Cost Schedule~25.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
Commercial Displays/Signs
Solicitation number
90DETR-S3581
Issued by
Nevada

About this file

This is a Cost Schedule document for a Commercial Displays/Signs contract opportunity in Nevada. The schedule outlines the pricing structure for commercial sign services, including standard hourly rates for work performed Monday through Friday between 8:00 a.m. and 5:00 p.m., and non-standard hourly rates for work performed Monday through Friday between 5:01 p.m. and 7:59 a.m. The document includes provisions for travel charges, which cannot exceed $50 per round trip for distances beyond 50 miles, with a specific reference to the Hoover Dam as a geographic parameter.

The cost schedule establishes material pricing constraints, limiting the cost of materials to the actual cost plus a markup not to exceed 20 percent. The document contains fields for vendor information including vendor name, contact person, phone number, and email address, as well as designated spaces for vendors to input their proposed hourly rates and other cost components. This structure allows vendors to submit competitive pricing proposals while maintaining cost controls and transparency in the bidding process.

View the file

Other files

File Type Posted
Standard-form-contract~9.docx DOCX document
Terms-and-conditions-for-services~12.pdf PDF
90DETR-S3581 Informal Solicitation~1.docx DOCX document
Quote Instructions.pdf PDF
Insurance Schedule - Standard~6.docx DOCX document
BOR Rules and Regulations~5.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Vendor Name:
Vendor Contact:
Vendor Phone Number:
Vendor Email Address:
Cost Schedule Commercial Signs
ItemsComments
Standard Hourly Rate (Mon-Fri 8:00am-5:00pm)$ per Hour
Non-Standard Hourly Rate (Mon-Fri 5:01pm - 7:59am)$ per hour
Travel ChargesCannot exceed $50 per round trip if passed 50 miles and The Hoover Dam
Cost of materialsNot to exceed at cost + 20%

File details come from the government source that posted it. Updated .