Range 85 W Sections 19, 20, 29, 30, 31, 32
SUPPLEMENTAL INFORMATION:
Bid Item 01:
· There is a Level/Class III Survey that will need bid on for this Task Order, which is required for the Vulcan Vegetation Management project on the Brush Creek Hayden Ranger District of the Medicine Bow – Routt National Forests, Thunder Basin National Grassland, as defined in Section C.6 of the Performance Work Statement. The Level/Class III survey includes a total of 1856 acres that require a cultural resource inventory and archeological field survey to identify, record, and evaluate the eligibility of all historic properties within the survey area for listing on the National Register of Historic Places.
Previous cultural resource inventories and archeological surveys have been conducted in and near the East Hog Vegetation Management Heritage Survey area, and these data can be accessed through WyoTrack with the appropriate access permissions.
Bid Item 02:
· There is one (1) site evaluation (full site re-record) needed for site 48CR3534 that will need bid on for this Task Order as defined in Section C.6.2.5 of the Performance Work Statement.
1) Site 48CR3534 is an historic site consisting of a cabin with a collapsed fireplace and historic debris. It is in T15N R86W Section 13 and is approximately 20m2 in area. The site was initially recorded in 1981 and has not been re-recorded since.
* Additional site data can be accessed through WyoTrack with appropriate permissions.
Pricing for 03-2021-CR Vulcan Vegetation Management Heritage Survey:
CONTRACTOR'S OFFER (to be completed by contractor):
Contract Number: TBD Contractor: ________________________________
| MBRTB-0001 |
| Level/Class III Survey |
| 1856 |
| Acre |
| $ |
| $ |
| MBRTB-0003 |
| Site Evaluations (non-Survey) |
| 1 |
| Each |
| $ |
| $ |
TASK ORDER TOTAL
Special Considerations:
Supplemental Information is included with this package via E-mail. All questions must be directed to the Contracting Officer (CO). Contact the CO with any questions or if larger maps are needed.
Request for Pricing (EPrice) cover sheet is due to the CO by the same response Date & Time of IDIQ Solicitation.
If the contractor cannot meet the “Desired Start Date” and the “Contract Completion Time” identified in the Task Order, an alternate schedule must accompany your pricing (address under “Comments” section below). Contractors are required to provide pricing on every Task Order. The contractor’s ability to meet the “Desired Start Date” and the “Contract Completion Time”, is an evaluation factor considered in the procedures used for deciding upon final award of a task order.
Comments:
Contractor's Signature/Company: /s/ Date: