Home Reconstruction at 1218 W 13th Place, Sanford, FL 32771
Solicitation number
7090-26/NBM
Issued by
Seminole County, Florida

About this file

Contract Documents for Home Reconstruction Project - Seminole County, Florida

This document is a standardized construction forms package issued by the Seminole County Board of County Commissioners for use in the Home Reconstruction project at 1218 W 13th Place, Sanford, Florida (Project 7090-26/NBM). The file contains thirteen mandatory forms that contractors must utilize throughout project execution, including Application for Payment (C-01), Continuation Sheet for Application for Payment (C-01(2)), Change Order Form (C-02), Shop Drawing Submittals (C-03), Authorized Field Change (C-04), Certificate of Substantial Completion (C-05), Certificate of Final Completion (C-06), Contractor's Release (C-07), Contractor's Waiver of Lien - Partial (C-08), Subcontractor's Waiver of Lien - Partial (C-09), Contractor's Waiver of Lien - Final and Complete (C-10), Subcontractor's Waiver and Release of Lien (C-11), and Consent of Surety to Final Payment (C-12). The project requires reconstruction of a two-bedroom, two-bathroom residential home containing a minimum of 1,100 square feet (plus or minus 100 square feet) with an attached one-car garage, stem wall foundation, block exterior walls, hip roof with pre-manufactured truss system, front porch (approximately 80 square feet), and rear patio slab (approximately 80 square feet). The contractor must complete the work within 270 total calendar days: 90 days for permitting and engineering, 150 days to substantial completion, and 30 days to final completion. Liquidated damages are assessed at $250 per day for delays beyond substantial completion and $62.50 per day for delays beyond final completion. All work must comply with current Florida Building Code requirements and federal, state, and local regulations. The bid submission deadline is April 8, 2026, with bid documents available through https://secure.procurenow.com/portal/seminolefl.

The engineer's estimate for the project is $250,000.00, with the final contract price to be determined through competitive bidding. Progress payments will be made based on contractor applications for payment with retainage held as collateral security; additional retainage may be withheld if mobilization does not occur within 31 days of contract commencement or if work falls behind schedule. The selected contractor's bid price constitutes full compensation for all work, materials, labor, and associated project costs, and the contractor serves as an independent contractor responsible for all aspects of project performance, including utility coordination, subsurface condition management, and weather-related challenges. The project is potentially funded through Federal Emergency Management Agency (FEMA) disaster relief assistance, subjecting the contract to compliance with federal statutes including the Davis-Bacon Act, Copeland Anti-Kickback Act, Contract Work Hours and Safety Standards Act, Clean Air Act, Federal Water Pollution Control Act, and Executive Order 11246 regarding equal employment opportunity. Contractors must provide debarment certification and anti-lobbying certification and comply with E-Verify employment verification requirements. Minority-owned and Women-owned Business Enterprises (M/WBEs) are explicitly encouraged to participate in the bidding process. Prospective bidders are prohibited from contacting Seminole County staff or officials except through the designated contact person.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEMINOLE COUNTY BOARD OF COUNTY COMMISSIONERS

CONSTRUCTION FORMS

EXHIBIT TO THE AGREEMENT

TO BE PROVIDED TO THE CONTRACTOR WITH THE AGREEMENT

Application for Payment ..................................................................................................... C-01

Continuation Sheet for Application for Payment ................................................................. C-01 (2)

Change Order Form ............................................................................................................ C-02

Shop Drawing Submittals ................................................................................................... C-03

Authorized Field Change (AFC) ......................................................................................... C-04

Certificate of Substantial Completion ................................................................................ C-05

Certificate of Final Completion .......................................................................................... C-06

Contractor’s Release .......................................................................................................... C-07

Contractor’s Waiver of Lien (Partial) ................................................................................. C-08

Subcontractor’s Waiver of Lien (Partial) ........................................................................... C-09

Contractor’s Waiver of Lien (Final and Complete) ............................................................ C-10

Subcontractor’s Waiver and Release of Lien (Final) ........................................................ C-11

Consent of Surety to Final Payment .................................................................................. C-12

Any manipulations of these documents would be grounds for fraud and misrepresentation.

EXHIBIT E

C-01 – Application for Payment (Rev 100120)

APPLICATION FOR PAYMENT

Contract for: _______________________________________ Payment Application No.: ____________

County Contract No.: _______________ CIP No.: __________

CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS

Total changes approved in previous months by County $ $

Total approved this month $ $

TOTAL $ $

NET CHANGES by Change Order $

1. ORIGINAL CONTACT SUM ………………………………………………………………. $ _________________

2. NET CHANGE BY CHANGE ORDER .…………………………………………………… $ _________________

3. CONTACT SUM TO DATE (Line 1 & Line 2) ……………………………………………. $ _________________

4. TOTAL COMPLETED AND STORED TO DATE.……………………………………….. $ _________________

5. RETAINAGE:

(a) ________ % of Completed Work ……………………………… $ _________________

(b) ________ % of Stored Material ……………………………… $ _________________

Total Retainage (Lines 5a + 5b, or Total in Column 1) ……………………………….. $ _________________

6. TOTAL EARNED LESS RETAINAGE .……………………………………………………. $ _________________

7. LESS PREVIOUS CERTIFICATES FOR PAYMENT ……………………………………. $ _________________

(Line 6 from Prior Payment Application)

8. CURRENT PAYMENT DUE…………………………………………………………………. $ _________________

9. BALANCE TO FINISH INCLUDING RETAINAGE (Line 3 minus Line 6)………………. $ _________________

The undersigned Contractor certifies that (1) all previous payments for Work performed have been applied to discharge in full all obligations on the Contractor incurred in connection with Work covered by prior payment applications (1 through _____) under this Agreement; (2) all Materials and Equipment incorporated in the project are free and clear of liens, security interests and encumbrances; (3) all previous payments have been applied to pay in full, minus retainage, all amounts owed to its subcontractors and suppliers; (4) all information provided is true and accurate.

