Copy_of_Ryon_Park_Stage_-_Bid_Schedule_(5.1.26).xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- RYON PARK STAGE AREA IMPROVEMENT PROJECT
- Solicitation number
- ITB NO. 3113
- Issued by
- Santa Barbara County, Los Angeles City, California
About this file
This is a bid schedule for the Ryon Park Stage Area Improvement Project submitted to the City of Lompoc, California. The project encompasses comprehensive park improvements organized into six major categories: mobilization, demolition, grading, hardscape, site amenities, irrigation, and planting. Mobilization items include standard construction requirements such as temporary restrooms, storage, fencing, water and power, erosion control, tree protection, insurance, bonding, as-builts, submittals, and construction staking. Demolition work involves turf and irrigation removal, and removal of the existing stage, stairs, and all footings. Hardscape work includes subgrade preparation and 3,934 square feet of concrete paving. Site amenities include a new stage with ramps and handrails, with the windwall to be furnished by the city. Irrigation work consists of drip irrigation system installation and turf irrigation system adjustment. Planting work includes weed abatement, soil preparation, fine grading, a 90-day plant establishment and maintenance period, 331 square feet of turf sod repair, and shrub plantings. Bids were due by 2:00 pm on Thursday, July 2, 2026, with proposals valid for 90 calendar days after the bid opening date.
The bid schedule presents line items with unit costs and total costs to be completed by bidders, though specific pricing amounts are not populated in the document provided. This schedule serves as the baseline for comparing competing bids submitted in response to the city's solicitation. No information regarding set-asides, incumbent contractors, contract term, renewal options, or specific funding sources is contained within this bid schedule document.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Bid
| BIDDER'S PROPOSAL - BID SCHEDULE |
| RYON PARK PARK IMPROVEMENTS |
| BASE BID ITEMS AS FOLLOWS: | ||||
| DESCRIPTION OF ITEMS PER PLANS AND SPECIFICATIONS | UNIT COST | TOTAL COST | ||
| QTY | UNIT |
MOBILIZATION
| 1 | MOBILIZATION AND DEMOBILIZATION | 1 | LS | |
| 2 | PORTABLE RESTROOM | 1 | LS | |
| 3 | STORAGE CONTAINER | 1 | LS | |
| 4 | TEMPORARY FENCING | 1 | LS | |
| 5 | TEMPORARY WATER AND POWER FOR CONSTRUCTION | 1 | LS | |
| 6 | SWPPP, EROSION AND DUST CONTROL | 1 | LS | |
| 7 | TREE PROTECTION | 1 | LS | |
| 8 | INSURANCE AND BONDING | 1 | LS | |
| 9 | AS-BUILTS | 1 | LS | |
| 10 | SUBMITTALS/ PERMITTING | 1 | LS | |
| 11 | CONSTRUCTION STAKING | 1 | LS | |
| MOBILIZATION TOTAL |
DEMOLITION
| TURF AND IRRIGATION REMOVAL | 1 | LS | |
| IRRIGATION REMOVAL | 1 | LS | |
| REMOVE EXISTING STAGE,STAIRS, AND ALL FOOTINGS | 1 | LS | |
| DEMOLITION TOTAL |
GRADING
| GRADING | 1 | LS | |
| GRADING TOTAL |
HARDSCAPE
| SUBGRADE PREPARATION | 1 | LS | |
| CONCRETE PAVING | 3,934 | SF | |
| HARDSCAPE TOTAL |
SITE AMENITIES
| STAGE WITH RAMPS AND HANDRAILS | 1 | EA | |
| WINDWALL (City Furnished) | 1 | EA | |
| SITE AMENITIES TOTAL |
IRRIGATION
| DRIP IRRIGATION SYSTEM | 1 | LS | |
| TURF IRRIGATION SYSTEM ADJUSTMENT | 1 | LS | |
| IRRIGATION TOTAL |
PLANTING
| WEED ABATEMENT, SOIL PREPARATION & FINE GRADE | 1 | LS | |
| 90 DAY PLANT ESTABLISHMENT/MAINTENANCE PERIOD | 1 | LS | |
| TURF (SOD) REPAIR | 331 | SF | |
| PLANTING (SHRUBS) | 1 | LS | |
| PLANTING TOTAL |
TOTAL BASE BID PROJECT IN FIGURES $
TOTAL BASE BID PROJECT IN WORDS
Page &P of &N