Cost Estimate Worksheet.pdf
PDF 146 KB Posted
- Solicitation number
- 36C78623B0024
About this file
This document contains a cost estimate worksheet for project number 890CM3014 titled "Gravesite Expansion" along with details of a related federal contract opportunity.
The cost estimate worksheet breaks down anticipated costs by construction division including general conditions, site work, concrete, and other categories. It requires lump sum estimates for any divisions to be utilized and includes spaces for additional line items. The worksheet will be used by the offeror to develop their total proposed cost.
The related federal contract opportunity is solicitation number 36C78623B0024 for improvements at the Marietta National Cemetery. It is being issued by the Department of Veterans Affairs National Cemetery Administration. The improvements include work under divisions for earthwork, exterior work, utilities, and other construction categories. Responses are due based on the standard solicitation timeline.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number:
Solicitation Number:
Project Title:
Division Unit of Measure # of Units Unit Cost $ Extended/Total
Cost $ Comments / Remarks Division 0 - Special Sections
General Conditions and Administration
JB 1
Division 01 - General Requirements
Mobilization JB 1
Division 02 - Existing Conditions
Site Investigation JB 1
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastic, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings (Doors, Windows, etc...)
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12- Furnishings
Division 13 - Special Construction
Division 14 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heat, Ventilating, and Air Conditioning
Division 25 - Integrated Automation
Division 26 - Electrical
Gravesite Expansion
Lump Sums are required for each Division that will be utilized in this project to total the Final Lump Sum number.
If a Division is not being used put N/A in that field.
Additional lines/items can be added if needed or appropriate.
IFB Contractor Cost Estimate Worksheet
890CM3014
36C78622B0016
Offeror shall use and edit to fit Task Order Project
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Mechanical, Electrical, Plumbing Subtotal
General Construction Subtotal
Total Base Construction Cost
Insurance (if applicable)
Bonding (if applicable)
Overhead ________ % $0.00
Profit ________ % $0.00
GRAND TOTALS $