Att.J.23R1_-_Drawings_and_Specifications.pdf
PDF 6 MB Posted
- Solicitation number
- CPFMD-17-0831
- Issued by
- District of Columbia Government
About this file
Att. J.23R1 - Drawings and Specs
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HC
RA M P U P : 5 "
RA M P U P : 3 "
RA
M P
U P:
RA
M P
U P:
0"
HC
STAIR #8 STAIR #9
STAIR #7STAIR #6
STAIR #5STAIR #4STAIR #3
STAIR #1
STAIR #2
GA
GC
GL
GFI
GYP BD
gage, gauge general contract(or) glass, glazing ground fault interrupter gypsum wall board
NAT
NRC
NOM
N
NIC
NTS
natural noise reduction coefficient nominal north not in contract not to scale
OC
OPG
OPP
OA
OH
on center(s) opening opposite overall overhead
FAB
FT
FIN
FFE
FFL
FA
FE
FEC
FHS
FLR
FLUOR
FH
FS
FW
FBO
FBT
FUT
fabric feet, foot finish(ed) finished floor elevation finished floor line fire alarm fire extinguisher fire extinguisher cab.
fire hose station/ fire standpipe floor(ing) fluorescent full height full size full width furnished by others furnished by tenant future
PNT
PNL
PAR
PBD
PTN
PED
PLAM
PWD
PT
POL
P/D/T
PFAB
PFIN
PREP
paint(ed) panel parallel particle board partition pedestal plastic laminate plywood point polished power/data/telephone prefabricate(d) prefinished preparation
QT quarry tile angle at centerline number plate round/phase (elec.)
AFF
ACT
ADJ
A/C
ALT
above finished floor acoustical tile adjacent air conditioning alternate
BLK
BLKG
block blocking
CPT
CLG
CT
CLR
COL
CONC
CMU
CONST
CONT
carpet(ed) ceiling ceramic tile clear(ance) column concrete concrete masonry unit construction continuous or continue
DTL
DIAG
DIAM
DIM
DIV
DBL
DN
DWR
DWG
detail diagonal diameter dimension division double down drawer drawing
EA
E
ELEC
EL
ELEV
EMER
ENCL
EQ
EQPT
EST
EXH
EXIST.
EXP
EXT
each east electric(al) elevation elevator emergency enclose(ure) equal equipment estimate exhaust existing exposed exterior
HDW
HWD
HDR
HTG
HVAC
HT
HC
hardware hardwood header heating heating/ventilating/ air conditioning height hollow core
JC
JT
JB
janitor's closet joint junction box
KD
KO
knock down knock out
LBS
LAM
LAV
L
LT
LF
LG
pounds laminate(d) lavatory length light linear feet long
IN
INCL
INFO
ID
INST
INT
inch include(d), (ing) information inside diameter install(ed), (ation) interior
HM
HOR
hollow metal horizontal
MFR
MAS
MAX
MED
MET
MEZZ
MWK
MIN
MISC
MOD
MLDG
MTD
manufacture(r) masonry maximum medium metal mezzanine millwork minimum miscellaneous modular molding, moulding mount(ed), (ing)
RAD
REC
REF
REQ
RES
RA
REV
RH
RM
RO
R radius recessed reference require(d) resilient return air revision(s), revised right hand room rough opening riser
SCH
SEC
SEP CIR
SHT
SIM
SC
STC
S
SPKR
SPEC
SQ
SF
SS
STD
STL
SUS
SYS
schedule section separate circuit sheet similar solid core sound transmission class south speaker specification(s) square square feet stainless steel standard steel suspended system
TKBD
TEL
THK
T
TOS
TYP
tackboard telephone thick(ness) tread top of slab typical
UNF
UNO
VFY
VIF
VERT
VWC
VT
V unfinished unless noted otherwise verify verify in field vertical vinyl wall covering vinyl tile volt wainscoat wall to wall wall hung water closet watt weight west width, wide with without wood
WSCT
WTW
WH
WC
W
WT
W W W/ W/O
WD
ɸ
STANDARD ABBREVIATIONS
HIDDEN LINES OR ITEMS ABOVE
CENTERLINES, PROJECTED LINES
NOT IN CONTRACT (NIC)
EXISTING PARTITION TO REMAIN
EXISTING PARTITION TO BE DEMOLISHED
NEW CEILING-HIGH PARTITION
NEW PARTITION TO SLAB OR
STRUCTURE ABOVE
KEYPLAN
The District of Columbia Courts Capital Projects and Facilities Management Division 616 H. Street N.W.,Suite 622 Washington, D.C. 20001 Phone: 202.879.2801
Client
THE DISTRICT OF COLUMBIA COURTS
400 SOUTH MAPLE AVENUE, SUITE 230
Falls Church, VA 22046
Phone: 703.884.0030
Construction Management
MARKON SOLUTIONS
PROJECT TEAM
1505 Prince Street Suite 200 Alexandria, VA 22314 Phone: 703.836.9600
Architect IBI GROUP, Virginia
1130 Connecticut Ave. NW.Suite 750 Washington, D.C. 20036-3915
Phone: 202.296.6583
MEP Consultant
LORING CONSULTING ENGINEERS
1201 Lee Jackson Memorial Highway, Suite 215 Fairfax, VA 22033
Phone: 703.251.2800
Fire Suppression Consultant Jensen Hughes
USE GROUP
CONSTRUCTION TYPE
HEIGHT/NO. STORIES:
HIGH RISE/ATRIUM:
FULLY SPRINKLERED:
SMOKE EVACUATION:
EFFECTED FLOOR AREA (GROSS):
OCCUPANT LOAD (TABULAR)
NO. OF EGRESS STAIRS
STAIR WIDTH PER RUN
MINIMUM SEPARATION BETWEEN STAIRS
ACTUAL SEPARATION BETWEEN STAIRS
MIXED USE
TYPE 1B, IBC 2000
6 STORIES ABOVE GRADE
YES
PARTIAL
NO
4571 SF.
BUSINESS: NONE
44"
200'
N/A
NO CHANGE
NO CHANGE
NO CHANGE
NO CHANGE
NO CHANGE
NO CHANGE
NO CHANGE
NO CHANGE
NO CHANGE
NO CHANGE
N/A
NO CHANGE
EXISTING BUILDING PROPOSED ALTERATION
PROJECT DATA/ CODE ANALYSIS
PARTITION REFERENCE
VICINITY MAP
H. CARL MOULTRIE COURTHOUSE
MUNICIPAL BUILDING 4T
H
ST
RE
ET
5T H
ST
RE
ET
6T H
ST
RE
ET
C STREET
D STREET
INDIANA AVE
STANDARD DRAWING SYMBOLS
LINE TYPE REFERENCE
NO
RT
H
NO
RT
H
PROJECT AREA
Elevation Reference
Top of Steel El: 10'-0" AFF
Description of Mark
Elevation Reference Dimension
Elevation Reference
Drawing Number
Sheet Number
Section Reference
Drawing Number
Sheet Number
Door Number Reference
Door Number Note: Where multiple suites are part of the Scope, refer to Door Schedule for full Door Number.
Blocking Reference
Indicates side(s) of partition to receive wood blocking for wall mounted eqpt. or furniture.
If no dimension is given, blocking extends full width of indicated partition.
B
Room Name & Number Reference
Room Number
210A
Column Grid Reference
Column Grid Reference Number
Partition Type
Partition Reference
A000
A
1A
Furnishing Reference
Keynote Reference
Terrazzo Base
Detail Reference
Finish Reference
Ax.xx
Drawing Number
Sheet Number
TYP.
Starting Point & Stopping Point
AK-01
TYP.
Keynote Reference Number (Prefix may vary)
XXX Item Reference for Millwork, Furniture, ETC...
x-1 Finish Type
Finish Reference
1 Revision Number
Hatching Reference
Not In Contract (NIC)
Gyp. Bd. Ceiling
New Millwork
NO
RT
H
PR
O
JE
CT
TI
TL
E
SH
EE
T
Date:
Scale:
Checked by:
Planned By:
Drawn by:
Do Not Scale this Drawing Contractors to Verify Dimensions on Site c
IB
I G ro up Pl ot te d:
This drawing and the design shown hereon are the property of IBI Group formally Gruzen Samton. The reproduction, copying, or other use of the drawing without their written consent is prohibited and any infringement will be subject to legal action.
Accepted By:
Capital Projects and Facilities Management Officer Contracting Officer District of Columbia Courts
SUBMISSION
RE
V
IS
IO
N S
ISSUED FOR DATE
NO. DESCRIPTION DATE BY
KEY PLAN
Pr oje ct Ti tle
A
RC
H
IT
EC
T
E
N G
IN
EE
R N
A M
E
L O
G O
Cl ien t N am e
APPROVALS DATE
Co ns tru cti on D oc um en ts for In ter ior
Im pr ov em en t t o:
Construction Documents for Interior Improvement to:
Location:
IBI
GROUP
IBI Group 1505 Prince Street, Suite 200 Alexandria VA 22314 United States tel 703 836 9600 fax 703.836.2484
HEALTH UNIT
09/13/2016
5T H
S T
RE
ET
6T H
S T
RE
ET
D STREET
C STREET
INDIANA AVE
H.CARL MOULTRIE
COURTHOUSE
MUNICIPAL
BUILDING
As indicated
9/ 6/
:3
0:
P M
BIM 360://2153 - DC Courts/HCMC_C Health Unit (IBIny).rvt
TYRONE HARLEY
JOSEPH ILARDI
Designer
A00002153-B.26
Di str ict of
C olu m bia
C ou rts Ca pi ta l P ro jec t a nd F ac ilit ies M an ag em en t D ivi sio n
COVER SHEET
ISSUE FOR PERMIT 12.12.16
H. Carl Moultrie I Courthouse Health Unit
H.
C ar l M ou ltr ie I C ou rth ou se
He alt h U nit
District of Columbia Courts Capital Project and Facilities
Management Division
ARCHITECTURAL INDEX OF DRAWINGS
Sheet Number Sheet Name
A0000 COVER SHEET X
A0001 GENERAL NOTES X
A0002 DOOR SCHEDULE & DETAILS X
A0003 PARTITION TYPES X
A0004 DEMOLITION PLAN X
A0005 REFLECTIVE CEILING DEMOLITION PLAN X
A0006 FLOOR PLAN X
A0007 REFLECTED CEILING PLAN X
A0008 POWER, DATA & TELEPHONE LOCATION PLAN X
A0008_B TELECOM & ELECTRICAL CLOSET LOCATION DIAGRAM AND GENERAL NOTES X
A0009 SWITCHING PLAN X
A0010 FINISH PLAN X
A0011 FURNITURE PLAN X
A0012 ENLARGED PANTRY PLAN, DETAILS, ELEVATIONS & SECTIONS X
A0013 ENLARGED RESTROOM PLAN DETAILS, ELEVATIONS & SECTIONS X
A0014 CEILING DETAILS X
A0015 WAITING ROOM MILLWORK COUNTER & GLAZING DETAILS X
A0016 ENLARGED EXAM ROOM & LACTATION ROOM DETAILS & ELEVATIONS X
A0017 MISCELLANEOUS DETAILS X
A0018 STORAGE ROOM SECTION & DETAILS X
A0019 PROGRAMMING PLAN AND SCHEDULE X
A0020 SIGNAGE PLAN, TYP. ELEVATIONS AND SCHEDULE X
District of Columbia Courts:
H.Carl Moultrie I Courthouse - C- Level 500 Indiana Avenue, Washington, D.C. 20001
ELECTRICAL INDEX OF DRAWINGS
Sheet
Number Sheet Name
E0000 ELECTRICAL COVER SHEET X
E0001 ELECTRICAL DEMOLITION PLANS X
E0002 ELECTRICAL FLOOR PLANS X
E0003 ELECTRICAL FIRE ALARM PLAN X
E0004 ELECTRICAL RISER DIAGRAM, DETAIL & SCHEDULES X
MECHANICAL INDEX OF DRAWINGS
Sheet
Number Sheet Name
M0000 MECHANICAL COVER SHEET X
M0001 MECHANICAL DEMOLITION AND NEW WORK FLOOR PLANS X
M0002 MECHANICAL SCHEDULES X
M0003 MECHANICAL DETAILS X
PLUMBING INDEX OF DRAWINGS
Sheet
Number Sheet Name
P000 PLUMBING COVER SHEET, NOTES & SCHEDULES X
P001 PLUMBING DEMOLITION & NEW WORK FLOOR PLANS X
P002 PLUMBING SCHEDULES, DETAILS & RISER DIAGRAM X
FIRE PROTECTION INDEX OF DRAWINGS
Sheet
Number Sheet Name
F001 FIRE SUPPRESSION DEMOLITION PLAN X
F002 FIRE SUPPRESSION NEW WORK PLAN X
ISSUE FOR CONSTRUCTION 09.05.17
Usable site area 1175 sf
1. See the Reflected Ceiling Plan for ceiling heights.
2. Unless indicated otherwise by the drawings, center all suspended ceilings in the space or spaces in which they occur such that the width of the perimeter tiles is greater than one-half of the width of a standard tile.
3. Unless noted otherwise, locate all new switches at 45" A.F.F. to center line of switch(is) in accordance with the ADA accessibility guidelines. All new switch locations to be as indicated by the engineering drawings.
4. Furnish and install in quantity and type all light fixtures together with all materials incidental thereto, as shown on the reflected ceiling plan, UNO. Locations of any item not shown or specifically located on the reflected ceiling plans shall be field coordinated with the Architect prior to installation.
5. Install multiple switch groupings in common gang boxes with barriers and common copperplates.
6. Coordinate the installation and verify the required location of any/all supplemental mechanical, electrical, or plumbing equipment. Furnish and install any required supplemental structure which may be required for the support of said equipment whether specifically noted in plan or not.
7. Supply finish trim for all ceiling mounted luminaries which is designed for use in the ceiling where it occurs.
8. Coordinate with light fixtures specifications and cut sheets for proper installation in the designated ceiling.
9. Fixtures on suspended ceiling shall be supported from the floor above by means of a minimum of 4 chains/wires per fixture; each chain capable of supporting 100 lbs.
10. Install all fixtures and wire fixtures to be connected to emergency circuits and exit lights based on applicable codes.
11. Mount ceiling recessed luminaires and devices as close to the center of ceiling tiles unless noted otherwise. Where conditions make it impractical or impossible to center a luminaire or device, notify and coordinate any such occurrences with the
Architect prior to the installation of said devices or any materials that are incidental thereto.
12. Perform selective demolition as required for the modification/installation of equipment and devices whether specifically noted in plan or not. Return the surrounding surfaces and substructure to "like-new" condition or replace as required to provide a suitable substrate for new finishes.
General Reflected Ceiling Notes
1. Install all wall mounted P/D/T devices vertically at 18" A.F.F. to centerline unless noted otherwise on the plans.
2. Electrical work and materials shall be in compliance with the National Electrical Code and all other related codes in use by the governing government agency(ies) at the time of construction. In the event of a conflict between the aforementioned requirements, the more restrictive shall apply.
3. All mounting heights indicated are to the centerline(s) of outlet(s), device(s) or equipment unless noted otherwise.
4. Outlets, or other devices, which are mounted on opposite sides of partitions shall not be mounted back to back.
5. Where core drilling is required, use (GPR) Ground Penetrating Radar for concrete slab to verify that the location to be drilled is free of obstructions. Report findings of the (GPR) to CM/PM and Architect prior to commencing the work.
6. Coordinate with Architect and CM/PM/vendor/Tyco for the provision and installation requirements for security.
General Power/Data/Telephone Notes
1. All finishes shall be applied in conformance with the manufacturer's recommendations and instructions. A copy of the recommendations and instructions shall be submitted to the designer prior to the installation of materials.
2. Unless otherwise noted, all paint, painting and priming for wallcovering's and wallpaper are to be furnished and installed by the contractor.
3. All changes in floor material and colors shall occur at the centerline of doorways unless noted otherwise.
4. Paint all unfinished materials, grilles, registers, etc, to match adjacent walls. Materials with a factory finish, such as anodized aluminum, shall be left in their natural finish unless otherwise noted by the construction documents.
5. See Reflected Ceiling Plans for ceiling finishes.
6. Prepare floor for installation of finishes in accordance with the manufacturer's specifications and recommendations. Remove all foreign matter, grease, wax, paint, oil, adhesives, dirt, etc. Cracks, holes and depressions should be filled with flashing compound or latex patch material. Cut off any protruding objects and grind smooth to level with the floor surface.
