This document contains questions and answers regarding a federal contract opportunity to correct exterior deficiencies at Building 53 of the James H. Quillen VA Medical Center in Mountain Home, Tennessee. The contractor will be responsible for renovating approximately 1,248 gross square feet on one floor and basement, including restoring all windows on the exterior of the building, reconstructing a retaining wall, repairing gutters and downspouts, replacing floor and ceiling tiles, and addressing other exterior repairs. The contract will have a period of performance of 365 calendar days from issuance of the notice to proceed. The contractor must coordinate all work with the VA to minimize disruptions and comply with VA security, safety and traffic regulations.

View the file

Other files

File Type Posted
36C24923B0004 0002.docx DOCX document
SECTION 02 83 33.13 Lead.docx DOCX document
SECTION 02 82 13.19 Asbestos Floor Tile and Mastic Abatement.docx DOCX document
36C24923B0004 0001.docx DOCX document
retaining wall Detail.pdf PDF
033053 (SHORT FORM) CAST-IN-PLACE CONCRETE.docx DOCX document
RFI Form 621-19-110.docx DOCX document
621-19-110_Spec for Building 53.pdf PDF
621-19-110-Construction drawing.pdf PDF
COVID Language_Updated 12-14-2021.docx DOCX document
36C24923B0004_1.docx DOCX document
DUNS _ TAX ID.docx DOCX document
Wage Determination TN20220191 10-28-2022.txt TXT text file
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Will there be any Asbestos Abatement required as per specs?

0. I am attaching specifications on the removal of asbestos that is only present in the Glazing of the windows. Only that area will be remedied so far, finding any suspicious areas is GC's responsibility to notify the VA.

1. Will temporary fencing be required as per specs?

1. No, Only on the perimeter of the retaining wall excavation.

1. Can the Contractors' superintendent also carry the duties of the SSHO as laid out in the specs?

2. Yes, as long as the superintendent has OSHA 30 certification and First aid credentials.

1. Will a Certified Safety Professional be required on sight?

3. No, as long as the superintendent has OSHA 30 certification and First aid credentials.

1. Part A-General Information calls for the replacement of floor tiles and leveling of floors, will the government supply specs sheet section and quantities/areas receiving it?

4. Yes, See attached specifications, please provide 2,340 sq. ft of black vinyl tile for high traffic, see attached specifications.

1. Can the Government supply a finish schedule for flooring/ceiling tiles?

5. Yes, please provide 2,340 sq. ft of black vinyl tile for high traffic, see attached specifications.

1. Will government employees be responsible for moving any/all workstations for tile installation.

6. The postmaster will be responsible for moving all the materials and equipment from the area to be worked, it must be coordinated with him so that the material is relocated with at least 48 hours' notice.

1. Glazing companies, we have reached out to say it will be impossible to alter the existing widows, Will the government except for new windows ILO alterations to existing. If so, can a spec be provided.

7. No, proceed to reglaze the existing windows and remediate the asbestos in the glazing, and replace the damaged panels.

1. Is there a limit to the number of widows that may be removed from the building at a time?

8. No, But you must provide the necessary security to the building after the removal of the windows.

1. Part A-General Information calls for “reconstruction of retaining wall” can the government supply drawings, and/or clarification as to what would be expected.

9. Please see section 03 30 53 for cast in place concrete add attached, and the attached drawing for the retaining wall. The length of the repair will only be the area that is currently affected, about 25 feet long, and as indicated in the field visit, the drainage that passes through the wall must be repaired. Must repair handrails on the top of the wall in its entirety, it must be plumb and painted, Take into consideration that they should asphalt the area after the repairs and repaint all the lines of the parking lines in that area. Please include the repair of the two bollards in the reception area, continuous with the wall, as well as the gutter at that entrance, which is about 12 feet.

1. As stated in the on-site discussion, please verify the absence of lead paint on the exterior exposed rafter tails.

10. It is presumed that the rafter tails contain lead paint, so it is necessary to proceed with abetment, see attached specifications.

1. Per site discussion, please verify that any broken or missing windowpanes will be replaced with new glass of the same thickness as existing conditions and reglazed with linseed oil-based putty as historically correct.

11. Yes, they will be replaced following the historical parameters

1. Confirm that (2) additional double hung window units will be constructed to match the existing windows and installed in the west lower openings that are currently boarded over.

12. Yes, you should provide the two additional windows following the same parameters as the existing windows.

1. Confirm that the air conditioner located in the lower east window unit will be removed and a new upper sash will be constructed to match the existing windows.

13. All window-type air conditioners will be removed from the building and in the event of sale will be restored.

1. Confirm that when re-installed, the repaired windows will be non-operable and weather-sealed.

14. It is confirmed that when the windows are reinstalled, they will be non-operable and weather-sealed

1. Confirm the absence of asbestos in the existing tile flooring of the area.

15. According to the most recent sample, there is no presence of asbestos on the floors in the area where the work will be carried out, but it is the responsibility of the General Contractor to notify the VA of finding suspicious material.

1. Confirmation that only the retaining wall area will need to be fenced in during that repair.

16. The only area that will be fenced off will be the area of the retaining wall excavation that will be repaired.