Contractor Cost Breakdown.xlsx
XLSX spreadsheet 36 KB Posted
- Attached to
- Range Echo Berm Upgrade - Fort Devens, MA
- Solicitation number
- W15QKN-26-Q-A143
About this file
This is a Contractor Cost Breakdown template file for a commercial construction solicitation. The file is associated with the Range Echo Berm Upgrade project at Fort Devens, Massachusetts, issued by the Department of the Army Materiel Command Contracting Command at Picatinny Arsenal under solicitation number W15QKN-26-Q-A143. The solicitation is a 100% small business set-aside using lowest price technically acceptable (LPTA) evaluation methodology, and the Government intends to award a firm-fixed-price purchase order to the responsible quoter with the lowest evaluated total price. The work involves commercial construction services for upgrading a firing berm at the Devens RFTA facility located at Building 3574, 12 Feinberg Street, Devens, MA 01434-4429.
Performance must comply with the Specifications of Work, provided drawings, Davis-Bacon wage decision requirements, Construction Form, and other incorporated solicitation attachments. The cost breakdown form serves as the pricing template that contractors must complete to provide their quote for labor, materials, equipment, and other cost elements associated with the berm upgrade work. All proposals must be technically acceptable and priced competitively to be considered for award of this firm-fixed-price purchase order.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet2
| ID | Sort | Type | Description (to include labor,equipment, material type and grade) | Quantity | Unit Measure | Labor in Manhours | Equipment | Material | Total Cost | ||||||||
| Crew (skill set) | Labor Hours | Total Hrs | City Cost Index | Unit Cost* | Total Labor Cost* | Unit Cost | Total Equipment Cost | City Cost Index | Unit Cost | Total Material Cost |
Totals
GENERAL CONTRACTOR
| OVERHEAD | $ - 0 |
| $ - 0 | |
| PROFIT | $ - 0 |
| $ - 0 | |
| BOND | $ - 0 |
G & A $ - 0
GRAND TOTAL $ - 0
| Unit Cost* | Cost for one labor hour of the specified crew |
| Total Labor Cost* | "=Unit Cost x Total Hours" |
File details come from the government source that posted it. Updated .