7. Inspect floor construction and surfaces to receive new finishes and promptly notify the Architect of any defects in the substrate that affect the work so that they may be corrected before the start of the work. Proceeding with the work shall be deemed as acceptance by the Contractor of the floor areas and he shall be responsible thereafter for the installation of the work
8. Install flooring materials within the allowable temperature range as stated by the manufacturer's installation instructions. All flooring material shall be delivered to the site in time to acclimate to conditions prior to installation. A copy of the installation instructions shall be submitted to the architect and the owner.
General Finish Notes
Unless otherwise indicated by the Construction Documents, all new items of construction are to be furnished and installed by the Contractor and/or his subcontractors. The terms "Furnish", "Install", "Provide", and any derivations thereof used in the
Construction Documents, are directing the Contractor to both furnish and install any given item and its incidental materials unless otherwise noted.
The Work includes, but is not necessarily limited to, the following:
1. The erection of temporary acoustical, dust proof partitions separating the area of the Work from the existing adjacent public areas
2. The demolition and disposal of all existing materials and constructs, together with all materials incidental thereto, as indicated by the Construction Documents. Said materials and constructs include, but are not necessarily limited to:
a. Acoustical ceiling tiles, suspension grid, and hanger wire,
b. Partitions, doors, frames & hardware
c. Exit SIGNAGE and other ceiling mounted devices,
d. Carpet and base materials,
e. Limited demolition outside of the Project Area as may be necessary for the completion of the Work
Related matters include:
f. Verify with CM/PM as to whether existing light fixtures are to be stored for the courts future use or whether they are to be discarded.
g. Coordinate with CM/PM/ Courts Vendor, TYCO Security, for the removal of any existing security devices.
h. Coordinate with CM/PM for the removal of any security equipment or furnishings not covered by TYCO security
Refer to the Engineering drawings for information on additional items to be removed.
3. The cleaning and preparation of surfaces to receive new finishes or constructs as indicated by the Construction documents.
Preparation shall be in accordance with the recommendations and specifications of the respective manufacturer.
4. The installation of new work as indicated by the Engineering Documents.
5. The installation of ceiling bulkheads and support framing.
6. The repair and refinishing of existing doors for reuse.
7. The erection of new gypsum board partitions.
8. The installation of all doors and hardware.
9. The installation of all finishes and accessories as indicated by the Construction Documents.
10. The installation of all millwork as indicated by the Construction Documents.
11. The installation of suspended ceiling grid assemblies & acoustical tiles.
12. The installation of all light fixtures and other ceiling mounted devices indicated by the Construction Documents together with all materials incidental thereto.
13. The installation of all fire and life safety devices as indicated by the Construction Documents.
14. The repair and/or replacement of existing construction to remain that was removed for the installation of work or which was damaged as a result of the work.
15. The installation of fire and safety devices as indicated by construction documents.
16. The installation of automatic sprinkler system to accommodate the proposed layout.
17. Coordination of the work courts audio-visual and the provision of rough-in work that may be required whether specifically noted in plan or not.
18. Coordination of work of the courts furniture vendor and the provision of any electrical connection services that they may require.
19. Contractor shall be responsible for coordination of work with all Courts vendors, including phone, data and cabling.
General Description of the Work
1. Codes and Regulations: Conform to codes and regulations currently in force by the District of Columbia and the US Marshals service. Said documents include, but are not limited to, the following:
a. 2012 International Building Code
b. 2012 International Fire Prevention Code
c. 2012 DCMR DC Building Code
d. ANSI 117.1 2003 Edition
e. Americans with Disabilities ACT Accessible Guidelines.
Where a conflict occurs in or between the aforementioned codes and regulations, the stricter shall apply unless otherwise indicated or agreed upon.
2. Due to the small scale of the drawings and the instability of the reproduction process, do not scale these drawings. Field verify any dimensions deemed, or noted as being, critical.
3. Verify all dimensions and existing conditions at job site and advise the Architect of any discrepancies, additions, deletions and/or alterations in any or all conditions before proceeding with any phase of the work.
4. Unless noted otherwise, all dimensions are from finish face to finish face.
5. Furnish and install fire retardant treated wood blocking as required at all locations for the proper and secure installation of all wall mounted equipment or millwork whether specifically noted in the drawings or not.
6. Where electrical and plumbing fixtures, or other related equipment, occur in millwork, provide cut-outs, rough-ins and stub-ins for these items and coordinate the work to assure proper location and installation.
7. Provide firestopping/safing material as required to maintain the fire-rating of floor, wall and ceiling assemblies whether specifically noted in plan or not. This applies to existing as well as new penetrations.
8. Provide demolition to the minimum extent required for the installation of fire alarm, sprinkler, MEP and telecommunications work. Coordinate with each of the respective trades and consultants and verify the extent of the work required. Unless noted otherwise, existing finishes and equipment in the designated areas are to remain and should be disturbed only to the minimum extent to perform the work. Repair or replace finishes that are damaged as a result of work to match surrounding conditions
9. Millwork:
a. Fabricate and install all millwork indicated in the Construction Documents in accordance with the specifications and provisions of the "Architectural Woodwork Quality Standards", 8th Edition, as published by the Architectural Woodwork
Institute, for Custom cabinets.
b. Refer to the Finish Schedule for the color selections.
General Architectural Notes
NO
RT
H
TI
TL
E
SH
EE
T
Date:
Scale:
Checked by:
Planned By:
Drawn by:
Do Not Scale this Drawing Contractors to Verify Dimensions on Site c
IB
I G ro up Pl ot te d:
This drawing and the design shown hereon are the property of IBI Group formally Gruzen Samton. The reproduction, copying, or other use of the drawing without their written consent is prohibited and any infringement will be subject to legal action.
Accepted By:
Capital Projects and Facilities Management Officer Contracting Officer District of Columbia Courts
SUBMISSION
RE
V
IS
IO
N S
ISSUED FOR DATE
NO. DESCRIPTION DATE BY
A
RC
H
IT
EC
T
E
N G
IN
EE
R N
A M
E
L O
G O
APPROVALS DATE
Location:
IBI
GROUP
IBI Group 1505 Prince Street, Suite 200 Alexandria VA 22314 United States tel 703 836 9600 fax 703.836.2484
HEALTH UNIT
09/13/16
PR
O
JE
CT
KEY PLAN
Pr oje ct Ti tle
Cl ien t N am e
Co ns tru cti on D oc um en ts for In ter ior
Im pr ov em en t t o:
5T H
S T
RE
ET
6T H
S T
RE
ET
D STREET
C STREET
INDIANA AVE
H.CARL MOULTRIE
COURTHOUSE
MUNICIPAL
BUILDING
ISSUE FOR CONSTRUCTION 09.05.17
1/8" = 1'-0"
9/ 6/
:3
0:
P M
BIM 360://2153 - DC Courts/HCMC_C Health Unit (IBIny).rvt
TYRONE HARLEY
JOSEPH ILARDI
Designer
A00012153-B.26
GENERAL NOTES
ISSUE FOR PERMIT 12.12.16
District of Columbia Courts Capital Project and Facilities
Management Division
Di str ict of
C olu m bia
C ou rts Ca pi ta l P ro jec t a nd F ac ilit ies M an ag em en t D ivi sio n
H.
C ar l M ou ltr ie I C ou rth ou se
He alt h U nit
DOOR SCHEDULE
DOOR
NO.:
DOOR FRAME HARDWARE
SIZE DESCRIPTION
TYPE FIN. SET #
GENERAL DOOR &
HARDWARE
REMARKSW H T MAT'L TYPE FIN.
GENERAL DOOR &
HARDWARE
NOTES
HARDWARE
SET
MODIFIERS
X
Hardware Set #1 General Usage Description:
No: Description: Qty: Manufacturer: Model: Finish: Remarks:
Hardware Set #2 General Usage Description:
No.: Description: Qty: Manufacturer: Model: Finish: Remarks:
Hardware Set #3
General Usage Description:
No.: Description: Qty: Manufacturer: Model: Finish: Remarks:
Hardware Set #4 General Usage Description:
Hardware Set Modifiers General Usage Description:
No.: Description: Qty: Manufacturer: Model: Finish: Remarks:
Standard Door Types
Standard Frame Types
SE
E
SC
HE
DU
LE
SEE
SCHEDULE
Typical Single Door
FLUSH SINGLE LEAF
DOOR -FOR FINISH REFER TO
GENERAL DOOR & HARDWARE
REMARKS #8 & #9 THIS SHEET.