CONTRACTOR: ___________________________________ DATE: _______________

By: ________________________________ (Print) ___________________________ (Signature)

STATE OF FLORIDA

COUNTY OF

Sworn to (or affirmed) and subscribed before me by means of □ physical presence or □ online notarization, this day of ____________, 20___, by _______________________________________.(name of person making statement)

Signature of Notary Public – State of Florida Print/Type/Stamp Commissioned Name of Notary Public

Personally Known OR Produced Identification Identification Type: _______________________

COUNTY: In accordance with the Contract Documents, the undersigned recommend payment as presented.

Engineer: ____________________________________________ Date: _______________

Project Manager: ______________________________________ Date: _______________

APPLICATION DATE:

PERIOD TO:

PROJECT #

A B C D E F H I

MATERIALS

TOTAL

COMPLETED

% BALANCE RETAINAGE

FROM

PREVIOUS

PRESENTLY

STORED

AND STORED TO FINISH (IF VARIABLE

RATE)

APPLICATION NOT IN D OR E TO DATE (C - G)

(D + E) (D+E+F)

GRAND TOTALS

SEMINOLE COUNTY BOARD OF COUNTY COMMISSIONERS

Containing Contractor's signed certification is attached APPLICATION #:

WORK COMPLETED

G

UNIT SCHEDULED

VALUE

(original base bid value)

QTYITE

M #

CONTINUATION SHEET

DESCRIPTION OF WORK

THIS PERIOD (G / C)

APPLICATION AND CERTIFICATION FOR PAYMENT

C-01 (2) - Continuation Sheet - Application and Certification for Payment (Rev 100120)

C-01 (2) - Continuation Sheet - Application and Certification for Payment (Rev 100120)

C-02 - CHANGE ORDER FORM (Rev 100120)

CHANGE ORDER

CONSTRUCTION PROJECTS

CONTRACTOR: ________________________________________ Date: _________________

Contract No.: ____________________ Project Name: ___________________________________________________________

Change Order No.: _____________________ Work Order No.: (if applicable) _____________________

Original Contract / Work Order Amount: $ ________________

Amount prior to this Change Order, if different: $ ________________

Change Order Amount: Increase Decrease No Change $ ________________

Revised Contract / Work Order Amount including this Change Order: $ ________________

Change Order Time: Increase Decrease No Change ________________ Days

Date of Substantial Completion through this Change Order: ________________

Date of Final Completion through this Change Order: ________________

Waiver: This Change Order constitutes full and mutual accord and satisfaction for the adjustment of Contract / Work Order Price and Time as a result of increases or decreases in costs and time of performance caused directly and indirectly from the change. Acceptance of this Waiver constitutes an agreement between the County and Contractor that the Change Order represents an equitable adjustment to the Agreement and that Contractor will waive all rights to file a contract claim of any nature on this Change Order. Execution of this Change Order constitutes Contractor’s acceptance and satisfaction that it is entitled to no more costs or time, direct, indirect, impact, etc., pursuant to this Change Order.

Acknowledgements: The aforementioned change, and work affected thereby, is subject to all provisions of the original Agreement not specifically changed by this Change Order; and it is expressly understood and agreed by the County and the Contractor that the approval of this Change Order will have no effect on the original Agreement other than matters expressly provided herein.

This Change Order _______ does or ______ does not involve changes to the design of the project, which would require the approval and signature of the Architect or Engineer of Record and County Project Manager.

County Project Manager: Architect / Engineer of Record: Contractor:

Name: _________________________ _____________________________ ____________________________

Address: _________________________ ______________________________ ____________________________

Sign: _________________________ ______________________________ ____________________________

Date: _________________________ ______________________________ ____________________________

PURCHASING AND CONTRACTS DIVISION:

Signature: __________________________________________ Date __________________________________ Procurement Administrator As authorized by Section 3.554, Seminole County Administrative Code

WITNESS: ______________________________________ WITNESS: ____________________________________

For Board approved Items: Meeting Date: _____________________ Item # ____________________

Seminole County Board of County Commissioners

C-03 - Shop Drawing Submittal (Rev 100120)

SHOP DRAWING SUBMITTALS

Date: ___________________________ Submittal #: ___________________

ENGINEER OF RECORD: CONTRACTOR:

Attention: __________________________ Project Manager

Project Name: ____________________________________________________________

Contract No.: ________________ CIP# _________ Contractor: ______________________

Item No.

Copies Description Previous

Submission No.

Specification

Section(s) Plan

Sheet No.

Contractor’s Authorized Representative: ___________________________________________

TO BE COMPLETED BY ENGINEER OF RECORD:

Item No.

Copies Resubmit

Yes No

Comments

Engineer of Record: _________________________ Date: __________________

C-04 - Authorized Field Change (AFC) (Rev. 100120)

AUTHORIZED FIELD CHANGE (AFC)

FIELD ORDER NO.:

AGREEMENT TITLE:

CONTRACT NO.:

CIP #:

CONTRACTOR:

ARCHITECT/ENGINEER:

AGREEMENT DATE:

CONTRACT DAY: ______ OF _____

Note: An AFC is not an instrument that amends the Contract Documents. This AFC issued by ENGINEER to CONTRACTOR authorizes minor variations in the Work and not a change in the Work. An AFC does not entitle CONTRACTOR to any adjustment in Contract Price or Contract Time. FINAL AS-BUILT PLANS WILL REFLECT

AFC.

