Copy of Price Proposal Template.xlsx

XLSX spreadsheet 103 KB Posted

Attached to
Z1DA--Upgrade Electrical Paralleling System Project # 626-18-203 Federal contract opportunity
Solicitation number
36C24921R0069
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Breakdown

JOB NAME: LOCATION: TBD PROPOSAL DATE: 01/01/1900Solicitation NumberProject NumberProject TitleProposal Date
36C24921R0069626-18-203Upgrade Electrical Paralleling System

SPEC/COST CODE DESCRIPTION LABOR MATERIAL EQUIPMENT DIVISION TOTALS

DIVISION 1GENERAL REQUIREMENTS$0.00
01 32 16Project Schedules (Small Projects - Design/Bid/Build)
01 33 23Shop Drawings, Product Data, and Samples
01 35 26Safety Requirements
01 42 19Reference Standards
01 45 00Quality Control
01 45 29Testing Laboratory Services
01 57 19Temporary Environmental Controls
01 58 16Temporary Interior Signage
01 74 19Construction Waste Management
01 91 00General Commissioning Requirements
DIVISION 2Existing Conditions$0.00
02 21 13Site Surveys
02 41 00Demolition
DIVISION 3CONCRETE$0.00
03 30 00Cast in Place Concrete
03 30 53Short Form - Cast in Place Concrete
DIVISION 4MASONRY
DIVISION 5Metals$0.00
05 12 00Structrural Steel Framing
05 21 00Steel Joist Framing
05 31 00Steel Decking
05 36 00Composite Metal Decking
05 40 00Cold - Formed Metal Decking
05 50 00Metal Fabrications
DIVISION 6Wood, plastics and CompositesERROR:#REF!
DIVISION 7THERMAL AND MOISTURE PROTECTION$0.00
07 01 50.19Preparation for Re-roofing
07 22 00Roof and Deck Insulation
07 84 00Firestopping
07 92 00Joint Sealants
07 95 13Expansion Joint Cover Assemblies
DIVISION 8Openings$0.00
08 11 13Hollow Metal Doors & Frames
08 17 00Integrated Door Assemblies
08 31 13Access Doors and Frames
08 34 53Security Doors and Frames
08 71 00Door Hardware
08 90 00Louvers and Vents
DIVISION 9FINISHES$0.00
09 05 16Subsurface Prep for Floor Finishing
09 06 00Schedule for Finishes
09 22 16Non Struct Metal Framing
09 29 00Gypsum Board
09 91 00Painting
DIVISION 10Specialties$0.00
10 44 13Fire extinguisher Cabinets
DIVISION 11EQUIPMENT
DIVISION 12Furnishings$0.00
DIVISION 13Special Construction$0.00
13 05 41Seismic Restraint Requirements for Non- Structural Components
DIVISION 21Fire Suppression$0.00
21 08 00Commisssioning of Fire Suppression System
21 12 00Manual Dry Standpipe Systems
21 13 13Wet-Pipe Sprinkler Systems
21 13 16Dry Pipe Sprinkler Systems
DIVISION 22Plumbing$0.00
22 05 11Common Work Results for Plumbing
22 07 11Plumbing Insulation
DIVISION 23Heating, Ventilating and Air Conditioning HVAC$0.00
22 13 00Facility Sanitary and Vent Piping
23 05 11Common Work Results for HVAC
23 05 12General Motor Requirments for HVAC and Steam Generation Equipment
23 05 41Noise and Vibration Control for HVAC Piping and Equipment
23 05 93Testing, Adjusting, and Balancing for HVAC
23 08 00Commissioning of HVAC Systems
23 09 23Direct - Digital Control System for HVAC
23 09 93HVAC Controls Sequence of Operations
23 31 00HVAC Ducts and Casings
23 34 00HVAC Fans
23 36 00Air Terminal Units
23 37 00Air Outlets & Inlets
DIVISION 26ELECTRICAL$0.00
26 05 11Requirements for Electrical Installations
26 05 19Low-Voltage Electrical Power Conductors and Cables
26 05 26Grounding and Bonding for Electrical Systems
26 05 33Raceway & Boxes for Electrical Systems
26 05 73Overcurrent Protective Device Coordination Study
26 08 00Commissioning of Electrical Systems
26 22 00Low Voltage Transformers
26 23 00Low Voltage Switchgear
26 23 13Generator Paralleling Controls
26 24 13Distribution Switchboards
26 24 16Panelboards
26 27 26Wiring Devices
26 29 11Motor Controllers
26 29 21Enclosed Switches and Circuit Breakers
26 36 23Automatic Transfer Switches
26 51 00Interior Lighting
26 56 00Exterior Lighting
DIVISION 27COMMUNICATIONS$0.00
27 05 11Requirements for Communications Installations
27 05 26Grounding and Bonding for Communication Systems
27 05 33Raceways and Boxers for Communication Systems
27 08 00Commissioning of Communications Systems
27 10 00Control, Communication and Signal Wiring
DIVISION 28ELECTRONIC SAFETY AND SECURITY$0.00
28 05 00Common Work Results for Electronic Safety and Security
28 05 13Conductors and Cables for Electronic Safety and Security
28 05 28.33Conduits & Backboxes for Electronic Safety & Security
28 08 00Commissioning of Electronic Safety and Security Systems
DIVISION 32EXTERIOR IMPROVEMENTS$0.00
32 05 23Cement & Concrete for Exterior Improvements
TOTALS
$0.00
TOTAL LABOR
$0.00
TOTAL MATERIALS
6%$0.00
TAX FOR MATERIALS
$0.00
TOTAL EQUIPMENT
DIVISION GRAND TOTALSERROR:#REF!
$0INSTRUCTIONS
DIVISION GRAND TOTALS$0
TAX FOR MATERIALS1. Contract breakdowns must include the applicable VA Medical Center, the date the proposal was provided to the VA, the job title, project number, and the solicitation number;
SUBTOTAL$0
OVERHEAD10%$0
PROFIT10%$02. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division or subdivision when each division or subdivision can be broken down by price to a greater degree;
$0
SUBTOTAL
BOND/FEE3%$03. Divisions must still be listed even if not applicable to the construction requirement;
PERMITS/LICENSES

GRAND TOTAL $0 4. The template above does not include all possible divisions or subdivisions needed for the fictitious requirement referenced above. It is only provided as an example of what would be acceptable to the VA Network Contracting Office 9 -Construction Team as of 6-30-2016. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept any subsequent price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown. Therefore, it is in the Governments and contractor’s best interest to provide a thorough price breakdown initially; and

5. This template, or another template that would be provide the same kind of information referenced above, is required for all proposals provided to the VA Network Contracting Office 9 - Construction as of 6-30-2016.

Sheet3

File details come from the government source that posted it. Updated .