Cost Sheet_I_85 _ SR 74 Water Main Relocation.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
ITB# 25-016 Fairburn Water Main Relocation Project I-85 @ SR 74
Solicitation number
PE-66073-NONST-2026-000000025
Issued by
Fulton County, Georgia

About this file

This document is a comprehensive cost sheet for a water main relocation project involving Interstate 85 and State Route 74, likely involving a local municipal or county infrastructure agency. The project encompasses multiple construction components including general conditions, clearing and grubbing, water line relocation, pump station installation, force main and gravity sewer work, and erosion control measures. Key project elements include installing 875 linear feet of 2" PVC water line, 3 18" HDPE culverts with headwalls, constructing a wetwell, installing pumps and control panels, electrical work, and a generator. The project also includes substantial erosion control efforts, such as 1,290 linear feet of silt fence, construction exit installation, and area stabilization across approximately 7,620 square yards.

The cost sheet includes three different bid format versions with varying line items, suggesting flexibility in bidding approaches. Specific financial provisions include a $10,000 utility relocation allowance and a $10,000 line item for engineer-directed changes, with additional $2,000 allocated for testing and inspection. While specific pricing for most line items is not completed, some unit prices are noted, such as $60 per cubic yard for rock excavation and $42 per ton for unsuitable soils management. The document appears to be structured for competitive bidding, with comprehensive itemization of anticipated project components and potential variability in site conditions, indicating a complex infrastructure improvement project with multiple technical and logistical considerations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASE Option 1

BASE BID
ITEMDESCRIPTIONESTIMATEDUNIT OFUNIT PRICEAMOUNT
NO.QUANTITYMEASURE(FIGURES)(FIGURES)
CONSTRUCTION ITEMS
1GENERAL CONDITIONS1LS
2CLEARING AND GRUBBING1LS
3GRADING COMPLETE1LS
42" SDR 21 PVC WATER LINE875LF
518" HDPE CULVERT WITH HEADWALLS3EA
6GAB ACCESS DRIVE1,205SYRIP RAP2 TN/CFT
7ACCESS DRIVE FENCING AND GATE32LFUNSUITABLE SOILS120 LB/CFT
8LANDSCAPE COMPLETE1LS
PUMP STATION
9CLEARING AND GRUBBING1LS
10GRADING COMPLETE1LS
11WETWELL (6-FT I.D.)1EA
12PIPING AND VALVES (FOR WETWELL AND VALVE VAULT)1LS
13PUMPS AND CONTROL PANEL1LS
14ELECTRICAL COMPLETE1LS
15GENERATOR1LS
16SCADA1LS
17FENCING AND GATE160LF
18GRADED ASPHALT BASE (GAB)2.8TN
19MASS ROCK EXCAVATION6.5CY$ 60.00$ 390.0015%32.6CY
20MASS UNSUITABLE SOILS10.5TN$ 42.00$ 441.0015%0.15%
21LANDSCAPE COMPLETE1LS4.89CY
FORCE MAIN AND GRAVITY SEWER
22CLEARING AND GRUBBING1LS
23LIGHT DUTY ASPHALT PAVING (DEMO, BACKFILL, CONCRETE TRENCH CAP, ETC.)1,614LF
246-INCH DR 11 HDPE VIA OPEN CUT3,056LF
256-INCH DR 11 HDPE VIA UN-CASED BORE40LF
2610-INCH SDR 26 PVC VIA OPEN CUT258LF
278-INCH SDR 26 PVC VIA JACK AND BORE WITH 16-INCH STEEL CASING216LFDOESN’T INCLUDE SERVICE LATERALS
28SANITARY SEWER MANHOLE (4-FT I.D.)3EA
29CONNECTION TO EX MANHOLE1EA
30ABANDONED AND PLUG EX GRAVITY SEWER LINE1EA
31AIR RELEASE VALVE1EA
32TRENCH ROCK EXCAVATION495CY$ 60.00$ 29,700.0015%3305CY
33TRENCH UNSUITABLE SOILS800TN$ 42.00$ 33,600.0015%0.15%
EROSION CONTROL ITEMS495.75CY
34SILT FENCE (Sd1-S)1,290LF
35CONSTRUCTION EXIT (Co)1EA
36DISTURBED AREA STABILIZATION (Ds1, Ds2, Ds3)5,900SY
37DISTURBED AREA STABILIZATION (Ds4)1,720SY
MISCELLANEOUS
38UTILITY RELOLCATION ALLOWANCE1LS$ 10,000.00$ 10,000.00
39ENGINEER DIRECTED CHANGES1LS$ 10,000.00$ 10,000.00
40TESTING AND INSPECTION ALLOWANCE1LS$ 2,000.00$ 2,000.00
TOTAL (IN FIGURES)
TOTAL (IN WORDS)

