CR_East Hog CR_SuppSpecs (bd).docx
DOCX document 33 KB Posted
- Attached to
- BLK-MBR-NEB Heritage IDIQ Federal contract opportunity
- Solicitation number
- 1240LP21R0003
- Issued by
- Department of Agriculture Forest Service
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A0001.pdf | ||
| WD 2015-5355 NE r.14.pdf | ||
| Sandstone_ProjectAreaMap_NoSites.pdf | ||
| CR_SuppSpecs_Vulcan.docx | DOCX document | |
| TeddyCreek_ProjectAreaMap.pdf | ||
| SuppSpecsTeddyCreek.docx | DOCX document | |
| WD 2015-5437 CO r.13.pdf | ||
| WD 2015-5413 WY r.12.pdf | ||
| WD 2015-5357 NE r.14.pdf | ||
| Vulcan_VicinityMap.pdf | ||
| EastHogTO_ProjectArea.pdf | ||
| EastHogTO_VicinityMap.pdf | ||
| PWS.pdf | ||
| WD 2015-5367 SD r.14.pdf | ||
| WD 2015-5411 WY r.12.pdf | ||
| Sandstone TO VicinityMap.pdf | ||
| SuppSpecs_Sandstone.docx | DOCX document | |
| Vulcan_ProjectArea.pdf | ||
| TeddyCreek_VicinityMap.pdf | ||
| BKF_MBTB_NNF _2021_Heritage IDIQ_- RFP Final.pdf | ||
| WD 2015-5439 CO r.13.pdf | ||
| WD 2015-5377 SD r.14.pdf |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TASK ORDER NUMBER: 01-2021-CR
HERITAGE IDIQ TASK ORDER
TASK ORDER NUMBER: 01-2021-CR
TASK ORDER NAME:
East Hog Vegetation Management Heritage Survey
All terms and conditions of the master Heritage IDIQ are hereby included by reference and are a part of this task order.
· Final Report Due: 9/30/2021 Work will be performed in Carbon County of Wyoming.
GENERAL SPECIFICATIONS:
The purpose of this order is to secure services to conduct a Level/Class III Survey (as defined in Section C.6 of the Performance Work Statement) on the Brush Creek Hayden Ranger District, Medicine Bow – Routt National Forests, Thunder Basin National Grassland. The contractor shall provide all material, personnel, equipment, and supplies to conduct the survey listed under this order.
PROJECT LOCATION:
The project areas are located approximately 80 miles directly west-southwest of Laramie, Wyoming (see attached vicinity and project location map). To access the project areas, take WY-230 west from Laramie to Encampment. Then proceed southwest on WY-70 to Forest Service Road 550 in Carbon County. Then follow Forest Road 550 for approximately 35 miles and then turn left on Forest Road 5502C. Travel northeast about 0.9 miles to project area on Forest Road 5502C. Total driving miles from Laramie to project areas are about 107 miles.
Legal Locations for Bid Item 3:
Township 13 N Range 84 W Sections 32 Township 12 N Range 84 W Sections 4, 5, 8, 9, 10, 15
SUPPLEMENTAL INFORMATION:
Bid Item 01:
· There is a Level/Class III Survey that will need bid on for this Task Order, which is required for the East Hog Vegetation Management project on the Brush Creek Hayden Ranger District of the Medicine Bow – Routt National Forests, Thunder Basin National Grassland, as defined in Section C.6 of the Performance Work Statement. The Level/Class III survey includes a total of 1167 acres that require a cultural resource inventory and archeological field survey to identify, record, and evaluate the eligibility of all historic properties within the survey area for listing on the National Register of Historic Places.
Previous cultural resource inventories and archeological surveys have been conducted in and near the East Hog Vegetation Management Heritage Survey area. These data and related information can be accessed in WyoTrack with access permissions.
Bid Item 02:
· There are two (2) previously documented eligible prehistoric and/or historic sites (48CR1273, 48CR4361) that require site monitoring for determining site conditions and a Condition Report added to WyoTrack for each site that will need bid on Task Order as defined in Section C.6.2.8 of the Performance Work Statement.
1) Site 48CR1273 is an historic site located in Section 8 and 9 or T12N, R84W. The site is approximately 3500 sq. meters in area. The site was initially recorded in 1979, then in 1983 and then again in 2010.
2) Site 48CR4361 is a multicomponent site located in Section 15 T12N, R84W.
*Additional site data can be accessed through WyoTrack with appropriate permissions.
Bid Item 03:
· There are six (6) site evaluations (full site re-record) needed for sites 48CR4360, 48CR4535, 48CR4846, 48CR4847, 48CR4849, 48CR9010, that will need bid on for this Task Order as defined in Section C.6.2.5 of the Performance Work Statement.
1) Site 48CR4360 is a linear historic site located in part in Section 15 T12N, R84W. The site extends for about 1000 meters through the survey area and continues to the southwest. The width of the site’s corridor varies but averages about 30 meters wide. The site was initially recorded in 1986. The site is also numbered as 5JA610.
2) Site 48CR4535 is a prehistoric site located in Section 9, T12N, R84W.
3) Site 48CR4846 is a small historic site located in Section 15, T12N, R84W.
4) Site 48CR4847 is a small historic site located in Section 15, T12N, R84W.
5) Site 48CR4849 is a small historic site located in Section 5, T12N, R84W.
6) Site 48CR9010 is an historic site located in Section 9, T12N, R84W.
*Additional site data can be accessed through WyoTrack with appropriate permissions.
Pricing for 01-2021-CR East Hog Vegetation Management Heritage Survey:
CONTRACTOR'S OFFER (to be completed by contractor):
Contract Number: TBD Contractor: _______________________________
| MBRTB-0001 |
| Level/Class III Survey |
| 1167 |
| Acre |
| $ |
| $ |
| MBRTB-0002 |
| Site Monitoring (non-survey) |
| 1 |
| Each |
| $ |
| $ |
| MBRTB-0003 |
| Site Evaluations (non-Survey) |
| 6 |
| Each |
| $ |
| $ |
TASK ORDER TOTAL
Special Considerations:
Supplemental Information is included with this package. All questions must be directed to the Contracting Officer (CO). Contact the CO with any questions or if larger maps are needed.
Request for Pricing (EPrice) cover sheet is due to the CO by the same response Date & Time of IDIQ Solicitation.
If the contractor cannot meet the “Desired Start Date” and the “Contract Completion Time” identified in the Task Order, an alternate schedule must accompany your pricing (address under “Comments” section below). Contractors are required to provide pricing on every Task Order. The contractor’s ability to meet the “Desired Start Date” and the “Contract Completion Time”, is an evaluation factor considered in the procedures used for deciding upon final award of a task order.
Comments:
Contractor's Signature/Company: /s/ Date: