Copy of General Conditions Breakout.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- Z1DA--Upgrade Electrical Paralleling System Project # 626-18-203 Federal contract opportunity
- Solicitation number
- 36C24921R0069
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24921R0069 0001.pdf | ||
| WD TN20210083 DTD 01 01 2021.pdf | ||
| RFI Form - Electrical Paralleling.pdf | ||
| Upgrade Paralleling System Drawings- 17-22 Mechanical and Demo.pdf | ||
| 36C24921R0069_1.docx | DOCX document | |
| Contractor EMR Certification Form.pdf | ||
| Upgrade Paralleling System Drawings- 5-10 Architectural.pdf | ||
| 626-18-203 Nashville VA Updated Specifications with 1200A ATS on 12-4-20.pdf | ||
| S02 - CALCULATION OF SELF PERFORMED WORK.pdf | ||
| Upgrade Paralleling System Drawings- 36-38 Electrical.pdf | ||
| Upgrade Paralleling System Drawings- 35 Electrical.pdf | ||
| Copy of Price Proposal Template.xlsx | XLSX spreadsheet | |
| Upgrade Paralleling System Drawings- 23-34 Electrical.pdf | ||
| Upgrade Paralleling System Drawings- 12-16 Structural.pdf | ||
| Upgrade Paralleling System Drawings- 11 Architectural.pdf | ||
| Upgrade Paralleling System Drawings- 1-4 General.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GC Breakout
| GENERAL CONDITIONS BREAKOUT | |
| When entering a line item for General Conditions costs on Schedule of Values, a breakout of the General Conditions costs must be provided. Per VAAR 852.236-88 Contract Changes-Supplement, paragraph (b)(10), the following contractual restrictions apply: Overhead and contractor’s fee percentages shall be considered to include insurance other than mentioned herein, field and office supervisors and assistants, security police, use of small tools, incidental job burdens, and general home office expenses and no separate allowance will be made therefore. Assistants to office supervisors include all clerical, stenographic and general office help. Incidental job burdens include, but are not necessarily limited to, office equipment and supplies, temporary toilets, telephone and conformance to OSHA requirements. Items such as, but not necessarily limited to, review and coordination, estimating and expediting relative to contract changes are associated with field and office supervision and are considered to be included in the contractor’s overhead and/or fee percentage. |
| General Condition Description | Value |
| Superintendent | $ - 0 |
| Project Manager | $ - 0 |
| Field Office Engineer | $ - 0 |
| Builder's Risk Insurance | $ - 0 |
| Other Project Specific Liability Insurance | $ - 0 |
| Site Maintenance and Protection | $ - 0 |
| Progress Photos (per contract specifications) | $ - 0 |
| Dumpsters | $ - 0 |
| Office Trailer | $ - 0 |
| Storage Trailer/POD/CONEX | $ - 0 |
| Telephone (Cell and/or Landline) | $ - 0 |
| Signage (per contract specifications and/or drawings) | $ - 0 |
| Travel (must comply with Federal Travel Regulations) | $ - 0 |
| Lodging (must comply with Federal Travel Regulations) | $ - 0 |
| Record Document Preparation | $ - 0 |
| As-builts (per contract specifications) | $ - 0 |
| Weather Protection (per contract specifications) | $ - 0 |
| Infection Control (per contract specifications) | $ - 0 |
| Information Technology (Internet, etc.) | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| General Conditions Total | $ - 0 |
File details come from the government source that posted it. Updated .