Construction RFO Clauses.pdf
PDF 298 KB Posted
- Solicitation number
- 70Z03326Q31190045
About this file
This document is a contract clauses section containing incorporation by reference (IBR) and full-text provisions for a Department of Homeland Security (DHS) construction project.
The contract establishes a construction completion deadline of July 5, 2026, with work commencement required within 30 calendar days of the notice to proceed. The contractor must prosecute work diligently and complete all work ready for use by the specified date, including final cleanup. The contract incorporates Buy American construction materials requirements under 41 U.S.C. chapter 83, mandating use of domestic construction materials unless exceptions apply based on unreasonable cost (exceeding domestic material cost by more than 20 percent for non-critical items, or 20 percent plus additional preference factors for critical items), impracticability, or unavailability in sufficient U.S. commercial quantities. The contractor must complete price comparison tables and market surveys to justify requests for foreign material use. For non-U.S. citizen employees accessing Department IT systems or involved in system operation, management, or maintenance, waivers require compelling justification and approval from the Component Head with concurrence from both the Chief Security Officer and Chief Information Officer. All contractor personnel require security briefings and nondisclosure agreements before accessing DHS information resources, with access limited to areas expressly authorized in the contract or approved in writing by the Contracting Officer's Representative. The contract incorporates numerous FAR clauses addressing wage requirements, labor standards, insurance, payments, construction specifications, environmental compliance, anti-trafficking provisions, and other federal contracting requirements, with full text available through DHS and Acquisition.GOV websites.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section E:
IBR:
52.246-12 Inspection of Construction (AUG 1996)
Section F:
Contractor Employee Access, in solicitations and contracts when contractor and/or subcontractor employees require recurring access to government facilities or access to CUI. Contracting officers shall insert the basic clause with its Alternate I for acquisitions requiring contractor access to government information resources. For acquisitions in which contractor and/or subcontractor employees will not have access to government information resources, but the Department has determined contractor and/or subcontractor employee access to CUI or government facilities must be limited to U.S.
citizens and lawful permanent residents, the contracting officer shall insert the clause with its Alternate II. Neither the basic clause nor its alternates shall be used unless contractor and/or subcontractor employees will require recurring access to government facilities or access to CUI. Neither the basic clause nor its alternates should ordinarily be used in contracts with educational institutions.
(g) Before receiving access to information resources under this contract, the individual must complete a security briefing; additional training for specific categories of CUI, if identified in the contract; and any nondisclosure agreement furnished by DHS. The Contracting Officer’s Representative (COR) will arrange the security briefing and any additional training required for specific categories of CUI.
(h) The Contractor shall have access only to those areas of DHS information resources explicitly stated in this contract or approved by the COR in writing as necessary for performance of the work under this contract. Any attempts by Contractor personnel to gain access to any information resources not expressly authorized by the terms and conditions in this contract, or as approved in writing by the COR, are strictly prohibited.
In the event of violation of this provision, DHS will take appropriate actions with regard to the contract and the individual(s) involved.
(i) Contractor access to DHS networks from a remote location is a temporary privilege for mutual convenience while the Contractor performs business for DHS. It is not a right, a guarantee of access, a condition of the contract, or government-furnished equipment
(GFE).
(j) Contractor access will be terminated for unauthorized use. The Contractor agrees to hold and save DHS harmless from any unauthorized use and agrees not to request additional time or money under the contract for any delays resulting from unauthorized use or access.
(k) Non-U.S. citizens shall not be authorized to access or assist in the development, operation, management, or maintenance of Department IT systems under the contract, unless a waiver has been granted by the Head of the Component or designee, with the concurrence of both the Department’s Chief Security Officer (CSO) and the Chief Information Officer (CIO) or their designees. Within DHS Headquarters, the waiver may be granted only with the approval of both the CSO and the CIO or their designees. In order for a waiver to be granted:
12-26-2024 HSAR
52-8
(1) There must be a compelling reason for using this individual as opposed to a U.S.
citizen; and
(2) The waiver must be in the best interest of the Government.
(l) Contractors shall identify in their proposals the names and citizenship of all non-U.S.
citizens proposed to work under the contract. Any additions or deletions of non-U.S.
citizens after contract award shall also be reported to the Contracting Officer
IBR:
52.242-14 Suspension of Work (APR 1984)
Full Text:
52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 30 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than July 05 2026.* The time stated for completion shall include final cleanup of the premises.
* The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.
(End of clause)
Section I:
CLAUSES INCORPORATED BY REFERENCE (IBR):
52.203-17 Contractor Employee Whistleblower Rights (April 2024) (DHS-USCG DEVIATION 14-
01, Revision 1) 52.204-9 Personal Identity Verification of Contractor Personnel (JAN 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (AUG 2025)
(DEVIATION 25-19) (effective November 28, 2025) 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014)
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2025) (DEVIATION 25-27) (effective November 28, 2025)
52.212-4 Contract Terms and Conditions—Commercial Products and Commercial Services (Aug 2025) (DEVIATION 25-21) (effective November 28, 2025)
52.215-8 Order of Precedence - Uniform Contract Format (OCT 2025) (DEVIATION 26-08) 52.219-28 Postaward Small Business Program Rerepresentation (OCT 2025) (DEVIATION 26-03)
(effective November 28, 2025) 52.222-6 Construction Wage Rate Requirements (OCT 2025) (DEVIATION 26-10) (effective
November 3, 2025) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (JUL 2021) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-12 Contract Termination – Debarment (MAY 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (MAY
2014) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-20 Contracts for Materials, Supplies, Articles, and Equipment (OCT 2025) (DEVIATION
26-10) (effective November 3, 2025) 52.222-50 Combating Trafficking in Persons (NOV 2021) 52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2022) 52.223-3 Hazardous Material Identification and Material Safety Data (OCT 2025) (DEVIATION
26-12) (effective November 28, 2025) 52.223-5 Pollution Prevention and Right-to-Know Information (May 2024) 52.225-13 Restrictions on Certain Foreign Purchases (FEB 2021) 52.226-7 Drug-Free Workplace (MAY 2024) 52.226-8 Encouraging Contractor Policies to Ban Text Messaging while Driving (MAY 2024) 52.228-5 Insurance-Work on a Government Installation (JAN 1997) 52.232-5 Payments Under Fixed-Price Construction Contracts (MAY 2014) 52.232-16 Progress Payments (OCT 2025) (DEVIATION 26-13) (effective November 28, 2025) 52.232-23 Assignment of Claims (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts (JAN 2017) 52.232-33 Payment by Electronic Funds Transfer-System For Award Management (OCT 2018) 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) 52.236-2 Differing Site Conditions (AUG 2025) (DEVIATION 25-15) 52.236-3 Site Investigation and Conditions Affecting the Work (AUG 2025) (DEVIATION 25-15) 52.236-5 Material and Workmanship (AUG 2025) (DEVIATION 25-15) 52.236-6 Superintendence by the Contractor (AUG 2025) (DEVIATION 25-15) 52.236-7 Permits and Responsibilities (AUG 2025) (DEVIATION 25-15) 52.236-8 Other Contracts (AUG 2025) (DEVIATION 25-15) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
(AUG 2025) (DEVIATION 25-15)
52.236-10 Operations and Storage Areas (AUG 2025) (DEVIATION 25-15) 52.236-11 Use and Possession Prior to Completion (AUG 2025) (DEVIATION 25-15) 52.236-12 Cleaning Up (AUG 2025) (DEVIATION 25-15) 52.236-13 Accident Prevention (AUG 2025) (DEVIATION 25-15) 52.236-21 Specifications and Drawings for Construction (FEB 1997) 52.236-26 Preconstruction Conference (FEB 1995) 52.243-5 Changes and Changed Conditions (JUNE 2025) (DEVIATION 25-09) 52.246-21 Warranty of Construction (MAR 1994) 52.249-10 Default (Fixed-Price Construction) (APR 1984)
CLAUSES INCORPORATED BY FULL TEXT:
52.225-9 Buy American-Construction Materials (OCT 2025) (DEVIATION 26-09) (effective
November 28, 2025)
(a) Definitions. As used in this clause—
Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply (including construction material) that is–
(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means—
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.
Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency. The list of critical items is at FAR 25.105.
Domestic construction material means—
(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-
(i) An unmanufactured construction material mined or produced in the United States; or
(ii) A construction material manufactured in the United States, if–
(A) The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or
(B) The construction material is a COTS item; or
(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of “cost of components”.
Fastener means a hardware device that mechanically joins or affixes two or more objects together.
Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.
Foreign construction material means a construction material other than a domestic construction material.
Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.
Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.
Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.
"United States" means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference. (1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR (a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows:
None [Contracting Officer to list applicable excepted materials or indicate “none”]
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-
(i) The cost of domestic construction material would be unreasonable.
(A) For domestic construction material that is not a critical item or does not contain critical components.
(1) The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;
(2) For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that is manufactured in the United States and does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(A)(1) of this clause.
(3) The procedures in paragraph (b)(3)(i)(A)(2) of this clause will no longer apply as of January 1, 2030.
(B) For domestic construction material that is a critical item or contains critical components.(1) The cost of a particular domestic construction material that is a critical item or contains critical components, subject to the requirements of the Buy American statute, is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent plus the additional preference factor identified for the critical item or construction material containing critical components listed at FAR 25.105.
(2) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest foreign offer of construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer, and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(B)(1) of this clause.
(3) The procedures in paragraph (b)(3)(i)(B)(2) of this clause will no longer apply as of January 1, 2030.
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material.
However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction Material Description Unit of Measure Quantity Price (dollars)* Item1:
Foreign construction material _______ _______ _______
Domestic construction material _______ _______ _______
Item 2:
Foreign construction material _______ _______ _______
Domestic construction material _______ _______ _______
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued)].
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response;
if oral, attach summary.]
[Include other applicable supporting information.]
(End of clause)
52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
RFO Deviation FAR Part 52 | Homeland Security at https://www.dhs.gov/publication/cpo-rfo-deviation-far-part-52
FAR Overhaul - Part 52 | Acquisition.GOV at https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-
52#FAR_52_204_10