Coopers Electrical Phase II - Project Drawings.pdf

PDF 20 MB Posted

Attached to
Coopers Rock High Voltage Power Construction Ph. 2
Solicitation number
CRFQ 0310 DNR2700000006 1
Issued by
Pleasants County, West Virginia

About this file

This is a set of construction documents and project drawings prepared by Miller Engineering Inc. for the West Virginia Division of Natural Resources for the Coopers Rock High Voltage Repairs Phase 2 project, involving high voltage and low voltage electrical replacement at Coopers Rock State Park near Bruceton Mills, West Virginia. The project encompasses comprehensive electrical infrastructure upgrades including the installation of new poles, overhead and underground electrical distribution systems, pad-mounted transformers, and associated electrical equipment across seven designated areas (A through G) spanning approximately 4,000 linear feet. The construction documents include detailed electrical demonstration plans, electrical plans by area, enlarged plans for specific installations, electrical details for pole construction and equipment mounting, and comprehensive schedules for transformers, feeders, and fuses. The project involves installation of multiple transformers with capacities ranging from 10 to 75 kilovolt-amperes (KVA), distribution panels serving various park facilities including water treatment plants, campgrounds, restrooms, and recreational areas, and coordination with utility companies for metering and primary voltage connections.

The electrical work must be performed in accordance with the 2020 National Electrical Code and includes provisions for both copper and aluminum cable conductors in various sizes, PVC and metal conduit installations, grounding systems utilizing copper ground rods and cadweld connections, and pole-mounted safety equipment including fused cutouts, disconnects, and lightning arrestors. Key project specifications require verification of field conditions prior to bidding, coordination among all trades and subcontractors, installation of new poles generally within three feet of existing poles unless otherwise indicated, complete new system installation prior to removal of existing systems, provision of insulating sleeves or wraps on poles for safety purposes, and final coordination of fixture locations with the project owner and general contractor. The project includes removal and repurposing of existing electrical infrastructure, extension of underground conduit to multiple facility locations, and installation of 15 kilovolt cable through previously installed conduit for interstate crossing bore locations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

C000

COVER PAGE

06-29-2026

TRT

BCM

26002

CONSTRUCTION

DOCUMENTS

WEST VIRGINIA

DIVISION OF

NATURAL

RESOURCES

COOPERS ROCK HIGH VOLTAGE REPAIRS

PHASE 2 - HIGH VOLTAGE & LOW VOLTAGE

ELECTRICAL REPLACEMENT

SHEET INDEX

Sheet Number Sheet Name

C000 COVER PAGE

E001 ELECTRICAL DEMO PLAN - OVERALL NORTH

E002 ELECTRICAL DEMO PLAN - OVERALL SOUTH

E003 ELECTRICAL DEMO PLAN "AREA A"

E004 ELECTRICAL DEMO PLAN "AREA B"

E005 ELECTRICAL DEMO PLAN "AREA C"

E006 ELECTRICAL DEMO PLAN "AREA D"

E007 ELECTRICAL DEMO PLAN "AREA E"

E008 ELECTRICAL DEMO PLAN "AREA F"

E009 ELECTRICAL DEMO PLAN "AREA G"

E101 ELECTRICAL PLAN "AREA A"

E102 ELECTRICAL PLAN "AREA B"

E103 ELECTRICAL PLAN "AREA C"

E104 ELECTRICAL PLAN "AREA D"

E105 ELECTRICAL PLAN "AREA E"

E106 ELECTRICAL PLAN "AREA F"

COOPERS ROCK HIGH VOLTAGE REPAIRS

PHASE 2 - MAIN PARK POWER FEED

61 COUNTY LINE DR.

BRUCETON MILLS, WV 26525

PA OFFICE:

PO BOX 42

GARARDS FORT, PA 15334

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN ROAD

MORGANTOWN, WV 26508

PH: (304) 291-2234

N O

D

E S

C R

IP

T

IO

N

D A

T E

SHEET INDEX

Sheet Number Sheet Name

E107 ELECTRICAL PLAN "AREA G"

E108 ELECTRICAL PLAN "AREA A"

E109 ELECTRICAL PLAN "AREA B"

E110 ELECTRICAL PLAN "AREA C"

E111 ELECTRICAL PLAN "AREA D"

E112 ELECTRICAL PLAN "AREA E"

E113 ELECTRICAL PLAN "AREA F"

E114 ELECTRICAL PLAN "AREA G"

E401 ENLARGED ELECTRICAL PLAN

E402 ENLARGED ELECTRICAL PLAN

E501 ELECTRICAL DETAILS

E502 ELECTRICAL DETAILS

E503 ELECTRICAL DETAILS

E504 ELECTRICAL DETAILS

E601 ELECTRICAL SCHEDULES

NOTE: ORIGINAL DOCUMENTS ARE IN COLOR

EXISTING R.O.W.

DISTANCE VARIES

NEW R.O.W.

#8 DN POLE

#11 UP POLE

A

B

C

D

CLEAR OVERHEAD, TREES, LIMBS, AND BRUSH ONLY

GROUND TO SKY, TO 50' EACH SIDE OF CENTER LINE.

CLEAR GROUND IN ALL OF THE EXISTING RIGHT OF

WAY BRUSH, TREES, ETC. DO NOT CUT TREES

OUTSIDE THE PROPOSED RIGHT OF WAY. (TYP - ALL

UNLESS OTHERWISE DIRECTED)

1. WIRING IS SHOWN ON DRAWINGS ONLY FOR SPECIFIC ROUTES

OR SPECIAL CONDITIONS. ALL WALL MOUNTED DEVICES ARE

FINAL HEIGHT BY. ARCH.

2. WIRING AND CONDUIT OR MC CABLE SHALL BE REQUIRED FOR

ALL OUTLETS AND DEVICES. FOLLOW INDICATED CIRCUITS

NUMBERS AND PANEL DESIGNATION. OBTAIN PRIOR APPROVAL

OF ENGINEER FOR DEVIATIONS.

3. ALL 15A AND 20A, 115V AND 120V RECEPTACLES LOCATED IN

DWELLING UNITS SHALL BE TAMPER RESISTANT.

4. ALTHOUGH ALL BRANCH CIRCUIT WIRING IS NOT SHOWN, IT IS

THE INTENT OF THESE DOCUMENTS THAT A COMPLETE

BRANCH CIRCUIT WIRING SYSTEM BE INSTALLED. ALL

NEUTRALS SHALL BE FULL CAPACITY. THE USE OF SHARED OR

COMMON NEUTRALS IS PROHIBITED ON ALL ELECTRIC WIRING.

5. PROVIDE CONTROL AND FIRE ALARM WIRE AS NECESSARY TO

INSTALL ALL SYSTEMS DEVICES AND PANELS FOR COMPLETE

SYSTEMS. FINAL CONNECTION TO PERMANTLY MOUNTED

EQUIPMENT IS PART OF THE ELECTRICAL SCOPE OF THIS

PROJECT.

6. PROVIDE TEL/DATA AND CAT5 AS INDICATED. REVIEW DATA,

SWITCH, RECEPTACLE, ETC LOCATIONS AND HEIGHTS WITH

OWNER PRIOR TO INSTALLATION.

7. ALL INTERIOR WIRING SHALL BE THHN/THWN IN METAL CONDUIT

OR MC CABLE. MAX OF 3'-0" OF FLEXIBLE CONDUIT MAY BE

USED FOR FINAL EQUIPMENT TERMINATIONS.

8. EXTERIOR WIRING IS TO BE THHN/THWN IN PVC CONDUIT. MAX.

OF 3'-0" OF FLEXIBLE METALLIC SEATITLE CONDUIT MAY BE

USED TO EXTERIOR EQUIPMENT.

9. TV AND TELEPHONE CABLING SHALL BE INSTALLED FROM

LOCATIONS INDICATED ON DRAWINGS TO DEMARC LOCATION.

COORDINATE FINAL DEMARC LOCATIONS w/ TV AND

TELEPHONE COMPANY.

10. GROUP AND TRAIN ALL TEL/DATA AND CABLE TV CABLE.

SUPPORT FROM STRUCTURE.

11. VERIFY ALL FIELD CONDITIONS AND MEASUREMENTS PRIOR TO

BIDDING. COORDINATE ALL WORK WITH OTHER TRADES.

COORDINATE ALL CEILING MOUNTED DEVICES WITH ALL OTHER

TRADES PRIOR TO INSTALLATION.

12. PERFORM ALL WORK IN ACCORDANCE WITH 2020 NEC.

13. COORDINATE FINAL FIXTURE LOCATIONS WITH OWNER AND

GENERAL CONTRACTOR PRIOR TO INSTALLATION OF CEILING.

FINAL COORDINATION OF SCOPE OF WORK , DIMENSIONS,

FIXTURE PLACEMENT, ROUTINGS, ETC IS THE RESPONSIBILITY

OF THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS

PRIOR TO BIDDING.

ELECTRICAL NOTES

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

E001

ELECTRICAL DEMO

PLAN - OVERALL

NORTH

06-29-2026

BCM

BCM

26002

CONSTRUCTION

DOCUMENTS

WEST VIRGINIA

DIVISION OF

NATURAL

RESOURCES

COOPERS ROCK HIGH VOLTAGE REPAIRS

PHASE 2 - HIGH VOLTAGE & LOW VOLTAGE

ELECTRICAL REPLACEMENT

RIGHT OF WAY KEY

1" = 400'-0"

ELECTRICAL DEMO PLAN - OVERALL NORTH

N O

D

E S

C R

IP

T

IO

N

D A

T E

EXISTING R.O.W.

DISTANCE VARIES

NEW R.O.W.

D

E F

G

1. WIRING IS SHOWN ON DRAWINGS ONLY FOR SPECIFIC ROUTES

OR SPECIAL CONDITIONS. ALL WALL MOUNTED DEVICES ARE

FINAL HEIGHT BY. ARCH.

2. WIRING AND CONDUIT OR MC CABLE SHALL BE REQUIRED FOR

ALL OUTLETS AND DEVICES. FOLLOW INDICATED CIRCUITS

NUMBERS AND PANEL DESIGNATION. OBTAIN PRIOR APPROVAL

OF ENGINEER FOR DEVIATIONS.

3. ALL 15A AND 20A, 115V AND 120V RECEPTACLES LOCATED IN

DWELLING UNITS SHALL BE TAMPER RESISTANT.

4. ALTHOUGH ALL BRANCH CIRCUIT WIRING IS NOT SHOWN, IT IS

THE INTENT OF THESE DOCUMENTS THAT A COMPLETE

BRANCH CIRCUIT WIRING SYSTEM BE INSTALLED. ALL

NEUTRALS SHALL BE FULL CAPACITY. THE USE OF SHARED OR

COMMON NEUTRALS IS PROHIBITED ON ALL ELECTRIC WIRING.

5. PROVIDE CONTROL AND FIRE ALARM WIRE AS NECESSARY TO

INSTALL ALL SYSTEMS DEVICES AND PANELS FOR COMPLETE

SYSTEMS. FINAL CONNECTION TO PERMANTLY MOUNTED

EQUIPMENT IS PART OF THE ELECTRICAL SCOPE OF THIS

PROJECT.

6. PROVIDE TEL/DATA AND CAT5 AS INDICATED. REVIEW DATA,

SWITCH, RECEPTACLE, ETC LOCATIONS AND HEIGHTS WITH

OWNER PRIOR TO INSTALLATION.

7. ALL INTERIOR WIRING SHALL BE THHN/THWN IN METAL CONDUIT

OR MC CABLE. MAX OF 3'-0" OF FLEXIBLE CONDUIT MAY BE

USED FOR FINAL EQUIPMENT TERMINATIONS.

8. EXTERIOR WIRING IS TO BE THHN/THWN IN PVC CONDUIT. MAX.

OF 3'-0" OF FLEXIBLE METALLIC SEATITLE CONDUIT MAY BE

USED TO EXTERIOR EQUIPMENT.

9. TV AND TELEPHONE CABLING SHALL BE INSTALLED FROM

LOCATIONS INDICATED ON DRAWINGS TO DEMARC LOCATION.

COORDINATE FINAL DEMARC LOCATIONS w/ TV AND

TELEPHONE COMPANY.

10. GROUP AND TRAIN ALL TEL/DATA AND CABLE TV CABLE.

SUPPORT FROM STRUCTURE.

11. VERIFY ALL FIELD CONDITIONS AND MEASUREMENTS PRIOR TO

BIDDING. COORDINATE ALL WORK WITH OTHER TRADES.

COORDINATE ALL CEILING MOUNTED DEVICES WITH ALL OTHER

TRADES PRIOR TO INSTALLATION.

12. PERFORM ALL WORK IN ACCORDANCE WITH 2020 NEC.

13. COORDINATE FINAL FIXTURE LOCATIONS WITH OWNER AND

GENERAL CONTRACTOR PRIOR TO INSTALLATION OF CEILING.

FINAL COORDINATION OF SCOPE OF WORK , DIMENSIONS,

FIXTURE PLACEMENT, ROUTINGS, ETC IS THE RESPONSIBILITY

OF THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS

PRIOR TO BIDDING.

ELECTRICAL NOTES

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

E002

ELECTRICAL DEMO

PLAN - OVERALL

SOUTH

06-29-2026

BCM

BCM

26002

CONSTRUCTION

DOCUMENTS

WEST VIRGINIA

DIVISION OF

NATURAL

RESOURCES

COOPERS ROCK HIGH VOLTAGE REPAIRS

PHASE 2 - HIGH VOLTAGE & LOW VOLTAGE

ELECTRICAL REPLACEMENT

RIGHT OF WAY KEY

1" = 400'-0"

ELECTRICAL DEMO PLAN - OVERALL SOUTH

N O

D

E S

C R

IP

T

IO

N

D A

T

#8 DN POLE

#11 UP POLE

2'

5/

344' - 9 17/32"

/3

374' - 8 3/8"

264' - 11 5/8" 291' - 7 29/32"

333' - 9 3/32"

387' - 1 3/32"

213' - 1 1 27/32"

196' - 2 9/16"

388' - 9 29/32"

216' - 8 25/32" 33' - 6 9/16"

39°39'22.00"N

79°47'21.00"W

39°39'25.07"N

79°47'18.38"W

39°39'26.24"N

79°47'14.24"W

39°39'30.63"N

79°47'14.23"W

39°39'31.02"N

79°47'10.54"W

39°39'31.11"N

79°47'6.27"W

39°39'32.46"N

79°47'1.64"W

39°39'33.33"N

79°46'59.15"W

39°39'34.37"N

79°46'57.03"W

39°39'36.38"N

79°46'52.79"W

39°39'36.44"N

79°46'50.02"W

39°39'36.44"N

79°46'49.59"W

39°39'31.17"N

79°47'17.55"W

39°39'31.27"N

79°47'22.34"W

FOR NEW RIGHT OF WAY, EXTEND THE EXISTING RIGHT

OF WAY AN ADDITIONAL 25' TO THE NORTH FOR POLES

2-9 (75' TOTAL NORTH, 50' TOTAL SOUTH OF CENTER OF

RIGHT OF WAY).

EXISTING POLE TO BE REMOVED AFTER INSTALLATION OF

NEW POLES AND NEW OVERHEAD IS ENERGIZED. WHEN

REMOVED, BUNK EXISTING POLES IN LOCATIONS ON

DRAWINGS UNLESS DESIGNATED OTHERWISE BY OWNER

POLE YARD BUNKER LOCATION (TYP)

UNDERGROUND CONDUIT BY OTHERS, (1)

CND INCLUDES NEWLY INSTALLED CABLE TO

BE RE-SERVED TO NEW POLES 8 & 11.

EXISTING R.O.W.

DISTANCE VARIES

NEW R.O.W.

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

E003

ELECTRICAL DEMO

PLAN "AREA A"

06-29-2026

BCM

BCM

26002

CONSTRUCTION

DOCUMENTS

WEST VIRGINIA

DIVISION OF

NATURAL

RESOURCES

COOPERS ROCK

HIGH VOLTAGE

REPAIRS PHASE

2 - HIGH VOLTAGE &

LOW VOLTAGE

ELECTRICAL

REPLACEMENT

N O

D

E S

C R

IP

T

IO

N

D A

T E

1" = 100'-0"

ELECTRICAL DEMO PLAN - "AREA A"

RIGHT OF WAY KEY

/3

1'

1/

7'

/1

6"

1'

/8

7'

9/

39°39'6.49"N

79°47'31.88"W

39°39'10.19"N

79°47'30.52"W

39°39'13.55"N

79°47'27.79"W

39°39'16.14"N

79°47'25.74"W

39°39'19.00"N

79°47'23.43"W

39°39'22.00"N

79°47'21.00"W

POLE YARD BUNKER LOCATION (TYP)

EXISTING R.O.W.

DISTANCE VARIES

NEW R.O.W.

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

E004

ELECTRICAL DEMO

PLAN "AREA B"

06-29-2026

BCM

BCM

26002

CONSTRUCTION

DOCUMENTS

WEST VIRGINIA

DIVISION OF

NATURAL

RESOURCES

COOPERS ROCK

HIGH VOLTAGE

REPAIRS PHASE

2 - HIGH VOLTAGE &

LOW VOLTAGE

ELECTRICAL

REPLACEMENT

N O

D

E S

C R

IP

T

IO

N

D A

T E

1" = 100'-0"

ELECTRICAL DEMO PLAN - "AREA B"

/3

/3

/3

/3

/3

39°38'50.08"N

79°47'38.40"W

39°38'53.77"N

79°47'37.02"W

39°38'55.69"N

79°47'36.26"W

39°38'57.25"N

79°47'35.50"W

39°38'59.41"N

79°47'34.70"W

39°39'3.19"N

79°47'33.32"W

EXISTING R.O.W.

DISTANCE VARIES

NEW R.O.W.

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

E005

ELECTRICAL DEMO

PLAN "AREA C"

06-29-2026

BCM

BCM

26002

CONSTRUCTION

DOCUMENTS

WEST VIRGINIA

DIVISION OF

NATURAL

RESOURCES

COOPERS ROCK

HIGH VOLTAGE

REPAIRS PHASE

2 - HIGH VOLTAGE &

LOW VOLTAGE

ELECTRICAL

REPLACEMENT

N O

D

E S

C R

IP

T

IO

N

D A

T E

1" = 100'-0"

ELECTRICAL DEMO PLAN - "AREA C"

39°38'38.80"N

79°47'42.71"W

169'

1 7 /3

2"

173' - 0 11/32"

/1

/3

308' - 9 1/4"

322' -

1/1

6"

127' - 7 31/32" 72' -

1/3 2"

/8

/3

/3

39°38'32.20"N

79°47'55.62"W

39°38'33.30"N

79°47'53.99"W

39°38'32.07"N

79°47'52.46"W

39°38'31.49"N

79°47'45.45"W

39°38'35.73"N

79°47'43.97"W

39°38'37.32"N

79°47'40.60"W

39°38'39.29"N

79°47'37.36"W

39°38'39.57"N

79°47'35.77"W

39°38'40.04"N

79°47'35.07"W

39°38'42.53"N

79°47'41.23"W

39°38'46.22"N

79°47'39.83"W

39°38'50.08"N

79°47'38.40"W

POLE YARD BUNKER LOCATION (TYP)

EXISTING R.O.W.

DISTANCE VARIES

NEW R.O.W.

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

E006

ELECTRICAL DEMO

PLAN "AREA D"

06-29-2026

BCM

BCM

26002

CONSTRUCTION

DOCUMENTS

WEST VIRGINIA

DIVISION OF

NATURAL

RESOURCES

COOPERS ROCK

HIGH VOLTAGE

REPAIRS PHASE

2 - HIGH VOLTAGE &

LOW VOLTAGE

ELECTRICAL

REPLACEMENT

N O

D

E S

C R

IP

T

IO

N

D A

T E

1" = 100'-0"

ELECTRICAL DEMO PLAN - "AREA D"

169'

1 7 /3

2"

173' - 0 11/32"

280' - 10 13/32"

424' - 0 13/32"

423' - 1 1/2"

399' - 1 9/32"

235' - 2 13/32"

468' - 10 3/16"

39°38'32.20"N

79°47'55.62"W

39°38'33.30"N

79°47'53.99"W

39°38'32.07"N

79°47'52.46"W

39°38'29.78"N

79°47'50.42"W

39°38'31.49"N

79°47'45.45"W

39°38'28.36"N

79°47'41.86"W

39°38'25.27"N

79°47'38.69"W

39°38'23.40"N

79°47'36.90"W

39°38'19.76"N

79°47'33.19"W

POLE YARD BUNKER LOCATION (TYP)

EXISTING R.O.W.

DISTANCE VARIES

NEW R.O.W.

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

E007

ELECTRICAL DEMO

PLAN "AREA E"

06-29-2026

BCM

BCM

26002

CONSTRUCTION

DOCUMENTS

WEST VIRGINIA

DIVISION OF

NATURAL

RESOURCES

COOPERS ROCK

HIGH VOLTAGE

REPAIRS PHASE

2 - HIGH VOLTAGE &

LOW VOLTAGE

ELECTRICAL

REPLACEMENT

1" = 100'-0"

ELECTRICAL DEMO PLAN - "AREA E"

N O

D

E S

C R

IP

T

IO

N

D A

T

340' - 4 17/32"

405' - 3 23/32"

7'

/3 2"

396'

17/3

2"

306' - 1 21/32"

385' - 0 5/32"

367' - 9 1/32"

169'

1 7 /3

2"

173' - 0 11/32"

280' - 10 13/32"

39°38'24.25"N

79°48'23.97"W 39°38'24.14"N

79°48'19.62"W

39°38'25.86"N

79°48'14.94"W

39°38'27.57"N

79°48'12.69"W

39°38'30.18"N

79°48'8.90"W

39°38'30.84"N

79°48'5.08"W

39°38'31.46"N

79°48'0.22"W

39°38'32.20"N

79°47'55.62"W

39°38'33.30"N

79°47'53.99"W

39°38'32.07"N

79°47'52.46"W

POLE YARD BUNKER LOCATION (TYP)

EXISTING R.O.W.

DISTANCE VARIES

NEW R.O.W.

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

E008

ELECTRICAL DEMO

PLAN "AREA F"

06-29-2026

BCM

BCM

26002

CONSTRUCTION

DOCUMENTS

WEST VIRGINIA

DIVISION OF

NATURAL

RESOURCES

COOPERS ROCK

HIGH VOLTAGE

REPAIRS PHASE

2 - HIGH VOLTAGE &

LOW VOLTAGE

ELECTRICAL

REPLACEMENT

N O

D

E S

C R

IP

T

IO

N

D A

T E

1" = 100'-0"

ELECTRICAL DEMO PLAN - "AREA F"

7'

5/

337' - 11 5/8

392' - 1 1/32"

/8

' - 0

469' - 9 23/32"

336' - 2 7/8"

330' - 0 7/8"

483' - 5 1/2"

39°38'17.53"N

79°48'56.65"W

39°38'20.74"N

79°48'52.71"W

39°38'22.72"N

79°48'49.23"W

39°38'23.46"N

79°48'44.31"W

39°38'24.29"N

79°48'38.40"W

39°38'25.15"N

79°48'34.25"W

39°38'25.19"N

79°48'30.03"W

39°38'24.25"N

79°48'23.97"W

39°38'19.90"N

79°48'44.74"W

39°38'15.33"N

79°48'44.57"W

REMOVE EXISTING TRANSFORMER.

CONDUIT TO BE REPURPOSED TO 7200

UNDERGROUND, EXTEND UNDERGROUND

FROM EXISTING LV DISCONNECT LOCATION

TO AND UP NEW POLE N58, PER DETAILS.

REMOVE CONDUCTORS FROM POLE 55

TO 57 LEAVE POLES 56 AND 57 IN PLACE

FOR INSTALLATION OF FIBER BY

OTHERS.

POLE YARD BUNKER LOCATION (TYP)

EXISTING R.O.W.

DISTANCE VARIES

NEW R.O.W.

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

E009

ELECTRICAL DEMO

PLAN "AREA G"

06-29-2026

BCM

BCM

26002

CONSTRUCTION

DOCUMENTS

WEST VIRGINIA

DIVISION OF

NATURAL

RESOURCES

COOPERS ROCK

HIGH VOLTAGE

REPAIRS PHASE

2 - HIGH VOLTAGE &

LOW VOLTAGE

ELECTRICAL

REPLACEMENT

N O

D

E S

C R

IP

T

IO

N

D A

T E

1" = 100'-0"

ELECTRICAL DEMO PLAN - "AREA G"

#11 UP POLE39°39'25.01"N

N12

79°47'18.34"W

39°39'26.23"N

N11

79°47'14.24"W

39°39'32.99"N

N4

79°46'59.95"W

39°39'34.58"N

N3

79°46'56.59"W

39°39'36.38"N

N2

79°46'52.79"W

39°39'36.44"N

N1

79°46'50.02"W

39°39'36.44"N

N0

79°46'49.59"W

39°39'31.27"N

N10

79°47'22.34"W

39°39'31.71"N

N5

79°47'4.12"W

39°39'30.99"N

N6

79°47'8.50"W

39°39'30.82"N

N7

79°47'11.25"W39°39'30.61"N

N8

79°47'14.12"W

39°39'31.02"N

N9

79°47'18.55"W

39°39'22.10"N

N13

79°47'20.72"W

TX-7, FUSED DISCONNECT.

REFER TO DETAIL 3 ON E503.

FOR THE BORED INTERSTATE CROSSING,

INSTALL W/ #1/0 15KV CABLE IN PREVIOUSLY

INSTALLED CONDUIT (TYP-1)

USE (2) #2/0 OVERHEAD AAC (TYP)

INSTALL ALL NEW POLES GENERALLY WITHIN 3' OF EXISTING POLES, UNLESS INDICATED

OTHERWISE. GUY POLES PER DETAILS IN ALL CHANGES OF DIRECTION. COMPLETE NEW

SYSTEM PRIOR TO REMOVAL OF THE EXISTING SYSTEM. PROVIDE POLE INSULATING

SLEEVES OR WRAPS AS REQUIRED FOR SAFETY. REVIEW QUESTIONS ON POLE LOCATIONS

WITH ENGINEER PRIOR TO START. (TYP-ALL)

INSTALL CROSSBAR ON THIS POLE AND PROVIDE (2) FUSED AIR CUTOUTS TO THE TWO UNDERGROUND CONDUCTORS. PROVIDE NON-FUSED JUMPER IN PLACE OF FUSE IN BOTH DISCONNECTS. THIS POLE TO BE CONDUCTORS IN PARALLEL, COMMON WIRE BUSS ON LOAD SIDE TO OVERHEAD CABLING.

RELOCATE PREVIOUSLY INSTALLED 15KV CABLE TO NEW POLE ON ONE OF THE TWO SWITCHES. LEAVE ONE SWITCH OPEN AS DIRECTED. COORDINATE THE SWITCHES ON EAST AND WEST OF THE POLE WITH POLE 8 AND MARK IN A MANNER VISIBLE FROM THE GROUND.

CLEAR OVERHEAD, TREES, LIMBS, AND BRUSH ONLY GROUND TO SKY, TO 50' EACH SIDE

OF CENTER LINE. CLEAR GROUND IN ALL OF THE EXISTING RIGHT OF WAY BRUSH, TREES,

ETC. DO NOT CUT TREES OUTSIDE THE PROPOSED RIGHT OF WAY. (TYP - ALL UNLESS

OTHERWISE DIRECTED)

UNDERGROUND CONDUIT BY OTHERS, (1)

CND INCLUDES NEWLY INSTALLED CABLE TO

BE RE-SERVED TO NEW POLES 8 & 11.

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

E101

ELECTRICAL PLAN

"AREA A"

06-29-2026

BCM

BCM

26002

CONSTRUCTION

DOCUMENTS

WEST VIRGINIA

DIVISION OF

NATURAL

RESOURCES

COOPERS ROCK

HIGH VOLTAGE

REPAIRS PHASE

2 - HIGH VOLTAGE &

LOW VOLTAGE

ELECTRICAL

REPLACEMENT

N O

D

E S

C R

IP

T

IO

N

D A

T E

1" = 100'-0"

ELECTRICAL PLAN - "AREA A"

INSTALL CROSSBAR ON THIS POLE AND PROVIDE TWO FUSED

CUTOUTS TO THE TWO UNDERGROUND CONDUCTORS. CONDUCTORS

IN PARALLEL, COMMON WIRE BUS ON LINE SIDE. RELOCATE

PREVIOUSLY INSTLLED 15KV CABLE TO NEW POLE ON ONE OF THE

TWO SWITCHES. COORDINATE THE SWITCHES ON EAST AND WEST OF

THE POLE WITH POLE 8 AND MARK IN A MANNER VISIBLE FROM THE

GROUND.

UTILITY WILL PROVIDE NEW METERING TO CONTRACTOR FOR MOUNTING ON OWNER'S

METERING POLE INSTALLED BY PROJECT. FOLLOW UTILITY REQUIREMENTS AND

DIRECTION. SLACK SPAN REQUIRED BETWEEN UTILITY OWNED AND OWNER'S FIRST POLE.

UTILITY METERING LOCATION.

SEE DETAIL 2 ON E501

39°39'22.10"N

N13

79°47'20.72"W

39°39'19.21"N

N14

79°47'23.15"W

39°39'16.21"N

N15

79°47'25.43"W

39°39'13.34"N

N16

79°47'27.98"W

39°39'10.30"N

N17

79°47'30.16"W

39°39'7.00"N

N18

79°47'31.58"W

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

E102

ELECTRICAL PLAN

"AREA B"

06-29-2026

BCM

BCM

26002

CONSTRUCTION

DOCUMENTS

WEST VIRGINIA

DIVISION OF

NATURAL

RESOURCES

COOPERS ROCK

HIGH VOLTAGE

REPAIRS PHASE

2 - HIGH VOLTAGE &

LOW VOLTAGE

ELECTRICAL

REPLACEMENT

N O

D

E S

C R

IP

T

IO

N

D A

T E

1" = 100'-0"

ELECTRICAL PLAN - "AREA B"

39°39'3.71"N

N19

79°47'32.87"W

39°39'0.42"N

N20

79°47'34.22"W

39°38'57.06"N

N21

79°47'35.28"W

39°38'55.64"N

N22

79°47'36.11"W

39°38'53.74"N

N23

79°47'36.87"W

N24

39°38'47.13"N

N25

79°47'39.27"W

NEW POLE 24

39°38'50.45"N 79°47'38.06"W

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

E103

ELECTRICAL PLAN

"AREA C"

06-29-2026

BCM

BCM

26002

CONSTRUCTION

DOCUMENTS

WEST VIRGINIA

DIVISION OF

NATURAL

RESOURCES

COOPERS ROCK

HIGH VOLTAGE

REPAIRS PHASE

2 - HIGH VOLTAGE &

LOW VOLTAGE

ELECTRICAL

REPLACEMENT

N O

D

E S

C R

IP

T

IO

N

D A

T E

1" = 100'-0"

ELECTRICAL PLAN - "AREA C"

39°38'31.90"N

N43

79°47'56.79"W

39°38'31.42"N

N34

79°47'45.45"W

39°38'35.71"N

N29

79°47'43.94"W

39°38'37.38"N

N30

79°47'40.65"W

N24

39°38'47.13"N

N25

79°47'39.27"W

39°38'43.85"N

N26

79°47'40.66"W

39°38'40.54"N

N27

79°47'41.94"W

39°38'37.94"N

N28

79°47'43.17"W

39°38'39.44"N

N31

79°47'37.04"W

39°38'33.60"N

N33

79°47'44.67"W

39°38'31.89"N

N42

79°47'52.76"W

NEW POLE 32

39°38'40.02"N 79°47'35.06"W

NEW POLE 24

39°38'50.45"N 79°47'38.06"W

TX-1

SECONDARY POWER

LOCATION. INCLUDE FUSED

DISCONNECT. REFER TO

DETAIL 3 ON E503.

TX-2

SECONDARY POWER

LOCATION. FUSED

DISCONNECT. REFER

TO DETAIL 3 ON E503.

FUSED CUTOUT AT THIS LOCATION

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

E104

ELECTRICAL PLAN

"AREA D"

06-29-2026

BCM

BCM

26002

CONSTRUCTION

DOCUMENTS

WEST VIRGINIA

DIVISION OF

NATURAL

RESOURCES

COOPERS ROCK

HIGH VOLTAGE

REPAIRS PHASE

2 - HIGH VOLTAGE &

LOW VOLTAGE

ELECTRICAL

REPLACEMENT

N O

D

E S

C R

IP

T

IO

N

D A

T E

1" = 100'-0"

ELECTRICAL PLAN - "AREA D"

79°47'56.79"W

N41

39°38'31.42"N

N34

79°47'45.45"W

39°38'20.13"N

N39

79°47'33.56"W

39°38'33.60"N

N33

79°47'44.67"W

39°38'28.69"N

N35

79°47'42.68"W

39°38'26.01"N

N36

79°47'39.86"W

39°38'23.41"N

N37

79°47'37.01"W

39°38'21.65"N

N38

79°47'35.17"W

39°38'30.64"N

N40

79°47'48.15"W

39°38'31.89"N

N42

79°47'52.76"W

NEW POLE 41

39°38'29.58"N 79°47'50.06"W

TX-3

SECONDARY POWER LOCATION.

SEE DETAIL 2 ON E503

TX-2

SECONDARY POWER

LOCATION. FUSED

DISCONNECT. REFER

TO DETAIL 3 ON E503.

DPLN1

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

E105

ELECTRICAL PLAN

"AREA E"

06-29-2026

BCM

BCM

26002

CONSTRUCTION

DOCUMENTS

WEST VIRGINIA

DIVISION OF

NATURAL

RESOURCES

COOPERS ROCK

HIGH VOLTAGE

REPAIRS PHASE

2 - HIGH VOLTAGE &

LOW VOLTAGE

ELECTRICAL

REPLACEMENT

N O

D

E S

C R

IP

T

IO

N

D A

T E

1" = 100'-0"

ELECTRICAL PLAN - "AREA E"

FUSED CUTOUT ON THIS POLE FOR TAP

FUSED CUTOUT ON

OVERLOOK LATERAL

FUSED CUTOUT ON CAMPGROUND LATERAL

INSTALL CROSSBAR AND PROVIDE (2) FUSED

CUTOUTS ON THIS POLE, ONE FOR NEW

PADMOUNT, ONE FOR EXISTING RENTAL CABINS

UNDERGROUND

39°38'24.56"N

N50

79°48'24.91"W

39°38'24.09"N

N49

79°48'20.47"W

39°38'25.32"N

N48

79°48'16.32"W

39°38'27.21"N

N47

79°48'12.61"W

39°38'31.20"N

N44

79°48'1.10"W

39°38'31.90"N

N43

79°47'56.79"W

N41

39°38'31.89"N

N42

79°47'52.76"W

39°38'30.71"N

N45

79°48'5.52"W

39°38'29.89"N

N46

79°48'9.79"W

NEW POLE 41

39°38'29.58"N 79°47'50.06"W

TX-2

SECONDARY POWER

LOCATION. FUSED

DISCONNECT. REFER

TO DETAIL 3 ON E503.

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

E106

ELECTRICAL PLAN

"AREA F"

06-29-2026

BCM

BCM

26002

CONSTRUCTION

DOCUMENTS

WEST VIRGINIA

DIVISION OF

NATURAL

RESOURCES

COOPERS ROCK

HIGH VOLTAGE

REPAIRS PHASE

2 - HIGH VOLTAGE &

LOW VOLTAGE

ELECTRICAL

REPLACEMENT

N O

D

E S

C R

IP

T

IO

N

D A

T E

1" = 100'-0"

ELECTRICAL PLAN - "AREA F"

39°38'23.30"N

N55

79°48'44.70"W

39°38'25.06"N

N52

79°48'33.82"W

39°38'25.04"N

N51

79°48'29.37"W

39°38'24.56"N

N50

79°48'24.91"W

39°38'15.35"N

N58

79°48'44.84"W

39°38'24.30"N

N53

79°48'38.28"W

39°38'23.81"N

N54

79°48'42.61"W

39°38'19.69"N

N56

79°48'44.96"W

39°38'17.53"N

N57

79°48'44.74"W

39°38'22.59"N

N59

79°48'49.21"W

EXISTING NEW BATHHOUSE

EXISTING UNDERGROUND ELECTRICAL CONDUIT

EXISTING OLD BATHHOUSE

TX-4

SECONDARY POWER LOCATION.

COOPER MAXISHRUB 37.5 KVA. SEE PAD

MOUNTED TRANSFORMER ON E502

TX-6

SECONDARY POWER

LOCATION. FUSED

DISCONNECT. REFER TO

DETAIL 3 ON E503.

INSTALL FUSED CUTOUT THIS LOCATION

INSTALL FUSED CUTOUT THIS LOCATION

EXTEND NEW 7200V FROM TX4 TO TX5

INSTALL FUSED CUTOUT THIS LOCATION. TAP POLE TO NEW

UNDERGROUND THROUGH EXTENDED EXISTING 3" CONDUIT TO NEW

PAD MOUNT TRANSFORMERS 4 & 5 AT BATHHOUSE AND GIFT SHOP. SEE

SHEET E401 FOR DETAILS

TX-4

TX-5, FUSED

DISCONNECT.

REFER TO DETAIL 3

ON E503.

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

E107

ELECTRICAL PLAN

"AREA G"

06-29-2026

BCM

BCM

26002

CONSTRUCTION

DOCUMENTS

WEST VIRGINIA

DIVISION OF

NATURAL

RESOURCES

COOPERS ROCK

HIGH VOLTAGE

REPAIRS PHASE

2 - HIGH VOLTAGE &

LOW VOLTAGE

ELECTRICAL

REPLACEMENT

N O

D

E S

C R

IP

T

IO

N

D A

T E

1" = 100'-0"

ELECTRICAL PLAN - "AREA G"

#11 UP POLE39°39'25.01"N

N12

79°47'18.34"W

39°39'26.23"N

N11

79°47'14.24"W

39°39'32.99"N

N4

79°46'59.95"W

39°39'34.58"N

N3

79°46'56.59"W

39°39'36.38"N

N2

79°46'52.79"W

39°39'36.44"N

N1

79°46'50.02"W

39°39'36.44"N

N0

79°46'49.59"W

39°39'31.27"N

N10

79°47'22.34"W

39°39'31.71"N

N5

79°47'4.12"W

39°39'30.99"N

N6

79°47'8.50"W

39°39'30.82"N

N7

79°47'11.25"W39°39'30.61"N

N8

79°47'14.12"W

39°39'31.02"N

N9

79°47'18.55"W

39°39'22.10"N

N13

79°47'20.72"W

USE (2) #2/0 OVERHEAD AAC (TYP)

FOR THE BORED INTERSTATE CROSSING, INSTALL W/ #1/0

15KV CABLE IN PREVIOUSLY INSTALLED CONDUIT (TYP-1)

INSTALL CROSSBAR ON THIS POLE AND PROVIDE (2) FUSED AIR CUTOUTS TO THE TWO UNDERGROUND CONDUCTORS. PROVIDE NON-FUSED JUMPER IN PLACE OF FUSE IN BOTH DISCONNECTS. THIS POLE TO BE CONDUCTORS IN PARALLEL, COMMON WIRE BUSS ON LOAD SIDE TO OVERHEAD CABLING.

RELOCATE PREVIOUSLY INSTALLED 15KV CABLE TO NEW POLE ON ONE OF THE TWO SWITCHES. LEAVE ONE SWITCH OPEN AS DIRECTED. COORDINATE THE SWITCHES ON EAST AND WEST OF THE POLE WITH POLE 8 AND MARK IN A MANNER VISIBLE FROM THE GROUND.

EXISTING R.O.W.

DISTANCE VARIES

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

E108

ELECTRICAL PLAN

"AREA A"

06-29-2026

BCM

BCM

26002

CONSTRUCTION

DOCUMENTS

WEST VIRGINIA

DIVISION OF

NATURAL

RESOURCES

COOPERS ROCK

HIGH VOLTAGE

REPAIRS PHASE

2 - HIGH VOLTAGE &

LOW VOLTAGE

ELECTRICAL

REPLACEMENT

N O

D

E S

C R

IP

T

IO

N

D A

T E

1" = 100'-0"

ELECTRICAL PLAN - "AREA A" (TOPO)

TX-7

39°39'22.10"N

N13

79°47'20.72"W

39°39'19.21"N

N14

79°47'23.15"W

39°39'16.21"N

N15

79°47'25.43"W

39°39'13.34"N

N16

79°47'27.98"W

39°39'10.30"N

N17

79°47'30.16"W

39°39'7.00"N

N18

79°47'31.58"W

EXISTING R.O.W.

DISTANCE VARIES

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

E109

ELECTRICAL PLAN

"AREA B"

06-29-2026

BCM

BCM

26002

CONSTRUCTION

DOCUMENTS

WEST VIRGINIA

DIVISION OF

NATURAL

RESOURCES

COOPERS ROCK

HIGH VOLTAGE

REPAIRS PHASE

2 - HIGH VOLTAGE &

LOW VOLTAGE

ELECTRICAL

REPLACEMENT

N O

D

E S

C R

IP

T

IO

N

D A

T E

1" = 100'-0"

ELECTRICAL PLAN - "AREA B" (TOPO)

39°39'3.71"N

N19

79°47'32.87"W

39°39'0.42"N

N20

79°47'34.22"W

39°38'57.06"N

N21

79°47'35.28"W

39°38'55.64"N

N22

79°47'36.11"W

39°38'53.74"N

N23

79°47'36.87"W

39°38'50.45"N

N24

79°47'38.06"W

39°38'47.13"N

N25

79°47'39.27"W

EXISTING R.O.W.

DISTANCE VARIES

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

E110

ELECTRICAL PLAN

"AREA C"

06-29-2026

BCM

BCM

26002

CONSTRUCTION

DOCUMENTS

WEST VIRGINIA

DIVISION OF

NATURAL

RESOURCES

COOPERS ROCK

HIGH VOLTAGE

REPAIRS PHASE

2 - HIGH VOLTAGE &

LOW VOLTAGE

ELECTRICAL

REPLACEMENT

N O

D

E S

C R

IP

T

IO

N

D A

T E

1" = 100'-0"

ELECTRICAL PLAN - "AREA C" (TOPO)

79°47'56.79"W

39°38'31.42"N

N34

79°47'45.45"W

39°38'35.71"N

N29

79°47'43.94"W

39°38'37.38"N

N30

79°47'40.65"W

39°38'47.13"N

N25

79°47'39.27"W

39°38'43.85"N

N26

79°47'40.66"W

39°38'40.54"N

N27

79°47'41.94"W

39°38'37.94"N

N28

79°47'43.17"W

39°38'39.44"N

N31

79°47'37.04"W

39°38'40.02"N

N32

79°47'35.06"W

39°38'33.60"N

N33

79°47'44.67"W

39°38'31.89"N

N42

79°47'52.76"W

EXISTING R.O.W.

DISTANCE VARIES

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

E111

ELECTRICAL PLAN

"AREA D"

06-29-2026

BCM

BCM

26002

CONSTRUCTION

DOCUMENTS

WEST VIRGINIA

DIVISION OF

NATURAL

RESOURCES

COOPERS ROCK

HIGH VOLTAGE

REPAIRS PHASE

2 - HIGH VOLTAGE &

LOW VOLTAGE

ELECTRICAL

REPLACEMENT

N O

D

E S

C R

IP

T

IO

N

D A

T E

1" = 100'-0"

ELECTRICAL PLAN - "AREA D" (TOPO)

79°47'56.79"W

39°38'29.58"N

N41

79°47'50.06"W

39°38'31.42"N

N34

79°47'45.45"W

39°38'20.13"N

N39

79°47'33.56"W

39°38'33.60"N

N33

79°47'44.67"W

39°38'28.69"N

N35

79°47'42.68"W

39°38'26.01"N

N36

79°47'39.86"W

39°38'23.41"N

N37

79°47'37.01"W

39°38'21.65"N

N38

79°47'35.17"W

39°38'30.64"N

N40

79°47'48.15"W

39°38'31.89"N

N42

79°47'52.76"W

TX-3

SECONDARY POWER LOCATION.

COOPER MAXISHRUB 75 KVA. SEE

PAD MOUNTED TRANSFORMER ON

E502

DPLN1

E402

EXISTING R.O.W.

DISTANCE VARIES

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

E112

ELECTRICAL PLAN

"AREA E"

06-29-2026

BCM

BCM

26002

CONSTRUCTION

DOCUMENTS

WEST VIRGINIA

DIVISION OF

NATURAL

RESOURCES

COOPERS ROCK

HIGH VOLTAGE

REPAIRS PHASE

2 - HIGH VOLTAGE &

LOW VOLTAGE

ELECTRICAL

REPLACEMENT

N O

D

E S

C R

IP

T

IO

N

D A

T E

1" = 100'-0"

ELECTRICAL PLAN - "AREA E" (TOPO)

39°38'24.56"N

N50

79°48'24.91"W

39°38'24.09"N

N49

79°48'20.47"W

39°38'25.32"N

N48

79°48'16.32"W

39°38'27.21"N

N47

79°48'12.61"W

39°38'31.20"N

N44

79°48'1.10"W

39°38'31.90"N

N43

79°47'56.79"W

39°38'31.89"N

N42

79°47'52.76"W

39°38'30.71"N

N45

79°48'5.52"W

39°38'29.89"N

N46

79°48'9.79"W

EXISTING R.O.W.

DISTANCE VARIES

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

E113

ELECTRICAL PLAN

"AREA F"

06-29-2026

BCM

BCM

26002

CONSTRUCTION

DOCUMENTS

WEST VIRGINIA

DIVISION OF

NATURAL

RESOURCES

COOPERS ROCK

HIGH VOLTAGE

REPAIRS PHASE

2 - HIGH VOLTAGE &

LOW VOLTAGE

ELECTRICAL

REPLACEMENT

N O

D

E S

C R

IP

T

IO

N

D A

T E

1" = 100'-0"

ELECTRICAL PLAN - "AREA F" (TOPO)

39°38'23.30"N

N55

79°48'44.70"W

39°38'25.06"N

N52

79°48'33.82"W

39°38'25.04"N

N51

79°48'29.37"W

39°38'24.56"N

N50

79°48'24.91"W

39°38'15.35"N

N58

79°48'44.84"W

39°38'24.30"N

N53

79°48'38.28"W

39°38'23.81"N

N54

79°48'42.61"W

39°38'19.69"N

N56

79°48'44.96"W

39°38'17.53"N

N57

79°48'44.74"W

39°38'22.59"N

N59

79°48'49.21"W

EXISTING NEW BATHHOUSE

EXISTING OLD BATHHOUSE

TX-4

E401

TX-5

EXISTING R.O.W.

DISTANCE VARIES

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

E114

ELECTRICAL PLAN

"AREA G"

06-29-2026

BCM

BCM

26002

CONSTRUCTION

DOCUMENTS

WEST VIRGINIA

DIVISION OF

NATURAL

RESOURCES

COOPERS ROCK

HIGH VOLTAGE

REPAIRS PHASE

2 - HIGH VOLTAGE &

LOW VOLTAGE

ELECTRICAL

REPLACEMENT

N O

D

E S

C R

IP

T

IO

N

D A

T E

1" = 100'-0"

ELECTRICAL PLAN - "AREA G" (TOPO)

EXISTING BATHHOUSE

EXISTING BATHHOUSE

TX-4

39°38'15.35"N

N58

79°48'44.84"W

39°38'17.53"N

N57

79°48'44.74"W

DPLN2

INTERCEPT EXISTING LV CONDUIT AND REPURPOSE TO SERVE TX-4.

