The document is a Vulnerability Assessment Compliance Checklist issued by the Florida Department of Environmental Protection (DEP) for the Resilient Florida Grant Program. This three-page exhibit provides a comprehensive checklist of requirements for vulnerability assessments initiated through June 30, 2024, detailing specific mandatory components for grant recipients. The checklist covers multiple aspects of environmental vulnerability assessment, including requirements for electronic mapping data, critical asset inventories, flood scenario analyses, and compliance with statutory guidelines under subsection 380.093(3), F.S.
The checklist mandates detailed reporting on various flood-related analyses, including tidal flooding, storm surge, rainfall-induced flooding, and compound flooding scenarios. Key requirements include using North American Vertical Datum of 1988, incorporating at least two local sea level rise scenarios (specifically the 2017 NOAA intermediate-low and intermediate-high projections), and analyzing two planning horizons (2040 and 2070). Grant recipients must provide geospatial data, GIS metadata, and an inventory of critical assets impacted by flooding and sea level rise, with assets prioritized by area and immediate need. The document serves as a compliance tool to ensure comprehensive and standardized vulnerability assessments across Florida jurisdictions receiving resilience grant funding.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit I
Rev. 7/1/2024
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
RESILIENT FLORIDA GRANT PROGRAM
VULNERABILITY ASSESSMENT COMPLIANCE CHECKLIST CERTIFICATION
Vulnerability Assessments using Statutory Requirements Effective through June 30, 2024
Required for all planning grant agreements that include a Comprehensive Vulnerability Assessment.
DEP Agreement Number: __________________________
Project Title: ___________________________________________________________________
Grantee: _______________________________________________________________________
In accordance with subsection 380.093(3), F.S., for a Vulnerability Assessment initiated through June 30, 2024, the following components, scenarios, data, and information are required for a comprehensive Vulnerability Assessment (VA).
The checklist must be completed and submitted with the final VA Report deliverable, pursuant to Attachment 3, Grant Work Plan. When filling out the checklist, please provide the corresponding page number in the VA or, if the item is not applicable, an explanation as to why it is not applicable. The Grantee must abide by the Resilient Florida Program’s GIS Data Standards found on the Resilient Florida Program webpage:
https://floridadep.gov/rcp/resilient-florida-program/documents/resilient-florida-program-gis-data-standards
Resilient Florida – Program Requirements
Item
ID
Check if Included Item Description
Page Reference in VA Report
(if applicable)
A ☐ The Final VA Report includes the Department’s logo and funding source language, pursuant to Attachment 6 of the grant agreement.
Part 1 – Subparagraph 380.093(3)(c)2., F.S.
Item
ID
Check if Included Item Description
Page Reference in VA Report
(if applicable)
B ☐ Final VA Report that provides details on the results and conclusions, including illustrations via maps and tables.
All electronic mapping data used to illustrate flooding and sea level rise impacts that are identified in the VA must be provided in the format consistent with the Department’s GIS Data Standards and include the following three (3) items:
C ☐ Geospatial data in an electronic file format.
D ☐ GIS metadata.
E ☐
An inventory of critical assets for each jurisdiction, including regionally significant assets, that are, impacted by flooding and sea level rise. The list must be prioritized by area or immediate need and must identify which flood scenario(s) impacts each asset. Critical assets and regionally significant assets are as defined in subsection 380.093(2), F.S.
https://floridadep.gov/rcp/resilient-florida-program/documents/resilient-florida-program-gis-data-standards
Rev. 7/1/2024
Part 2 – Subparagraphs 380.093(3)(d)1. and 380.093(3)(d)2., F.S.
Item
ID
Check if Included Item Description
Page Reference in VA Report
(if applicable)
F ☐
Peril of Flood Comprehensive Plan amendments developed that address paragraph 163.3178(2)(f), F.S. (as applicable)
☐ Noncoastal community/Peril of Flood not required ☐ Already in compliance
G ☐ Depth of tidal flooding, including future high tide flooding. The threshold for tidal flooding is 2 feet above mean higher high water.
(as applicable)
G.1 ☐Analysis geographically displays the number of tidal flood days expected for each scenario and planning horizon.
(to the extent practicable)
H
Depth of current and future storm surge flooding using publicly available NOAA or FEMA storm surge data. (check one, as applicable)
☐ NOAA data ☐ FEMA data
H.1 ☐ Initial storm surge event equals or exceeds current 100-year flood event.
H.2 ☐ Higher frequency storm analyzed for exposure of a critical asset.
(optional, but must provide additional detail if included)
I ☐ Rainfall-induced flooding was considered using spatiotemporal analysis or existing hydrologic and hydraulic modeling results.
(to the extent practicable but required if Item F is noncoastal)
I.1
☐ Future boundary conditions have been modified to consider sea level rise and high tide conditions. For rainfall-induced flood modeling, the model inputs for the 2040/2070 rainfall scenarios should use projected sea level rise/high tide conditions.
I.2 ☐ Depth of rainfall-induced flooding for 100-year storm and 500-year storm event.
(required if Item F is noncoastal)
I.3 ☐ If Water Management District data is not available, data from an appropriate federal agency was used.
Agency used:
J ☐ Compound flooding or the combination of tidal, storm surge, and rainfall-induced flooding.
(to the extent practicable)
Rev. 7/1/2024
Part 3 – Subparagraph 380.093(3)(d)3., F.S.
Item
ID
Check if Included Item Description
Page Reference in VA Report
(if applicable) K ☐ All analyses in North American Vertical Datum of 1988.
L ☐ Includes at least two local sea level rise scenarios, which must include the 2017 NOAA intermediate-low and intermediate-high sea level rise projections.
M ☐ Includes at least two planning horizons, which must include years 2040 and 2070.
N ☐ Uses local sea level data that has been interpolated between the two closest NOAA tide gauges.
N.1 ☐ Local, publicly available, sea level data was taken from one of the two closest NOAA tide gauges. Data may be taken from one such gauge if the gauge has a higher mean sea level.
N.2 ☐ An alternate tide gauge with appropriate rationale and Department approval.
(if checked, provide Department approval)
Identify all counties and municipalities that are included in this Vulnerability Assessment:
I certify that, to the Grantee’s knowledge, all information contained in this completed Vulnerability Assessment Compliance Checklist is true and accurate as of the date of the signature below.
Grantee's Grant Manager Signature
Print Name
Date
| Print Name: |
| Date: |
| Project Title: |
| Grantee: |
| DEP Agreement Number: |
| 6: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 7: |
| 8: |
| 9: |
| 10: |
| 11: |
| 12: |
| 13: |
| 14: |
| 15: |
| 16: |
| 17: |
| 18: |
| 19: |
| 20: |
| 21: |
| 22: |
| 23: |
| 24: |
| 25: |
| 26: |
| 27: |
| 28: |
| 29: |
| 30: |
| 31: |
| 32: |
| 33: |
| 34: |
| 35: |
| 36: |
| 37: |
| 38: |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Off |
| Check Box17: Off |
| Check Box18: Off |
| Check Box19: Off |
| Check Box20: Off |
| Check Box21: Off |
| Check Box22: Off |
| Check Box23: Off |
| Check Box24: Off |
| Check Box25: Off |
| Check Box26: Off |
| Check Box27: Off |
File details come from the government source that posted it. Updated .