CR_SuppSpecs_Vulcan.docx

DOCX document 30 KB Posted

Attached to
BLK-MBR-NEB Heritage IDIQ Federal contract opportunity
Solicitation number
1240LP21R0003
Issued by
Department of Agriculture Forest Service

View the file

Other files for this federal contract opportunity

Other files attached to BLK-MBR-NEB Heritage IDIQ, newest first.
File Type Posted
A0001.pdf PDF
Sandstone_ProjectAreaMap_NoSites.pdf PDF
TeddyCreek_ProjectAreaMap.pdf PDF
SuppSpecsTeddyCreek.docx DOCX document
WD 2015-5437 CO r.13.pdf PDF
WD 2015-5413 WY r.12.pdf PDF
WD 2015-5357 NE r.14.pdf PDF
Sandstone TO VicinityMap.pdf PDF
SuppSpecs_Sandstone.docx DOCX document
Vulcan_ProjectArea.pdf PDF
TeddyCreek_VicinityMap.pdf PDF
CR_East Hog CR_SuppSpecs (bd).docx DOCX document
BKF_MBTB_NNF _2021_Heritage IDIQ_- RFP Final.pdf PDF
WD 2015-5439 CO r.13.pdf PDF
WD 2015-5377 SD r.14.pdf PDF
WD 2015-5355 NE r.14.pdf PDF
Vulcan_VicinityMap.pdf PDF
EastHogTO_ProjectArea.pdf PDF
EastHogTO_VicinityMap.pdf PDF
PWS.pdf PDF
WD 2015-5367 SD r.14.pdf PDF
WD 2015-5411 WY r.12.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TASK ORDER NUMBER: 03-2021-CR

HERITAGE IDIQ TASK ORDER

TASK ORDER NUMBER: 03-2021-CR

TASK ORDER NAME:

Vulcan Vegetation Management Heritage Survey

All terms and conditions of the master Heritage IDIQ are hereby included by reference and are a part of this task order.

· Final Report Due: 09/30/2021 Work will be performed in Carbon County of Wyoming.

GENERAL SPECIFICATIONS:

The purpose of this order is to secure services to conduct a Level/Class III Survey (as defined in Section C.6 of the Performance Work Statement) on Brush Creek Hayden Ranger District, Medicine Bow – Routt National Forests, Thunder Basin National Grassland. The contractor shall provide all material, personnel, equipment, and supplies to conduct the survey listed under this order.

PROJECT LOCATION:

The project areas are located approximately 72 miles west southwest of Laramie, WY. Project areas are 11 miles northwest of Encampment, Wyoming, north of Hwy 70 by 4 miles (see attached vicinity and project location map). To access the project areas from Encampment, WY head west on Wyoming Highway 70 for 6 miles. Then head north on National Forest System Route (NFSR) 443, Jerry Accord Road. Follow NFSR 443 for approximately 12 miles. NFSR 443 bisects the southernmost portion of the project areas. Total driving miles from Laramie to project areas are about 119 miles.

Legal Locations for Bid Item 3:

Township 15 N Range 86 W Sections 13, 24 – 26, 35, 36 Township 15 N Range 85 W Sections 19, 20, 29, 30, 31, 32

SUPPLEMENTAL INFORMATION:

Bid Item 01:

· There is a Level/Class III Survey that will need bid on for this Task Order, which is required for the Vulcan Vegetation Management project on the Brush Creek Hayden Ranger District of the Medicine Bow – Routt National Forests, Thunder Basin National Grassland, as defined in Section C.6 of the Performance Work Statement. The Level/Class III survey includes a total of 1856 acres that require a cultural resource inventory and archeological field survey to identify, record, and evaluate the eligibility of all historic properties within the survey area for listing on the National Register of Historic Places.

Previous cultural resource inventories and archeological surveys have been conducted in and near the East Hog Vegetation Management Heritage Survey area, and these data can be accessed through WyoTrack with the appropriate access permissions.

Bid Item 02:

· There is one (1) site evaluation (full site re-record) needed for site 48CR3534 that will need bid on for this Task Order as defined in Section C.6.2.5 of the Performance Work Statement.

1) Site 48CR3534 is an historic site consisting of a cabin with a collapsed fireplace and historic debris. It is in T15N R86W Section 13 and is approximately 20m2 in area. The site was initially recorded in 1981 and has not been re-recorded since.

* Additional site data can be accessed through WyoTrack with appropriate permissions.

Pricing for 03-2021-CR Vulcan Vegetation Management Heritage Survey:

CONTRACTOR'S OFFER (to be completed by contractor):

Contract Number: TBD Contractor: ________________________________

MBRTB-0001
Level/Class III Survey
1856
Acre
$
$
MBRTB-0003
Site Evaluations (non-Survey)
1
Each
$
$

TASK ORDER TOTAL

Special Considerations:

Supplemental Information is included with this package via E-mail. All questions must be directed to the Contracting Officer (CO). Contact the CO with any questions or if larger maps are needed.

Request for Pricing (EPrice) cover sheet is due to the CO by the same response Date & Time of IDIQ Solicitation.

If the contractor cannot meet the “Desired Start Date” and the “Contract Completion Time” identified in the Task Order, an alternate schedule must accompany your pricing (address under “Comments” section below). Contractors are required to provide pricing on every Task Order. The contractor’s ability to meet the “Desired Start Date” and the “Contract Completion Time”, is an evaluation factor considered in the procedures used for deciding upon final award of a task order.

Comments:

Contractor's Signature/Company: /s/ Date: