Construction SOW PSXE242020 Repair TEC Physical Fitness Area.pdf
PDF 10 MB Posted
- Attached to
- PSXE 242020 Repair TEC Physical Fitness Area
- Solicitation number
- W50S98-24-B-0009
About this file
This document is a Statement of Work (SOW) for the PSXE 242020 Repair TEC Physical Fitness Area solicitation (Solicitation Number W50S98-24-B-0009) issued by the Department of the Army Tennessee Army National Guard.
The SOW outlines the requirements for repairing the TEC Physical Fitness Area. The solicitation includes drawings, specifications, and additional statements of work. Contractors must submit a base access request to TSgt Morelock and SSgt Phipps, and attend a site visit on August 30, 2024 at 2 PM as per the instructions in section 00 21 00 of the solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ver. October 2022
STATEMENT OF WORK (SOW)
FOR
PSXE242020 Repair TEC Physical Fitness Area
1.0 General:
1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform upgrades, repairs, and new construction to enhance TEC infrastructure, to include all services, as defined in this SOW.
1.2 Background: The Base requires properly maintained and adequate Air Force and Air National Guard compliant facilities and infrastructure to provide mission requirements in support of the 10 PAA KC-135R Air Refueling Wing, 119th Cyber Operations Squadron (COS), 241st Engineering Installations Squadron (EIS), and the Air National Guard Training and Education Center. The maintenance of base infrastructure is vital to preserving a large portion of the Base capital investment. Civil Engineering primarily serves as base sustainment and maintenance. Existing resources and personnel do not exist to perform large scale repair and construction activities, therefore contracted services are required to complete necessary upgrades, repairs, and construction of base infrastructure and various facilities.
1.3 The Period of Performance shall be 365 days after notice to proceed.
1.4 General Information:
1.4.1 Place and Performance of Services: The contractor shall provide services between the hours of 0700 – 1700 on Monday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be located at McGhee Tyson Air National Guard Base. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this SOW when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential. Teleworking is not authorized.
1.4.1.1 Telework: The Government does not permit the contractor to telework in support of this requirement. In furtherance of Continuity of Operations Planning (COOP), a telework program may be enacted to ensure that the Government's mission-critical operations stay operational during times of national emergency or incidents of national significance. Telework shall be at no additional cost to the Government.
1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.
1.4.1.3 The contractor’s employees shall become familiar with and obey the regulations of the installation, including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times and shall be subject to such checks as may be deemed necessary.
The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.
1.4.2 Recognized Holidays: The following are recognized United States (US) holidays.
The contractor shall not perform services on these days:
1.4.2.1 New Year’s Day: January 1st
1.4.2.2 Martin Luther King, Jr.’s Birthday
1.4.2.3 President’s Day
1.4.2.4 Memorial Day
1.4.2.5 Juneteenth National Independence Day: June 19th
1.4.2.6 Independence Day: July 4th
1.4.2.7 Labor Day
1.4.2.8 Columbus Day
1.4.2.9 Veteran’s Day: November 11th
1.4.2.10 Thanksgiving Day
1.4.2.11 Christmas Day: December 25th
1.4.3 Quality Control (QC): The contractor shall develop and maintain an effective QC Plan (QCP) to ensure services are performed in accordance with this SOW. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is how it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary (PRS). A final QCP shall be submitted to the Contracting Officer Representative (COR) NLT 10 days after contract award. After acceptance of the QCP, the contractor shall obtain the Contracting Officer’s (KO’s) acceptance in writing of any proposed changes to its QCP.
1.4.4 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).
1.4.5 Access and General Protection/Security Policy and Procedures. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR).
The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, Headquarters Air Force (HAF) and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
1. The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.
2. The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver s license, current vehicle registration, valid vehicle insurance certificate, and [insert any additional requirements to comply with local security procedures] to obtain a vehicle pass.
3. During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.
4. When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall coordinate with the COR and comply with AFI 31-101, Integrated Defense, and DODMAN5200.02_AFMAN 16-1405, Air Force Personnel Security Program.
5. Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.
6. Failure to comply with these requirements may result in withholding of final payment.
1.4.5.1. Reserved
1.4.5.2 For Contractors that do not require CAC but require access to a DoD Facility and/or Installation. Contractor and all associated sub-contractors’ employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Air Force Instruction (AFI) 10-245, AFI 31-101 and Air Force Manual (AFMAN) 31-113), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by Government representative)
1.4.5.3 Antiterrorism Awareness Level I Training (AT Level I). All contractor employees, to include subcontractor employees, requiring access to US Government installations, facilities and controlled access areas shall complete AT Level I training within 15 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. AT Level I may be accomplished by a Level I qualified instructor; completing the Force Protection computer-based training (CBT) course on the Advanced Distributed Learning System (ADLS) or Joint Knowledge Online at http://jko.jten.mil. Tracking for each contractor or subcontractor employee is the responsibility of the COR or unit AT Representative. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee to the COR within 15 calendar days after completion of training by each employee or subcontractor personnel.
1.4.5.4 Reserved
1.4.5.5 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.
