Cost_Formula-reward_average_cost_for_RFP.docx

DOCX document 15 KB Posted

Attached to
On Call Security Systems Maintenance and Repair for NHPS
Solicitation number
2026-HYRFP-CNH-324
Issued by
New Haven County, Connecticut

About this file

This is a scoring methodology document related to a New Haven Public Schools (NHPS) on-call security systems maintenance and repair contract opportunity in Connecticut. The document explains the cost formula mechanics used in competitive scoring processes, specifically detailing how the "Reward Low Cost" scoring method calculates points for proposal evaluation. Rather than establishing specific project parameters, response dates, or contract terms for the NHPS opportunity itself, this file serves as an instructional guide on point calculation methodologies.

The "Reward Low Cost" formula divides the lowest proposal cost by each individual proposal's cost and multiplies the resulting percentage by the total available points to determine scoring. The document illustrates this through three examples where proposals costing $100, $200, and $500 receive 30, 15, and 6 points respectively out of a possible 30 points, demonstrating how cost competitiveness directly influences final scores. This methodology ensures that cost efficiency is quantitatively reflected in the evaluation process, with the lowest cost proposal receiving maximum points and competing proposals receiving proportionally fewer points based on their cost differential from the lowest submission.

View the file

Other files

File Type Posted
On_Call_Security_Systems_Maintenance_and_Repair_for_NHPS_(Addendum_#2_Revision).pdf PDF
On_Call_Security_Systems_Maintenance_and_Repair_for_NHPS.pdf PDF
PDF_Vrsn-Request_for_Waiver-_On_Call_Security_Maintenance_and_Repair.pdf PDF
PDF_Vrsn-Request_for_Waiver-_On_Call_Security_Maintenance_and_Repair.pdf PDF
5-MBE_Utilization_Form.docx DOCX document
ARPA_Subrecipient_Subaward_Agreement_(More_Than_$100000)_(MPB)_(TEMPLATE_11-26-24_UPDATE).docx DOCX document
Evaluation_Criteria_for_OpenGov.docx DOCX document
9a-Exhibit__RFP_Standard_Form_of_Agreement_-_City_of_New_Haven.pdf PDF
9b-Exhibit__RFP_Standard_Terms_Part_II_-_City_of_New_Haven.pdf PDF
ARPA_Contractor_Agreement_($100000_OR_LESS)_(MPB)_(TEMPLATE_11-26-24_UPDATE).docx DOCX document
5-MBE_Utilization_Form.docx DOCX document
9a-Exhibit__RFP_Standard_Form_of_Agreement_-_City_of_New_Haven.pdf PDF
9b-Exhibit__RFP_Standard_Terms_Part_II_-_City_of_New_Haven.pdf PDF
ARPA_Contractor_Agreement_(More_Than_$100000)_(MPB)_(TEMPLATE_11-26-24_UPDATE).docx DOCX document
EEOC_Vendors_Notice_of_Fees.pdf PDF
ARPA_Subrecipient_Subaward_Agreement_($100000_OR_LESS)_(MPB)_(TEMPLATE_11-26-24_UPDATE).docx DOCX document
EEOC_Vendors_Notice_of_Fees.pdf PDF
Evaluation_Criteria_for_OpenGov.docx DOCX document
ARPA_Contractor_Agreement_($100000_OR_LESS)_(MPB)_(TEMPLATE_11-26-24_UPDATE).docx DOCX document
ARPA_Contractor_Agreement_(More_Than_$100000)_(MPB)_(TEMPLATE_11-26-24_UPDATE).docx DOCX document
ARPA_Subrecipient_Subaward_Agreement_(More_Than_$100000)_(MPB)_(TEMPLATE_11-26-24_UPDATE).docx DOCX document
ARPA_Subrecipient_Subaward_Agreement_($100000_OR_LESS)_(MPB)_(TEMPLATE_11-26-24_UPDATE).docx DOCX document
Cost_Formula-reward_average_cost_for_RFP.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A Closer Look at Cost Formulas The scoring methods Reward Average Cost and Reward Low Cost rely on cost formulas to track and calculate point values. Reward Low Cost, for example, uses this equation to determine how many points each individual submission should receive:

Lowest overall cost / Proposal's cost = X% of the possible points Expand the tabs to see Reward Low Cost in action.

Proposal A costs $100. How many points will it receive?

$100 (Lowest Proposal) / $100 (Proposal A) = 100% of 30 points

30 points awarded Proposal B costs $200. How many points will it receive?

$100 (Lowest Proposal) / $200 (Proposal B) = 50% of 30 points 15 points awarded Proposal C costs $500. How many points will it receive?

$100 (Lowest Proposal) / $500 (Proposal C) = 20% of 30 points 6 points awarded

File details come from the government source that posted it. Updated .