1A- (WD) WOOD DOOR
2" 2"
2"
SE
E
SC
HE
DU
LE
SEE SCHEDULE
Single Leaf Hollow Metal Door Frame
SIM NEW HOLLOW METAL FRAME
TYPICAL DETAIL TAGS, SEE STANDARD
FRAME DETAIL ON THIS SHEET
DETAIL TAG "1" FOR DOOR
1.00D & 1.00E
Standard Frame Details
A. Supply all frames, doors & hardware and install in accordance with manufacturers, specifications (See also Finish Plan for finishes) and with the Americans with Disabilities Accessibilities guidelines (ADAAG). In the event of a conflict, ADAAG shall govern unless otherwise noted, B. Install all new hardware in new door and new frames in accordance with manufacturers specifications, using proper templates and instructions.
C. All fire door assemblies shall be labeled by an approved Agency.
Labeled assemblies shall be in conformance with applicable codes.
See Schedule for labeled doors.
D. Maximum undercut on all doors shall be 1/2" AFF unless noted otherwise
E. Coordinate card reader, electric strike, remote door release button and video intercom installation with CM/PM, Architect, and Tyco prior to shop drawing submittal for doors and hardware.
F. ALPHANUMERIC SUBSCRIPT Listed Below indicates Standard Door Threshold Detail used at door indicated in schedule.
F-1 ceramic tile to carpet, F-2 Resilent Floor to carpet, F-3 exposed concrete to carpet, F-4 carpet to carpet
Fire-rated door/frame assembly, 1-1/2 hours 'B' LABEL
Wood faced B-label door assmebly
Indicated equipment by TYCO Security- coordinate with vendor and provide conduit and junction boxes as req'd per coordination.
provide hold open on closer
Refer to architecture standard details for additional information
Contractor shall coordinate final hardware order with architect and CM/PM representative prior to placing order
Provide strike reinforcement as required
Corridor Door Red Oak ; Plain Sliced with factory transparent finish to match Marshfield Toast 28-95. Refer Project Manual for additional information and finish schedule for Frame paint color.
Interior Doors Red Oak ; Plain Sliced with factory transparent finish to custom match Architects sample - Haworth Medium Cherry VC-U. Refer Project Manual for additional information and finish schedule for Frame paint color.
General Door & Hardware Notes General Door & Hardware Remarks
1.
2.
3.
4.
5.
6.
7.
8.
9.
Standard Door Placement
Standard Door Thresholds
1/ 2"
M
AX
VARIESVARIES
1/ 2'
FLOOR SLABFLOOR SLAB
SCHEDULED
DOOR
SCHEDULED CARPET
SCHEDULED
RESILIENT FLOOR.
DOOR FRAME
(BEYOND)
VINYL THRESHOLD
DOOR FRAME
(BEYOND)
SCHEDULED
DOOR
SCHEDULED
CARPET
SCHEDULED TILE
MARBLE THRESHOLD
1/4'' THICK
SETTING BED
WATERPROOFING
MEMBRANE
F2 VCT to Carpet ThresholdF1 Ceramic Tile to Carpet Thresold 1/
2"
M
AX
VARIES
FLOOR SLAB
SCHEDULED
DOOR
SCHEDULED CARPET
DOOR FRAME
(BEYOND)
NOTE:
ALIGN CENTERLINE OF SCHEDULED FLOORING
WITH CENTERLINE OF DOOR WHEN PRODUCTS
PHYSICAL CHARACTERISTICS VARY
F3 Carpet to Carpet Threshold
18"
MIN.
6"
1 Standard Door Placement w/ In-Swing Door
12"
MIN
6"
2 Standard Door Placement w/ Out-Swing Door
1 Typical Jamb Detail @ Hollow Metal Frame
DI
M
EN
SI
ON
VA
RI
ES
SE
E
PA
RT
IT
IO
N
SC
HE
DU
LE
2''
/1 6'
9/
1/ 2'
VA
RI
ES
NOTE: PROVIDE HINGE &
STRIKE REINFORCING
16 GA. HOLLOW METAL DOOR
JAMB-HEAD SIM
SCHEDULED DOOR
JAMB ANCHORS MIN 3
ANCHORS / SIDE
GYP. BD. SHEATING
METAL STUD
1.01
1.02
1.03
1.04
HINGES
OFFICE LOCKSET W/ PUSH BUTTON
SILENCERS
FLOOR MTD. STOP
1.5PR.
STANLEY
CORBIN RUSSWIN
IVES
IVES
FBB199-4.5X4.5
CL3351-PZD
SR64
FS438
US32D SATIN. STAIN
626- SATIN. CHROM
US26D
GREY
2.01
2.02
2.03
HINGES
OFFICE LOCKSET W/PUSH BUTTON
SILENCERS
1.5 PR
STANLEY
CORBIN RUSSWIN
IVES
FBB199-4.5X4.5
CL3351-PZD
SR64
FLOOR MTD. STOP 12.04 IVES FS438
US32D
GREY
US2D
3.01
3.02
HINGES
STOREFRONT LOCKSET:
1.5PR
STANLEY
CORBIN RUSSWIN
FBB199-4.5X4.5
CL3357-PZD
US26D
US26D
C326H
C01
C04
C05
C07
C08
C09
3'-0'' 3'-0''
3'-0''
3'-0'' 3'-0''
3'-0''
3'-0'' 7'-0''
7'-0''
7'-0''
7'-0''
7'-0''
7'-0''
7'-0'' 13/4''
13/4''
13/4''
13/4''
13/4''
13/4''
13/4''
SCWD
SCWD
SCWD
SCWD
SCWD
SCWD
SCWD
STAIN
STAIN
STAIN
STAIN
STAIN
STAIN
STAIN
MTL
MTL
MTL
MTL
MTL
MTL
MTL
PAINT
PAINT
PAINT
PAINT
PAINT
PAINT
PAINT
COORD. MTD W/ ARCHITECT
626- SATIN. CHROM
COORD. MTD W/ ARCHITECT
3.03
3.04
SILENCERS
FLOOR MTD. STOP
IVES SR64
IVES FS438
GREY
US2D COORD. MTD W/ ARCHITECT
A
A
C D E E F-1 1 2 3 4 6 7 8 F-4
F-2
F-2 F-2
F-1
F-4
C03 3'-0'' 7'-0'' 13/4'' SCWD 1 STAIN MTL PAINT
B F
F-2
6 9
6 9
6 9
6 9
6 9
6 9
6 9
A
B
C
D
E
F
OVERHEAD SURFACE MTD. CLOSER.
ELECTRIC ADA DOOR OPERATOR
ELECRIC STRIKE/CARD/READER
ELECTRIC REMOTE RELEASE BUTTON
SECURITY VIDEO INTERCOM
PUSH PLATE REQUEST TO ENTER/EXIT
DORMA
DORMA
SDC DOOR CONTROL
SDC DOOR CONTROL
TS 93N
ED700
413NU
482A4U
ALUM 689
204-R1
BLUE INFILL
FURNISHED AND INSTALL BY G.C.
FURNISHED AND INSTALL BY G.C.
FURNISHED AND INSTALL BY G.C.
FURNISHED AND INSTALL BY G.C.
FURNISHED AND INSTALL BY TYCO
FURNISHED AND INSTALL BY TYCO
ALIGN WITH FRAME
5/ 8'
1'
RE
TU
RN
T
RI
M
1/
2'
10 1/2''
SCHEDULED PARTITION
J.L. INDUSTRIES 101/2'' X 24''
X 6'' FIRE RATED TUB OR
APPROVED EQUAL
5/8'' FRT PLYWD. BLOCKING-
BOTH SIDES, TYP.
