Coyote Ranger District Rdent Infestation Statement Of Work.pdf

PDF 153 KB Posted

Attached to
US Forest Service Santa Fe Rodent Infestation
Solicitation number
1170406
Issued by

About this file

This is a Statement of Work for rodent extermination, exclusion, and decontamination services at the Santa Fe National Forest in Coyote, New Mexico, issued by the U.S. Forest Service in May 2026.

The work encompasses five primary tasks across two housing units at the Coyote Ranger District Office Administrative Site: Housing Unit #28 (Crew Quarters) and Housing Unit #46 (Ranger House). Task 1 requires rodent extermination using approximately 60 traps with pre-baiting and rotation to live traps, monitored daily across 4 service stops of 2 hours each per house, plus installation of New Mexico Department of Agriculture-compliant interior and exterior bait stations. Task 2 specifies exclusion work using stainless steel contractors fabric and hardware cloth to seal penetrations, including patching over 25 holes in the Crew Quarters stucco and over 10 holes in the Ranger House with steel mesh, installing 1/4-inch stainless steel hardware cloth caps on 10 roof penetrations per unit, and screening 10 crawlspace vents per unit. Task 3 requires thorough decontamination of all interior areas using 365nM UV lights, HEPA vacuums, enzymatic cleaners, and viricide disinfectants, including removal and reinstallation of three interior vent fans. Task 4 involves installation of self-contained next-generation bait stations with locks and ramps. Task 5, applicable only to the Ranger House, requires installation of an 18-foot garage door cap. The contractor must provide all materials, supplies, equipment, transportation, and personnel. The Period of Performance is 30 calendar days after contract award, with work to be scheduled with the Contracting Officer's Representative within 5 days of award. A final deliverable report must document all services, trap types and quantities, bait types, number of rodents removed, photographs of sealed holes, and decontamination procedures. The USFS contact is Chris Wissen at 505-479-3625 or christopher.wissen@usda.gov.

View the file

Other files

File Type Posted
Amendment 1 Q A Solicitation 1170406.pdf PDF
RFQ for Services.pdf PDF
15-5451.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Coyote Rodent Infestation

SANTA FE NATIONAL FOREST

May 2026

I. Description of Work

This work consists of rodent extermination, rodent exclusion, and decontamination of two housing units infested with rodents. The houses are located at the Coyote Ranger District Office Administrative Site on the Santa Fe National Forest, in Coyote, New Mexico in Rio Arriba County.

The contractor shall furnish all materials, supplies, equipment, transportation, and personnel to provide the services described in this scope of work.

II. Location:

The Coyote Ranger District Office is located at 20 Private Drive 1707, Box 1 Coyote, NM 87012. Two housing units are included in this scope of work: Housing Unit #28 (Crew Quarters), and Housing Unit #46 (Ranger House). The Ranger District Office can be accessed starting in Santa Fe, New Mexico, travel north on US-84 W/US Hwy 285N to NM-96 in Rio Arriba County. Follow NM-96 for approximately 20 miles to arrive.

III. Tasks:

The Contractor shall perform tasks to remove, exclude, and decontaminate a housing unit infested with rodents.

Task 1: Rodent Extermination Contractor shall install traps throughout the housing units at appropriate times of day to reduce rodent population quickly. Trap rotation will consist of an initial set and placement of traps (approximately 60 traps with pre-bait placed on un-set traps (2 service stops), and switch to live traps (2 services) monitored daily for each house. Assume 4 service stops of approximately 2hours for each house.

Install NM Department of Agriculture compliant exterior bait stations and interior bait stations for preventive rodent control.

Task 2: Exclusion Service Contractor shall use stainless steel contractors fabric and adhesive/screws or staples to seal and prevent future travel for target pest.

Crew Quarters: Exclusion areas include under the sink, interior left side of cabinets, exterior penetrations from damaged stucco and eves. Holes (>25) in stucco will be patched with steel mesh and finished with a stucco patch. Roof penetrations (10) will be excluded using 1/4inch stainless steel hardware cloth caps. Crawlspace vents (10) will be screened off from the inside to allow proper venting of the crawl space.

Ranger House: Exclusion areas include under the sink, and exterior penetrations from damaged stucco and eves. Holes (>10) in stucco will be patched with steel mesh and finished with a stucco patch. Roof penetrations (10) will be excluded using 1/4inch stainless steel hardware cloth caps.

Crawlspace vents (10) will be screened off from the inside to allow proper venting of the crawl space.

Task 3: Rodent Infestation Decontamination Thorough clean out of all rooms in housing unit using 365nM UV lights, HEPA vacuum, scrubbers, high pressure stem injectors. Contractor will move all furniture and other items, and clean all items using an enzymatic cleaner and viricide disinfectant to destroy pheromones, feces strains, and urine accumulation from rodents. Areas include entirety of home: cabinets, drawers, appliances, vent fan penetrations. Three interior vent fans will be removed, decontaminated, and reinstalled.

Task 4: Bait Stations Self-contained next generation bait station with locks and ramps to prevent water infiltration into station.

Task 5: Garage Door Cap and Installation (Ranger House Only) Install garage door cap (18ft) to seal interior space and exclude rodents.

IV. Deliverables:

Contractor shall provide a report on all services provided. The report shall include the number and types of traps used, types of bait, number of rodents removed, photos documenting location of interior and exterior holes fixed to exclude rodents, detailed information regarding decontamination procedures, and any other relevant or pertinent information. The deliverable is incidental to Tasks 1-5.

V. Period of Performance and USFS Contact:

Work shall be scheduled with the COR within 5 days of contract award. All tasks shall be completed within 30 days.

Contract Time:

The Period of Performance shall be 30 calendar days after contract award.

Contact:

Chris Wissen 505-479-3625 christopher.wissen@usda.gov