Contractor Cost Breakdown.xlsx

XLSX spreadsheet 36 KB Posted

Attached to
Range Echo Berm Upgrade - Fort Devens, MA
Solicitation number
W15QKN-26-Q-A143
Issued by

About this file

This is a Contractor Cost Breakdown template file for a commercial construction solicitation. The file is associated with the Range Echo Berm Upgrade project at Fort Devens, Massachusetts, issued by the Department of the Army Materiel Command Contracting Command at Picatinny Arsenal under solicitation number W15QKN-26-Q-A143. The solicitation is a 100% small business set-aside using lowest price technically acceptable (LPTA) evaluation methodology, and the Government intends to award a firm-fixed-price purchase order to the responsible quoter with the lowest evaluated total price. The work involves commercial construction services for upgrading a firing berm at the Devens RFTA facility located at Building 3574, 12 Feinberg Street, Devens, MA 01434-4429.

Performance must comply with the Specifications of Work, provided drawings, Davis-Bacon wage decision requirements, Construction Form, and other incorporated solicitation attachments. The cost breakdown form serves as the pricing template that contractors must complete to provide their quote for labor, materials, equipment, and other cost elements associated with the berm upgrade work. All proposals must be technically acceptable and priced competitively to be considered for award of this firm-fixed-price purchase order.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet2

IDSortTypeDescription (to include labor,equipment, material type and grade)QuantityUnit MeasureLabor in ManhoursEquipmentMaterialTotal Cost
Crew (skill set)Labor HoursTotal HrsCity Cost IndexUnit Cost*Total Labor Cost*Unit CostTotal Equipment CostCity Cost IndexUnit CostTotal Material Cost

Totals

GENERAL CONTRACTOR

OVERHEAD$ - 0
$ - 0
PROFIT$ - 0
$ - 0
BOND$ - 0

G & A $ - 0

GRAND TOTAL $ - 0

Unit Cost*Cost for one labor hour of the specified crew
Total Labor Cost*"=Unit Cost x Total Hours"

File details come from the government source that posted it. Updated .