J.L. INDUSTRIES "COSMIC 10E"
MULTIPURPOSE FIRE EXTINGUISHER
OR APPROVED EQUAL
J.L. INDUSTRIES F.E. CABINET TRIM
WITH SATIN ALUM. FINISH -"
ACADEMY" MODEL #C1027V10 OR
APPROVED EQUAL
FIRE EXTINGUISHER CABINET DETAIL
Scale: NTS
3/4'' PLYWOOD FIRE RETARDANT
SHEATHING SCRIBE TO EXISTING
MTL JAMB. CAULK AROUND AS REQ'D
1 1/2'' OWENS CORNING XPS RIGID FOAM
INSULATION IN CAVITY BETWEEN
EXISTING WOOD DOOR AND PLYWOOD
SHEATHING. CAULK ALL AROUND AS REQ'D
PUBLIC CORRIDOR THIS SIDE
HEALTH UNIT SPACE THIS SIDE
EXISTING PARTITION
TYPICAL SCHEDULE GYP. BD. PARTITION
REFER TO ARCHITECTURAL FLOOR PLAN
SHEET A0006 & PARTITION TAPES ON
SHEET A0003 FOR ADD INFO.
SECURE DOOR TO JAMB WITH (3) PAIR
OF GALVANIZED STEEL ANGLE BRACKETS
3 1/2'' X 1 1/4'' X 1/8'' THK. (TYP)
NOTE: EXISTING DOOR FRAME &
HARDWARE TO REMAIN IN PLACE
EXCEPT LEVER. REMOVE LEVER FROM
ROOM SIDE AND PIN/SECURE LEVER IN
PLACE ON CORRIDOR SIDE TO
MAINTAIN CONTINUITY OF AESTHETIC.
NO
RT
H
TI
TL
E
SH
EE
T
Date:
Scale:
Checked by:
Planned By:
Drawn by:
Do Not Scale this Drawing Contractors to Verify Dimensions on Site c
IB
I G ro up Pl ot te d:
This drawing and the design shown hereon are the property of IBI Group formally Gruzen Samton. The reproduction, copying, or other use of the drawing without their written consent is prohibited and any infringement will be subject to legal action.
Accepted By:
Capital Projects and Facilities Management Officer Contracting Officer District of Columbia Courts
SUBMISSION
RE
V
IS
IO
N S
ISSUED FOR DATE
NO. DESCRIPTION DATE BY
A
RC
H
IT
EC
T
E
N G
IN
EE
R N
A M
E
L O
G O
APPROVALS DATE
Location:
IBI
GROUP
IBI Group 1505 Prince Street, Suite 200 Alexandria VA 22314 United States tel 703 836 9600 fax 703.836.2484
HEALTH UNIT
09/13/16
PR
O
JE
CT
KEY PLAN
Pr oje ct Ti tle
Cl ien t N am e
Co ns tru cti on D oc um en ts for In ter ior
Im pr ov em en t t o:
5T H
S T
RE
ET
6T H
S T
RE
ET
D STREET
C STREET
INDIANA AVE
H.CARL MOULTRIE
COURTHOUSE
MUNICIPAL
BUILDING
ISSUE FOR CONSTRUCTION 09.05.17
As indicated
9/ 6/
:3
0:
P M
BIM 360://2153 - DC Courts/HCMC_C Health Unit (IBIny).rvt
Checker
Author Designer
A00022153-B.26
DOOR SCHEDULE & DETAILS
ISSUE FOR PERMIT 12.12.16
District of Columbia Courts Capital Project and Facilities
Management Division
Di str ict of
C olu m bia
C ou rts Ca pi ta l P ro jec t a nd F ac ilit ies M an ag em en t D ivi sio n
H.
C ar l M ou ltr ie I C ou rth ou se
He alt h U nit
Scale : 1/8" = 1'-0" 2 Typical Closure Detail @ Existing Door to remaim
CONTINUOUS STEEL RUNNERS (TOP & BOTTOM)
6' ' M
IN
SEE RCP
STEEL STUDS
1 LAYER OF 5/8'' TYPE X GYP. BD. ROOM SIDE (TYP.)
FULL HEIGHT 3 1/2'' SOUND ATTENUATION BLANKET (SAB)
FOR BASE & FLOOR FINISHES, SEE ROOM FINISH SCHEDULE
TOP OF SLAB OR DECK
INTERIOR PARTITION
WITH 2 1/2'', 20 GA STEEL STUDS 16'' O.C. MAX. & 5/8'' GWB
SCHED. PARTITION
1. REFER TO ARCHITECTURAL PLAN FOR THE LOCATIONS OF PARTITION TYPES HEREIN INDICATED.
2. PROVIDE 5/8" WATER RESISTANT GWB IN LIEU OF 5/8" GWB AT ALL WALLS WITH CERAMIC TILES.
3. PROVIDE SEALANT AROUND ALL WALL PENETRATIONS, SUCH AS ELECTRICAL BOXES, ETC., WITH SOUND
ATTENUATION TO PREVENT NOISE TRANSFER. PROVIDE FIRE-RATED ACOUSTICAL SEALANT AT ALL FIRE-RATED PARTITIONS
4. PROVIDE BRACE AT STUDS ABOVE CEILING TO MEET DEFLECTION REQUIREMENT L/360.
5. REINFORCE AND BRACE WALLS AS REQUIRED TO SUPPORT THE INSTALLATION OF WALL MOUNTED TOILET AND KITCHEN EQUIPMENT, CABINETRY, AND SHELVING WHETHER SPECIFICALLY INDICATED BY THE DRAWINGS OR NOT.
6. CONFIRM THE GAUGES REQUIRED FOR COLD ROLLED STEEL FRAMING MEMBERS IN RELATION TO THEIR APPLICATION AND/OR JUNCTION AND INCREASE THE GAUGES INDICATED BY THE PARTITION TYPES IF REQUIRED.
THE CONTRACTOR SHALL NOT DECREASE THE GAUGES OF MEMBERS WITHOUT THE PRIOR WRITTEN CONSENT OF
THE ARCHITECT AND THE OWNER.
7. ALL FIRE RATED PARTITIONS SHALL FIT TIGHT AGAINST STRUCTURE.
8. PROVIDE NON-COMBUSTIBLE FIRE STOPPING MATERIAL AND SEAL AROUND PENETRATIONS IN FLOOR AND
PARTITIONS IN ORDER TO PROVIDE REQUIRED FIRE SEPARATION.
9. ALL VERTICAL PIPES AND DUCTS IN SPACES SHALL BE FURRED AND FINISHED IN THE SAME MATERIAL AS
THE ADJACENT WALL OR COLUMN WHETHER INDICATED OR NOT ON THE ARCHITECTURAL DRAWINGS.
10. ALL GWB PROVIDED FOR ALL NEW PARTITIONS SHALL BE FIRE RATED, TYPE X GWB.
11. REFER TO DRAWING 3 ON SHEET PH1.1 FOR 2 HR. FIRE RATED CEILING DETAIL
NOTES:
1. WHERE INDICATED BY THE ARCHITECTURAL FLOOR PLAN, BLOCKING SHALL EXTEND
FROM FLOOR TO CEILING.
VERT. FIRE-RETARDANT TREATED
WOOD BLOCKING (TYP.)
GYPSUM BOARD
METAL STUD
SOUND ATTENUATION BLANKET
Partition Notes
Typical Blocking Detail
CONTINUOUS STEEL RUNNERS
(TOP & BOTTOM)
STEEL STUD CROSS BRACING
LOCATED VERTICALLY @ 4'-0"
O.C. MAX.; USE SAME TYPE AS
PARTITION STUD
FULL HEIGHT 3 1/2" SOUND
ATTENUATION BLANKET (SAB)
SCHEDULED CERAMIC TILE
FINISH REFER TO FINISH
PLAN A0010
PIPE SLEEVES & OPENINGS SHALL
BE EXTENDED 1" ABOVE SLAB OR
DECK & FIRESTOPPED
WITH 2 1/2", 20 GA. STEEL STUDS, 16" O.C. MAX.
