Cost Estimate Worksheet.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Y1AZ--953-MM22-002: Site Improvements - Committal Shelter, Fort Sheridan National Cemetery
Solicitation number
36C78622B0009
Issued by

About this file

This document contains a cost estimate worksheet for a federal construction project. The worksheet requires lump sum pricing for various construction divisions that will be used in site improvements for a committal shelter at the Fort Sheridan National Cemetery. Divisions include general conditions, mobilization, site investigation, concrete work, masonry, metals, wood and composites, thermal and moisture protection, openings, finishes, specialties, equipment, furnishings, special construction, fire suppression, plumbing, HVAC, electrical, communications, electronic safety and security, earthwork, exterior improvements, utilities, and general and mechanical/electrical/plumbing construction. Offerors are to use the worksheet to provide pricing, including subtotals by construction division and an overall total base construction cost. Pricing must also account for any applicable insurance, bonding, overhead and profit.

The related federal contract opportunity is solicitation number 36C78622B0009 for site improvements to the committal shelter at Fort Sheridan National Cemetery, issued by the Department of Veterans Affairs National Cemetery Administration.

View the file

Other files

File Type Posted
GSLM_Fort Sheridan_Set_JAN_2022 (June 22 Version).pdf PDF
971857 Fort Sheridan Boundary Survey.pdf PDF
Pages from 124810 Fort Sheridan Cemetery Road Repaving.pdf PDF
Pre-fab storage building.pdf PDF
Map-Cemetery.pdf PDF
Site Plan.pdf PDF
36C78622B0009 0001.docx DOCX document
DOL Wage Determination _ Lake County.pdf PDF
Cemetery Map.pdf PDF
36C78622B0009_1.docx DOCX document
AsBuilts Drawings.pdf PDF
Technical Specifications.pdf PDF
Spec Attachments.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

IFB Contractor Cost Estimate Worksheet
Lump Sums are required for each Division that will be utilized in this project to total the Final Lump Sum number.

If a Division is not being used put N/A in that field.

Additional lines/items can be added if needed or appropriate.

Offeror shall use and edit to fit Task Order Project
Project Number:953-MM22-002
Solicitation Number:36C78622B0009
Project Title:Site Improvements - Committal Shelter, Fort Sheridan
DivisionUnit of Measure# of UnitsUnit Cost $Extended/Total Cost $Comments / Remarks
Division 0 - Special Sections
General Conditions and AdministrationJB1
Division 01 - General Requirements
MobilizationJB1
Division 02 - Existing Conditions
Site InvestigationJB1
Division 03 - Concrete

Division 04 - Masonry

Division 05 - Metals

Division 06 - Wood, Plastic, and Composites

Division 07 - Thermal and Moisture Protection

Division 08 - Openings (Doors, Windows, etc...)

Division 09 - Finishes

Division 10 - Specialties

Division 11 - Equipment

Division 12- Furnishings

Division 13 - Special Construction

Division 14 - Fire Suppression

Division 22 - Plumbing

Division 23 - Heat, Ventilating, and Air Conditioning

Division 25 - Integrated Automation

Division 26 - Electrical

Division 27 - Communications

Division 28 - Electronic Safety and Security

Division 31 - Earthwork

Division 32 - Exterior Improvements

Division 33 - Utilities

Mechanical, Electrical, Plumbing Subtotal
General Construction Subtotal
Total Base Construction Cost
Insurance (if applicable)
Bonding (if applicable)
Overhead________ %$0.00
Profit________ %$0.00
GRAND TOTALS$