I. Minor Variations Authorized:

II. Justification

III. Acknowledgements: Mutually agreed to by the CONTRACTOR and the COUNTY.

This AFC authorized by:

Includes ____ attachments:

ARCHITECT/ENGINEER

By: ________________________________________________

Date: __________________________

Receipt of this AFC:

Acknowledged By:

CONTRACTOR

By: ________________________________________________

Date: __________________________

2 Pages Form

C-05 - CERTIFICATE OF SUBSTANTIAL COMPLETION (Rev 100120)

CERTIFICATE OF SUBSTANTIAL COMPLETION

Construction Projects

Contractor: ___________________________________ Date: __________________

Contract No.: _____________ Project Name: ___________________________________

Master Agreement (if applicable): ___________________________________________________

CIP No.: ___________________________

This Certificate of Substantial Completion applies to all work under the Contract Documents or the following specified parts thereof:

To: ______________________________________________________ (Print) Architect/Engineer of Record

Contractor

The work to which this Certificate applies has been inspected by authorized representatives of CONTRACTOR, and ARCHITECT/ENGINEER, and that Work is hereby declared to be substantially completed in accordance with the Contract Documents on:

Date of Substantial Completion

A list of items to be completed or corrected is attached hereto. This list may not be all-inclusive, and the failure to include an item in it does not alter the responsibility of CONTRACTOR to complete and warrant all the Work in accordance with the Contract Documents. All items on the list shall be completed or corrected by CONTRACTOR within ________ calendar days of the above date of Substantial Completion.

C-05 - CERTIFICATE OF SUBSTANTIAL COMPLETION (Rev 100120)

This Certificate does not constitute an acceptance of Work not in accordance with the Contract Documents nor is it a release of CONTRACTOR’s obligations to complete the Work in accordance with the Contract Documents, including “As-Built” drawings.

Executed by ARCHITECT/ENGINEER on the _______ day of _________________, 20____

ARCHITECT/ENGINEER:

Print Name

Signature

Accepted by CONTRACTOR on the _______ day of _________________, 20____

CONTRACTOR:

Executed by County’s PROJECT MANAGER on the _______ day of ________________, 20____

PROJECT MANAGER:

C-06 - CERTIFICATE OF FINAL COMPLETION (Rev 100120)

CERTIFICATE OF FINAL COMPLETION

Construction Projects

Contractor: ___________________________________ Date: __________________

Contract No.: _____________ Project Name: ___________________________________

Master Agreement (if applicable): ___________________________________________________

CIP No.: ___________________________

This Certificate of Final Completion applies to all work under the Contract Documents.

Architect/Engineer of Record

Contractor

To: Seminole County Board of County Commissioners or Designee

The Work to which this Certificate applies has been inspected on ________________ (date) by authorized representatives of CONTRACTOR, and ARCHITECT/ENGINEER, and that Work is hereby declared to be finally completed in accordance with the Contract Documents on:

Date of Final Completion

C-06 - CERTIFICATE OF FINAL COMPLETION (Rev 100120)

This Final Completion Certificate constitutes an acceptance of Work excepting latent defects, warranty work, maintenance, and other post Final Completion obligations of the CONTRACTOR under the Contract Documents.

Executed by ARCHITECT/ENGINEER on the _______ day of _________________, 20____

ARCHITECT/ENGINEER:

Accepted by CONTRACTOR on the _______ day of _________________, 20____

CONTRACTOR:

Accepted by SEMINOLE COUNTY on the _______ day of ________________, 20____

WITNESSES: BOARD OF COUNTY COMMISSIONERS

SEMINOLE COUNTY, FLORIDA

Procurement Administrator

As authorized by Section 3.554, Seminole County Administrative Code

C-07 - CONTRACTOR’S RELEASE (Rev 100120)

CONTRACTOR’S RELEASE

This Release must be submitted simultaneously with the Contractor’s request for Final Payment and Subcontractor Affidavits.

Agreement Title: County Contract No.:

Construction Contract # OR Master Services Agreement # & Work Order #

Contractor: ______ CIP No.:

BEFORE ME, the undersigned authority in said County and State, appeared

(Name of Affiant) who, being duly sworn and personally know to me, deposes and says that he/she is ___________________ (Title of Affiant) of ___ (Full Legal Company Name), a company and/or corporation authorized to do business under the laws of Florida, which is the CONTRACTOR on (Agreement Title), located in Seminole County, Florida, dated the _____ day of ___________, 20___, that the deponent is duly authorized to make this affidavit by resolution of the Board of Directors of said company and/or corporation; that deponent knows of their own knowledge that said Agreement has been complied with in every particular by said CONTRACTOR and that all parts of the Work have been approved by the COUNTY’s Architect/Engineer; that there are no bills remaining unpaid for labor, Materials, or otherwise, in connection with said Agreement and Word, and that there are no suits pending against the undersigned as CONTRACTOR or anyone in connection with the Work done and Materials furnished or otherwise under this Agreement.

Affiant further says that the final estimate in the amount of $ _______________ which has been submitted to the COUNTY simultaneously with the making of this affidavit constitutes all claims and demands against the COUNTY on account of said Agreement or otherwise, and that acceptance of the sum specified in said final estimate in the amount of $ ________________ will operate as a full and final release and discharge of the COUNTY from any further claims, demands or compensation by CONTRACTOR under the above Agreement.

Deponent further agrees that all guarantees under this Agreement shall start and be in full force from the date of this release as spelled out in the Contract Documents.

Affiant

State of Florida County of

Sworn to (or affirmed) and subscribed before me by means of □ physical presence OR □ online notarization, this __ day of , 20 , by .

(Name of Affiant)

Signature of Notary Public – State of Florida

Print, Type, Stamp Commissioned Name of Notary Public

Personally Known OR Produced Identification

Type of Identification Produced:

C-08 - CONTRACTOR’S WAIVER OF PARTIAL LIEN (Rev 100120)

CONTRACTOR’S WAIVER OF LIEN (Partial)

Copy of Waiver to be submitted with Each Pay Request

CIP No.:

From: ________________________________________________________________________

Full Legal Name of Contractor

To: Seminole County Board of County Commissioners

Pursuant to the Contract, identified above, entered into on the ______ day of ___________________, 20 ___, between the Contractor and Seminole County for the following project: _____________________________________________.

CONTRACTOR CERTIFIES THAT:

1. All Work covered by Application For Payment No: _______ has been performed in accordance with the terms of the Contract Documents;

2. The materialmen, subcontractors, mechanics, and laborers have been paid from previous payments received from the County on account of Work performed;

3. All Material and Equipment obligations of the Contractor have been paid from previous payments received from the County on account of Work performed; and

4. All just and lawful claims of the Contractor arising out of the performance of the Work covered by this Application for Payment have been paid and satisfied.

IN WITNESS WHEREOF, the undersigned has signed and sealed this instrument this _____ day of ___________________, 20 ___.

Witness:

Signature – Contractor’s Representative

Printed Name & Title

Sworn to (or affirmed) and subscribed before me by means of □ physical presence OR □ online notarization, this _____ day of _______________________, 20 , by ____________________________________.

Name of Person making statement

C-09 - SUB-CONTRACTOR’S WAIVER OF PARTIAL LIEN (Rev 100120)

SUB-CONTRACTOR’S WAIVER OF LIEN (Partial)

Copy of Waiver to be submitted with Each Pay Request

CIP No.:

From: ________________________________________________________________________

Full Legal Name of Sub-Contractor

To: Seminole County Board of County Commissioners

Pursuant to the Contract, identified above, entered into on the ______ day of ___________________, 20 ___, between the Contractor and Seminole County for the following project: _____________________________________________.

SUB-CONTRACTOR CERTIFIES THAT:

1. The materialmen, subcontractors, mechanics, and laborers have been paid from previous payments received from the County on account of Work performed;

2. All Material and Equipment obligations of the Contractor have been paid from previous payments received from the County on account of Work performed; and

3. All just and lawful claims of the Contractor arising out of the performance of the Work covered by this Application for Payment have been paid and satisfied.

IN WITNESS WHEREOF, the undersigned has signed and sealed this instrument this _____ day of ___________________, Signature – Sub-Contractor’s Representative

Sworn to (or affirmed) and subscribed before me by means of □ physical presence OR □ online notarization, this _____

C-10 - CONTRACTOR’S WAIVER OF FINAL AND COMPLETE LIEN (Rev 100120)

CONTRACTOR’S WAIVER OF LIEN (Final and Complete)

Copy of Waiver to be submitted with Final Pay Request

Agreement Title: County Contract No.: ________________________________

Contractor: ____________________________________ CIP No.:______________________________

_____________________________________ (Affiant), being duly sworn according to law, deposes and states that he/she is the ____________________________ (Title) of ____________________________________ (Full Legal Name of Contractor), Contractor in a Contract entered into between the Contractor and Seminole County for the _________________________________________________ (Agreement Title) and that he is authorized to and does make this affidavit on behalf of the Contractor.

THE AFFIANT FURTHER DEPOSES AND STATES THAT:

1. All Work has been performed in accordance with the terms of the Contract Documents, the Contractor alone has made all subcontracts, and the Contractor and his subcontractors have purchased all materials and fixtures and employed all labor in the performance of the Work.

2. All laborers, materialmen, mechanics, manufacturers and subcontractors who have furnished any one or all of the following: services, labor, fixtures, or materials have been satisfied and paid in full for the Work performed, and for materials, fixtures, and/or services supplied, and that the Contractor is not indebted to any person or firm in connection with the Work in any amount whatsoever.

3. There are no outstanding claims of any nature, contractual or otherwise, or for any personal injury, death or property damage, arising from or associated with the performance of the Work that might be the basis of any claim, suit, lien or demand that could be asserted against either the County or the Contractor.

4. All Bonds and Insurance policies required by the Contract are presently in effect and shall not be permitted to expire within the time periods stated in the Contract Documents.

5. This affidavit is made for the purpose of inducing the County to make Final Payment, and acceptance of such Final Payment by the Contractor shall release the County from any further liability under the Contract Documents.

IN WITNESS WHEREOF, the undersigned has signed and sealed this instrument this _____ day of ___________________, Signature – Contractor’s Representative

Sworn to (or affirmed) and subscribed before me by means of □ physical presence OR □ online notarization, this _____

C-11 - SUBCONTRACTOR’S WAIVER AND RELEASE OF LIEN (Rev 100120)

SUB-CONTRACTOR’S WAIVER AND RELEASE OF LIEN UPON FINAL PAYMENT

Copy of Waiver to be submitted with Contractor’s Final Pay Request

State of: _____________________ County of: _______________________

(Affiant), being duly sworn according to law, deposes and states that he/she is the (Title) of (Full Legal Name of Subcontractor), Subcontractor/Vendor/Lienor to the above Contractor under Contract with Seminole County for the (Agreement Title) and that he is authorized to and does make this affidavit on behalf of the Subcontractor.

The undersigned, in consideration of the final payment in the amount of $ , hereby waives its lien and right to claim a lien for labor, services, or materials furnished to (Contractor) on the above listed project to the following described property:

Property Address: _______________________________________________________________

Tax Parcel Number: ______________________________________________________________

Legal Description: _________________________________________________________________________________

IN WITNESS WHEREOF, the undersigned has signed this instrument this day of , 20 .