EXTEND NEW 3" CONDUIT PLUS SPARE FROM TX-4 TO TX-5. SEE DETAIL 2

THIS SHEET.

A B

NEW CONDUIT FROM DPLN2 TO EXISTING QUAZITE

BOX. MATCH TO EXISTING CONDUCTOR SIZE IN

QUAZITE.

(2) 2" CND

(1) 3" CND

C

SPARE 3" CND

EXISTING CND

EXISTING CND

EXISTING CND

TX-5

RE-SERVE EXISTING 200A, AND (2) 100A

FEEDERS FROM NEW PANEL SERVED BY TX4

EXTEND AND REUSE 3" CND

FOR 7200V TO NEW TX-4

TX-4

7200V DISTRIBUTION

DPLN2

240V DISTRIBUTION

NEW POLE 58

TO QUAZITE BOX THAT SERVES OLD &

NEW BATH HOUSES AND PAVILLION

TO TX-5

7200V DISTRIBUTION

TX-5

7200V DISTRIBUTION

A

B

C E

D

REPURPOSE METERING ENCLOSURE TO FEED

THROUGH VOLTAGE SUPPLY TO OVERLOOK

TRADING POST PANEL

OVERLOOK TRADING POST

EXTEND 2" CND TO REPURPOSED

METERING ENCLOSURE

1. WIRING IS SHOWN ON DRAWINGS ONLY FOR SPECIFIC ROUTES

OR SPECIAL CONDITIONS. ALL WALL MOUNTED DEVICES ARE

FINAL HEIGHT BY. ARCH.

2. WIRING AND CONDUIT OR MC CABLE SHALL BE REQUIRED FOR

ALL OUTLETS AND DEVICES. FOLLOW INDICATED CIRCUITS

NUMBERS AND PANEL DESIGNATION. OBTAIN PRIOR APPROVAL

OF ENGINEER FOR DEVIATIONS.

3. ALL 15A AND 20A, 115V AND 120V RECEPTACLES LOCATED IN

DWELLING UNITS SHALL BE TAMPER RESISTANT.

4. ALTHOUGH ALL BRANCH CIRCUIT WIRING IS NOT SHOWN, IT IS

THE INTENT OF THESE DOCUMENTS THAT A COMPLETE

BRANCH CIRCUIT WIRING SYSTEM BE INSTALLED. ALL

NEUTRALS SHALL BE FULL CAPACITY. THE USE OF SHARED OR

COMMON NEUTRALS IS PROHIBITED ON ALL ELECTRIC WIRING.

5. PROVIDE CONTROL AND FIRE ALARM WIRE AS NECESSARY TO

INSTALL ALL SYSTEMS DEVICES AND PANELS FOR COMPLETE

SYSTEMS. FINAL CONNECTION TO PERMANTLY MOUNTED

EQUIPMENT IS PART OF THE ELECTRICAL SCOPE OF THIS

PROJECT.

6. PROVIDE TEL/DATA AND CAT5 AS INDICATED. REVIEW DATA,

SWITCH, RECEPTACLE, ETC LOCATIONS AND HEIGHTS WITH

OWNER PRIOR TO INSTALLATION.

7. ALL INTERIOR WIRING SHALL BE THHN/THWN IN METAL CONDUIT

OR MC CABLE. MAX OF 3'-0" OF FLEXIBLE CONDUIT MAY BE

USED FOR FINAL EQUIPMENT TERMINATIONS.

8. EXTERIOR WIRING IS TO BE THHN/THWN IN PVC CONDUIT. MAX.

OF 3'-0" OF FLEXIBLE METALLIC SEATITLE CONDUIT MAY BE

USED TO EXTERIOR EQUIPMENT.

9. TV AND TELEPHONE CABLING SHALL BE INSTALLED FROM

LOCATIONS INDICATED ON DRAWINGS TO DEMARC LOCATION.

COORDINATE FINAL DEMARC LOCATIONS w/ TV AND

TELEPHONE COMPANY.

10. GROUP AND TRAIN ALL TEL/DATA AND CABLE TV CABLE.

SUPPORT FROM STRUCTURE.

11. VERIFY ALL FIELD CONDITIONS AND MEASUREMENTS PRIOR TO

BIDDING. COORDINATE ALL WORK WITH OTHER TRADES.

COORDINATE ALL CEILING MOUNTED DEVICES WITH ALL OTHER

TRADES PRIOR TO INSTALLATION.

12. PERFORM ALL WORK IN ACCORDANCE WITH 2020 NEC.

13. COORDINATE FINAL FIXTURE LOCATIONS WITH OWNER AND

GENERAL CONTRACTOR PRIOR TO INSTALLATION OF CEILING.

FINAL COORDINATION OF SCOPE OF WORK , DIMENSIONS,

FIXTURE PLACEMENT, ROUTINGS, ETC IS THE RESPONSIBILITY

OF THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS

PRIOR TO BIDDING.

ELECTRICAL NOTES

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

E401

ENLARGED

ELECTRICAL PLAN

06-29-2026

BCM

BCM

26002

CONSTRUCTION

DOCUMENTS

WEST VIRGINIA

DIVISION OF

NATURAL

RESOURCES

COOPERS ROCK

HIGH VOLTAGE

REPAIRS PHASE

2 - HIGH VOLTAGE &

LOW VOLTAGE

ELECTRICAL

REPLACEMENT

N O

D

E S

C R

IP

T

IO

N

D A

T E

1" = 50'-0"

ENLARGED ELECTRICAL PLAN - OVERLOOK AREA

DRAWING NOT SCALABLE

POLE 58 NEW LAYOUT

FEEDER SCHEDULE

TAG # SETS

CONDUCTOR SIZE

CONDUIT SIZE

VOLTAGE

TYPEPOWER & NEUTRAL GROUND

A 1 2 - #1/0 (CU) (133% INSULATION)(CONCENTRIC NEUTRAL) #6 EXISTING MEDIUM

B 1 3 - #350 KCMIL (CU) #1/0 3" LOW

C 1 2 - #1/0 (CU) (133% INSULATION)(CONCENTRIC NEUTRAL) #6 3" MEDIUM

D 1 2 - 2/0 (AAC) #6 NA MEDIUM

E 1 3 - #2/0 (CU) #4 2" LOW

F 1 2 - #1/0 (CU) #6 EXISTING PHASE 1 MEDIUM

G 1 3 - #400 KCMIL (CU) #1/0 3" LOW

FUSE SCHEDULE

FUSE TAG VOLTAGE (V) FUSE HOLDER SERIES / FUSE MODEL NUMBER

A 7200 HX OPEN TYPE T / 40T

B 7200 HX OPEN TYPE T / 30T

C 7200 HX OPEN TYPE T / 25T

D 7200 HX OPEN TYPE T / 20T

E 7200 HX OPEN TYPE T / 15T

F 7200 XFMR BAY-O-NET / 6A

G 7200 XFMR BAY-O-NET / 25A

H 7200 XFMR BAY-O-NET / 15A

J 7200 XFMR BAY-O-NET / 12A

A

39°38'23.41"N

N37

79°47'37.01"W

39°38'21.65"N

N38

79°47'35.17"W

TX-3 SECONDARY POWER

LOCATION. SEE DETAIL 2 ON E503.

DPLN1

CAMPGROUND STORE

CAMPGROUND BATHHOUSE

N39 39°38'20.13"N 79°47'33.56"W

G

E

NEW POLE 39

TX-3

7200V DISTRIBUTION

DPLN1

240V DISTRIBUTION

EXTEND NEW UNDERGROUND

TO EXISTING BATHHOUSE

EXTEND AND INTERCEPT CONDUIT

THAT FEEDS EXISTING RENTAL CABINS.

EXTEND NEW UNDERGROUND TO

EXISTING CAMPGROUND OFFICE PANEL.

EXTEND AND INTERCEPT CND TO WATER TREATMENT PLANT.

EXTEND AND INTERCEPT CND TO CAMPGROUND POWER DIST. PANEL.

NOTE: WHERE INTERCEPTING CONDUIT, MATCH EXISTING

CONDUIT SIZE AND CONDUCTOR SIZE. VERIFY IN FIELD. (TYP)

REMOVE AND REPLACE SIDEWALK TO ALLOW FOR

CONDUIT TRENCHING TO CAMPGROUND BATHHOUSE.

D

DE

G

C

E

1. WIRING IS SHOWN ON DRAWINGS ONLY FOR SPECIFIC ROUTES

OR SPECIAL CONDITIONS. ALL WALL MOUNTED DEVICES ARE

FINAL HEIGHT BY. ARCH.

2. WIRING AND CONDUIT OR MC CABLE SHALL BE REQUIRED FOR

ALL OUTLETS AND DEVICES. FOLLOW INDICATED CIRCUITS

NUMBERS AND PANEL DESIGNATION. OBTAIN PRIOR APPROVAL

OF ENGINEER FOR DEVIATIONS.

3. ALL 15A AND 20A, 115V AND 120V RECEPTACLES LOCATED IN

DWELLING UNITS SHALL BE TAMPER RESISTANT.

4. ALTHOUGH ALL BRANCH CIRCUIT WIRING IS NOT SHOWN, IT IS

THE INTENT OF THESE DOCUMENTS THAT A COMPLETE

BRANCH CIRCUIT WIRING SYSTEM BE INSTALLED. ALL

NEUTRALS SHALL BE FULL CAPACITY. THE USE OF SHARED OR

COMMON NEUTRALS IS PROHIBITED ON ALL ELECTRIC WIRING.

5. PROVIDE CONTROL AND FIRE ALARM WIRE AS NECESSARY TO

INSTALL ALL SYSTEMS DEVICES AND PANELS FOR COMPLETE

SYSTEMS. FINAL CONNECTION TO PERMANTLY MOUNTED

EQUIPMENT IS PART OF THE ELECTRICAL SCOPE OF THIS

PROJECT.

