Copy of SSL Bid Sheet.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Install a grinder pump lift station, sewer service line, electrical cabling and pump and abandon existing septic tank.
Solicitation number
246-24-Q-0022
Issued by

About this file

This document contains a bid sheet template and related federal contract opportunity notice. The bid sheet template lists seven items required for the installation of a grinder pump lift station, sewer service lines, and abandonment of an existing septic tank. The items include various sizes of PVC piping and fittings, a grinder pump station, casing, tapping saddle, and abandonment of a septic tank. Pricing is requested by line item with estimated quantities and unit costs provided. The related federal contract opportunity is solicitation number 246-24-Q-0022 issued by the Department of Health and Human Services Indian Health Service to install the items listed in the bid sheet template. Responses are due based on the standard solicitation timeline.

View the file

Other files

File Type Posted
eone-grinder-pump-system-dh071-drawings.pdf PDF
SOW_Lift Station and SSL_KMY EDITS.pdf PDF
ok30 (1).txt TXT text file
SF18-95a and Clauses.pdf PDF
eone-dh071-grinder-pump-installation-instructions.pdf PDF
Drawing r1je.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IGCE

Okmulgee OEH&E field Office
24010 East 97th Street Broken Arrow, OK 74014
SR 6569 & OK22-13I
EstimatedUnitTotal
ItemDescriptionQuantityUnitCostCost
Schedule A - Sewer Service Line and Sewer Lift Station
1F & I 4" SCH 40 PVC Sewer Service Line and Fittings30LF
2F & I 4" Two-Way Cleanout with Plug and Adapter1EA
3F & I E/ONE DH071-61 Grinder Pump Station1LS
4F & I 1-1/4" SCH 40 PVC Pressure Sewer Service Line and Fittings225LF
5F & I 3" SCH 40 PVC Casing45LF
6F & I 8" x 1-1/4" Sanitary Sewer Tapping Saddle and Fittings1LS
7Pump and Abandon Existing Septic Tank1LS
Total Project Cost
Date of Estimate:
NOTE: Bidder must bid on all items of all schedules to be considered
responsive for award.

File details come from the government source that posted it. Updated .