Construction Schedule rev March 2024.pdf
PDF 140 KB Posted
- Attached to
- RBPF Police Training College Renovation
- Solicitation number
- 19AQMM24N0047
About this file
This document is a Construction Schedule for the renovation of the Royal Bahamas Police Force (RBPF) Police Training College. The renovation project, with an estimated cost of $1,000,000 - $5,000,000, is being managed by the U.S. Department of State, Bureau of International Narcotics and Law Enforcement Affairs (INL). The scope of work includes the renovation of four buildings totaling 19,872 square feet, with elements such as demolition, concrete and masonry work, steel work, water and sewer upgrades, electrical, mechanical and HVAC work, carpentry, and painting. The anticipated period of performance is 180 calendar days from the issuance of the Notice to Proceed. This is not a solicitation, but rather a Sources Sought/Request for Information notice to conduct market research and gather data for planning purposes. Responses are requested by May 31, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RBPF College Upgrades SOW.docx | DOCX document | |
| 100p Specifications combined.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
hollingsworth pack
BASE BID INCL ALTERNATES CONSTRUCTION SCHEDULE
RBPF College Upgrades Rev. March 2024
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
Site Office & staging area, containers
Equipment; scaffolding, fence etc..
Demolition
Demolition work inside
Demolition work outside
Demolition windows and doors
CONCRETE & MASONRY WORK
Floor tile work
Floor and wall tiles Toilet room 5‐28
Windows sills
Mason repairs around windows and doors
Concrete and mason repairs
STEEL WORK
Auditorium
WATER & SEWER
Toilet room 5‐28 kitchen sink room 5‐25
Greas tank room 5‐23
ELECTRICAL, MECHANICAL & HVAC
Outside work
Inside work
Aircon
Computerroom
Light fixtures
Kitchen
Panels
Cables
Outside: lighting and conection to existing
CARPENTRY WORK, doors, windows, shutters
Doors and windows
Roof
Inside finish
PAINT WORK
Inside finish
Outside finish
Site Development
Garbage area
Close up, punch list Close up & punch list Demobilization
1 2 3 4 5 6
MOBILIZATION
TASK Description 7 8 9
Hollingsworth Pack
Construction Schedule (Ext): Page 1 of 1