6. PROVIDE TEL/DATA AND CAT5 AS INDICATED. REVIEW DATA,

SWITCH, RECEPTACLE, ETC LOCATIONS AND HEIGHTS WITH

OWNER PRIOR TO INSTALLATION.

7. ALL INTERIOR WIRING SHALL BE THHN/THWN IN METAL CONDUIT

OR MC CABLE. MAX OF 3'-0" OF FLEXIBLE CONDUIT MAY BE

USED FOR FINAL EQUIPMENT TERMINATIONS.

8. EXTERIOR WIRING IS TO BE THHN/THWN IN PVC CONDUIT. MAX.

OF 3'-0" OF FLEXIBLE METALLIC SEATITLE CONDUIT MAY BE

USED TO EXTERIOR EQUIPMENT.

9. TV AND TELEPHONE CABLING SHALL BE INSTALLED FROM

LOCATIONS INDICATED ON DRAWINGS TO DEMARC LOCATION.

COORDINATE FINAL DEMARC LOCATIONS w/ TV AND

TELEPHONE COMPANY.

10. GROUP AND TRAIN ALL TEL/DATA AND CABLE TV CABLE.

SUPPORT FROM STRUCTURE.

11. VERIFY ALL FIELD CONDITIONS AND MEASUREMENTS PRIOR TO

BIDDING. COORDINATE ALL WORK WITH OTHER TRADES.

COORDINATE ALL CEILING MOUNTED DEVICES WITH ALL OTHER

TRADES PRIOR TO INSTALLATION.

12. PERFORM ALL WORK IN ACCORDANCE WITH 2020 NEC.

13. COORDINATE FINAL FIXTURE LOCATIONS WITH OWNER AND

GENERAL CONTRACTOR PRIOR TO INSTALLATION OF CEILING.

FINAL COORDINATION OF SCOPE OF WORK , DIMENSIONS,

FIXTURE PLACEMENT, ROUTINGS, ETC IS THE RESPONSIBILITY

OF THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS

PRIOR TO BIDDING.

ELECTRICAL NOTES

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

E402

ENLARGED

ELECTRICAL PLAN

06-29-2026

BCM

BCM

26002

CONSTRUCTION

DOCUMENTS

WEST VIRGINIA

DIVISION OF

NATURAL

RESOURCES

COOPERS ROCK

HIGH VOLTAGE

REPAIRS PHASE

2 - HIGH VOLTAGE &

LOW VOLTAGE

ELECTRICAL

REPLACEMENT

N O

D

E S

C R

IP

T

IO

N

D A

T E

1" = 50'-0"

ENLARGED ELECTRICAL PLAN - CAMPGROUND

DRAWING NOT SCALABLE

POLE 39 NEW LAYOUT

FEEDER SCHEDULE

TAG # SETS

CONDUCTOR SIZE

CONDUIT SIZE

VOLTAGE

TYPEPOWER & NEUTRAL GROUND

A 1 2 - #1/0 (CU) (133% INSULATION)(CONCENTRIC NEUTRAL) #6 EXISTING MEDIUM

B 1 3 - #350 KCMIL (CU) #1/0 3" LOW

C 1 2 - #1/0 (CU) (133% INSULATION)(CONCENTRIC NEUTRAL) #6 3" MEDIUM

D 1 2 - 2/0 (AAC) #6 NA MEDIUM

E 1 3 - #2/0 (CU) #4 2" LOW

F 1 2 - #1/0 (CU) #6 EXISTING PHASE 1 MEDIUM

G 1 3 - #400 KCMIL (CU) #1/0 3" LOW

FUSE SCHEDULE

FUSE TAG VOLTAGE (V) FUSE HOLDER SERIES / FUSE MODEL NUMBER

A 7200 HX OPEN TYPE T / 40T

B 7200 HX OPEN TYPE T / 30T

C 7200 HX OPEN TYPE T / 25T

D 7200 HX OPEN TYPE T / 20T

E 7200 HX OPEN TYPE T / 15T

F 7200 XFMR BAY-O-NET / 6A

G 7200 XFMR BAY-O-NET / 25A

H 7200 XFMR BAY-O-NET / 15A

J 7200 XFMR BAY-O-NET / 12A

CUT AND REPLACE CONCRETE SIDEWALK

FOR NEW CONDUIT TRENCHING

8" X 7' DOUBLE HELIX ANCHOR

W/ 8,000 FT/LB TORQUE

ROTBLOC UTILITY POLEWRAP. START AT

BUTT AND END 2" - 4" ABOVE GROUND

LEVEL. ATTACH W/ 1-1/4 STAINLESS

STAPLES, OVERLAP 12" ON EACH TURN.

CUSTOM POLE TAG

NOTE: BOND ALL METAL PARTS TO GROUND

COPPER POLE BONDING

PLATE( BURNDY 000038595504)

1: OHIO BRASS PSPT 552 INSULATOR

2: 24" PINTOP, CHANCE MODEL PSC2060874P

3: #6 BARE SOLID GROUND WIRE W/ 3/4" CABLE GUARD (GALVANIZED

STEEL TO 8', THEN PVC), COPPER COATED 1-1/4" STAPLE EVERY 5'

4: 3/4" GALV THROUGHBOLT. CLEVIS AND INSULATOR.

POLE BURIED 6'-6"

45'/3 POLE

6'

0"

COMPRESSION CONNECTOR (TYP)

THROUGH BOLT

STRAIN CLAMP

SLACK SPAN

METERING CT

FROM POWER CO

TO STATE PARK

NOTE: FOLLOW ALL POLE

INSTALLATION DETAILS

FUSED CUTOUT BY PROJECT,

COORDINATE W/ UTILITY

15KV POLY PIN TOP INSULATOR

BOND ALL METAL HARDWARE

USE EXTENDED "L" BRACKET OFF THE POLE TO TRIP SAVER.

TRIP SAVER II IN 200A LOAD BREAK

CUTOUT HOLDER. MOUNTING

HEIGHT 21' AFG TO CENTER.

HORIZONTAL PIN

STANDOFF BRACKET.

NEUTRAL CONNECTS TO

REARWARD STANDOFF BRACKET

(3) 3/4" X 10' GROUND RODS. 6' SPACING (3) 3/4" X 10' GROUND

RODS. 6' SPACING

#6 GRN

45.00°

DOWN POLEUP POLE

TRIP SAVER II CUTOUT-MOUNTED RECLOSER

CHANCE STANDOFF BRACKET (1SBH20H1)

CHANCE STANDOFF BRACKET (1SBH27H1)

15.00°

DOWN POLE

UP POLE

TO NEUTRAL CONNECTION

TO PARK TO UTILITY

PRIMARY VOLTAGE

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

E501

ELECTRICAL DETAILS

06-29-2026

TRT

BCM

26002

CONSTRUCTION

DOCUMENTS

WEST VIRGINIA

DIVISION OF

NATURAL

RESOURCES

COOPERS ROCK

HIGH VOLTAGE

REPAIRS PHASE

2 - HIGH VOLTAGE &

LOW VOLTAGE

ELECTRICAL

REPLACEMENT

N O

D

E S

C R

IP

T

IO

N

D A

T E

DRAWING NOT SCALABLE

15 KV AND BELOW SINGLE PHASE LINE POLE (TYP-ALL)

DRAWING NOT SCALABLE

METERING POINT & OWNER'S DISCONNECT DETAIL

DRAWING NOT SCALABLE

HORIZONTAL STANDOFF BRACKET POLE DETAIL

BACK GUY

LINE GUY

LINE GUY

BACK GUY

45.00°

8' FULL ROUND GUY

MARKER, YELLOW.

HUBBEL 96FRPE

CLASS 3 POLE

XFMR

#2 CONCENTRIC NEUTRAL

CABLE W/ TERMINATION

CROSSBAR

CONTINUOUS GALVANIZED STEEL CABLE GUARD UP

THE POLE. 3" P80 PVC CONDUIT UP THE POLE 10'

AGL.

SECONDARY CONDUIT AS INDICATED

GROUND ROD

24"

GRAVEL OR

COMPACTED

EARTH(10" - 12")

RURAL PAD MOUNT XFMR. SEE

PLANS FOR KVA.

NOTE: FOLLOW ALL POLE INSTALLATION DETAILS

FIBERGLASS GROUND SLEEVE

8KV LIGHTNING ARRESTOR

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

E502

ELECTRICAL DETAILS

06-29-2026

TRT

BCM

26002

CONSTRUCTION

DOCUMENTS

WEST VIRGINIA

DIVISION OF

NATURAL

RESOURCES

COOPERS ROCK

HIGH VOLTAGE

REPAIRS PHASE

2 - HIGH VOLTAGE &

LOW VOLTAGE

ELECTRICAL

REPLACEMENT

N O

D

E S

C R

IP

T

IO

N

D A

T E

DRAWING NOT SCALABLE

GUY DETAIL GREATER THAN 10 DEG. DIR. CHANGE

DRAWING NOT SCALABLE

GUY DETAIL LESS THAN 10 DEG. DIR. CHANGE

1/4" = 1'-0"

DOUBLE GUY ANCHOR DETAIL (TYP-ALL)

DRAWING NOT SCALABLE

PAD MOUNTED TRANSFORMER DETAIL

NEW POLE 8

NEW POLE 11

FROM POWER

COMPANY

NEW POLE 10

NEW POLE 29

NEW POLE 32

TX-1

10 KVA

NEW POLE 39

TX-3

75 KVA

NEW POLE 34

NEW POLE 42

TX-2

10 KVA

NEW POLE 58

TX-4

37.5 KVA

TX-6

10 KVA

TX-5

15 KVA

ALL ALUMINUM CABLE (AAC)

NEW POLE 55

NEW POLE 59

D

A C

D

TX-7

10 KVA

C C

C

RE-USE EXISTING UNDERGROUND CND

F

TO EXISTING RENTAL CABINS

A B C

F

F

D

D

D

F

D

D

E

G

J

H

D

F

D

FUSE (TYP)

FEEDER (TYP)

D D D

PANEL

4' - 0"

2"X12" TREATED BOARD (TYP)

4"Ø GALVANIZED POST (TYP)

INSTALL POST IN 10" SONOTUBE & FILL

WITH 3,500 PSI CONCRETE.

ARRANGE ELECTRICAL EQUIPMENT AS NEEDED IN FIELD.

TRANSFORMER

FIBERGLASS GROUND SLEEVE

GRAVEL OR

COMPACTED

EARTH(10" - 12")

6"Ø GALVANIZED

POST (TYP)

INSTALL POST IN 10" SONOTUBE & FILL WITH 3,500 PSI CONCRETE.

FUSED

DISCONNECT

TO UTILITY POLE

TO LOAD

TRANSFORMER

2"X12" TREATED BOARD (TYP)

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

E503

ELECTRICAL DETAILS

06-29-2026

TRT

BCM

26002

CONSTRUCTION

DOCUMENTS

WEST VIRGINIA

DIVISION OF

NATURAL

RESOURCES

COOPERS ROCK

HIGH VOLTAGE

REPAIRS PHASE

2 - HIGH VOLTAGE &

LOW VOLTAGE

ELECTRICAL

REPLACEMENT

N O

D

E S

C R

IP

T

IO

N

D A

T E

DRAWING NOT SCALABLE

ELECTRICAL LAYOUT

FEEDER SCHEDULE

TAG # SETS

CONDUCTOR SIZE

CONDUIT SIZE

VOLTAGE

TYPEPOWER & NEUTRAL GROUND

A 1 2 - #1/0 (CU) (133% INSULATION)(CONCENTRIC NEUTRAL) #6 EXISTING MEDIUM

B 1 3 - #350 KCMIL (CU) #1/0 3" LOW

C 1 2 - #1/0 (CU) (133% INSULATION)(CONCENTRIC NEUTRAL) #6 3" MEDIUM

D 1 2 - 2/0 (AAC) #6 NA MEDIUM

E 1 3 - #2/0 (CU) #4 2" LOW

F 1 2 - #1/0 (CU) #6 EXISTING PHASE 1 MEDIUM

G 1 3 - #400 KCMIL (CU) #1/0 3" LOW

DRAWING NOT SCALABLE

ELECTRIC POWER BACKBOARD - GENERAL

DRAWING NOT SCALABLE

ELECTRIC POWER BACKBOARD - TO RECONNECTION POINTS

FUSE SCHEDULE

FUSE TAG VOLTAGE (V) FUSE HOLDER SERIES / FUSE MODEL NUMBER

A 7200 HX OPEN TYPE T / 40T

B 7200 HX OPEN TYPE T / 30T

C 7200 HX OPEN TYPE T / 25T

D 7200 HX OPEN TYPE T / 20T

E 7200 HX OPEN TYPE T / 15T

F 7200 XFMR BAY-O-NET / 6A

G 7200 XFMR BAY-O-NET / 25A

H 7200 XFMR BAY-O-NET / 15A

J 7200 XFMR BAY-O-NET / 12A

A A

POWER CO. POLE

#6 BARE CU

CAD WELD (TYP)

TX-7

1Ø

7200V/240V

10KVA

NEMA 3R

C

CONDUCTOR BY UTILITY

METERING POLE

FIRST POLE DNR

#1/0 BARE CU

CAD WELD (TYP)

3/4" X 10' CU GRN ROD (TYP)

#6 BARE CU

CAD WELD (TYP)

TX-1

1Ø

7200V/240V

10KVA

NEMA 3R

C

#6 BARE CU

CAD WELD (TYP)

TX-3

1Ø

7200V/240V

75KVA

NEMA 3R

C

#6 BARE CU

CAD WELD (TYP)

3/4" X 10' CU

GRN ROD (TYP)

TX-2

1Ø

7200V/240V

10KVA

NEMA 3R

C

#6 BARE CU

CAD WELD (TYP)

TX-4

1Ø

7200V/240V

37.5KVA

NEMA 3R

A

#6 BARE CU

CAD WELD (TYP)

TX-5

1Ø

7200V/240V

15KVA

NEMA 3R

C

D D D D D D

3/4" X 10' CU

GRN ROD (TYP)

3/4" X 10' CU

GRN ROD (TYP)

3/4" X 10' CU

GRN ROD (TYP)

3/4" X 10' CU

GRN ROD (TYP)

3/4" X 10' CU

GRN ROD (TYP)

#6 BARE CU

CAD WELD (TYP)

TX-7

1Ø

7200V/240V

10KVA

NEMA 3R

A

3/4" X 10' CU

GRN ROD (TYP)

D

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

E504

ELECTRICAL DETAILS

06-29-2026

TRT

BCM

26002

CONSTRUCTION

DOCUMENTS

WEST VIRGINIA

DIVISION OF

NATURAL

RESOURCES

COOPERS ROCK

HIGH VOLTAGE

REPAIRS PHASE

2 - HIGH VOLTAGE &

LOW VOLTAGE

ELECTRICAL

REPLACEMENT

N O

D

E S

C R

IP

T

IO

N

D A

T E

DRAWING NOT SCALABLE

SERVICE ONE-LINE

FEEDER SCHEDULE

TAG # SETS

CONDUCTOR SIZE

CONDUIT SIZE

VOLTAGE

TYPEPOWER & NEUTRAL GROUND

A 1 2 - #1/0 (CU) (133% INSULATION)(CONCENTRIC NEUTRAL) #6 EXISTING MEDIUM

B 1 3 - #350 KCMIL (CU) #1/0 3" LOW

C 1 2 - #1/0 (CU) (133% INSULATION)(CONCENTRIC NEUTRAL) #6 3" MEDIUM

D 1 2 - 2/0 (AAC) #6 NA MEDIUM

E 1 3 - #2/0 (CU) #4 2" LOW

F 1 2 - #1/0 (CU) #6 EXISTING PHASE 1 MEDIUM

G 1 3 - #400 KCMIL (CU) #1/0 3" LOW

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

E601

ELECTRICAL

SCHEDULES

06-29-2026

BCM

BCM

26002

CONSTRUCTION

DOCUMENTS

WEST VIRGINIA

DIVISION OF

NATURAL

RESOURCES

COOPERS ROCK

HIGH VOLTAGE

REPAIRS PHASE

2 - HIGH VOLTAGE &

LOW VOLTAGE

ELECTRICAL

REPLACEMENT

N O

D

E S

C R

IP

T

IO

N

D A

T E

TRANSFORMER SCHEDULE

TAG MANUFACTURER MODEL PHASES

VOLTAGES

KVA LOCATION SERVES

PRIMARY SECONDARY

TX-1 EATON COOPER MAXISHRUB 1 7200 240 10.0 WATER PLANT EXISTING PANEL

TX-2 EATON COOPER MAXISHRUB 1 7200 240 10.0 RESERVOIR PUMPHOUSE EXISTING PANEL

TX-3 EATON COOPER MAXISHRUB 1 7200 240 75.0 CAMPGROUND DPLN1

TX-4 EATON COOPER MAXISHRUB 1 7200 240 37.5 RESTROOM AREAS DPLN2

TX-5 EATON COOPER MAXISHRUB 1 7200 240 15.0 CLIFFSIDE SHOP EXISTING PANEL

TX-6 EATON COOPER MAXISHRUB 1 7200 240 10.0 RHOD. CAMPGROUND EXISTING DISCONNECT

TX-7 EATON COOPER MAXISHRUB 1 7200 240 10.0 TROUT LAKE NEW DISCONNECT

SLOTS 13, 14, 15, 16, 17, 18, 19, 20 IS 1 BREAKER

SLOTS 21, 22, 23, 24, 25, 26, 27, 28 IS 1 BREAKER

Notes:

29 30 27 28 25 26 23 24 21 22 19 20 17 18 15 16 13 14 11 12 9 10 7 ... 8

BATH HOUSE 400 A 2

2 400 A CAMPGROUND PANEL

3 ... 4

WATER TREATMENT PLANT 200 A 2

2 200 A CAMPGROUND OFFICE

CKT Circuit Description Trip Poles Poles Trip Circuit Description CKT

ENCLOSURE: NEMA 3R Outdoor MAIN TYPE: MCB

WIRES: 3 MAIN: 600 A

VOLTS: 120/240 Single PHASES: 1

Branch Panel: DPLN1

SLOTS 21, 22, 23, 24 IS A FEED THROUGH LUG SECTION

SLOTS 25, 26, 27, 28, 29, 30 IS A BLANK COVER

Notes:

29 COVER -- 1 ... 1 -- COVER 30

27 COVER -- 1 ... 1 -- COVER 28

25 COVER -- 1 ... 1 -- COVER 26

23 ... 24

THROUGH FEED BATH HOUSE 1 -- 2

2 -- THROUGH FEED BATH HOUSE 2

19 20 17 18 15 16 13 14 11 12 9 10 7 8 5 6 3 ... 4

PAVILION PANEL 100 A 2

... 2

CKT Circuit Description Trip Poles Poles Trip Circuit Description CKT

ENCLOSURE: NEMA 3R Outdoor MAIN TYPE: MCB

WIRES: 3 MAIN: 300 A

VOLTS: 120/240 Single PHASES: 1

Branch Panel: DPLN2

File details come from the government source that posted it. Updated .