Cost_and_Price_Analysis_Sheet.pdf
PDF 101 KB Posted
- Solicitation number
- 107587
- Issued by
- Prince George's County, Maryland
About this file
This is a Cost and Price Analysis Sheet form issued by the Washington Suburban Sanitary Commission (WSSC) in Maryland for use by contractors submitting estimates and final costs on WSSC contracts. The form is designed to be completed for water treatment services and related work at eleven facility locations throughout the WSSC service area. Contractors must submit sealed responses via the WSSC eProcurement Portal at https://procurement.opengov.com/portal/wsscwater prior to 2:00 pm on Monday, August 3, 2026, with late responses not accepted. The selected contractor will provide comprehensive water treatment services for HVAC and biosolids systems, furnishing all necessary supervision, labor, equipment, materials, chemicals, and tools to maintain proper operating condition across the designated facilities.
The cost analysis form requires itemization of labor costs (with hours and hourly rates), materials with general descriptions and itemized invoices, equipment costs with supporting documentation, subcontracting costs with detailed pricing and subcontractor information, and bond costs if applicable. All rates must be inclusive, and contractors must provide the total estimated or final cost along with the number of calendar days required for completion after notice to proceed. The form requires approval signatures from both a supervisor and inspector, with designated spaces for approval or rejection with corresponding dates. This standardized pricing submission format ensures consistent evaluation of contractor proposals across all cost categories for the water treatment services contract.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
This form is to be completed by contractors providing an estimate on work in accordance with a WSSC contract and when submitting final or partial costs for a completed project. Questions on the use of this form should be referred to the Procurement Director.
Facility Name: Purchase Order No.:
Building Name: Project No.:
Name and Address of Contractor: Account No.:
Circle One:
Max. Estimate or Partial Cost or Final Cost
No. of Calendar Days for Completion after
Notice to Proceed DaysProject Description:
Contractor’s Signature and Date
Complete the following using additional pages, if necessary. Rates all inclusive.
1. Labor: Hours: Rate/Hours: Cost:
A = $
2. Materials (provide general description Cost:
here and attach itemized invoice): $
State Tax $
B = $
3. Equipment Cost (provide general description Cost:
attach itemized invoice and receipts): $
C = $
4. Total Cost: A + B + C =
5. Total Subcontractor Cost from Pricing Page. Attach Subcontracting Form anditemized invoices; list subcontractor’s name and address here: Cost:
Total $
6. Bond Cost, if applicable: $
Inspector’s Initials:
Approval Date:
Supervisor’s Initials:
Approved Rejected
Date:
7. GRAND TOTAL (Total Costs + Subcontracting + Bond Cost) =
W
COST AND PRICE ANALYSIS SHEET