JN

BASE BID
ITEMDESCRIPTIONESTIMATEDUNIT OFUNIT PRICEAMOUNT
NO.QUANTITYMEASURE(FIGURES)(FIGURES)
CONSTRUCTION ITEMS
1GENERAL CONDITIONS1LS
2CLEARING AND GRUBBING1LS
324-INCH CONCRETE HEADWALL, PRECAST OR CAST-IN-PLACE1EA
4GALVANIZED COATED 3' X 3' GABION BASKETS, W/ 4-INCH BEDDING, AND NON-WOVEN GEOTEXTILE990LF
54-INCH TO 8-INCH STONE FILL FOR GABION BASKETS330CY
6GRADING COMPLETE1LS
WATER
78" PVC WATER LINE RELOCATION/ADJUSTMENT1LS
EROSION CONTROL ITEMS
8CONSTRUCTION EXIT (Co)1EA
8SEDIMENT CONTROL GATE (Rt-Sg)1EA
10STONE CHECK DAM (Cd-S)8EA
11RECP-C LONG TERM ROLLED EROSION CONTROL BLANKET W/ HECP HYDROSEED (Ss)2300SY
12LONG TERM ROLLED EROSION CONTROL BLANKET W/ HECP HYDROSEED (Ch-1)1725SY
13DISTURBED AREA STABILIZATION (Ds1, Ds2, Ds3, Du)1.25AC
MISCELLANEOUS
14UTILITY RELOLCATION ALLOWANCE1LS$ 10,000.00$ 10,000.00
15ENGINEER DIRECTED CHANGES1LS$ 10,000.00$ 10,000.00
TOTAL (IN FIGURES)
TOTAL (IN WORDS)

Formatted for Project Manual

BASE BID
ITEM NO.DESCRIPTIONESTIMATED QUANTITYUNIT OF MEASUREUNIT PRICE (FIGURES)AMOUNT (FIGURES)
CONSTRUCTION ITEMS
1MOBILIZATION1LS
2TRAFFIC CONTROL1LS
3WATER MAIN VERTICAL RELOCATION (12-INCH DIP)3EA
TOTAL (IN FIGURES)
TOTAL (IN WORDS)

Formatted for Dwg Set

QUANTITIES TABULATION
ITEM NO.DESCRIPTIONESTIMATED QUANTITYUNIT OF MEASURE
CONSTRUCTION ITEMS
1GENERAL CONDITIONS1LS
2CLEARING AND GRUBBING1LS
324-INCH CONCRETE HEADWALL, PRECAST OR CAST-IN-PLACE1EA
4GALVANIZED COATED 3' X 3' GABION BASKETS, W/ 4-INCH BEDDING, AND NON-WOVEN GEOTEXTILE990LF
54-INCH TO 8-INCH STONE FILL FOR GABION BASKETS (6-INCH SURGE FROM MACON VULCAN QUARRY IS ACCEPTABLE)330CY
6GRADING COMPLETE1LS
WATER
78" PVC WATER LINE RELOCATION/ADJUSTMENT1LS
EROSION CONTROL ITEMS
8CONSTRUCTION EXIT (Co)1EA
9SEDIMENT CONTROL GATE (Rt-Sg)1EA
10STONE CHECK DAM (Cd-S)8EA
11RECP-C LONG TERM ROLLED EROSION CONTROL BLANKET W/ HECP HYDROSEED (Ss)2300SY
12LONG TERM ROLLED EROSION CONTROL BLANKET W/ HECP HYDROSEED (Ch-1)1725SY
13DISTURBED AREA STABILIZATION (Ds1, Ds2, Ds3, Du)1.25AC
MISCELLANEOUS
14UTILITY RELOLCATION ALLOWANCE1LS
15ENGINEER DIRECTED CHANGES1LS
TOTAL (IN FIGURES)
TOTAL (IN WORDS)