MAX. HEIGHT = 17'-6" (5 PSF, L/240); 15'-6" (5 PSF, L/360)
STC RATING W/ 3 1/2" SAB = 52
DIMENSION VARIES
SEE PLAN
FILL FLUTES WITH FIRMLY
PACKED SAFING TO MEET
PARTITION CRITERIA
CONTINUOUS
ACOUSTICAL SEALANT
TO BOTH SIDES OF
STEEL RUNNERS
(TOP & BOTTOM)
TWO LAYERS OF 5/8" TYPE X GWB
EACH SIDE TYP. REFER TO TYPE 3
PARTITION
16 GA. PLATE 8" LONG MIN.
SHOT IN ANCHORS (2) PER ANGLE:
ANGLES RATED FOR 500LB TOTAL SHEER
FORCE
TYPICAL PLUMBING CHASE PARTITION
REFER TO RCP FOR TYPE
CONTINUOUS ACOUSTICAL SEALANT
TO BOTH SIDES OF STEEL
RUNNERS (TOP & BOTTOM)
CONTINUOUS 2 1/2'' STEEL RUNNERS
(TOP & BOTTOM) TYP. EACH SIDE
CONTINUOUS L BEAD, TAPE &
COMPOUND
TWO LAYERS OF 5/8" TYPE X
GWB EACH SIDE, TYP.
FULL HEIGHT 3 1/2" SOUND
ATTENUATION BLANKET (SAB)
FOR BASE & FLOOR
FINISHES, SEE ROOM FINISH SCHEDULE
TOP OF SLAB OR DECK
UNDERSIDE OF FLOOR DECK ABOVE
CONTINUOUS ACOUSTICAL
SEALANT TO BOTH SIDES
OF STEEL RUNNERS (TOP &
BOTTOM)
CONCRETE SLAB
GYP. BD. CEILING. REFER
TO RCP
CONSTRUCT IN ACCORDANCE WITH UL ASSEMBLY V403
USE 3 5/8", 20 GA. STEEL STUDS, 16" O.C. MAX.
MAX. HEIGHT = 15'-8"(5 PSF, L/240); 13'-7"(5 PSF, L/360),
STC RATING WITH 3" SAB = 49
2 HR. RATED INTERIOR PARTITION
NOMINAL 6"
ACTUAL 6 1/8"
SHOT IN ANCHORS (2) PER ANGLE:
ANGLES RATED FOR 500lb. TOTAL
SHEER FORCE
FILL FLUTES WITH
FIRMLY PACKED SAFING
TO MEET PARTITION
CRITERIA
ONE LAYER OF 5/8" TYPE X GWB
EACH SIDE, TYP.
FULL HEIGHT 3 1/2" SOUND
ATTENUATION BLANKET (SAB)
FOR BASE & FLOOR
FINISHES, SEE ROOM FINISH SCHEDULE
TOP OF SLAB OR DECK
SEE RCP
WITH 3 5/8", 2O GA. STEEL STUDS 16" O.C. MAX. & 5/8"
GWB NO FIRE RATING
TYPICAL INTERIOR PARTITION2
NOMINAL 5"
ACTUAL 4 7/8"
6" M
IN
NO FIRE RATING, WITH 3 5/8", 20 GA. STEEL STUDS, 16" O.C. MAX.
MAX. HEIGHT = 15'-8"(5 PSF, L/240); 13'-7"(5 PSF, L/360),
STC RATING WITH 3" SAB = 49
STEEL STUD RUNNER
STL. STUDS
16 GA. PLATE 8" LONG MIN.
STEEL STUD RUNNER
FILL FLUTES WITH FIRMLY
PACKED SAFING TO MEET
PARTITION CRITERIA
CONTINUOUS ACOUSTICAL
SEALANT TO BOTH SIDES OF
STEEL RUNNERS (TOP & BOTTOM)
RETAINING ANGLE FASTENER
ATTACHED TO RUNNER
20 GA METAL SLIP RUNNER
TRACK MEMBER SIZE AS
REQUIRED
TYPICAL INTERIOR PARTITION
NOMINAL 5"
ACTUAL 4 7/8"
SHOT-IN ANCHORS (2) PER ANGLE:
ANGLES RATED FOR 500lb. TOTAL
SHEER FORCE
SEE RCP
ONE LAYER OF 5/8" TYPE X
GWB EACH SIDE, TYP. U.O.N.
FOR WALL BASE AND
FLOOR FINISHES, SEE
ROOM FINISH
SCHEDULE
FULL-HEIGHT 3" SOUND
ATTENUATION BLANKET
(SAB)
ONE LAYER OF 5/8"
DUROCK BRAND CEMENT BOARD ROOM
SIDE ONLY. @ ADA RESTROOM ONLY
EXISTING CONCRETE
SLAB
RCP FOR THIS SIDE G.C.
COORDINATE WITH CM/PM
FACE OF EXISTING ADJACENT PARTITION
STEEL STUD CROSS BRACING LOCATED
VERTICALLY @ 4'-0'' O.C. MAX.: USE SAME TYPE
AS PARTITION STUD
CONCRETE SLAB
SHOT IN ANCHORS (2) PER ANGLE:
ANGLES RATED FOR 500lb. TOTAL
SHEER FORCE
FILL FLUTES WITH
FIRMLY PACKED SAFING
TO MEET PARTITION
CRITERIA
HEALTH UNIT ROOM SIDEADJACENT SPACE SIDE
ONE LAYER OF 5/8"
DUROCK BRAND CEMENT BOARD ON
ROOM SIDE OF STEEL STUDS @ ADA
RESTROOM ONLY
16 GA. PLATE 8" LONG MIN.
STEEL STUD RUNNER
FILL FLUTES WITH FIRMLY
PACKED SAFING TO MEET
PARTITION CRITERIA
RETAINING ANGLE FASTENER
ATTACHED TO RUNNER
20 GA METAL SLIP RUNNER
TRACK MEMBER SIZE AS
REQUIRED
SHOT-IN ANCHORS (2) PER ANGLE:
ANGLES RATED FOR 500lb. TOTAL
SHEER FORCE
EXISTING CONCRETE
SLAB
EXISTING PARTITION
NO
RT
H
TI
TL
E
SH
EE
T
Date:
Scale:
Checked by:
Planned By:
Drawn by:
Do Not Scale this Drawing Contractors to Verify Dimensions on Site c
IB
I G ro up Pl ot te d:
This drawing and the design shown hereon are the property of IBI Group formally Gruzen Samton. The reproduction, copying, or other use of the drawing without their written consent is prohibited and any infringement will be subject to legal action.
Accepted By:
Capital Projects and Facilities Management Officer Contracting Officer District of Columbia Courts
SUBMISSION
RE
V
IS
IO
N S
ISSUED FOR DATE
NO. DESCRIPTION DATE BY
A
RC
H
IT
EC
T
E
N G
IN
EE
R N
A M
E
L O
G O
APPROVALS DATE
Location:
IBI
GROUP
IBI Group 1505 Prince Street, Suite 200 Alexandria VA 22314 United States tel 703 836 9600 fax 703.836.2484
HEALTH UNIT
09/13/16
PR
O
JE
CT
KEY PLAN
Pr oje ct Ti tle
Cl ien t N am e
Co ns tru cti on D oc um en ts for In ter ior
Im pr ov em en t t o:
5T H
S T
RE
ET
6T H
S T
RE
ET
D STREET
C STREET
INDIANA AVE
H.CARL MOULTRIE
COURTHOUSE
MUNICIPAL
BUILDING
ISSUE FOR CONSTRUCTION 09.05.17
3/32" = 1'-0"
9/ 6/
:3
0:
P M
BIM 360://2153 - DC Courts/HCMC_C Health Unit (IBIny).rvt
TYRONE HARLEY
JOSEPH ILARDI
Designer
A00032153-B.26
PARTITION TYPES
ISSUE FOR PERMIT 12.12.16
District of Columbia Courts Capital Project and Facilities
Management Division
Di str ict of
C olu m bia
C ou rts Ca pi ta l P ro jec t a nd F ac ilit ies M an ag em en t D ivi sio n
H.
C ar l M ou ltr ie I C ou rth ou se
He alt h U nit
ETR
ETR
ETR D7
F
97.1 8.8
D6
5' - 2"
V.I.F. W/ ARCHITECT PRIOR TO COMMENCING WORK
16' - 4 1/8"
ADK-01
ADK-02
ADK-01
ADK-05
ADK-05
ADK-01
ADK-02
ADK-10
ADK-09
ADK-11
ADK-05
ADK-01
ADK-01
ADK-06
ADK-03
ADK-04
ADK-07
ADK-04
ADK-07
ADK-04
ADK-07
ADK-28
ADK-29
ADK-29
EXISTING PUBLIC AREA
TO REMAIN (N.I.C.)
EXISTING PUBLIC AREA
TO REMAIN (N.I.C.)
