COVID Language_Updated 12-14-2021.docx
DOCX document 31 KB Posted
- Attached to
- Z2AA--36C249-23-AP-0268 - Project 621-19-110 - Correct Exterior Deficiencies Building 53
- Solicitation number
- 36C24923B0004
About this file
This statement of work outlines requirements for a construction project at the James H. Quillen VA Medical Center in Mountain Home, Tennessee. The project involves exterior restoration of Building 53 including restoration of all windows, repair of mortar, reconstruction of a retaining wall, painting of wooden surfaces, repair of gutters and downspouts, and some minor interior work. The contractor must provide supervision, samples, submittals, and as-built drawings. Work is to be completed within 365 calendar days of the notice to proceed during after-hours Monday through Thursday. The contractor must coordinate access, outages, and noisy work with the contracting officer's representative and limit disruption to facility operations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24923B0004 0002.docx | DOCX document | |
| SECTION 02 83 33.13 Lead.docx | DOCX document | |
| SECTION 02 82 13.19 Asbestos Floor Tile and Mastic Abatement.docx | DOCX document | |
| Questions and Answers.docx | DOCX document | |
| 36C24923B0004 0001.docx | DOCX document | |
| retaining wall Detail.pdf | ||
| 033053 (SHORT FORM) CAST-IN-PLACE CONCRETE.docx | DOCX document | |
| RFI Form 621-19-110.docx | DOCX document | |
| 621-19-110_Spec for Building 53.pdf | ||
| 621-19-110-Construction drawing.pdf | ||
| 36C24923B0004_1.docx | DOCX document | |
| DUNS _ TAX ID.docx | DOCX document | |
| Wage Determination TN20220191 10-28-2022.txt | TXT text file |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHA Supplemental Contract Requirements for Combatting COVID-19
1. Contractor employees who work in or travel to VHA locations must comply with the following:
a. Documentation requirements:
1) If fully vaccinated, contractors shall show proof of vaccination.
i. NOTE: Acceptable proof of vaccination includes a signed record of immunization from a health care provider or pharmacy, a copy of the COVID-19 Vaccination Record Card (CDC Form MLS-319813_r, published on September 3, 2020), or a copy of medical records documenting the vaccination.
2) If unvaccinated, contractors shall show negative COVID-19 test results dated within three calendar days prior to desired entry date. Test must be approved by the Food and Drug Administration (FDA) for emergency use or full approval. This includes tests available by a doctor’s order or an FDA approved over-the-counter test that includes an affiliated telehealth service.
3) Documentation cited in this section shall be digitally or physically maintained on each contractor employee while in a VA facility and is subject to inspection prior to entry to VA facilities and after entry for spot inspections by Contracting Officer Representatives (CORs) or other hospital personnel.
4) Documentation will not be collected by the VA; contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.
2. Contractor employees are subject to daily screening for COVID-19 and may be denied entry to VA facilities if they fail to pass screening protocols. As part of the screening process contractors may be asked screening questions found on the COVID-19 Screening Tool. Check regularly for updates.
a. Contractor employees who work away from VA locations, but who will have direct contact with VA patients shall self-screen utilizing the COVID-19 Screening Tool, in advance, each day that they will have direct patient contact and in accordance with their person or persons who coordinate COVID-19 workplace safety efforts at covered contractor workplaces. Contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.
3. Contractor must immediately notify their COR or Contracting Officer if contract performance is jeopardized due to contractor employees being denied entry into VA Facilities.
1. For indefinite delivery contracts: Contractor agrees to comply with VHA Supplemental Contract Requirements for any task or delivery orders issued prior to this modification when performance has already commenced.
Last Updated on Wednesday, December 21, 2022
File details come from the government source that posted it. Updated .