Cost Estimate Worksheet Blank.xlsx
XLSX spreadsheet 21 KB Posted
- Attached to
- Expand Parking Lighting and Rewiring Federal contract opportunity
- Solicitation number
- 36C24622R0011
About this file
This document contains a cost estimate worksheet and related federal contract opportunity for a parking lighting and rewiring project for the Department of Veterans Affairs. The cost estimate worksheet provides unit pricing and estimated costs for site preparation, demolition of existing lighting infrastructure, site improvements including asphalt repair, and installation of new site lighting including light poles, LED luminaires, electrical components, trenching, and controls. The related federal contract opportunity is a solicitation to expand parking lighting and rewiring for Veterans Health Administration Veterans Integrated Service Network 6. The opportunity number is 36C24622R0011 and it seeks the products and services outlined in the cost estimate worksheet to complete the parking lighting and rewiring project numbered 637-20-104 for a VA medical center.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Map of Panel Locations.pdf | ||
| Questions and Responses - Parking Lighting Amendment 0002.pdf | ||
| Site Map - Utilities.pdf | ||
| 36C24622R0011 - Parking Lighting Amendment 0002 1.26.2022.pdf | ||
| NC Wage Determination 1.07.2022.pdf | ||
| Site Visit Sign-in Sheet pg 1.jpg | JPG image | |
| Site Visit Sign-in Sheet pg 2.jpg | JPG image | |
| 36C24622R0011 0001 - Parking Lighting 1.21.2022.pdf | ||
| Spec - Final 12.21.2021.pdf | ||
| Drawings - Final.pdf | ||
| 36C24622R0011_2.pdf | ||
| Map of Hospital - Path to B15 .jpg | JPG image | |
| 36C24622R0011 RFP - Parking Lighting and Rewiring.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| IGCE - Parking Lighting & Rewiring Project 637-20-104 | |||||||||
| DESCRIPTION | Quantity | Material | Labor | Equipment | TOTAL | ||||
| UNITS | UOM | UNIT PRICE | COST | UNIT PRICE | COST | UNIT PRICE | COST |
| Site Preparation | ||||
| $ - 0 | $ - 0 | |||
| Site Demo | ||||
| Remove poles with fixtures and direct burial cable | EA | $0 | $ - 0 | $0 |
| Remove direct burial cable between poles | EA | $0 | $ - 0 | $0 |
| Remove exposed conduit | LS | $0 | $ - 0 | $0 |
| Remove bldg. light | EA | $0 | $ - 0 | $0 |
| Site Improvements | ||
| Demo, Patch, & Repair Paving as Needed | AL | $0 |
| Site Electrical Utilities | |||||
| Site Lights | |||||
| Buss water tight in-line fuse holder | EA | $0.00 | $ - 0 | $0 | |
| Disconnect switch, 30 amp, nema 3R | EA | $0.00 | $ - 0 | $0 | |
| Light pole | EA | $0.00 | $ - 0 | $ - 0 | $0 |
| Small 48 LED luminaire | EA | $0.00 | $ - 0 | $0 | |
| Large 80 LED luminaire | EA | $0.00 | $ - 0 | $0 | |
| Bollard | EA | $0.00 | $ - 0 | $0 | |
| Light pole base, 4" AG | EA | $0.00 | $ - 0 | $ - 0 | $0 |
| Light pole base, 30" AG | EA | $0.00 | $ - 0 | $ - 0 | $0 |
| Bollard base, ground floor base | EA | $0.00 | $ - 0 | $0 | |
