About this file

This document is a set of electrical construction plans for the Orange County Convention Center's West Water Fountain Eco-Friendly Sustainability Upgrade project located in Orlando, Florida. The plans, prepared by Hanson Professional Services Inc., detail electrical specifications and notes for a fountain replacement and sustainability upgrade at 9800 International Drive. The project is part of a competitive bid solicitation with sealed bids being accepted electronically through the ProcureNow OpenGov e-Procurement Platform until 4:00 pm EST on Thursday, September 28, 2023. The estimated project cost is $684,523.00, with electronic bid submissions required and no hand-delivery, mail, telephone, fax, or email submissions permitted.

The electrical plans include comprehensive technical specifications covering electrical work compliance with the 2017 National Electrical Code, Florida Building Code, and other applicable local and state regulations. The project involves detailed electrical notes covering conduit requirements, conductor specifications, grounding procedures, voltage drop calculations, and installation guidelines. Bidders are instructed to thoroughly review project documents, verify existing conditions, coordinate with other trades, and ensure all electrical installations meet or exceed specified requirements. Questions regarding the solicitation were to be submitted by Monday, September 18, 2023, at 5:00 pm EST through the ProcureNow OpenGov platform's question and answer module.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

No. 95386

STATE

OF

L I C E N S E

F L O R I D

A

P R O F

E

SSIONAL EN

G

IN

E E R

XIN

TONG

Engineering | Planning | Allied Services

Offices Nationwide www.hanson-inc.com

Hanson Professional Services Inc.

CONSULTANTS

EB0007061

AA0003116

IB0001058

SHEET TITLE

REVIEWED BY:

DRAWN BY:

DESIGN BY:

PROJECT NO:

ISSUE:

© Copyright Hanson Professional Services Inc. 2020

54321 6

E

D

C

B

A

54321 6

MARK DATE DESCRIPTION

SEAL

/1

/2

:3 :5

P

M

C

U s e rs

\l a m o t0

\D o c u m e n ts

\M E

P O

C C

C W a te r F o u n ta in s R m la m o tt

.r v t

2300 Maitland Center Pkwy, Suite Maitland, FL. 32751

(321) 788-4906

WEST BUILDING

FOUNTAIN

ECO-FRIENDLY

SUSTAINABILITY

UPGRADE

9800 International Dr, Orlando, FL 32819

ELECTRICAL NOTES

AND SCHEDULES

E-001

07/10/2023

22G0120

MGL

MGL

XT

100% CD

GENERAL ELECTRICAL NOTES

1. ALL ELECTRICAL WORK SHALL COMPLY WITH THE 2017 NATIONAL ELECTRICAL CODE, THE FLORIDA

BUILDING CODE, THE NATIONAL FIRE CODES, STATE REQUIREMENTS AND ALL APPLICABLE LOCAL CODES

AND ORDINANCES.

2. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION AND ALL REQUIREMENTS NOT INDICATED ON THE

DRAWINGS.

3. IT IS THE INTENT OF THESE PLANS AND SPECIFICATIONS THAT A COMPLETE AND WORKABLE ELECTRICAL INSTALLATION BE PROVIDED FOR ALL THE EQUIPMENT DESCRIBED OR SHOWN AS BEING IN THIS CONTRACT.

ANY ITEMS WHICH ARE CLEARLY NECESSARY FOR THE COMPLETION OF THE WORK OR ITS

APPURTENANCES SHALL BE CONSIDERED A PORTION OF THE WORK AND SHALL BE PROVIDED AND

INSTALLED BY THE CONTRACTOR EVEN THOUGH NOT DIRECTLY SPECIFIED.

4. THE PLANS AND SPECIFICATIONS ARE COMPLIMENTARY, AND THAT WHICH IS CALLED FOR BY ONE SHALL BE AS BINDING AS IF CALLED FOR BY BOTH. IN THE EVENT THAT THE PLANS AND SPECIFICATIONS CONFLICT, THE MORE STRINGENT SHALL APPLY. ANY DISCREPANCIES IN THE DRAWINGS SHALL BE BROUGHT TO THE

IMMEDIATE ATTENTION OF THE DESIGN PROFESSIONAL PRIOR TO SUBMITTAL OF BID.

5. THE PLANS INDICATE THE GENERAL ARRANGEMENT OF THE WORK TO BE PERFORMED AND ARE DIAGRAMMATIC ONLY. ALL DIMENSIONS AND EQUIPMENT LOCATIONS SHALL BE VERIFIED IN THE FIELD.

6. VISIT AND CAREFULLY EXAMINE THOSE PORTIONS OF THE BUILDING AND SITE AFFECTED BY THIS WORK BEFORE SUBMITTING PROPOSALS, SO AS TO BECOME FAMILIAR WITH EXISTING CONDITIONS AND DIFFICULTIES THAT WILL AFFECT EXECUTION OF THE WORK. SUBMISSION OF A PROPOSAL WILL BE CONSTRUED AS EVIDENCE THAT SUCH EXAMINATION HAS BEEN MADE AND LATER CLAIMS FOR LABOR, EQUIPMENT OR MATERIALS REQUIRED BECAUSE OF DIFFICULTIES ENCOUNTERED WILL NOT BE

RECOGNIZED.

7. THE CONTRACTOR SHALL THOROUGHLY REVIEW THE PROJECT TO ENSURE THAT ALL WORK SHALL MEET OR EXCEED THE ABOVE REQUIREMENTS. ANY ALLEGED DISCREPANCIES SHALL BE BROUGHT TO THE

OWNER'S AND ENGINEER'S ATTENTION PRIOR TO THE START OF WORK.

8. THE CONTRACTOR IS DIRECTED TO OBTAIN COPIES OF ALL RELATED PLANS, SPECIFICATIONS, SHOP

DRAWINGS AND ADDENDUM TO COORDINATE THE RELATED WORK AND SCHEDULING.

9. VERIFY EXISTING CONDITIONS IN FIELD AND COORDINATE WITH ALL TRADES PRIOR TO INSTALLING OR

FABRICATING EQUIPMENT.

10. PRIOR TO BID, COORDINATE ALL ELECTRICAL WORK WITH PLUMBING WORK. SEE SPECIFICATIONS FOR

REQUIREMENTS.

11. CONTRACTOR SHALL NOT CONCEAL ANY WORK UNTIL INSPECTED BY ELECTRICAL INSPECTOR AND/OR ARCHITECT/ENGINEER. CONTRACTOR SHALL NOTIFY A/E OF A SCHEDULED INSPECTION WITHIN 72 HOURS.

GENERAL CONTRACTOR SHALL NOT CONCEAL WORK UNTIL APPROVED, REGARDLESS OF SCHEDULE.

12. PRIME CONTRACTOR IS RESPONSIBLE TO HAVE LICENSED AND QUALIFIED SUBCONTRACTORS PERFORMING

ALL WORK.

13. ALL CHANGES MADE IN THE FIELD SHALL BE RECORDED BY THE CONTRACTOR(S) ON AS-BUILT DRAWINGS, SHOP DRAWINGS, AND IN MAINTENANCE MANUALS.

14. THE SIZE, LOCATION AND ELECTRICAL REQUIREMENTS AND SERVICE CLEARANCES OF EQUIPMENT INSTALLED UNDER DIVISION 26, ELECTRICAL, SHALL BE COORDINATED WITH ALL OTHER TRADES.

15. WHERE CROWDED LOCATIONS EXIST OR WHERE THERE IS A POSSIBILITY OF CONFLICT BETWEEN TRADES, CONTRACTOR SHALL MAKE COMPOSITE DRAWINGS SHOWING THE EXACT LOCATION OF PANELBOARDS, SWITCHBOARDS, TRANSFORMERS, CONDUIT AND EQUIPMENT AND MECHANICAL PIPING, DUCTWORK, AND OTHER ARCHITECTURAL APPURTENANCES. DRAWINGS SHALL BE BASED ON FIELD MEASUREMENTS AND, AFTER CONSULTATION AND AGREEMENT BETWEEN THE TRADES, SHALL BE APPROVED BY THE

ARCHITECT/ENGINEER PRIOR TO INSTALLATION OF THE WORK.

16. NOTIFY ARCHITECT/ENGINEER OF ANY CONFLICTS PRIOR TO PURCHASING EQUIPMENT AND PRIOR TO

CUTTING OPENINGS.

17. ALL WORK SHALL BE CONSTRUCTED TO MEET ANY PHASING REQUIREMENTS OF THE PROJECT AS MAY BE

OUTLINED IN THE DRAWINGS AND/OR SPECIFICATIONS.

18. THE CONTRACTOR SHALL THOROUGHLY FAMILIARIZE THEMSELVES WITH THE WORK TO BE PERFORMED BY OTHER TRADES AND THE PHYSICAL CHARACTERISTICS OF THE STRUCTURE IN ORDER TO SCHEDULE AND INSTALL EQUIPMENT AND TO MINIMIZE POSSIBLE INTERFERENCE. FAILURE TO PROPERLY COMMUNICATE AND SCHEDULE WORK WITH OTHER TRADES RESULTING IN ADDITIONAL WORK AND MATERIAL, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THE MODIFICATIONS REQUIRED TO RESOLVE THE CONFLICT SHALL BE DECIDED BY THE OWNER AND THE COST OF THE MODIFICATIONS SHALL BE BORNE BY THE

CONTRACTOR.

19. ALL MODIFIED CIRCUITS SHALL BE PROVIDED WITH A PRINTED DIRECTORY SHOWING CIRCUIT NUMBERS

AND A COMPLETE DESCRIPTION OF EACH CIRCUIT.

20. MINIMUM TRADE SIZE CONDUIT PERMITTED SHALL BE 3/4 INCH UNLESS NOTED OTHERWISE. TYPE AC AND TYPE MC CABLE SHALL NOT BE PERMITTED FOR USE ANYWHERE EXCEPT FOR LIGHTING FIXTURE WHIPS

NOT EXCEEDING 6'-0" IN LENGTH.

21. ALL SECONDARY FEEDERS AND BRANCH CIRCUIT CONDUCTORS SHALL BE COPPER WITH 600 VOLT INSULATION TYPE THHN, THW OR THWN. (MINIMUM SIZE SHALL BE NO. 12 AWG.) CONTRACTOR SHALL PROVIDE AND INSTALL ALL PHASE (A, B, C, AS REQUIRED) CONDUCTORS, NEUTRAL CONDUCTORS, AND

GROUND CONDUCTORS AS NECESSARY FOR A COMPLETE AND OPERABLE SYSTEM. NO INDIVIDUAL

CONDUCTOR SPECIFICATION SHALL BE CONSTRUED AS REQUIRING ONLY ONE CONDUCTOR. A COMPLETE AND OPERABLE SYSTEM IS INTENDED BY THE CONSTRUCTION DOCUMENTS AND THE CONTRACTOR SHALL PROVIDE AND INSTALL ALL NECESSARY WIRING AND CONDUCTORS AS REQUIRED TO DELIVER A COMPLETE AND OPERABLE ELECTRICAL SYSTEM TO THE OWNER. NO ADDITIONAL COMPENSATION WILL BE MADE TO THE CONTRACTOR FOR UNDER-ESTIMATING AND/OR MIS-CALCULATING THEIR WIRING AND CABLING

RESPONSIBILITIES.

22. ALL CONDUIT RUNS SHALL BE CONCEALED UNLESS SPECIFICALLY NOTED OTHERWISE OR PRIOR APPROVED

BY OWNER FOR SURFACE MOUNTING.

23. ALL CONDUITS SHALL HAVE A SEPARATE GREEN GROUND CONDUCTOR INSTALLED FOR GROUNDING.

24. ALL FEEDER AND BRANCH CIRCUIT CONDUCTORS SHALL BE SIZED FOR THE MAXIMUM VOLTAGE DROP ALLOWED IN ACCORDANCE WITH THE 2020 FLORIDA BUILDING CODE, ENERGY CONSERVATION, CHAPTER 4, SECTION C405.7.3. THE ELECTRICAL CONTRACTOR SHALL CALCULATE VOLTAGE DROP AND ADJUST CONDUCTORS AS NEEDED. FOR DESIGN LOADS, A MAXIMUM VOLTAGE DROP OF 2% IS PERMITTED FOR FEEDER CONDUCTORS AND A MAXIMUM VOLTAGE DROP OF 3% IS PERMITTED FOR BRANCH CIRCUIT CONDUCTORS. CONTRACTOR SHALL NOT DECREASE CONDUCTOR SIZES NOTED ON PLAN. CONTRACTOR SHALL ONLY INCREASE CONDUCTOR SIZES NOTED IF NEEDED TO MEET MINIMUM CODE REQUIREMENTS.

25. FOR MULTI-WIRE BRANCH CIRCUITS, ADD SEPARATE NEUTRALS AND PROVIDE & INSTALL MULTI-POLE

CIRCUIT BREAKERS PER 2017 NEC, ARTICLE 210.4.

26. THE CONTRACTOR SHALL PROVIDE AND INSTALL CHROME FINISHED METAL ESCUTCHEONS TO FINISH THE HOLES OR SLEEVES OFF, INCLUDING THE OUTSIDE AND INSIDE OF THE EXTERIOR WALLS AND ANY OTHER PLACE WHERE THE PENETRATION IS VISIBLE, FOR ALL ELECTRICAL PIPES, CONDUITS, AND PENETRATIONS

MADE OR OTHERWISE NECESSARY FOR CONSTRUCTION OF THE ELECTRICAL SYSTEMS.

27. THE CONTRACTOR SHALL MAKE AND PERFORM ALL EXOTHERMIC WELDING PROCEDURES (CADWELD) IN ACCORDANCE WITH THE APPLICABLE ANSI STANDARDS INCLUDING SAFETY IN WELDING AND CUTTING, AND

IN STRICT ACCORDANCE WITH THE MANUFACTURER'S WRITTEN INSTALLATION AND HANDLING

INSTRUCTIONS. ALL EXOTHERMIC WELDS (CADWELDS) SHALL BE INDIVIDUALLY DOCUMENTED AND CERTIFIED BY THE INSTALLING CONTRACTOR AND SHALL BE UNIQUELY RECORDED ON THE AS-BUILT DRAWINGS. ALL DOCUMENTATION SHALL BEAR THE CONTRACTORS SIGNED CERTIFICATION OF PROPERLY

COMPLETED WELDS AND SHALL BE SUBMITTED TO THE OWNER FOR THEIR PERMANENT RECORDS.

28. ALL ELECTRICAL EQUIPMENT FEEDERS, BRANCH CIRCUIT CONDUCTORS, AND DEVICE AND EQUIPMENT

TERMINATIONS SHALL BE RATED FOR A MINIMUM OF 75ºC UNLESS OTHERWISE NOTED.

This item has been digitally signed and sealed by Xin Tong, P.E. on the date adjacent to the seal.

Printed copies of this document are not considered signed and sealed and the signatures must be verified on any electronic copies.

ALL ELECTRICAL EQUIPMENT FEEDERS, BRANCH CIRCUIT CONDUCTORS, AND DEVICE AND EQUIPMENT

TERMINATIONS SHALL BE RATED FOR A MINIMUM OF 75ºC UNLESS OTHERWISE NOTED.