Signature of Subcontractor’s Representative Title

STATE OF FLORIDA

COUNTY OF:

The Foregoing instrument was acknowledged before me by means of □ physical presence OR □ online notarization, on this day of , 20 , by (Name of Affiant), who is personally known to me or who has produced as identification.

Printed/Typed/Stamped Commissioned Name of Notary Public

Title or Rank

Serial Number (if any)

C-12 - CONSENT OF SURETY TO FINAL PAYMENT (Rev 100120)

CONSENT OF SURETY TO FINAL PAYMENT

We, (Name of Surety), having heretofore executed Performance and

Payment Bonds for the above named Contractor covering the Project referenced above in the sum of

Dollars ($ ) hereby agree that the County may make full payment of the final estimate, including the retained percentage, to said Contractor. The Surety concurs that full payment to the Contractor is appropriate and the Surety expressly releases the County from all liability to Surety resulting from full payment to the Contractor.

It is fully understood that the granting of the right to the County to make payment of the final estimate to the Contractor and/or his assigns shall in no way relieve this Surety of its obligations under its bonds as set forth in the Contract Documents and Bonds pertaining to the above referenced Project. By execution of this Consent, Surety specifically acknowledges that, in the event it is discovered that the Contractor has failed to pay any subcontractors under this Project, the Surety will make such payments as are due, either in whole or in part, and hold the County harmless therefrom.

IN WITNESS WHEREOF, (Name of Surety) has caused this instrument to be executed on behalf of its and its duly authorized attorney-in-fact, and its corporate seal shall be affixed, on this _____ day of ___________________, 20 ___.

Signature – Surety’s Representative Signature – Attorney-in-Fact

*Power of Attorney must be attached if signed by Attorney-in-Fact

STATE OF FLORIDA

COUNTY OF:

The Foregoing instrument was acknowledged before me by means of □ physical presence OR □ online notarization, on this day of , 20 , by (Name of Affiant), who is personally known to me or who has produced as identification.

Printed/Typed/Stamped Commissioned Name of Notary Public

Title or Rank

Serial Number (if any)