| Post light | EA | $0.00 | $ - 0 | $0 | |
| Ground flood light | EA | $0.00 | $ - 0 | $0 | |
| Light guard | EA | $0.00 | $ - 0 | $0 | |
| 1" PVC conduit, sch. 40 | LF | $0.00 | $ - 0 | $0 | |
| 1" PVC elbow | EA | $0.00 | $ - 0 | $0 | |
| 1" PVC adapter | EA | $0.00 | $ - 0 | $0 | |
| 1" RGS conduit | LF | $0.00 | $ - 0 | $0 | |
| 1" LB | EA | $0.00 | $ - 0 | $0 | |
| #8 THHN, copper wire | LF | $0.00 | $ - 0 | $0 | |
| #10 THHN, copper wire | LF | $0.00 | $ - 0 | $0 | |
| Chain Trenching, 8"x36", backfill | LF | $ - 0 | $ - 0 | $ - 0 | |
| Light controls | AL | $ - 0 | $ - 0 | ||
| Emergency/security circuits | AL | $ - 0 | $ - 0 | ||
| Small 48 LED luminaire | AL | $ - 0 | $ - 0 | $ - 0 | |
| Large 80 LED luminaire | AL | $ - 0 | $ - 0 | $ - 0 | |
| Site power GP | AL | $ - 0 | $ - 0 |
| Cameras | |||||
| 1" PVC conduit, sch 40 | LF | $ - 0 | $ - 0 | $ - 0 | |
| 1" PVC elbow | EA | $ - 0 | $ - 0 | $ - 0 | |
| 1" PVC adapter | EA | $ - 0 | $ - 0 | $ - 0 | |
| Camera junction box | EA | $ - 0 | $ - 0 | $ - 0 | |
| CAT 6, OSP | LF | $ - 0 | $ - 0 | $ - 0 | |
| Chain Trenching, 8"x36" backfill | LF | $ - 0 | $ - 0 | $0 |
Subtotal $0.00 $ - 0 $ - 0 $ - 0
Total $ - 0
Sales Tax - 7% $ - 0
Subtotal $ - 0
Profit $0 insert percentage in field to calculate
Subtotal $ - 0
OH $0 insert percentage in field to calculate
Subtotal $ - 0
Bonds $0 insert percentage in field to calculate
TOTAL $ - 0
$0
Sheet2
| DESCRIPTION | QUANTITY | LABOR | MATERIAL | TOTAL | |||
| NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | ||
| Site Demo | |||||||
| Remove poles with fixtures and direct burial cable | 9 | Ea | $0 | $390.00 | $3,510 | $3,510 | |
| Remove direct burial cable between poles | 103 | Ea | $0 | $253.50 | $26,111 | $26,111 | |
| Remove exposed conduit | 1 | LS | $0 | $3,250.00 | $3,250 | $3,250 | |
| Remove bldg. light | 1 | Ea | $0 | $84.50 | $85 | $85 | |
| $0 | $0 | $0 | |||||
| Site Improvements | $0 | ||||||
| Demo, Patch, & Repair Paving as Needed | 1 | AL | 50000 | $50,000 | $13,000.00 | $13,000 | $63,000 |
| $0 | $0 | ||||||
| $0 | $0 | ||||||
| Site Electrical Utilities | $0 | $0 | |||||
| Site Lights | $0 | ||||||
| Buss water-tight in-line fuse holder | |||||||
| Disconnect switch, 30 amp, nema 3R | |||||||
| Light pole |
Small 48 LED luminaire
| Large 80 LED luminaire |
| Bollard |
| Light pole base, 4" AG |
| Light pole base, 30" AG | ||
| Bollard base, ground flood base | ||
| Post light | ||
| Ground flood light | ||
| Light guard | ||
| 1" PVC conduit, sch. 40 | ||
| 1" PVC elbow | ||
| 1" PVC adapter | ||
| 1" RGS conduit | $0 | |
| 1" LB | ||
| #8 THHN, copper wire | ||
| #10 THHN, copper wire | $45,955 | |
| Chain Trenching, 8"x36", backfill | $0.00 | |
| Light controls | ||
| Emergency/security circuits | ||
| Small 48 LED luminaire | $0 | |
| Large 80 LED luminaire | ||
| Site power GP |
10% Profit $0
Subtotal $0
10% OH $0
Subtotal $0
Bond, 3% $0
TOTAL $0