ADK-07
ADK-03
V.I.F. W/ ARCHITECT PRIOR
TO COMMENCING WORK
ADK-30
ADK-01 Remove all existing partitions indicated as required coordinate work of other trades.
ADK-02 Remove existing gypsum board partition, metal studs, runner track as indicated on plan
ADK-03
ADK-04
Remove existing door, frame and masonry partition assemblies at this location.
Contractor shall salvage all doors and hollow metal frames. Coordinate with CM and PM.
ADK-05 All partitions indicated to remain shall be stripped of all existing finish materials such as wall covering, carpet, rubber base & gyp. bd. etc.
ADK-06
ADK-07 Remove all existing receptacles, switches and all other miscellaneous devices, as required. Refer to electrical engineering documents for additional scope of work.
ADK-09
Existing door to remain. Refer to new scope of work for this area.
ADK-11
ADK-14
ADK-16
ADK-17
ADK-10 Height of new opening shall be 7'-8'' aff. or to align with existing bulkhead at fire doors.
ARCHITECTURAL DEMOLITION KEYNOTES
Contractor shall remove all existing flooring material, adhesive subfloor coatings, including curing compounds and other substance that are in compatible with adhesives and that contain soap, wax, oil or silicone and prepare substrates indicated to receive the new scheduled flooring material.
Contractor shall remove existing plumbing fixtures along with all exiting toilet partitions, piping, hangers support indicated. refer to engineering drawing documents for additional scope of work.
ADK-08
Contractor shall coordinate location of new opening in existing partition with architect and cm/pm in filed prior to cutting opening.
The intent of these drawings is to provide general guidelines for the selective demolition of portions of Architectural, Mechanical, Electrical and Piping systems serving this area while maintaining continuous operation of the systems serving other floors. Note the contractor is obligated to examine the plans. Any observed discrepancies between the drawings and field conditions shall be called to the attention of the Architect immediately requesting clarification so that the matter may be resolved prior to submission of bids. Note by submission of bid, the Contractor shall acknowledge acceptance of these documents as an adequate definition of the scope of work and extra cost claims on inadequacy of documents will not be considered.
Before submitting a proposal, all contractors shall visit the premises, familiarize themselves with existing conditions, and satisfy themselves as to the nature and scope of the work and the difficulties that attend its successful execution and completion of the work as indicated in the documents.
All work on this project shall be performed in accordance with the latest applicable codes and regulations.
The work detailed on these plans is based on previously prepared base building drawings where existing field condition are different than shown. The contractor shall advise the Architect of discrepancies which will affect the proposed work prior to beginning of any work.
Symbols shown on Legend define type of items only. Contractor is responsible for researching drawings for exact construction materials or quantities of each.
All work demolished shall be removed from the premises everyday, except items indicated to be reused or returned to the owner.
Contractor shall verify all points of disconnect before commencing any electrical and telecom demolition work, and coordinate with the building security data, telephone and communications systems provider and CM/PM prior to disconnect.
Where opening occur in existing fire-rated areas or partitions due to removal of conduit, ductwork, piping, etc. and/or where existing fire stopping has been removed, Contractor to provide temporary closure as required.
Remove existing wall construction, together with all materials incidental thereto, and dispose of as directed by the CM/PM. Carefully protect existing items to remain throughout the course of the Work. Repair or replace any damaged items as a result of the Work so as to be indistinguishable from "Like-new" conditions.
Demolish and remove all interior existing electrical systems and installation in the area designated for demolition and retain the system components that may support and serve the existing building structure without interruption and compromising the operations. Any interruption and/or outage to services shall be coordinated with the owner's representative Architect and the owners vendor for Tyco security.
Contractor to refer to engineers documents for electrical demolition requirements.
Contractor shall not cut/remove any fire protection signal or equipment unless otherwise noted, contractor shall coordinate this work with CM/PM prior to commencing any work.
Contractor shall note that he/she is responsible to protect and seal all existing to remain ducts/vents during demolition and construction.
ADK-12
Not used
Not used
ADK-13
ADK-15 Not used
Not used
ADK-18
ADK-19
ADK-20
ADK-21
ADK-22
ADK-23
ADK-24
ADK-25
ADK-26
ADK-27
GC to carefully remove the existing travertine tiles from area indicated and salvage them for reuse and return the remaining tiles to CPFMD. Coordinate with Architect and CM/PM prior to commencing any work.
ADK-28
GC to protect existing travertine tiles that remain on adjacent wall surface areas indicated round new wall opening. Coordinate with Architect in the field prior to demolition.
ADK-29
GC to refer to signage documents for scope of work in this area. Coordinate with Architect and CM/PM in the field prior to start of work in this area.
ADK-30
NO
RT
H
NO
RT
H
TI
TL
E
SH
EE
T
Date:
Scale:
Checked by:
Planned By:
Drawn by:
Do Not Scale this Drawing Contractors to Verify Dimensions on Site c
IB
I G ro up Pl ot te d:
This drawing and the design shown hereon are the property of IBI Group formally Gruzen Samton. The reproduction, copying, or other use of the drawing without their written consent is prohibited and any infringement will be subject to legal action.
Accepted By:
Capital Projects and Facilities Management Officer Contracting Officer District of Columbia Courts
SUBMISSION
RE
V
IS
IO
N S
ISSUED FOR DATE
NO. DESCRIPTION DATE BY
A
RC
H
IT
EC
T
E
N G
IN
EE
R N
A M
E
L O
G O
APPROVALS DATE
Location:
IBI
GROUP
IBI Group 1505 Prince Street, Suite 200 Alexandria VA 22314 United States tel 703 836 9600 fax 703.836.2484
HEALTH UNIT
09/13/16
KEYPLAN
PR
O
JE
CT
KEY PLAN
Pr oje ct Ti tle
Cl ien t N am e
Co ns tru cti on D oc um en ts for In ter ior
Im pr ov em en t t o:
5T H
S T
RE
ET
6T H
S T
RE
ET
D STREET
C STREET
INDIANA AVE
H.CARL MOULTRIE
COURTHOUSE
MUNICIPAL
BUILDING
PROJECT AREA
ISSUE FOR CONSTRUCTION 09.05.17
As indicated
9/ 6/
:3
0:
P M
BIM 360://2153 - DC Courts/HCMC_C Health Unit (IBIny).rvt
Checker
Author Designer
A00042153-B.26
DEMOLITION PLAN
ISSUE FOR PERMIT 12.12.16
District of Columbia Courts Capital Project and Facilities
Management Division
Di str ict of
C olu m bia
C ou rts Ca pi ta l P ro jec t a nd F ac ilit ies M an ag em en t D ivi sio n
H.
C ar l M ou ltr ie I C ou rth ou se
He alt h U nit
Scale : 1/4" = 1'-0"
1 ARCHITECTURAL DEMOLITION PLAN
1 Revision 1 Date 1
7.9
E
D7
F
97.1 8.8
D6
ADK-01
ADK-04
ADK-05
ADK-01
ADK-04
ADK-05
ADK-03
ADK-01
ADK-03
ADK-01
ADK-04
ADK-05
ADK-03
EXISTING PUBLIC AREA
TO REMAIN (N.I.C.)
EXISTING PUBLIC AREA
TO REMAIN (N.I.C.)
ADK-02
EXISTING MONITORS W/ DOCKET
INFORMATION TO REMAIN
DEMOLITION REFLECTED CEILING AND GENERAL NOTES
ADK-01
ADK-02
ADK-03
ADK-04
ADK-05
ADK-06
ADK-07
DISCONNECT AND REMOVE EXISTING LIGHT FIXTURES, DIFFUSERS, EXIT SIGNS
AND OTHER CEILING/WALL MOUNTED DEVICES, TOGETHER WITH ALL MATERIALS
INCIDENTAL THERETO, AND DISPOSE OF AS DIRECTED BY CM/PM. COORDINATE
REMOVAL OF SECURITY AND FIRE ALARM EQUIPMENT WITH CM/PM, TYCO COURT
AND COURTS FIRE ALARM VENDOR .
REMOVE EXISTING GYP. BD. CEILING ASSEMBLY, TOGETHER WITH ALL MATERIAL
INCIDENTAL THERETO, AND DISPOSE OF AS DIRECTED BY OWNER.
CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL EXISTING ACOUSTICAL TILE AND
CEILING SUSPENSION ASSEMBLY AND GYP. BD. CEILINGS AND SUPPORT SYSTEMS AS
INDICATED.
ALL EXPOSED WIRING, SWITCHES AND METAL CONDUITS NOT BEING REUSED SHALL
BE REMOVED UNLESS OTHERWISE NOTED. CONTRACTOR SHALL COORDINATE WORK
OF OTHER TRADES.
CONTRACTOR SHALL REFER TO ENGINEERING DOCS FOR REMOVAL OF EXISTING
CLING MOUNTED HVAC DIFFUSERS, GRILLES AND DUCTWORK.
CONTRACTOR SHALL CLOSE DUCT OPENING AS REQ'D. REFER TO ENGINEERING
DOCS. FOR ADD. INFO.
PURSUANT TO ARCHITECTURAL/ENGINEERING DOCS. CONTRACTOR SHALL PROVIDE
DEMOLITION TO THE MINIMUM EXTENT REQ'D FOR THE FACILITATION AND
COMPLETENESS OF PROPOSED SCOPE OF WORK WETHER ILLUSTRATED IN
CONSTRUCTION DOCS. OR NOT AND COORDINATE WITH ARCHITECT/ COURTS
REPRESENTATIVE PRIOR TO COMMENCEMENT OF ANY WORK.
ADK-08
ADK-09
THE DEMOLITION SHOWN SHALL BE CONSIDERED ONLY AS A GUIDE AND NOT
INTENDED TO SHOW EVERY SINGLE ITEM IN THE SCOPE OF WORK. ACTUAL FIELD
CONDITIONS WILL DETERMINE THE PRECISE WORK TO BE DONE.
SHOULD ANY QUESTIONS ARISE AS TO WHETHER OR NOT ANY PIPING,
EQUIPMENT/DEVICE,DUCTWORK, OR OTHER ITAM SHALL BE REMOVED OR REMAIN
AS PRESENTLY INSTALLED, THE CONTRACTOR SHALL REQUEST IN WRITING
CLARIFICATION FROM THE ARCHITECT.
CONTRACTOR SHALL FURNISH AND INSTALL A SYSTEM OF TEMPORARY LIGHTS
THROUGHOUT CONTRACT AREA AS REQUIRED.
NO
RT
H
NO
RT
H
TI
TL
E
SH
EE
T
Date:
Scale:
Checked by:
Planned By:
Drawn by:
Do Not Scale this Drawing Contractors to Verify Dimensions on Site c
IB
I G ro up Pl ot te d:
This drawing and the design shown hereon are the property of IBI Group formally Gruzen Samton. The reproduction, copying, or other use of the drawing without their written consent is prohibited and any infringement will be subject to legal action.
Accepted By:
Capital Projects and Facilities Management Officer Contracting Officer District of Columbia Courts
SUBMISSION
RE
V
IS
IO
N S
ISSUED FOR DATE
NO. DESCRIPTION DATE BY
A
RC
H
IT
EC
T
E
N G
IN
EE
R N
A M
E
L O
G O
APPROVALS DATE
Location:
IBI
GROUP
IBI Group 1505 Prince Street, Suite 200 Alexandria VA 22314 United States tel 703 836 9600 fax 703.836.2484
HEALTH UNIT
09/13/16
KEYPLAN
PR
O
JE
CT
KEY PLAN
Pr oje ct Ti tle
Cl ien t N am e
Co ns tru cti on D oc um en ts for In ter ior
Im pr ov em en t t o:
5T H
S T
RE
ET
6T H
S T
RE
ET
D STREET
C STREET
INDIANA AVE
H.CARL MOULTRIE
COURTHOUSE
MUNICIPAL
BUILDING
PROJECT AREA
ISSUE FOR CONSTRUCTION 09.05.17
As indicated
9/ 6/
:3
0:
P M
BIM 360://2153 - DC Courts/HCMC_C Health Unit (IBIny).rvt
Checker
Author Designer
A00052153-B.26
REFLECTIVE CEILING DEMOLITION
PLAN
ISSUE FOR PERMIT 12.12.16
District of Columbia Courts Capital Project and Facilities
Management Division
Di str ict of
C olu m bia
C ou rts Ca pi ta l P ro jec t a nd F ac ilit ies M an ag em en t D ivi sio n
H.
C ar l M ou ltr ie I C ou rth ou se
He alt h U nit
Scale : 1/4" = 1'-0"
1 REFLECTED CEILING DEMOLITION PLAN
R
EF
R
EF
SUPPLY STORAGE
C08 OFFICE
C09
WAITING ROOM
C01
OPEN OFFICE
C02
EXAM ROOM
C03
LACTATION RM
C04
EXAM ROOM
C05
PANTRY
C06
ADA RESTROOM
C07
5'
0"
CL
EQ EQ
8'
5"
16' - 9 3/4"10' - 10 1/2"10' - 4 1/2"
0"
11' - 6"
C04C05 C03
C01C09
C07
C08
C326H
/2
5'
0" 3'
1/ 8"
7.9
E
BROCHURE RACK
D7
F
97.1
TEL. CLOSET
C-G
PUBLIC CORRIDOR
C.10.10
Existing Monitors with Docket Information To Remain
8.8
8' - 7 1/4"
CL
1' - 6"
CL
1' - 6"
6' - 9 7/8"
EXISTING PUBLIC
AREA TO REMAIN
(N.I.C.)
EXISTING PUBLIC
AREA TO REMAIN
(N.I.C.)
V.I.F.
52' - 5"
7'
12' - 7"
5' - 2"
V.
I.F
/8
A0015 1A0018
A0013
A0012
A0016
AK-18
AK-20 AK-19
AK-16
AK-04
AK-06
AK-23
AK-09
AK-10
AK-04
AK-09
2' - 0"
AK-09
AK-04
AK-09
AK-04
AK-09
AK-04
AK-16
AK-14
AK-09
AK-04
FEC
16' - 4 1/8"
V.I.F.
6' - 6"
V.
I.F
3'
2"
HO
LD
1'
1"
A0002
ET
R
ET
R
ET
R
ET
R
ET
R
ET
R
ETR
AK-09
AK-24
AK-01 Align
AK-02 Not in contract
AK-03 Where new gypsum board construction abuts existing construction. Columns, partitions, pilasters, etc. Align new stud track with existing adjacent surface and continue a new layer of the scheduled gypsum wall board across existing surface for a smooth continuous surface. Architect to approve all chalk lines for partition layout prior to securing metal track runner at all partition types.
AK-04 All hatched areas indicated on this plan shall imply new millwork.
Contractor should refer to appropriate documents for scope. Refer to floor plan legend.
AK-05 Not Used
AK-06
AK-07 Architect to approve chalk lines of all new scheduled partition in writing prior to the securing of any metal track runner, or setting any non-bearing concrete masonry units.
AK-08 Millworker contractor shall verify loading dock, freight elevator and all path of travel from point of entry through path of travel points of installation prior to shop drawing production.
AK-09 Contractor shall coordinate, provide and install metal grounds steel supports, wood blocking, bridging etc that are embedded dinto scheduled gypsum board partition for support of items mtd. to all wall surface that relate to other trades.
AK-10
AK-12 Not used
AK-13 Existing automatic external defibrillator (sed) device as secure corridor C.10.11
AK-14 Contractor shall provide and install new spray-on fireproofing that was removed due to demolition that meets original fire proection plan in area of new construction scope of work. Coordinate with architect and CM/PM prior to commencement of any work.
AK-15 Contractor shall refer to enlarged plan for add. info.
AK-16 Contractor shall provide and install control joints as follows at construction changes within plane of scheduled partition or ceiling, where partition exceeds 30' in length. furred partition run all control joints shall be filled with a pliable caulk and finished as scheduled.
AK-18 Existing wall surface finish to remain unless otherwise noted.
AK-20
AK-21
AK-22
AK-23
AK-11 For door information, refer to architectural specification documents and door schedule drawing sheet A0002.
AK-17 Not used
AK-19
ARCHITECTURAL KEYNOTES & GENERAL NOTES
Contractor shall furnish and install frameless pass-thru windows with 1/4'' thick clear tempered glass. Pass-thru unit config. shall be sliding type with two panel concealed top hung with clamp on roller assemblies. Sized to fit final opening/field conditions.
This is the start of the file's text. The full file is on GovTribe.