Contract for:
Payment Application No:
County Contract No:
CIP No:
CHANGE ORDER SUMMARY:
fill_47:
fill_48:
Total approved this month:
fill_50:
fill_51:
TOTAL:
fill_53:
fill_54:
NET CHANGES by Change Order:
fill_56:
ORIGINAL CONTACT SUM:
undefined:
NET CHANGE BY CHANGE ORDER:
undefined_2:
CONTACT SUM TO DATE Line 1 Line 2:
undefined_3:
TOTAL COMPLETED AND STORED TO DATE:
undefined_4:
a:
undefined_5:
b:
of Stored Material:
undefined_6:
Total Retainage Lines 5a 5b or Total in Column 1:
undefined_7:
TOTAL EARNED LESS RETAINAGE:
undefined_8:
LESS PREVIOUS CERTIFICATES FOR PAYMENT:
undefined_9:
CURRENT PAYMENT DUE:
undefined_10:
BALANCE TO FINISH INCLUDING RETAINAGE Line 3 minus Line 6:
undefined_11:
Contractor incurred in connection with Work covered by prior payment applications 1 through:
CONTRACTOR:
DATE:
By:
Print:
COUNTY OF:
online notarization this:
Sworn to or affirmed and subscribed before me by means of: Off
physical presence or: Off
day of 1:
by:
PrintTypeStamp Commissioned Name of Notary Public:
Personally Known:
OR:
Identification Type:
Engineer:
Date:
Project Manager:
Date_2:
B:
ITE M Row1:
DESCRIPTION OF WORKRow1:
QTYRow1:
UNITRow1:
SCHEDULED VALUE original base bid valueRow1:
FROM PREVIOUS APPLICATION D ERow1:
THIS PERIODRow1:
MATERIALS PRESENTLY STORED NOT IN D OR ERow1:
TOTAL COMPLETED AND STORED TO DATE DEFRow1:
G CRow1:
BALANCE TO FINISH C GRow1:
RETAINAGE IF VARIABLE RATERow1:
ITE M Row2:
DESCRIPTION OF WORKRow2:
QTYRow2:
UNITRow2:
SCHEDULED VALUE original base bid valueRow2:
FROM PREVIOUS APPLICATION D ERow2:
THIS PERIODRow2:
MATERIALS PRESENTLY STORED NOT IN D OR ERow2:
TOTAL COMPLETED AND STORED TO DATE DEFRow2:
G CRow2:
BALANCE TO FINISH C GRow2:
RETAINAGE IF VARIABLE RATERow2:
ITE M Row3:
DESCRIPTION OF WORKRow3:
QTYRow3:
UNITRow3:
SCHEDULED VALUE original base bid valueRow3:
FROM PREVIOUS APPLICATION D ERow3:
THIS PERIODRow3:
MATERIALS PRESENTLY STORED NOT IN D OR ERow3:
TOTAL COMPLETED AND STORED TO DATE DEFRow3:
G CRow3:
BALANCE TO FINISH C GRow3:
RETAINAGE IF VARIABLE RATERow3:
ITE M Row4:
DESCRIPTION OF WORKRow4:
QTYRow4:
UNITRow4:
SCHEDULED VALUE original base bid valueRow4:
FROM PREVIOUS APPLICATION D ERow4:
THIS PERIODRow4:
MATERIALS PRESENTLY STORED NOT IN D OR ERow4:
TOTAL COMPLETED AND STORED TO DATE DEFRow4:
G CRow4:
BALANCE TO FINISH C GRow4:
RETAINAGE IF VARIABLE RATERow4:
ITE M Row5:
DESCRIPTION OF WORKRow5:
QTYRow5:
UNITRow5:
SCHEDULED VALUE original base bid valueRow5:
FROM PREVIOUS APPLICATION D ERow5:
THIS PERIODRow5:
MATERIALS PRESENTLY STORED NOT IN D OR ERow5:
TOTAL COMPLETED AND STORED TO DATE DEFRow5:
G CRow5:
BALANCE TO FINISH C GRow5:
RETAINAGE IF VARIABLE RATERow5:
ITE M Row6:
DESCRIPTION OF WORKRow6:
QTYRow6:
UNITRow6:
SCHEDULED VALUE original base bid valueRow6:
FROM PREVIOUS APPLICATION D ERow6:
THIS PERIODRow6:
MATERIALS PRESENTLY STORED NOT IN D OR ERow6:
TOTAL COMPLETED AND STORED TO DATE DEFRow6:
G CRow6:
BALANCE TO FINISH C GRow6:
RETAINAGE IF VARIABLE RATERow6:
ITE M Row7:
DESCRIPTION OF WORKRow7:
QTYRow7:
UNITRow7:
SCHEDULED VALUE original base bid valueRow7:
FROM PREVIOUS APPLICATION D ERow7:
THIS PERIODRow7:
MATERIALS PRESENTLY STORED NOT IN D OR ERow7:
TOTAL COMPLETED AND STORED TO DATE DEFRow7:
G CRow7:
BALANCE TO FINISH C GRow7:
RETAINAGE IF VARIABLE RATERow7:
ITE M Row8:
DESCRIPTION OF WORKRow8:
QTYRow8:
UNITRow8:
SCHEDULED VALUE original base bid valueRow8:
FROM PREVIOUS APPLICATION D ERow8:
THIS PERIODRow8:
MATERIALS PRESENTLY STORED NOT IN D OR ERow8:
TOTAL COMPLETED AND STORED TO DATE DEFRow8:
G CRow8:
BALANCE TO FINISH C GRow8:
RETAINAGE IF VARIABLE RATERow8:
ITE M Row9:
DESCRIPTION OF WORKRow9:
QTYRow9:
UNITRow9:
SCHEDULED VALUE original base bid valueRow9:
FROM PREVIOUS APPLICATION D ERow9:
THIS PERIODRow9:
MATERIALS PRESENTLY STORED NOT IN D OR ERow9:
TOTAL COMPLETED AND STORED TO DATE DEFRow9:
G CRow9:
BALANCE TO FINISH C GRow9:
RETAINAGE IF VARIABLE RATERow9:
ITE M Row10:
DESCRIPTION OF WORKRow10:
QTYRow10:
UNITRow10:
SCHEDULED VALUE original base bid valueRow10:
FROM PREVIOUS APPLICATION D ERow10:
THIS PERIODRow10:
MATERIALS PRESENTLY STORED NOT IN D OR ERow10:
TOTAL COMPLETED AND STORED TO DATE DEFRow10:
G CRow10:
BALANCE TO FINISH C GRow10:
RETAINAGE IF VARIABLE RATERow10:
ITE M Row11:
DESCRIPTION OF WORKRow11:
QTYRow11:
UNITRow11:
SCHEDULED VALUE original base bid valueRow11:
FROM PREVIOUS APPLICATION D ERow11:
THIS PERIODRow11:
MATERIALS PRESENTLY STORED NOT IN D OR ERow11:
TOTAL COMPLETED AND STORED TO DATE DEFRow11:
G CRow11:
BALANCE TO FINISH C GRow11:
RETAINAGE IF VARIABLE RATERow11:
ITE M Row12:
DESCRIPTION OF WORKRow12:
QTYRow12:
UNITRow12:
SCHEDULED VALUE original base bid valueRow12:
FROM PREVIOUS APPLICATION D ERow12:
THIS PERIODRow12:
MATERIALS PRESENTLY STORED NOT IN D OR ERow12:
TOTAL COMPLETED AND STORED TO DATE DEFRow12:
G CRow12:
BALANCE TO FINISH C GRow12:
RETAINAGE IF VARIABLE RATERow12:
ITE M Row13:
DESCRIPTION OF WORKRow13:
QTYRow13:
UNITRow13:
SCHEDULED VALUE original base bid valueRow13:
FROM PREVIOUS APPLICATION D ERow13:
THIS PERIODRow13:
MATERIALS PRESENTLY STORED NOT IN D OR ERow13:
TOTAL COMPLETED AND STORED TO DATE DEFRow13:
G CRow13:
BALANCE TO FINISH C GRow13:
RETAINAGE IF VARIABLE RATERow13:
ITE M Row14:
DESCRIPTION OF WORKRow14:
QTYRow14:
UNITRow14:
SCHEDULED VALUE original base bid valueRow14:
FROM PREVIOUS APPLICATION D ERow14:
THIS PERIODRow14:
MATERIALS PRESENTLY STORED NOT IN D OR ERow14:
TOTAL COMPLETED AND STORED TO DATE DEFRow14:
G CRow14:
BALANCE TO FINISH C GRow14:
RETAINAGE IF VARIABLE RATERow14:
ITE M Row15:
DESCRIPTION OF WORKRow15:
QTYRow15:
UNITRow15:
SCHEDULED VALUE original base bid valueRow15:
FROM PREVIOUS APPLICATION D ERow15:
THIS PERIODRow15:
MATERIALS PRESENTLY STORED NOT IN D OR ERow15:
TOTAL COMPLETED AND STORED TO DATE DEFRow15:
G CRow15:
BALANCE TO FINISH C GRow15:
RETAINAGE IF VARIABLE RATERow15:
ITE M Row16:
DESCRIPTION OF WORKRow16:
QTYRow16:
UNITRow16:
SCHEDULED VALUE original base bid valueRow16:
FROM PREVIOUS APPLICATION D ERow16:
THIS PERIODRow16:
MATERIALS PRESENTLY STORED NOT IN D OR ERow16:
TOTAL COMPLETED AND STORED TO DATE DEFRow16:
G CRow16:
BALANCE TO FINISH C GRow16:
RETAINAGE IF VARIABLE RATERow16:
ITE M Row17:
DESCRIPTION OF WORKRow17:
QTYRow17:
UNITRow17:
SCHEDULED VALUE original base bid valueRow17:
FROM PREVIOUS APPLICATION D ERow17:
THIS PERIODRow17:
MATERIALS PRESENTLY STORED NOT IN D OR ERow17:
TOTAL COMPLETED AND STORED TO DATE DEFRow17:
G CRow17:
BALANCE TO FINISH C GRow17:
RETAINAGE IF VARIABLE RATERow17:
ITE M Row18:
DESCRIPTION OF WORKRow18:
QTYRow18:
UNITRow18:
SCHEDULED VALUE original base bid valueRow18:
FROM PREVIOUS APPLICATION D ERow18:
THIS PERIODRow18:
MATERIALS PRESENTLY STORED NOT IN D OR ERow18:
TOTAL COMPLETED AND STORED TO DATE DEFRow18:
G CRow18:
BALANCE TO FINISH C GRow18:
RETAINAGE IF VARIABLE RATERow18:
ITE M Row19:
DESCRIPTION OF WORKRow19:
QTYRow19:
UNITRow19:
SCHEDULED VALUE original base bid valueRow19:
FROM PREVIOUS APPLICATION D ERow19:
THIS PERIODRow19:
MATERIALS PRESENTLY STORED NOT IN D OR ERow19:
TOTAL COMPLETED AND STORED TO DATE DEFRow19:
G CRow19:
BALANCE TO FINISH C GRow19:
RETAINAGE IF VARIABLE RATERow19:
ITE M Row20:
DESCRIPTION OF WORKRow20:
QTYRow20:
UNITRow20:
SCHEDULED VALUE original base bid valueRow20:
FROM PREVIOUS APPLICATION D ERow20:
THIS PERIODRow20:
MATERIALS PRESENTLY STORED NOT IN D OR ERow20:
TOTAL COMPLETED AND STORED TO DATE DEFRow20:
G CRow20:
BALANCE TO FINISH C GRow20:
RETAINAGE IF VARIABLE RATERow20:
ITE M Row21:
QTYGRAND TOTALS:
UNITGRAND TOTALS:
SCHEDULED VALUE original base bid valueGRAND TOTALS:
FROM PREVIOUS APPLICATION D EGRAND TOTALS:
THIS PERIODGRAND TOTALS:
MATERIALS PRESENTLY STORED NOT IN D OR EGRAND TOTALS:
TOTAL COMPLETED AND STORED TO DATE DEFGRAND TOTALS:
G CGRAND TOTALS:
BALANCE TO FINISH C GGRAND TOTALS:
RETAINAGE IF VARIABLE RATEGRAND TOTALS:
CONTRACTOR_2:
Date_3:
Contract No:
Project Name:
Change Order No:
Work Order No if applicable:
undefined_12:
undefined_13:
undefined_14:
Increase: Off
Decrease: Off
No Change: Off
undefined_15:
Days:
Increase_2: Off
Decrease_2: Off
No Change_2: Off
1:
2:
This Change Order:
does or:
Name:
Address 1:
Address 2:
Architect Engineer of Record 1:
Architect Engineer of Record 2:
Architect Engineer of Record 3:
Contractor 1:
Contractor 2:
Contractor 3:
1_2:
2_2:
1_3:
2_3:
Date 1:
Date 2:
Date_4:
WITNESS:
WITNESS_2:
For Board approved Items: Off
Meeting Date:
Item:
Date_5:
Submittal:
ENGINEER OF RECORD 1:
ENGINEER OF RECORD 2:
ENGINEER OF RECORD 3:
CONTRACTOR 1:
CONTRACTOR 2:
CONTRACTOR 3:
Attention:
Project Name_2:
Contract No_2:
CIP:
Contractor:
Item NoRow1:
CopiesRow1:
DescriptionRow1:
Previous Submission NoRow1:
Specification SectionsRow1:
Plan Sheet NoRow1:
Item NoRow2:
CopiesRow2:
DescriptionRow2:
Previous Submission NoRow2:
Specification SectionsRow2:
Plan Sheet NoRow2:
Item NoRow3:
CopiesRow3:
DescriptionRow3:
Previous Submission NoRow3:
Specification SectionsRow3:
Plan Sheet NoRow3:
Contractors Authorized Representative 1:
Contractors Authorized Representative 2:
Item NoRow1_2:
CopiesRow1_2:
Resubmit Yes NoRow1:
Resubmit Yes NoRow1_2:
CommentsRow1:
Item NoRow2_2:
CopiesRow2_2:
Resubmit Yes NoRow2:
Resubmit Yes NoRow2_2:
CommentsRow2:
Item NoRow3_2:
CopiesRow3_2:
Resubmit Yes NoRow3:
Resubmit Yes NoRow3_2:
CommentsRow3:
Engineer of Record:
Date_6:
FIELD ORDER NO:
AGREEMENT TITLE:
CONTRACT NO:
CIP_2:
CONTRACTOR_3:
ARCHITECTENGINEER:
AGREEMENT DATE:
undefined_16:
undefined_17:
OF:
I Minor Variations Authorized:
II Justification:
III Acknowledgements Mutually agreed to by the CONTRACTOR and the COUNTY:
Includes:
This AFC authorized by Includes attachments:
ARCHITECTENGINEER_2:
By_2:
Date_7:
Receipt of this AFC Acknowledged By:
CONTRACTOR_4:
By_3:
Date_8:
Contractor_2:
Date_9:
Contract No_3:
Project Name_3:
Master Agreement if applicable:
CIP No_2:
To:
To_2:
Date of Substantial Completion:
list shall be completed or corrected by CONTRACTOR within:
ARCHITECTENGINEER_3:
20:
undefined_18:
Print Name:
Accepted by CONTRACTOR on the:
20_2:
undefined_19:
Print Name_2:
day of:
20_3:
undefined_20:
Print Name_3:
Contractor_3:
Date_10:
Contract No_4:
Project Name_4:
Master Agreement if applicable_2:
CIP No_3:
To_3:
To_4:
The Work to which this Certificate applies has been inspected on:
Date of Final Completion:
ARCHITECTENGINEER_4:
20_4:
undefined_21:
Print Name_4:
Accepted by CONTRACTOR on the_2:
20_5:
undefined_22:
Print Name_5:
BOARD OF COUNTY COMMISSIONERS:
20_6:
undefined_23:
undefined_24:
undefined_25:
Procurement Administrator:
County Contract No_2:
Construction Contract OR Master Services Agreement Work Order:
CIP No_4:
Name of Affiant who being duly sworn and personally know to me:
deposes and says that heshe is:
Full Legal Company Name a company andor corporation authorized to do business:
Title of Affiant of:
Agreement Title located in Seminole County Florida dated the:
day of_2:
20_7:
undefined_26:
that the deponent is duly authorized to make this affidavit by resolution of the Board of:
Directors of said company andor corporation that deponent knows of their own knowledge that said Agreement:
to the COUNTY simultaneously with the making of this affidavit constitutes all claims and demands against the:
COUNTY from any further claims demands or compensation by CONTRACTOR under the above Agreement:
Affiant:
County of:
Sworn to or affirmed and subscribed before me by means of_2: Off
physical presence OR: Off
20_8:
Name of Affiant:
Print Type Stamp Commissioned Name of Notary Public:
Type of Identification Produced:
Produced Identification:
OR_2:
Agreement Title:
County Contract No_3:
CIP No_5:
From:
Pursuant to the Contract identified above entered into on the:
day of_3:
the Contractor and Seminole County for the following project:
All Work covered by Application For Payment No:
day of_4:
Witness:
Witness_2:
Printed Name Title:
County of_2:
Sworn to or affirmed and subscribed before me by means of_3: Off
physical presence OR_2: Off
online notarization this_2:
day of_5:
20 by:
Print Type Stamp Commissioned Name of Notary Public_2:
Personally Known_2:
OR_3:
Type of Identification Produced_2:
Agreement Title_2:
County Contract No_4:
CIP No_6:
From_2:
Pursuant to the Contract identified above entered into on the_2:
day of_6:
the Contractor and Seminole County for the following project_2:
day of_7:
Witness_3:
Witness_4:
Printed Name Title_2:
County of_3:
Sworn to or affirmed and subscribed before me by means of_4: Off
physical presence OR_3: Off
online notarization this_3:
day of_8:
20 by_2:
Print Type Stamp Commissioned Name of Notary Public_3:
Personally Known_3:
OR_4:
Type of Identification Produced_3:
Agreement Title_3:
County Contract No_5:
Contractor_4:
CIP No_7:
Affiant being duly sworn according to law deposes and states that heshe:
is the:
Title of:
Agreement Title and that he is authorized to and does make:
day of_9:
Witness_5:
Witness_6:
Printed Name Title_3:
County of_4:
Sworn to or affirmed and subscribed before me by means of_5: Off
physical presence OR_4: Off
online notarization this_4:
day of_10:
20 by_3:
Print Type Stamp Commissioned Name of Notary Public_4:
Personally Known_4:
OR_5:
Type of Identification Produced_4:
Agreement Title_4:
County Contract No_6:
Contractor_5:
CIP No_8:
State of 1:
State of 2:
County of_5:
Affiant being duly sworn according to law deposes and states that heshe is the:
undefined_27:
Title of_2:
Subcontractor SubcontractorVendorLienor to the above Contractor under Contract with Seminole County for the:
Agreement Title and that he is authorized to and does make this affidavit:
to claim a lien for labor services or materials furnished to:
Property Address:
Tax Parcel Number:
Legal Description 1:
Legal Description 2:
Legal Description 3:
day of_11:
20_9:
Title:
COUNTY OF_2:
The Foregoing instrument was acknowledged before me by means of: Off
physical presence OR_5: Off
day of_12:
by_2:
is personally known to me or who has produced:
PrintedTypedStamped Commissioned Name of Notary Public:
Title or Rank:
Serial Number if any:
County Contract No_7:
Construction Contract OR Master Services Agreement Work Order_2:
Contractor_6:
CIP No_9:
Payment Bonds for the above named Contractor covering the Project referenced above in the sum of:
Dollars:
hereby agree that the County may make full:
payment of the final estimate including the retained percentage to said Contractor The Surety concurs that full payment:
be executed on behalf of its:
and its corporate seal shall be affixed on this:
day of_13:
20_10:
Printed Name Title_4:
COUNTY OF_3:
The Foregoing instrument was acknowledged before me by means of_2: Off
physical presence OR_6: Off
Affiant who is personally known to me or who has produced:
20_11:
by_3:
as:
PrintedTypedStamped Commissioned Name of Notary Public_2: