Contractor Pricing Breakdown TEMPLATE.xlsx

XLSX spreadsheet 8 KB Posted

Attached to
Walk-in Cooler Repair at 725 17th St NW Washington DC 20506
Solicitation number
47PM1024Q0021
Issued by

About this file

This document is a contractor pricing breakdown template for Solicitation PIID 47PM1024Q0021, a Request for Quotes (RFQ) for repairing the walk-in cooler at the New Executive Office Building located at 725 17th St NW, Washington, DC 20506. The solicitation is a total small business set-aside under NAICS code 811412 Appliance Repair and Maintenance, with a size standard of $19.0 million in annual revenue.

The template includes line items for materials and labor related to the repair, such as compressor, evaporator coil, refrigerant, plumbing, electrical, and shipping. Vendors are instructed to provide pricing details on the template and submit it along with the Standard Form 18, Contractor Proposal, Management Plan, Past Performance, and Representations and Certifications by the due date of August 2, 2024 at 4:30 PM ET via email to the Contracting Officer. The solicitation is being issued by the General Services Administration's Public Buildings Service.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Standard Breakdown

Contractor Pricing BreakdownCover Page
Solicitation PIID47PM1024Q0021Vendor Name
Project TitleNew Executive Office Building Walkin Cooler RepairVendor UEI
Item No.Description of WorkQuantityMaterialLaborTotal
No. of UnitsUnit Meas.Per UnitSubtotalPer UnitSubtotal
10$0.00$0.00$0.00$0.00$0.00
2Compressor0$0.00$0.00$0.00$0.00$0.00
3Evaporator Coil0$0.00$0.00$0.00$0.00$0.00
4Refrigerant0$0.00$0.00$0.00$0.00$0.00
5Copper Pipe/Fittings/Unions0$0.00$0.00$0.00$0.00$0.00
6Misc Plumbing0$0.00$0.00$0.00$0.00$0.00
7Misc Electric0$0.00$0.00$0.00$0.00$0.00
8Insulation0$0.00$0.00$0.00$0.00$0.00
9Welding/Cutting/Braising0$0.00$0.00$0.00$0.00$0.00
10Nitrogen0$0.00$0.00$0.00$0.00$0.00
110$0.00$0.00$0.00$0.00$0.00
12Additional Labor0$0.00$0.00$0.00$0.00$0.00
13Shipping0$0.00$0.00$0.00$0.00$0.00
140$0.00$0.00$0.00$0.00$0.00
150$0.00$0.00$0.00$0.00$0.00
160$0.00$0.00$0.00$0.00$0.00
170$0.00$0.00$0.00$0.00$0.00
180$0.00$0.00$0.00$0.00$0.00
190$0.00$0.00$0.00$0.00$0.00
200$0.00$0.00$0.00$0.00$0.00
210$0.00$0.00$0.00$0.00$0.00
220$0.00$0.00$0.00$0.00$0.00
230$0.00$0.00$0.00$0.00$0.00
240$0.00$0.00$0.00$0.00$0.00
250$0.00$0.00$0.00$0.00$0.00
Subtotal Direct Construction Costs$0.00$0.00$0.00
Design Costs$0.00
Equipment RentalsQtyUnitsper UnitTotal
0$0.00
0$0.00
Subtotal Equipment Rentals$0.00
Subtotal Costs$0.00
Cost NotesPercentageAmount
Overhead$0.00
Subtotal with Overhead$0.00
Profit$0.00
Subtotal with Overhead, Profit$0.00
Bond$0.00
Subtotal with Overhead, Profit, and Bond$0.00
Total Project Costs$0.00

File details come from the government source that posted it. Updated .