Cost Breakdown Mather B647 Re-Roof Install Ladder.pdf
PDF 100 KB Posted
- Solicitation number
- 36C26125R0065
About this file
This document is a detailed cost breakdown template for a roofing project at the VA Mather facility (Building 645). The solicitation (36C26125R0065) covers a re-roofing and ladder installation project for the Veterans Health Administration, with the template designed to capture comprehensive project costs across multiple categories including roofing work (demolition, preparation, installation), project management (project manager, superintendent, 3rd party inspector), and additional expenses like overhead, profit, insurance, taxes, and bonds. The template requires contractors to provide line-item material, labor, and total costs for each project component, with the final total price proposal to be recorded on Standard Form 1442, Block 17.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 612A4_25_018 Mather Bldg 647 Roofing Scope of work 9.3.25 .pdf | ||
| 36C26125R0065 0004.docx | DOCX document | |
| Site Visit Log -7-22-2025 B647 Re-Roof Install Ladder.pdf | ||
| 36C26125R0065 0003.docx | DOCX document | |
| 36C26125R0065 0002.docx | DOCX document | |
| 36C26125R0065 0001.docx | DOCX document | |
| VAAR 852.219-75.pdf | ||
| Specifications - Building 647 Roofing.pdf | ||
| 612A4-25-018 Mather Bldg 647 Roofing SOW 7.8.2025.pdf | ||
| Davis-Bacon Act WD CA20250019.pdf | ||
| 36C26125R0065.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION: 36C26125R0065 PROJECT: 612A4-25-018
VANCHCS, Mather B645 Re-Roof/Install Ladder
PROVIDE COMPLETE DIVISIONAL COST BREAK-OUT FOR COMPLETE PROJECT
REF DESCRIPTION Material Labor Total
ROOFING
Demolition $ $ $ Roofing Preparation
Roofing Installation Stainless Steel
Installation
Drain Replacement and Addition
SUB TOTAL:
Project Management Project Manager Superintendent 3rd Party Inspector Premium Time Work Design/Layout Mobilization
SUB TOTAL:
TOTAL:
OVERHEAD
PROFIT
Insurance and Taxes
BONDS
TOTAL PRICE PROPOSAL:
*Total Price Proposal amount to be recorded on SF1442, block 17