1.4.5.6 Reserved
1.4.5.7 Advanced Distributed Learning Service (ADLS). All contractor employees and associated sub-contractor employees assigned to work on a Government site and/or requiring access to a DoD network will be required to register with ADLS at commencement of services in order to complete the necessary training required of them initially and annually for the duration of the contract (i.e., DoD IAA CyberAwareness, http://jko.jten.mil/
Protecting Sensitive Information, Force Protection, etc.). ADLS website:
https://golearn.csd.disa.mil/kc/rso/login/ADLS_login.asp
1.4.5.8 Reserved
1.4.5.9 Reserved
1.4.5.10 Protection of Personally Identifiable Information (PII). The contractor shall protect all PII encountered in the performance of services in accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 224.103 Personally Identifiable Information and Department of Defense Directive (DoDD) 5400.11, Department of Defense Privacy Program, and DoD 5400.11-R. If a PII breach results from the contractor’s violation of the aforementioned policies, the contractor shall bear all notification costs, call-center support costs, and credit monitoring service costs for all individuals whose PII has been compromised.
1.4.5.11 Requirement for OPSEC Training. In accordance with AFI 10-701, Operations Security, OPSEC PMs/Signature Managers/Coordinators will provide OPSEC training or training materials to contract employees within 30 days of employees’ initial assignment to the contract and prior to having access to any critical information (CI) and annually thereafter. General organizational orientations may need to be supplemented by duty-related orientations in the work center targeted toward specific critical information and vulnerabilities associated with the work. Initial training (OPSE 1301 - OPSEC Fundamentals) is located on the ADLS website and refresher OPSEC training is conducted annually (at Commander's Call). The contractor shall submit certificates of completion for each contractor employee to the COR within 15 calendar days after completion of training.
1.4.5.12 OPSEC Plan: Reserved
1.4.5.13 Reserved
1.4.5.14 Reserved
1.4.6 Physical Security: The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.
1.4.6.1 Key Control: All references to keys include key cards. The contractor shall establish and implement methods of ensuring that no keys/key cards issued by the Government are lost or misplaced or are used by unauthorized persons. No keys issued by the Government shall be duplicated. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas.
1.4.6.1.1 The contractor shall immediately report any occurrences of lost or duplicated keys/key cards to the COR.
https://golearn.csd.disa.mil/kc/rso/login/ADLS_login.asp
1.4.6.1.2 In the event keys, other than master keys, are lost or duplicated, the contractor shall, upon direction by the KO, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying.
When the Government replaces or re-keys the locks, the Government will deduct the total cost of lock replacement or re-keying from the monthly payment due the contractor. In the event a master key is lost or duplicated, the Government will replace all locks and keys for that system and will deduct the total cost from the monthly payment due the contractor.
1.4.6.1.3 The contactor shall prohibit the use of the Government issued keys/key cards by any persons other than the contractor’s employees. The contractor shall prohibit the opening of locked areas by contractor employees to permit entrance of persons other than contactor employees engaged in the performance of services in those areas, or personnel authorized entrance by the KO.
1.4.6.2 Lock Combinations: The contractor shall establish and implement methods of ensuring that no lock combinations are revealed to unauthorized persons. The contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations.
1.4.7 Special Qualifications: The contractor shall ensure all employees possess all required licenses for disciplines used in the performance of this contract. This does not include education or other qualifications for the position in which the contractor employee is performing, dress codes, or other information. (NOTE: The Government does not provide training to contractors. Contractors must ensure that any personnel performing under a contract are fully trained, licensed, certified, and otherwise qualified to provide services.)
1.4.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with FAR 42.5.
The KO, COR and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the KO will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced. The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.
1.4.9 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO. The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.
1.4.10 Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed.
The contractor’s status as a “contractor” shall be predominantly displayed in all correspondence types (to include signature blocks on e-mail) and dealings with Government or non-Government entities. Contractor personnel shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed.
1.4.10.1 The contractor shall retrieve all identification media (including vehicle passes) from its employees who depart employment for any reason. The contractor shall return all identification media (i.e., badges and vehicles passes) to the KO within 14 days of an employee’s departure.
1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero-tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at FAR 22.17.
1.4.12 Contractor Travel: Reserved
1.4.13 Data Rights: The Government has unlimited rights to all documents/materials produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the KO. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.4.14 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.4.15 Reserved
2.0 Definitions and Acronyms:
2.1 Definitions:
2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
2.1.2 Defective Service: A service output that does not meet the standard of performance associated with the SOW.
2.1.3 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.
2.1.4 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the SOW. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.5 Physical Security: Actions that prevent the loss or damage of Government property.
2.1.6 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.7 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.8 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.
2.1.9 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.2 Acronyms:
A4A Logistics, Engineering and Force Protection A&E Architect and Engineer AEI Army Enterprise Infostructure ANG Air National Guard ANGETL Air National Guard Engineering Technical Letter AR Army Regulation ARW Air Refueling Wing AT/OPSEC Antiterrorism/Operational Security BCE Base Civil Engineer BI Background Investigation CM Contract Manager COR Contracting Officer Representative COS Cyber Operations Squadron DA Department of the Army DD254 Department of Defense Contract Security Classification Specification DFARS Defense Federal Acquisition Regulation Supplement DoD Department of Defense DSCA Defense Counterintelligence and Security Agency FAR Federal Acquisition Regulation FFE Furniture, Fixtures and Equipment FY Fiscal Year GFP/M/E/S Government Furnished Property/Material/Equipment/Services HPSB High Performance and Sustainable HVAC Heating, Ventilation and Air-Conditioning HQDA Headquarters, Department of the Army HSPD Homeland Security Presidential Directive IA Information Assurance IBC International Building Code IS Information System(s) KO Contracting Officer LRS Logistics Readiness Squadron NGB National Guard Bureau OCI Organizational Conflict of Interest PII Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary QA Quality Assurance QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program RFI Request for information SATAF Site Activation Task Force SCR Service Contract Reporting
SF Square Feet SOW Statement of Work SSN Social Security Number TE Technical Exhibit UFC Unified Facilities Criteria USD(I) Under Secretary of Defense for Intelligence
3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S):
The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:
3.1 Property: The Government will furnish the necessary workspace/staging area for the contractor to perform services outlined in this SOW. Contractor is responsible for securing worksite, equipment, and all associated materials.
3.2 Materials: N/A
3.3 Equipment: N/A
3.4 Services: N/A
3.5 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.
4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):
4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.
4.2 Reserved
4.3 Reserved
5.0 Requirements: The contractor shall provide the following in accordance with this SOW and the associated plans and specifications.
5.1 Progress Schedule, Submittals, & Requests for Information (RFIs):
5.1.1 Contractor will provide Progress Schedule by direction of the Contracting Officer not to exceed ten (10) days after contract award.
5.1.2 Contractor shall submit the manufacturer’s products requested as in accordance with this SOW and the provided plans and specifications. Contractor shall wait for approval before purchasing material. The contractor will supply all equipment and material unless otherwise stated in scope of work. A list of all recovered materials and quantities must be submitted by the contractor following project completion. The contractor must submit a list of hazardous materials required for project completion, if any, to the Base Environmental Manager (EM) before project execution begins. All unused product, if any, must be removed from base upon project completion.
5.1.3 Contractor will immediately notify Contracting Officer when conflicts or delays are identified that require additional information from the Government to proceed. Contractor shall submit Requests for Information (RFIs) to the Contracting Officer within 5 calendar days of identification.
5.2 Site Visits / Project Meetings: Civil Engineering will schedule site visits and design meetings between 8:00 A.M. and 4 P.M Monday through Friday. Contact Lt Col J. David Barrett at (865) 336-4213 or jon.barrett@us.af.mil for all scheduling requirements.
5.3 Coordination: All work will require coordination with the Tennessee Air National Guard Civil Engineering. The contractor shall conduct their work in a manner that will not interfere with or stop the operations being conducted in and around the work area.
Contractors are NOT to connect to the base water distribution system without prior approval from Civil Engineering. Once approval is received, the contractor must provide a functional backflow prevention device to ensure cross contamination is prevented.
5.4 PROJECTS: The Contractor shall ensure that all of the following tasks are properly accomplished in strict compliance with this SOW and the associated plans and specifications provided to include but not limited to the following tasks:
5.4.1 Base Bid – Repair TEC Physical Fitness Area: Contractor shall construct a new full size fenced in recreational court consisting of half basketball court and half tennis court. Contractor will construct sidewalks to TEC campus and parking lot and light fixtures. Recreational court, sidewalks, and lights to be constructed and installed in accordance with plans and specs titled “Repair TEC Physical Fitness Area” dated April 2024.
5.5 Service Contract Reporting:
5.5.1 The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the 134th ARW via a secure data collection site.
5.5.2 The contractor shall completely fill in all required data fields using the following web address: https://sam.gov. Log in and select Entity Registrations and then select Service Contract Reporting.
mailto:jon.barrett@us.af.mil
The Contractor shall report the required information annually by October 31, for services performed under this contract during the preceding Government fiscal year (October 1- September 30).
Contract Reporting:
The DoD Guidebook for Service Contract Reporting in SAM, available on the DoD Procurement Toolbox at https://dodprocurementtoolbox.com/site-pages/service-contract-reporting-scr. The General Services Administration (GSA) has also posted additional guidance such as quick start guides, informational videos, and frequently asked questions, that can be accessed by going to https://sam.gov and searching the “HELP” section. The SAM Federal User Guide is also available in the “HELP” section for comprehensive instructions on navigating SAM. Contractors requiring assistance using SAM should contact the Federal Service Desk at https://www.fsd.gov.
6.0 Applicable Publications: Publications applicable to this SOW are listed below:
Publication (Chapter/Page)
Date of Publicatio n
Mandator y or
Advisory Website Federal Acquisition
Regulation https://www.acquisition.gov/?q=browsef ar Defense Federal Acquisition
Regulation Supplement http://www.acq.osd.mil/dpap/dars/dfarsp gi/current/index.html or https://www.acquisition.gov/dfars
Joint Travel Regulation
(JTR)
https://www.defensetravel.dod.mil/site/tr avelreg.cfm
DoDM 1000.13-M-V1 DoD Identification (ID) Cards (Enclosure 2, paragraph 3.b)
01/23/2014 (Change 1:
07/28/2020 http://www.esd.whs.mil/Directives/issua nces/dodm
Federal Information Processing Standards
(FIPS) Publication 201-2 Personal Identity Verification (PIV) of Federal Employees and Contractors (paragraph 9)
August http://nvlpubs.nist.gov/nistpubs/FIPS/NI ST.FIPS.201-2.pdf
DoDM 5200.2 Procedures for the DoD Personnel
Security Program (PSP)
04/03/2017 https://www.esd.whs.mil/Directives/issu ances/dodm/
DoDI 5200.46 DoD Investigative and
Adjudicative Guidance for Issuing the Common Access
Card (CAC)
09/09/14 (Change 1:
05/04/2018 https://www.esd.whs.mil/Directives/issu ances/dodi/ https://dodprocurementtoolbox.com/site-pages/service-contract-reporting-scr https://dodprocurementtoolbox.com/site-pages/service-contract-reporting-scr https://www.fsd.gov/ https://www.acquisition.gov/?q=browsefar https://www.acquisition.gov/?q=browsefar http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html https://www.acquisition.gov/dfars https://www.defensetravel.dod.mil/site/travelreg.cfm https://www.defensetravel.dod.mil/site/travelreg.cfm http://www.esd.whs.mil/Directives/issuances/dodm http://www.esd.whs.mil/Directives/issuances/dodm http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodi/ https://www.esd.whs.mil/Directives/issuances/dodi/
Publication (Chapter/Page)
Date of Publicatio n
Mandator y or
Advisory Website Homeland Security
Presidential Directive
(HSPD)-12
Policy for a Common Identification Standard for Federal Employees and
Contractors
08/27/2004 https://www.dhs.gov/homeland-security-presidential-directive-12
DoDI 5400.11 Department of Defense
Privacy and Civil Liberties Programs
01/29/2019 ances/dodi/
DoD 5400.11-R Department of Defense
Privacy Program
05/14/2007 https://www.esd.whs.mil/Directives/issu ances/dodm/ DoDD 8140.01
Cyberspace Workforce Management
10/05/2020 https://www.esd.whs.mil/Directives/issu ances/dodd/
DoD 8570.01-M
Information Assurance Workforce Improvement
Program
12/19/2005 (Change 4:
11/10/2015
DoD 5220.22-M National Industrial Security Program Operating Manual
(NISPOM)
02/28/2006 (Change 2:
05/18/2016
AFI 10-245
Antiterrorism
03/28/2013 (Certified current
03/30/2017 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catI
D=1&series=- 1&modID=449&tabID=131
AFI 31-101
Security Forces Standards and Procedures
08/18/2020 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catI
D=1&series=- 1&modID=449&tabID=131
AFMAN 31-113
Security Forces Standards and Procedures
03/05/2013 Change 1:
12/02/2015 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catI
D=1&series=- 1&modID=449&tabID=131
AFPD 17-1
Information Dominance
Governance and Management
04/12/2016 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catI
D=1&series=- 1&modID=449&tabID=131
AFMAN 17-1301
Computer Security
(COMPUSEC)
02/12/2020 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catI
D=1&series=- 1&modID=449&tabID=131 https://www.dhs.gov/homeland-security-presidential-directive-12 https://www.dhs.gov/homeland-security-presidential-directive-12 https://www.esd.whs.mil/Directives/issuances/dodi/ https://www.esd.whs.mil/Directives/issuances/dodi/ https://www.esd.whs.mil/Directives/issuances/dodd/ https://www.esd.whs.mil/Directives/issuances/dodd/ https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodm/
Publication (Chapter/Page)
Date of Publicatio n
Mandator y or
Advisory Website
AFI 10-701
Operations Security 7/24/2019 (Change 1:
06/09/2020 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catI
D=1&series=- 1&modID=449&tabID=131
6.1 Applicable Forms: Forms applicable to the SOW are listed below:
Form Date Website
DD 1172-2
Application for Identification
Card/DEERS Enrollment
Mar 2017 http://www.dtic.mil/whs/directives/for ms/index.htm
I-9 Employment Eligibility Verification
10/21/2019 https://www.uscis.gov/sites/default/fil es/files/form/i-9.pdf
DD 441
Department of Defense Security
Agreement
Feb 2020 http://www.dtic.mil/whs/directives/for ms/dd/ddforms0001-0499.htm
DD 250
Material Inspection and Receiving
Report
Aug 2000 https://www.esd.whs.mil/Directives/fo rms/dd0001_0499/
TECHNICAL EXHIBIT 1
Performance Requirements Summary (PRS)
This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).
SOW Paragraph Task Performance
Standard Acceptable
Quality Levels
(AQL)
Surveillance Method / By Whom
5.4 PSXE242020
Repair TEC
Physical Fitness Area
Complete upgrades, repairs, & construction of
TEC infrastructure In accordance with plans & specifications
Completed within POP
Weekly / COR http://www.dtic.mil/whs/directives/forms/forminfo/forminfopage2479.html http://www.dtic.mil/whs/directives/forms/forminfo/forminfopage2479.html http://www.dtic.mil/whs/directives/forms/index.htm http://www.dtic.mil/whs/directives/forms/index.htm https://www.uscis.gov/sites/default/files/files/form/i-9.pdf https://www.uscis.gov/sites/default/files/files/form/i-9.pdf http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm https://www.esd.whs.mil/Directives/forms/dd0001_0499/ https://www.esd.whs.mil/Directives/forms/dd0001_0499/
TECHNICAL EXHIBIT 2
Deliverables Schedule
SOW Reference / Deliverable Title
Frequency Number of Copies
Medium/Format Submit To
1.4.5.2 AT Level 1
Awareness Training
Certificates
Provide within 15 calendar days after employee completes training.
1 Electronic Submission
COR
1.4.6.1 Personnel Badging /
Visitor Passes
Return within 14 days of employee’s departure from contract performance.
Original(s) Hard Copy COR
5.1.1 Progress Schedule
10 Days after NTP and monthly there after
1 Electronic Submission
COR
Documentation As required per plans and specifications
1 Electronic Submission
KO
5.1.2 Submittals
Provide within 60 calendar days per plans and specifications
1 Electronic Submission
KO
5.1.3 Request for
Information (RFIs)
Provide within 5 calendar days after question or concern is identified
1 Electronic Submission
KO
REPAIR TEC PHYSICAL FITNESS AREA
PSXE242020
TENNESSEE AIR NATIONAL GUARD
134TH AIR REFUELING WING
APRIL 2024
N.T.S.
LOCATION MAP
PROJECT
SITE
DRAWING LIST
C1.1 SITE LAYOUT PLAN
C1.2 SITE GRADING & DRAINAGE PLAN
C1.3 EROSION & SEDIMENT CONTROL PLAN - INITIAL
C1.4 EROSION & SEDIMENT CONTROL PLAN - FINAL
C2.1 DETAILS
C2.2 DETAILS
C2.3 DETAILS
C2.4 DETAILS
E1.2 SITE LAYOUT PLAN - LIGHTING
E2.1 ELECTRICAL SCHEDULES & SPECIFICATIONS
240 West Bessemer St. Alcoa, TN. 37701 Ph. (865) 980-3500
CIVIL ELECTRICAL
AutoCAD SHX Text
AutoCAD SHX Text
PELLISIPPI PKY
AutoCAD SHX Text
TOPSIDE RD
AutoCAD SHX Text
AutoCAD SHX Text
MARYVILLE PIKE
AutoCAD SHX Text
AutoCAD SHX Text
LOUISVILLE
AutoCAD SHX Text
MENTOR
AutoCAD SHX Text
AIR BASE RD
AutoCAD SHX Text
CALLAHAN RD
AutoCAD SHX Text
AutoCAD SHX Text
LOUISVILLE RD
AutoCAD SHX Text
W HUNT RD
AutoCAD SHX Text
W HUNT RD
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ALCOA HWY
AutoCAD SHX Text
CUSICK RD
AutoCAD SHX Text
E HUNT RD
AutoCAD SHX Text
E BROADWAY AVE
AutoCAD SHX Text McARTHUR RD
AutoCAD SHX Text
MARYVILLE
AutoCAD SHX Text
METROPOLITAN
AutoCAD SHX Text
KNOXVILLE
AutoCAD SHX Text
AIRPORT AUTHORITY
AutoCAD SHX Text
AutoCAD SHX Text
FORT
AutoCAD SHX Text
LOUDON
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
LIBERTY ST.
AutoCAD SHX Text
TENNESSEE AIR NATIONAL GUARD
AutoCAD SHX Text
BRISCOE DR.
AutoCAD SHX Text
AutoCAD SHX Text
FRONT GATE ENTRANCE TO TANG BASE
4 "W
R ep ai r
TE
C
P h ys ic al F it n es s
A re a
4t h A ir R ef u el in g W in g
PSXE242020
4.4.24
C1.1
S it e La yo u t Pl an
TCC
CJS
SCALE: 1" = '
0 30 60 90
BENCH MARK
ELECTRIC LINE
HIGH DENSITY POLYETHYLENE
CLEANOUT
DUCTILE IRON PIPE
SANITARY SEWER LINE
WATER LINE
CURB INLET
MANHOLE
FIRE HYDRANT
CATCH BASINS
WATER METER
VALVE
UTILITY-LIGHT POLE
GAS LINE
INTERMEDIATE CONTOUR
INDEX CONTOUR
ELECTRIC METER
ROUND AREA DRAIN
ELECTRIC TRANSFORMER
LIGHT POLE
STORM SEWER LINE
B.M.
LEGEND
EXISTING
NEW
COMMUNICATIONS DUCT BANK
8 9
10 116
5 4
6'
7'
19'
19'
9'
LIGHT DUTY PAVEMENT
G5
C2.2
SIDEWALK
G13 C2.2
122'
CONCRETE CURB
SEE DETAIL
G9 C2.2
BENCH & BOTTLE FILLER AREA
SEE DETAIL
ONLY
R3-5R
G1 C2.2
18'
18'
24'
10'R
15'R
15'R
MATCH NEW SIDEWALK
TO EXISTING (TYP.)
Point Northing Easting Description
COORDINATE TABLE
TENNIS COURT FENCE
A1
C2.3
8' RAMP
8' RAMP
CROSSWALK STRIPING
SEE DETAIL
35'R
K1 C2.2
MATCH NEW PAVEMENT
TO EXISTING
WATERLINEW
WATERLINE
CONNECTION
NEATLY SAWCUT & REMOVE
EXISTING SIDEWALK, TO INCLUDE
WIPEDOWNS. REPLACE WITH 27
LF+/- OF NEW SIDEWALK.
NOTES:
1. EXISTING TOPOGRAPHIC INFORMATION TAKEN FROM SURVEY
PERFORMED BY C2RL ENGINEERS, INC. DATED FEBRUARY 20, 2024.
DATUM: NAD83 - NAVD88
2. LOCATION OF THE EXISTING ABOVE GROUND AND UNDERGROUND
UTILITIES AND STRUCTURES INDICATED ARE APPROXIMATE ONLY, AND
THOSE INDICATED ARE NOT NECESSARILY ALL WHICH MAY EXIST ON
THE PROJECT SITE. CONTRACTOR SHALL DETERMINE ACTUAL
LOCATION OF ALL UTILITIES AND STRUCTURES ON THE PROJECT SITE
WHETHER THEY ARE INDICATED OR NOT. CONTRACTOR SHALL ASSUME
RESPONSIBILITY FOR ANY DAMAGE TO THE UTILITY LINES, WHETHER
SHOWN ON THE CONSTRUCTION PLANS OR NOT. CONTRACTOR SHALL
REQUEST A DIG PERMIT FROM WORK CONTROL (865)336-4219 PRIOR TO
ENGAGING IN ANY EXCAVATION OR PENETRATING THE GROUND IN ANY
WAY. CONTRACTOR SHALL ALSO CONTACT TENNESSEE ONE CALL
CENTER 811 FOR LOCATION OF ANY/ALL ELECTRICAL FACILITIES. THE
PRIMARY ELECTRICAL SERVICE ON BASE IS OWNED AND OPERATED BY
THE CITY OF ALCOA ELECTRIC SYSTEM. POC FOR THE ELECTRIC
SYSTEM IS MR. MIKE LINDSEY (865)380-4853.
3. ALL DISTURBED AREAS SHALL BE HAND-SMOOTHED TO MATCH
SURROUNDING GRADE. SOD IS REQUIRED FOR ALL DISTURBED AREAS.
A 4" LAYER OF TOPSOIL SHALL BE APPLIED ALONG WITH SOD.
4. ALL STRIPING SHALL BE IN ACCORDANCE WITH MUTCD LATEST VERSION.
5. CONTRACTOR SHALL ALIGN SIDEWALK EXPANSION JOINTS WITH CURB
EXPANSION JOINTS.
6. ALL NOVAPLAY SURFACES SHALL BE INSTALLED IN ACCORDANCE WITH
ALL MANUFACTURERS RECOMMENDATIONS.
7. EXISTING VALVE BOX COVERS, METER COVERS AND ANY OTHER
SURFACE UTILITY FEATURES SHALL BE ADJUSTED TO FINISHED GRADES
AS IMPACTED BY CONSTRUCTION.
545,862.61 2,561,674.04 CL DRIVE
545,803.56 2,561,652.04 CL DRIVE
545,877.59 2,561,561.44 CL DRIVE PC
545,858.23 2,561,545.62 RADIUS POINT
545,874.04 2,561,526.26 CL DRIVE PT
545,869.40 2,561,522.47 CL DRIVE PC
545,853.58 2,561,541.83 RADIUS POINT
545,834.22 2,561,526.01 CL DRIVE PT
545,776.01 2,561,597.25 CL DRIVE PC
545,795.37 2,561,613.07 RADIUS POINT
545,779.55 2,561,632.43 CL DRIVE PT
545,839.11 2,561,694.10 RADIUS POINT
545,857.99 2,561,643.51 RADIUS POINT
545,837.07 2,561,641.05 RADIUS POINT
545,823.88 2,561,635.07 RADIUS POINT
STAIRS
SEE DETAIL
A11 C2.3
ADA WARNING TILE (TYP.)
SEE DETAIL
L11 C2.3
CW
CW
CW CURB WIPEDOWN
H11 C2.3
CW
CW
B.M. 4 - NAIL
N. 545,828.91 E. 2,561,722.95
EL. 972.52
B.M. 3 - NAIL
N. 545,987.39 E. 2,561,257.83
EL. 969.75
52'
BASKETBALL COURT SURFACE
NOVABOND ON CONCRETE W/ NOVAPLAY II SURFACE
NOVATEX TEXTURED LINE PAINT
TENNIS COURT SURFACE
(NOVACRYLIC COMBINATION SYSTEM)
1. CP 761 CONCRETE PRIMER
2. NOVASURFACE ACRYLIC RESURFACER
3. NOVA COMBINATION SURFACE
ADJUST VALVE BOXES TO FINISHED
GRADE AND REPLACE IF TRAFFIC
GRADE COVERS ARE NEEDED
R1-1 (24"x24")
24" STOP
BAR
CAREFULLY PROTECT VOLLEYBALL COURT.
PROVIDE SIGNS INDICATING CONSTRUCTION
ZONE WITH NO PLAY ALLOWED.
BENCH (TYP.)
SEE DETAIL
G1 C2.2
545,826.40 2,561,511.87 COURTS LIMITS
545,778.39 2,561,472.64 COURTS LIMITS
545,888.48 2,561,337.90 COURTS LIMITS
545,936.49 2,561,377.13 COURTS LIMITS
EXISTING PAVEMENT & CURB
TO BE DEMOLISHED
NEATLY SAWCUT & REMOVE
92 LF +/- EXISTING SIDEWALK
6'
B.M. 2 - NAIL
N. 545,623.34 E. 2,561,204.41
EL. 972.56
B.M. 1 - NAIL
N. 545,505.74 E. 2,561,402.73
EL. 969.37
MATCH NEW CONCRETE
TO EXISTING
FOR COURT DIMENSIONS
SEE DETAILA1
C2.2
AutoCAD SHX Text
AC
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
8"DIP
AutoCAD SHX Text
8"DIP
AutoCAD SHX Text
8"DIP
AutoCAD SHX Text
8"DIP
AutoCAD SHX Text
8"DIP
AutoCAD SHX Text
6"DIP
AutoCAD SHX Text
8"TRANSITE
AutoCAD SHX Text
8"TRANSITE
AutoCAD SHX Text
6"DIP
AutoCAD SHX Text W
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
SAMH ABANDONED
AutoCAD SHX Text
8"DIP
AutoCAD SHX Text
6"PVC
AutoCAD SHX Text
6"PVC
AutoCAD SHX Text SAMH AG035 T.C. 969.72 Inv.(NE) 962.76 Inv.(NE Aband.) 965.33 Inv.(SE) 962.88 Inv.(SW) 962.76
AutoCAD SHX Text
8"PVC
AutoCAD SHX Text
8"DIP
AutoCAD SHX Text SAMH AG034 T.C. 966.49 Inv.(NE) 957.25 Inv.(NE Aband.) 961.09 Inv.(SW) 957.23
AutoCAD SHX Text
8"PVC
AutoCAD SHX Text
6"PVC
AutoCAD SHX Text
6"PVC
AutoCAD SHX Text
8"PVC
AutoCAD SHX Text
8"PVC
AutoCAD SHX Text SAMH AG082 T.C. 978.66 Inv.(NW) 967.08 Inv.(W) 967.04 Inv.(SW) 966.88
AutoCAD SHX Text
10"PVC
AutoCAD SHX Text
8"PVC
AutoCAD SHX Text
8"PVC
AutoCAD SHX Text
CO
AutoCAD SHX Text
UNDERGROUND CHAMBER LOCATION
AutoCAD SHX Text
TAKEN FROM DESIGN DRAWING
AutoCAD SHX Text
24"CMP
AutoCAD SHX Text Curb Inlet T.C. 965.38 Inv. 961.43
AutoCAD SHX Text
18"HDPE
AutoCAD SHX Text
30"RCP
AutoCAD SHX Text
30"RCP
AutoCAD SHX Text
12"HDPE
AutoCAD SHX Text
12"HDPE
AutoCAD SHX Text CB2x2 T.C. 967.06 Inv.(NE) 964.81 Inv.(SE) 964.94
AutoCAD SHX Text CB2x2 T.C. 967.62 Inv. 965.52
AutoCAD SHX Text
12"HDPE
AutoCAD SHX Text CB2x2 T.C. 968.55 Inv.(NE) 966.51
AutoCAD SHX Text
BLIND JUNCTION
AutoCAD SHX Text CB2x2 T.C. 968.65 Inv.(NE) 967.16
AutoCAD SHX Text
12"HDPE
AutoCAD SHX Text
24"CMP
AutoCAD SHX Text CB2x2 T.C. 971.63 Inv.(W) 966.48 Inv.(SE) 966.34 Inv.(SW) 966.41
AutoCAD SHX Text
15"HDPE
AutoCAD SHX Text
15"HDPE
AutoCAD SHX Text
15" HDPE
AutoCAD SHX Text
15" HDPE
AutoCAD SHX Text
15" HDPE
AutoCAD SHX Text
15" HDPE
AutoCAD SHX Text
15" HDPE
AutoCAD SHX Text
15" HDPE
AutoCAD SHX Text
15" HDPE
AutoCAD SHX Text
15" HDPE
AutoCAD SHX Text
15" HDPE
AutoCAD SHX Text
15" HDPE
AutoCAD SHX Text
15" HDPE
AutoCAD SHX Text
15" HDPE
AutoCAD SHX Text
15" HDPE
AutoCAD SHX Text
15" HDPE
AutoCAD SHX Text
15" HDPE
AutoCAD SHX Text CB2X3 T.C. 967.78 Inv. 965.86
AutoCAD SHX Text
36"RCP
AutoCAD SHX Text CB2x2 T.C. 968.30 Inv. 966.34
AutoCAD SHX Text
15" HDPE
AutoCAD SHX Text CB3x3 T.C. 968.55 Inv. In 965.38 Inv. Out 965.07
AutoCAD SHX Text
18" HDPE
AutoCAD SHX Text CB3x3 T.C. 968.89 Inv. In 964.82 Inv. Out 964.82
AutoCAD SHX Text
18" HDPE
AutoCAD SHX Text CB2x2 T.C. 964.06 Inv. In 961.47 Inv. Out 960.46
AutoCAD SHX Text
12" RCP
AutoCAD SHX Text CB2x3 T.C. 963.54 Inv. 957.29(NW) Inv. 954.18(NE) Inv. 954.16(SW) Inv. 958.24(SE)
AutoCAD SHX Text
36"RCP
AutoCAD SHX Text CB2X2 T.C. 962.60 Inv. In 958.40 Inv. Out 958.38
AutoCAD SHX Text
15" RCP
AutoCAD SHX Text
12" RCP
AutoCAD SHX Text CB2x2 T.C. 963.41 Inv. In 959.96 Inv. Out 959.96
AutoCAD SHX Text
12" RCP
AutoCAD SHX Text CB2x2 T.C. 963.52 Inv. In 960.89 Inv. Out 960.89
AutoCAD SHX Text
12" RCP
AutoCAD SHX Text
24"CMP
AutoCAD SHX Text
30"RCP
AutoCAD SHX Text
COMM.
AutoCAD SHX Text
COMM.
AutoCAD SHX Text
COMM.
AutoCAD SHX Text
COMM.
AutoCAD SHX Text
COMM. VAULT
AutoCAD SHX Text
COMM.
AutoCAD SHX Text
COMM.
AutoCAD SHX Text
ELECT.
AutoCAD SHX Text
ELECT.
AutoCAD SHX Text
SAMH AG083 (#2) T.C.=979.92 I.E.(N)=973.71 I.E.(SW)=972.77 I.E.(SE)=972.72
AutoCAD SHX Text Sidewalk
AutoCAD SHX Text Sidewalk
AutoCAD SHX Text Sidewalk
AutoCAD SHX Text Sidewalk
AutoCAD SHX Text Pull Up Bars
AutoCAD SHX Text Flag Pole
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Sign
AutoCAD SHX Text
AutoCAD SHX Text
SAMH ABANDONED
AutoCAD SHX Text CB2x2 T.C. 965.68 Inv.(N) 959.44 Inv.(SW) 963.43 Inv.(SE) 958.96 Inv.(NE) 959.47 Inv.(NW) 959.44
AutoCAD SHX Text Existing Track
AutoCAD SHX Text Track
AutoCAD SHX Text
8"DIP
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ELECT.
AutoCAD SHX Text Bleachers
AutoCAD SHX Text
BUILDING 207 F.F.E. 977.00
AutoCAD SHX Text Mon.
AutoCAD SHX Text Existing Volleyball Court
AutoCAD SHX Text Existing Parade Field
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
REVISIONS:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
PROJ. NO:
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
CHECKED:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text M
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text L
AutoCAD SHX Text K
AutoCAD SHX Text J
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text G
AutoCAD SHX Text 240 West Bessemer St. Alcoa, TN. 37701
AutoCAD SHX Text
ph. 865 980 3500 fax. 865 980 3555
AutoCAD SHX Text
COR
AutoCAD SHX Text H:\USPFO\47.242 - REPAIR TEC PHYSICAL FITNESS AREA\02-DRAWINGS\SHEETS\C1-1 SITE LAYOUT PLAN.DWGPLOTTED ON:April 17, 2024 11:21 AM BY:TIM CHILDRESSApril 17, 2024 11:21 AM BY:TIM CHILDRESS11:21 AM BY:TIM CHILDRESSBY:TIM CHILDRESSTIM CHILDRESS
AutoCAD SHX Text Knoxville, Tennessee
AutoCAD SHX Text Knoxville, Tennessee
AutoCAD SHX Text
HDPE
AutoCAD SHX Text
DIP
AutoCAD SHX Text
SS
AutoCAD SHX Text W
AutoCAD SHX Text G
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text
CO
AutoCAD SHX Text T
AutoCAD SHX Text C
S
R ep ai r
TE
C
P h ys ic al F it n es s
A re a
4t h A ir R ef u el in g W in g
PSXE242020
4.4.24
C1.2
S it e G ra di n g
D ra in ag e
Pl an
SLC
CJS
SCALE: 1" = '
0 30 60 90
ELECTRIC LINE
HIGH DENSITY POLYETHYLENE
CLEANOUT
DUCTILE IRON PIPE
SANITARY SEWER LINE
WATER LINE
CURB INLET
MANHOLE
FIRE HYDRANT
CATCH BASINS
WATER METER
VALVE
UTILITY-LIGHT POLE
GAS LINE
INTERMEDIATE CONTOUR
INDEX CONTOUR
ELECTRIC METER
ROUND AREA DRAIN
ELECTRIC TRANSFORMER
LIGHT POLE
STORM SEWER LINE
LEGEND
EXISTING
NEW
COMMUNICATIONS DUCT BANK
STORM LINE
A1
C2.4
CURB INLET
A11 C2.4
NOTES:
1. ALL COORDINATES AND EXISTING CONDITIONS BASED ON BASE
MAPPING AERIAL SURVEY DATED 2022.
2. ALL UTILITIES TAKEN FROM BASE MAPPING SURVEY PERFORMED BY
C2RL ENGINEERS, INC.
3. LOCATION OF THE EXISTING ABOVE GROUND AND UNDERGROUND
UTILITIES AND STRUCTURES INDICATED ARE APPROXIMATE ONLY,
AND THOSE INDICATED ARE NOT NECESSARILY ALL WHICH MAY
EXIST ON THE PROJECT SITE. CONTRACTOR SHALL DETERMINE
ACTUAL LOCATION OF ALL UTILITIES AND STRUCTURES ON THE
PROJECT SITE WHETHER THEY ARE INDICATED OR NOT.
CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ANY DAMAGE
TO THE UTILITY LINES, WHETHER SHOWN ON THE CONSTRUCTION
PLANS OR NOT. CONTRACTOR SHALL REQUEST A DIG PERMIT FROM
WORK CONTROL (865)336-4219 PRIOR TO ENGAGING IN ANY
EXCAVATION OR PENETRATING THE GROUND IN ANY WAY.
CONTRACTOR SHALL ALSO CONTACT TENNESSEE ONE CALL
CENTER 811 FOR LOCATION OF ANY/ALL ELECTRICAL FACILITIES.
THE PRIMARY ELECTRICAL SERVICE ON BASE IS OWNED AND
OPERATED BY THE CITY OF ALCOA ELECTRIC SYSTEM. POC FOR
THE ELECTRIC SYSTEM IS MR. MIKE LINDSEY (865)380-4853.
4. ONCE ALL EARTH DISTURBING ACTIVITIES HAVE BEEN COMPLETED,
ALL DISTURBED AREAS SHALL BE STABILIZED WITH SOD OR
WASHED RIVER ROCK AS SOON AS PRACTICAL.
5. ALL DISTURBED AREAS SHALL BE HAND-SMOOTHED TO MATCH
SURROUNDING GRADE. IF SOD IS REQUIRED, A 4" LAYER OF
TOPSOIL SHALL BE APPLIED ALONG WITH SOD.
969.7
CI-1
28"Ø
T.C. 967.3
INV. OUT 965.7
970.8
969.7
969.5969.5
967.9
970.3
970.3 971.2
970.5969.7
969.6 969.9
966.5
969.31
12" HDPE
CONNECT NEW 12" HDPE
TO EXISTING STRUCTURE.
INV. IN 965.6
REMOVE FRAME AND
GRATE AND REPLACE
WITH SOLID LID. ADJUST
TOP OF CASTING.
T.C. 968.2
REMOVE FRAME AND
GRATE AND REPLACE
WITH SOLID LID.
AutoCAD SHX Text
A…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .